CN204621504U - A kind of hydraulic pressure pin inserting-drawing mechanism - Google Patents

A kind of hydraulic pressure pin inserting-drawing mechanism Download PDF

Info

Publication number
CN204621504U
CN204621504U CN201520237520.4U CN201520237520U CN204621504U CN 204621504 U CN204621504 U CN 204621504U CN 201520237520 U CN201520237520 U CN 201520237520U CN 204621504 U CN204621504 U CN 204621504U
Authority
CN
China
Prior art keywords
connecting rod
hydraulic
rod
pin
threaded connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520237520.4U
Other languages
Chinese (zh)
Inventor
宋明全
罗兴齐
马旭
李景乐
杨志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum First Construction Corp
Original Assignee
China Petroleum First Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum First Construction Corp filed Critical China Petroleum First Construction Corp
Priority to CN201520237520.4U priority Critical patent/CN204621504U/en
Application granted granted Critical
Publication of CN204621504U publication Critical patent/CN204621504U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model describes a kind of hydraulic pressure pin inserting-drawing mechanism, is applicable to installation and the dismounting of multiple large the bearing pin of gantry crane, it is characterized in that: base, hydraulic jack, stator, connecting rod, three contiguous blocks and adapter sleeve; Base is fixedly connected with the bearing pin support of large part bearing pin by bolt of lower base, hydraulic jack is fixed on base for fitted bolt by stator, connecting rod comprises long whorl brace rod and short thread connecting rod, be connected with adapter sleeve by contiguous block between length whorl brace rod, connecting rod two ends connect the grooved piston bar of large part bearing pin and hydraulic jack respectively, make large part bearing pin, long whorl brace rod, short thread connecting rod, grooved piston bar on the same axis; This mechanism operation is convenient, and can use the existing power source of crane self, work that just can be more steady, safe under not needing additionally to provide power source situation.

Description

一种液压插拔销机构A hydraulic plugging pin mechanism

技术领域 technical field

本实用新型涉及安装和拆除销轴的技术领域,特别是一种适用于门式起重机多种大件销轴安装与拆除的液压插拔销机构。 The utility model relates to the technical field of installing and removing pin shafts, in particular to a hydraulic plugging-out pin mechanism suitable for installing and removing various large pin shafts of gantry cranes.

背景技术 Background technique

目前现有的MYQ型5000t门式起重机部分部件通过销轴连接,其中部分销轴体积大、重量大,安装连接销轴通常依靠普通人力及常用工具安装,这种安装方法有以下缺点和不足:①门式起重机部件组装大多是在高空,销轴在高空连接困难大,组对时需配合的机具设备较多;②使用常用工具敲击销子安装会对销轴本体造成破坏;③销轴安装时大多离地面高、四周无可靠劳动保护,人员及工器具存在高处坠落的风险;④销轴的安装位置空间狭小或没有安装站位致使安装工期长、效率低。 At present, some parts of the existing MYQ 5000t gantry crane are connected by pin shafts. Some of the pin shafts are large in size and heavy in weight. The installation and connection pin shafts are usually installed by ordinary manpower and common tools. This installation method has the following disadvantages and deficiencies: ①The assembly of gantry crane components is mostly at high altitude, and the pin shaft is difficult to connect at high altitude, and there are many machines and equipment that need to be matched during assembly; ②Using common tools to knock on the pin installation will cause damage to the pin shaft body; ③Pin shaft Most of the installations are high from the ground and there is no reliable labor protection around, and there is a risk of falling from a height for personnel and tools; ④The installation position of the pin shaft is narrow or there is no installation station, resulting in long installation period and low efficiency.

发明内容 Contents of the invention

本实用新型所要解决的技术问题是提供一种适用于门式起重机多种大件销轴安装与拆除的液压插拔销机构,该机构操作方便,并且能够使用起重机自身现有动力源,在不需额外提供动力源情况下就能够更平稳、安全的工作。 The technical problem to be solved by the utility model is to provide a hydraulic plug-in pin mechanism suitable for the installation and removal of various large pin shafts of gantry cranes. The mechanism is easy to operate and can use the existing power source of the crane itself. It can work more smoothly and safely when an additional power source is required.

