CN204625439U - Integrated sewage water is collected, promote and process pumping plant - Google Patents

Integrated sewage water is collected, promote and process pumping plant Download PDF

Info

Publication number
CN204625439U
CN204625439U CN201520295132.1U CN201520295132U CN204625439U CN 204625439 U CN204625439 U CN 204625439U CN 201520295132 U CN201520295132 U CN 201520295132U CN 204625439 U CN204625439 U CN 204625439U
Authority
CN
China
Prior art keywords
water
pipeline
pond
sewage
lifting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520295132.1U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wu Canpeng
Original Assignee
Wu Canpeng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wu Canpeng filed Critical Wu Canpeng
Priority to CN201520295132.1U priority Critical patent/CN204625439U/en
Application granted granted Critical
Publication of CN204625439U publication Critical patent/CN204625439U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The utility model discloses a kind of integrated sewage water to collect, promote and process pumping plant, relate to field of sewage treatment equipment.This pumping plant comprises Sewage treatment systems, collects storage lifting system and water purification lifting system; Collect storage lifting system and comprise recovery storage prefabricated well, recovery stores prefabricated well and is provided with blowdown inlet channel; Sewage treatment systems comprises anaerobic acidification pond, Aerobic Pond assembly and film and to react device, reclaims to store prefabricated well and be connected with anaerobic acidification pond by pipeline, and the film device that reacts is connected with Aerobic Pond assembly by pipeline; Water purification lifting system comprises water purifying tank, and the film device that reacts is connected with water purifying tank by pipeline; Be provided with 2 submersible type lift pumps in water purifying tank, the drainage pipeline of all submersible type lift pumps all with one through water purifying tank is connected.The utility model not easily pollutes external environment, compares environmental protection, can not only save a large amount of electric energy, and reduce use cost, and can not take floor area, Appropriate application soil, is conducive to city planning.