为了实现解决上述技术问题的目的,本实用新型采用了如下技术方案: In order to achieve the purpose of solving the above technical problems, the utility model adopts the following technical solutions:

本实用新型的一种液压插拔销机构,适用于门式起重机多种大件销轴的安装与拆除,其特征是:包括底座、液压油缸、固定片、连接杆、三个连接块和连接套; A hydraulic plug-in mechanism of the utility model is suitable for the installation and removal of various large pin shafts of gantry cranes. set;

所述底座上设有多个底座螺栓,用于将底座与大件销轴的销轴支架固定连接; The base is provided with a plurality of base bolts for fixedly connecting the base with the pin support of the large pin;

所述固定片为两端设有通孔的U型金属片,用于配合螺栓将液压油缸固定在底座上; The fixing piece is a U-shaped metal piece with through holes at both ends, which is used to fix the hydraulic cylinder on the base with bolts;

所述液压油缸包括带槽活塞杆、换向阀块、液控单向阀;带槽活塞杆前端设置有膨胀头,膨胀头设置有可以容纳连接块的凹槽,通过凹槽实现带槽活塞杆与螺纹连接杆的卡式连接;该液压油缸的控制及使用的动力源能够取用门式起重机本身工作所用的液压控制回路;换向阀块设置在液压控制回路上,换向阀块上设置有操作杆,通过操作杆来实现带槽活塞杆的双向作用;液控单向阀设置在液压油缸的伸缸和缩缸油口,在液压油缸不工作时提供液压锁定功能; The hydraulic cylinder includes a grooved piston rod, a reversing valve block, and a hydraulic control check valve; the front end of the grooved piston rod is provided with an expansion head, and the expansion head is provided with a groove that can accommodate the connecting block, and the grooved piston is realized through the groove. The card connection between the rod and the threaded connecting rod; the control of the hydraulic cylinder and the power source used can use the hydraulic control circuit used by the gantry crane itself; the reversing valve block is set on the hydraulic control circuit, and the reversing valve block An operating rod is provided to realize the two-way action of the grooved piston rod through the operating rod; the hydraulic control check valve is arranged at the oil port of the hydraulic cylinder for extending and retracting, and provides hydraulic locking function when the hydraulic cylinder is not working;

所述连接块为设有螺纹通孔的矩形块; The connecting block is a rectangular block provided with a threaded through hole;

所述连接套为侧面设有U型槽的圆柱形结构,该U型槽上设有矩形凹槽; The connecting sleeve is a cylindrical structure with a U-shaped groove on the side, and a rectangular groove is arranged on the U-shaped groove;

所述连接杆包括长螺纹连接杆和短螺纹连接杆;长螺纹连接杆的一端连接大件销轴,另一端连接连接块一;短螺纹连接杆的两端分别连接连接块二和连接块三;长螺纹连接杆上的连接块一和短螺纹连接杆的连接块二均设置在连接套的矩形凹槽内,短螺纹连接杆的连接块三设置在带槽活塞杆的槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆在同一轴线上。 The connecting rod includes a long threaded connecting rod and a short threaded connecting rod; one end of the long threaded connecting rod is connected to a large pin, and the other end is connected to connecting block one; the two ends of the short threaded connecting rod are respectively connected to connecting block two and connecting block three The connecting block one on the long threaded connecting rod and the connecting block two of the short threaded connecting rod are all arranged in the rectangular groove of the connecting sleeve, and the connecting block three of the short threaded connecting rod is arranged in the groove of the grooved piston rod, so that the large Pin shaft, long threaded connecting rod, short threaded connecting rod, and grooved piston rod are on the same axis.

具体的:所述液压油缸的小腔油口设置安全阀用于避免压力超载,该小腔油口的尺寸能够满足相应起吊和回落速度下的流量要求。 Specifically: the small cavity oil port of the hydraulic cylinder is provided with a safety valve to avoid pressure overload, and the size of the small cavity oil port can meet the flow requirements at corresponding lifting and falling speeds.

具体的:所述液压油缸设有接头,该接头与液压动力站液压油管接头相配。这是为了使该液压插拔销机构不仅能够使用门式起重机液压动力站提供的动力,也能够使用便携式液压动力站提供的动力,实现在多种工作环境下的使用目的。 Specifically: the hydraulic oil cylinder is provided with a joint, and the joint is matched with the hydraulic oil pipe joint of the hydraulic power station. This is to make the hydraulic plugging pin mechanism not only use the power provided by the hydraulic power station of the gantry crane, but also use the power provided by the portable hydraulic power station, so as to realize the purpose of use in various working environments.

具体的:所述的长、短螺纹连接杆均为两端设有螺纹段的圆杆。 Specifically: the long and short threaded connecting rods are round rods with threaded sections at both ends.

具体的:连接长螺纹连接杆上的连接块一和短螺纹连接杆的连接块二时连接套凹槽开口一侧朝下以防掉落。 Concrete: when connecting the connecting block one on the long threaded connecting rod and the connecting block two of the short threaded connecting rod, the opening side of the connecting sleeve groove faces downward to prevent falling.

具体的:所述带槽活塞杆的强度能够承受由于大件销轴与销轴孔孔不重合产生的额外负载。 Specifically: the strength of the grooved piston rod can withstand the extra load caused by the misalignment of the pin shaft of the large piece and the hole of the pin shaft.

使用方法:使用时,在地面上将液压油缸通过固定片固定在底座上,将长螺纹连接杆的一端安装上连接块,短螺纹连接杆的两端均安装上连接块;使用吊车配合将该液压插拔销机构通过底座上的底座螺栓将该机构固定在销轴支架上;将液压油缸与起重机本身工作所用的液压控制回路或便携式液压动力站通过油管连接。 How to use: When in use, fix the hydraulic cylinder on the ground through the fixing piece on the base, install the connecting block on one end of the long threaded connecting rod, and install the connecting block on both ends of the short threaded connecting rod; use a crane to cooperate with the The hydraulic plug-in pin mechanism is fixed on the pin shaft bracket through the base bolts on the base; the hydraulic cylinder and the hydraulic control circuit or portable hydraulic power unit used for the crane itself are connected through oil pipes.

插销轴过程:先将长螺纹连接杆的另一端安装上大件销轴,接着将短螺纹连接杆的一端的连接块设置在带槽活塞杆的槽中,将短螺纹连接杆的另一端的连接块和长螺纹连接杆上的连接块放入连接套的矩形凹槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆在同一轴线方向上且该销轴对准销轴孔;然后启动动力源液压动力包,通过控制液压油缸的换向阀实现该液压插拔销机构的伸缸工作,完成销轴的安装;接着取下连接套,先配合吊车卸下带有短螺纹连接杆的液压插拔销机构,然后取下与大件销轴连接的长螺纹连接杆。 Pin shaft process: first install the other end of the long threaded connecting rod on the large pin shaft, then set the connecting block at one end of the short threaded connecting rod in the groove of the piston rod with groove, and install the other end of the short threaded connecting rod The connecting block on the connecting block and the long threaded connecting rod is put into the rectangular groove of the connecting sleeve, so that the large pin shaft, the long threaded connecting rod, the short threaded connecting rod, and the grooved piston rod are in the same axis direction and the pin shaft Align the pin hole; then start the hydraulic power package of the power source, realize the cylinder extension work of the hydraulic plugging pin mechanism by controlling the reversing valve of the hydraulic cylinder, and complete the installation of the pin shaft; then remove the connecting sleeve, and first cooperate with the crane to unload Lower the hydraulic plug-in pin mechanism with the short threaded connecting rod, and then take off the long threaded connecting rod connected with the large pin.