Description

Integrated sewage water is collected, promote and process pumping plant
Technical field
The utility model relates to field of sewage treatment equipment, is specifically related to a kind of integrated sewage water and collects, promotes and process pumping plant.
Background technology
Along with the development of society, environment protection and water resources crisis have become the emphasis of the concern in the world; Water resources recycles the emphasis problem having become current field of scientific study with environment protection, utilizes also put among current city planning effective the conjunction in soil.
For sewage disposal, common technology, for recycle in process in water resources, promotes water and filters.At present, when existing Municipal water exhaust system is disposed of sewage, sewage is directly delivered to sewage work by sewage lifting pump station, sewage work directly discharges after sewage disposal to water quality reaching standard.
But, by the sewage after process directly discharge can cause the waste of water resources, and can consume the electric energy of sewage disposal device, use cost is higher; Meanwhile, sewage is delivered to from sewage lifting pump station the situation that to there will be sewage outflow (such as sewage runs, emit, ooze, drip, leakage etc.) the process of distant sewage work and in discharge process, and then destroy external environment, be unfavorable for environmental protection.
Utility model content
For the defect existed in prior art, the purpose of this utility model is to provide a kind of integrated sewage water to collect, promotes and process pumping plant; The utility model not easily pollutes external environment, compares environmental protection, can not only save a large amount of electric energy, and reduce use cost, and can not take floor area, Appropriate application soil, is conducive to city planning.
For reaching above object, the integrated sewage water that the utility model provides is collected, promote and process pumping plant, comprises Sewage treatment systems, and the both sides of Sewage treatment systems are respectively arranged with to collect and store lifting system and water purification lifting system;
Described collection stores lifting system and comprises recovery storage prefabricated well, reclaims storage prefabricated well and is provided with blowdown inlet channel; Described Sewage treatment systems comprises anaerobic acidification pond and Aerobic Pond assembly, and described recovery is stored prefabricated well and is connected with anaerobic acidification pond by pipeline;
Described Aerobic Pond assembly comprises at least 1 Aerobic Pond, and anaerobic acidification pond is connected by pipeline with contiguous Aerobic Pond, and connected by pipeline between adjacent Aerobic Pond, be provided with aerating apparatus in all Aerobic Ponds, all Aerobic Pond inside is provided with floating stuffing; Described Sewage treatment systems also comprises second pond, is provided with film and reacts device in second pond, and the film device that reacts is connected with all Aerobic Ponds by pipeline;
Described water purification lifting system comprises water purifying tank, and the film device that reacts is connected with water purifying tank by pipeline; Be provided with 2 submersible type lift pumps in water purifying tank, the drainage pipeline of all submersible type lift pumps all with one through water purifying tank is connected; Drainage pipeline is three-dimensional pipeline, and it comprises and to be connected first input end, the first output terminal for being connected with extraneous discharge purified water pipeline, the second output terminal for utilizing pipeline to be connected with extraneous water purification with submersible type lift pump.
On the basis of technique scheme, described Sewage treatment systems also comprises mud impurity discharge chamber, mud impurity discharge chamber is positioned at the bottom of Aerobic Pond assembly, and the film device that reacts is connected with mud impurity discharge chamber by blow-off line, and mud impurity discharge chamber is provided with mud discharging pipe.
On the basis of technique scheme, described water purification lifting system also comprises back-purge system, and all submersible type lift pumps are all connected with mud impurity discharge chamber by back-purge system.
On the basis of technique scheme, described collection stores lifting system, Sewage treatment systems and water purification lifting system and is all positioned at prefabricated pit shaft inside.
On the basis of technique scheme, the inside of described blowdown inlet channel is provided with the filter grid guiding device for filter sewage.
On the basis of technique scheme, described recovery stores in prefabricated well and is provided with 2 sewage pumps.
On the basis of technique scheme, described Aerobic Pond assembly comprises 3 Aerobic Ponds of laterally arranging: the first Aerobic Pond, the second Aerobic Pond and the 3rd Aerobic Pond; Described anaerobic acidification pond is connected with the first Aerobic Pond.
Compared with prior art, the utility model has the advantage of:
(1) with to be used alone in prior art and the sewage lifting pump station that position separates is compared with sewage work, the utility model is through a large amount of theoretical investigationes and actual experiment, cross-cutting, inter-trade sewage lifting device and sewage disposal device are combined, meticulous collection of having formulated the integrated form of integral intelligent stores lifting system, Sewage treatment systems and water purification lifting system.Collection storage lifting system promotes water quality by Sewage treatment systems, makes water quality reach emission standard, carry out second stage employ or discharge finally by water purification lifting system after being collected by sewage.
Therefore, the utility model can by the collection of sewage, process and lifting integration, and the time of sewage transport and process is shorter, and sewage not easily outflows; Not only not easily pollute external environment, compare environmental protection, and lifting sewage can not be repeated on a large scale to sewage work, saved a large amount of electric energy, reduced use cost.
In sum, the sewage lifting pump station be used alone with prior art is comprehensively compared with sewage work, and the utility model is by the collection of sewage, process and lifting integration, and technique effect of the present utility model is better superior.
(2) of the present utility model collection stores lifting system, Sewage treatment systems and water purification lifting system to be all positioned at the prefabricated pit shaft of underground inner, can not take floor area, and Appropriate application soil, is conducive to city planning.
Accompanying drawing explanation
Fig. 1 is the structural representation that in the utility model embodiment, pumping plant was collected, promoted and processed to integrated sewage water.
In figure: 1-collects and stores lifting system, 1a-blowdown inlet channel, 1b-filter grid guiding device, 1c-reclaims and stores prefabricated well, 1d-sewage pump, 2-Sewage treatment systems, 2a-anaerobic acidification pond, 2b-Aerobic Pond, 2c-film reacts device, 2d-mud discharging pipe, 2e-mud impurity discharge chamber, 2f-Aerobic Pond assembly, 2g-floating stuffing, 2h-aerating apparatus, 2i-second pond, 3-water purification lifting system, 3a-water purifying tank, 3b-drainage pipeline, 3c-back-purge system, 3d-submersible type lift pump.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Shown in Figure 1, the integrated sewage water collection in the utility model embodiment, lifting and process pumping plant, comprise the collection being successively set on prefabricated pit shaft inside from left to right and store lifting system 1, Sewage treatment systems 2 and water purification lifting system 3.
Collect storage lifting system 1 and comprise recovery storage prefabricated well 1c, recovery stores prefabricated well 1c and is provided with the blowdown inlet channel 1a being with water check valve, is provided with filter grid guiding device 1b in blowdown inlet channel 1a; Reclaim to store in prefabricated well 1c and be provided with 2 sewage pump 1d:1 pumps and No. 2 pumps.
Sewage treatment systems 2 comprises anaerobic acidification pond 2a and Aerobic Pond assembly 2f, reclaims storage prefabricated well 1c and is connected with anaerobic acidification pond 2a by the pipeline of 1 band water check valve.Aerobic Pond assembly 2f comprises at least 1 Aerobic Pond 2b, and the Aerobic Pond assembly 2f in the present embodiment comprises 3 Aerobic Pond 2b: the first Aerobic Ponds of laterally arranging, the second Aerobic Pond and the 3rd Aerobic Ponds; Anaerobic acidification pond 2a is connected by pipeline with contiguous Aerobic Pond 2b (the first Aerobic Pond), connected by pipeline between adjacent Aerobic Pond 2b, be provided with aerating apparatus 2h in all Aerobic Pond 2b, all Aerobic Pond 2b inside is provided with floating stuffing 2g.
Sewage treatment systems 2 also comprises second pond 2i, is provided with film and reacts device 2c in second pond 2i, and the film device 2c that reacts is connected with all Aerobic Pond 2b by pipeline.Sewage treatment systems 2 also comprises mud impurity discharge chamber 2e, mud impurity discharge chamber 2e is positioned at the bottom of Aerobic Pond assembly 2f, the film device 2c that reacts is connected with mud impurity discharge chamber 2e by blow-off line, and mud impurity discharge chamber 2e is provided with mud discharging pipe 2d.
Water purification lifting system 3 comprises water purifying tank 3a and back-purge system 3c, and the film device 2c that reacts is connected with water purifying tank 3a by pipeline; 2 submersible type lift pump 3d:3 pumps and No. 4 pumps are provided with in water purifying tank 3a, all submersible type lift pump 3d are all connected with mud impurity discharge chamber 2e by back-purge system 3c, and all submersible type lift pump 3d also pass water purifying tank 3a with one and are with the drainage pipeline 3b of vacuum breaker to be connected.Drainage pipeline 3b is three-dimensional pipeline, and it comprises first input end, the first output terminal and the second output terminal, and first input end is connected with submersible type lift pump 3d, and the first output terminal is connected with discharge purified water pipeline, and the second output terminal and water purification utilize pipeline to be connected.
Use procedure of the present utility model is as follows:
S1: after being filtered by the filter grid guiding device 1b of blowdown inlet channel 1a by the sewage in external world municipal wastewaters such as () community, factory, motorway, airports, is collected into reclaim and stores in prefabricated well 1c.
S2: by sewage pump 1d by reclaim store sewage lifting in prefabricated well 1c to anaerobic acidification pond 2a carry out that anaerobic acidification, sewage are nitrated, after denitrification and dephosphorization, successively by Aerobic Pond 2b all in Aerobic Pond assembly 2f; Sewage by passing through aerating apparatus 2h continuous aeration in the process of Aerobic Pond 2b, and then under the condition of sufficient dissolved oxygen, carries out oxygenolysis to the organism in sewage.
S3: react sewage transport to the film through Aerobic Pond assembly 2f process device 2c, the impurity (germ, virus etc.) in sewage is separated by the film device 2c that reacts, and then the water quality of lifting sewage; Be separated the impurity that obtains and be delivered to mud impurity discharge chamber 2e by mud discharging pipe 2d, the water purification of the water quality reaching standard after separation by Cemented filling to water purifying tank 3a.
Mud in mud impurity discharge chamber 2e and impurity to mud impurity discharge chamber 2e, are discharged by mud discharging pipe 2d by the ability of swimming lift pump 3d of S4: water purifying tank 3a by water purification high-pressure delivery.Water purification is delivered to drainage pipeline 3b by the submersible type lift pump 3d of water purifying tank 3a; If desired water purification is used such as Afforestation Landscape moisturizing and flushing garage, industrial project water etc., then drainage pipeline 3b and water purification are utilized pipeline communication, water purification is used if do not need, then by drainage pipeline 3b and discharge purified water pipeline communication, because water quality is through process, can reach emission standard, the water purification therefore discharged does not pollute the environment.
The utility model is not limited to above-mentioned embodiment; for those skilled in the art; under the prerequisite not departing from the utility model principle, can also make some improvements and modifications, these improvements and modifications are also considered as within protection domain of the present utility model.The content be not described in detail in this specification sheets belongs to the known prior art of professional and technical personnel in the field.