拔销轴过程:先将长螺纹连接杆的另一端设置在需要拔出的大件销轴上,接着将短螺纹连接杆的一端的连接块设置在带槽活塞杆的槽中,将短螺纹连接杆的另一端的连接块和长螺纹连接杆上的连接块放入连接套的矩形凹槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆在同一轴线方向上;然后启动动力源液压动力包,通过控制液压油缸的换向阀实现该液压插拔销机构的缩缸工作,完成销轴的卸下;接着取下连接套,先取下长螺纹连接杆,然后配合吊车卸下带有短螺纹连接杆的液压插拔销机构。 The process of pulling out the pin shaft: first set the other end of the long threaded connecting rod on the large pin shaft to be pulled out, then set the connecting block at one end of the short threaded connecting rod in the groove of the grooved piston rod, and put the short threaded The connecting block at the other end of the connecting rod and the connecting block on the long threaded connecting rod are put into the rectangular groove of the connecting sleeve, so that the large pin, the long threaded connecting rod, the short threaded connecting rod and the grooved piston rod are on the same axis direction; then start the hydraulic power package of the power source, realize the shrinking work of the hydraulic plug-in pin mechanism by controlling the reversing valve of the hydraulic cylinder, and complete the unloading of the pin shaft; then remove the connecting sleeve, first remove the long threaded connecting rod , and then cooperate with the crane to remove the hydraulic plug-in pin mechanism with a short threaded connecting rod.

这些技术方案,包括改进的技术方案以及进一步改进的技术方案也可以互相组合或者结合,从而达到更好的技术效果。 These technical solutions, including improved technical solutions and further improved technical solutions, can also be combined or combined with each other to achieve better technical effects.

通过采用上述技术方案,本实用新型具有以下的有益效果: By adopting the above technical scheme, the utility model has the following beneficial effects:

1、本实用新型的一种液压插拔销机构具有体积小、重量轻,结构布置方便灵活; 1. A hydraulic plug-in and pull-out mechanism of the utility model has the advantages of small size, light weight, and convenient and flexible structural arrangement;

2、该液压插拔销机构的运动惯性小,反应速度快,很容易实现直线运动; 2. The motion inertia of the hydraulic plug-in mechanism is small, the reaction speed is fast, and it is easy to realize linear motion;

3、该液压插拔销机构操纵控制(起动、制动、换向等)方便,可实现快速的双向运动; 3. The hydraulic plug-in pin mechanism is easy to operate and control (starting, braking, reversing, etc.), and can realize fast two-way movement;

4、该液压插拔销机构的具有液压动力源选择多样性的优点,可实现多种情况下的使用的目的; 4. The hydraulic plug-in mechanism has the advantages of a variety of hydraulic power sources, and can be used in various situations;

5、该液压插拔销机构通过连接套连接长、短螺纹连接杆,使液压油缸对大件销轴传递的力有“柔性”,保护销轴不受损坏。 5. The hydraulic plug-in pin mechanism connects the long and short threaded connecting rods through the connecting sleeve, so that the hydraulic cylinder is "flexible" to the force transmitted by the large pin shaft and protects the pin shaft from damage.

附图说明 Description of drawings

图1是本实用新型的整体结构示意图。 Fig. 1 is a schematic diagram of the overall structure of the utility model.

图2是底座的结构示意图。 Fig. 2 is a structural schematic diagram of the base.

图3是液压油缸的结构示意图。 Fig. 3 is a structural schematic diagram of a hydraulic cylinder.

图4是长螺纹连接杆和连接块连接的结构示意图。 Fig. 4 is a structural schematic diagram of the connection between the long threaded connecting rod and the connecting block.

图5是连接套的结构示意图。 Fig. 5 is a schematic diagram of the structure of the connection sleeve.

图中:1-底座,2-液压油缸,3-带槽活塞杆,4-连接杆,5-连接套,6-固定片,7-底座螺栓,8-连接块。 In the figure: 1-base, 2-hydraulic cylinder, 3-piston rod with groove, 4-connecting rod, 5-connecting sleeve, 6-fixing piece, 7-base bolt, 8-connecting block.

具体实施方式 Detailed ways

下面结合附图对本专利进一步解释说明。但本专利的保护范围不限于具体的实施方式。 Below in conjunction with accompanying drawing this patent is further explained and illustrated. But the scope of protection of this patent is not limited to the specific implementation.