Claims (7)

1. an integrated sewage water is collected, is promoted and process pumping plant, it is characterized in that: comprise Sewage treatment systems (2), the both sides of Sewage treatment systems (2) are respectively arranged with to collect and store lifting system (1) and water purification lifting system (3);
Described collection stores lifting system (1) and comprises recovery storage prefabricated well (1c), reclaims storage prefabricated well (1c) and is provided with blowdown inlet channel (1a); Described Sewage treatment systems (2) comprises anaerobic acidification pond (2a) and Aerobic Pond assembly (2f), and described recovery is stored prefabricated well (1c) and is connected with anaerobic acidification pond (2a) by pipeline;
Described Aerobic Pond assembly (2f) comprises at least 1 Aerobic Pond (2b), anaerobic acidification pond (2a) is connected by pipeline with contiguous Aerobic Pond (2b), connected by pipeline between adjacent Aerobic Pond (2b), be provided with aerating apparatus (2h) in all Aerobic Ponds (2b), all Aerobic Ponds (2b) inside is provided with floating stuffing (2g); Described Sewage treatment systems (2) also comprises second pond (2i), be provided with film in second pond (2i) to react device (2c), the film device (2c) that reacts is connected with all Aerobic Ponds (2b) by pipeline;
Described water purification lifting system (3) comprises water purifying tank (3a), and the film device (2c) that reacts is connected with water purifying tank (3a) by pipeline; Be provided with 2 submersible type lift pumps (3d) in water purifying tank (3a), the drainage pipeline (3b) of all submersible type lift pumps (3d) all with one through water purifying tank (3a) is connected; Drainage pipeline (3b) is three-dimensional pipeline, and it comprises and to be connected first input end, the first output terminal for being connected with extraneous discharge purified water pipeline, the second output terminal for utilizing pipeline to be connected with extraneous water purification with submersible type lift pump (3d).
2. integrated sewage water as claimed in claim 1 is collected, is promoted and process pumping plant, it is characterized in that: described Sewage treatment systems (2) also comprises mud impurity discharge chamber (2e), mud impurity discharge chamber (2e) is positioned at the bottom of Aerobic Pond assembly (2f), the film device (2c) that reacts is connected with mud impurity discharge chamber (2e) by blow-off line, and mud impurity discharge chamber (2e) is provided with mud discharging pipe (2d).
3. integrated sewage water as claimed in claim 2 is collected, is promoted and process pumping plant, it is characterized in that: described water purification lifting system (3) also comprises back-purge system (3c), all submersible type lift pumps (3d) are all connected with mud impurity discharge chamber (2e) by back-purge system (3c).
4. integrated sewage water as claimed in claim 1 is collected, is promoted and process pumping plant, it is characterized in that: it is inner that described collection storage lifting system (1), Sewage treatment systems (2) and water purification lifting system (3) are all positioned at prefabricated pit shaft.
5. the integrated sewage water as described in any one of Claims 1-4 is collected, promote and process pumping plant, it is characterized in that: the inside of described blowdown inlet channel (1a) is provided with the filter grid guiding device (1b) for filter sewage.
6. the integrated sewage water as described in any one of Claims 1-4 is collected, promote and process pumping plant, it is characterized in that: described recovery stores in prefabricated well (1c) and is provided with 2 sewage pumps (1d).
7. the integrated sewage water as described in any one of Claims 1-4 is collected, promote and process pumping plant, it is characterized in that: described Aerobic Pond assembly (2f) comprises 3 Aerobic Ponds (2b) of laterally arranging: the first Aerobic Pond, the second Aerobic Pond and the 3rd Aerobic Pond; Described anaerobic acidification pond (2a) is connected with the first Aerobic Pond.
CN201520295132.1U 2015-05-08 2015-05-08 Integrated sewage water is collected, promote and process pumping plant Withdrawn - After Issue CN204625439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520295132.1U CN204625439U (en) 2015-05-08 2015-05-08 Integrated sewage water is collected, promote and process pumping plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520295132.1U CN204625439U (en) 2015-05-08 2015-05-08 Integrated sewage water is collected, promote and process pumping plant

Publications (1)

Publication Number Publication Date
CN204625439U true CN204625439U (en) 2015-09-09

Family

ID=54044486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520295132.1U Withdrawn - After Issue CN204625439U (en) 2015-05-08 2015-05-08 Integrated sewage water is collected, promote and process pumping plant

Country Status (1)

Country Link
CN (1) CN204625439U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104817236A (en) * 2015-05-08 2015-08-05 於璨鹏 Integrated sewage collecting, lifting and treating pump station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104817236A (en) * 2015-05-08 2015-08-05 於璨鹏 Integrated sewage collecting, lifting and treating pump station

Similar Documents

Publication Publication Date Title
CN101928097B (en) Domestic sewage treatment system for ecological residential quarter
CN204319932U (en) A kind of three-stage filtration sewage-treatment plant
CN204454829U (en) A kind of integrated underground sewage treatment equipment efficiently
CN101948215A (en) Garbage leachate treatment process
CN102531170B (en) Ecological pond system of water body circulation flow oxygenation
CN201864641U (en) Housing estate domestic sewage ecological treatment system
CN205087965U (en) Insulating oily recovery system
CN204151171U (en) A kind of fracturing outlet liquid process discharge equipment
CN204625439U (en) Integrated sewage water is collected, promote and process pumping plant
CN205258236U (en) Pig is bred and uses sewage treatment pond
CN206127080U (en) A manufacturing equipment for refuse disposal filtration liquid
CN104817236A (en) Integrated sewage collecting, lifting and treating pump station
CN205398373U (en) Municipal administration wastewater recovery processing system
CN203653384U (en) Wastewater treatment system
CN111549881A (en) Initial rainwater flow dividing method
CN206051801U (en) A kind of transportable water treatment apparatus
CN206279058U (en) One kind building sanitary sewage multistage filtering environment-friendly disposal system
CN106065654B (en) A kind of association system of agricultural non-point source pollution reduction and treated waste water for irrigation in agriculture
CN205224231U (en) Urban rainwater store up naturally with comprehensive utilization system
CN204689826U (en) Advanced sewage treatment system
CN202322472U (en) Pharmaceutical factory sewage treatment plant
CN203866126U (en) Novel buried integrated sewage treatment equipment
CN207429806U (en) A kind of separation of solid and liquid accurate filter
CN213865558U (en) BAF aeration device for advanced treatment of kitchen biogas slurry
CN213865821U (en) Novel biochemical treatment system for treating leachate of sewage treatment station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150909

Effective date of abandoning: 20171114

AV01 Patent right actively abandoned