实施例1 Example 1

如图所示,本专利的一种液压插拔销机构,适用于门式起重机多种大件销轴的安装与拆除,其特征是:包括底座1、底座螺栓7、液压油缸2、固定片6、连接杆4、连接块8和连接套5;底座1上设有多个底座螺栓7,所述底座螺栓7用于固定连接大件销轴的销轴支架;固定片6为两端设有通孔的U型金属片;固定片6配合螺栓将液压油缸2固定在底座1上。 As shown in the figure, a hydraulic plug-in and pull-out mechanism of this patent is suitable for the installation and removal of various large pin shafts of gantry cranes. 6. Connecting rod 4, connecting block 8 and connecting sleeve 5; the base 1 is provided with a plurality of base bolts 7, and the base bolts 7 are used to fix the pin bracket connecting the large pin; A U-shaped metal sheet with a through hole; the fixed sheet 6 cooperates with bolts to fix the hydraulic cylinder 2 on the base 1 .

液压油缸2包括带槽活塞杆3,该带槽活塞杆3的强度能够承受由于大件销轴与销轴孔孔不重合产生的额外负载;该液压油缸2的控制及使用的动力源能够取用门式起重机本身工作所用的液压控制回路;该液压油缸2能够通过手动操作换向阀块上的操作杆来实现带槽活塞杆3的双向作用;该液压油缸2的伸缸和缩缸油口均设置有液控单向阀,在液压油缸2不工作时提供液压锁定功能;该液压油缸2的小腔油口设置安全阀用于避免压力超载,该小腔油口的尺寸能够满足相应起吊和回落速度下的流量要求;该液压油缸2还设有接头,该接头与液压动力站液压油管接头相配;这是为了使该液压插拔销机构不仅能够使用门式起重机液压动力站提供的动力,也能够使用便携式液压动力站提供的动力,实现在多种工作环境下的使用目的。 The hydraulic cylinder 2 includes a grooved piston rod 3, the strength of which can withstand the extra load caused by the misalignment of the pin shaft and the hole of the pin shaft; the control of the hydraulic cylinder 2 and the power source used can take Use the hydraulic control circuit used by the gantry crane itself; the hydraulic cylinder 2 can realize the bidirectional action of the grooved piston rod 3 by manually operating the operating rod on the reversing valve block; the extension and contraction oil of the hydraulic cylinder 2 Each port is equipped with a hydraulic control check valve, which provides a hydraulic locking function when the hydraulic cylinder 2 is not working; the small cavity oil port of the hydraulic cylinder 2 is provided with a safety valve to avoid pressure overload, and the size of the small cavity oil port can meet the corresponding requirements. The flow requirements at the lifting and falling speeds; the hydraulic cylinder 2 is also provided with joints, which are matched with the hydraulic oil pipe joints of the hydraulic power station; The power can also use the power provided by the portable hydraulic power station to achieve the purpose of use in a variety of working environments.

连接块8为设有螺纹通孔的矩形块;连接套5为侧面设有U型槽的圆柱形结构,该U型槽上设有矩形凹槽;连接杆4包括长螺纹连接杆和短螺纹连接杆;长螺纹连接杆的一端连接大件销轴,另一端连接一连接块8;短螺纹连接杆的两端分别连接一连接块8;长螺纹连接杆上的连接块8和短螺纹连接杆一端的连接块8均设置在连接套5的矩形凹槽内,短螺纹连接杆另一端的连接块8设置在带槽活塞杆3的槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆3在同一轴线上;其中,长、短螺纹连接杆均为两端设有螺纹段的圆杆。 The connecting block 8 is a rectangular block provided with a threaded through hole; the connecting sleeve 5 is a cylindrical structure with a U-shaped groove on the side, and the U-shaped groove is provided with a rectangular groove; the connecting rod 4 includes a long threaded connecting rod and a short thread Connecting rod; one end of the long threaded connecting rod is connected with a large pin, and the other end is connected with a connecting block 8; the two ends of the short threaded connecting rod are respectively connected with a connecting block 8; the connecting block 8 on the long threaded connecting rod is connected with the short thread The connecting block 8 at one end of the rod is all arranged in the rectangular groove of the connecting sleeve 5, and the connecting block 8 at the other end of the short threaded connecting rod is arranged in the groove of the grooved piston rod 3, so that the large pin, the long threaded connecting rod, The short threaded connecting rod and the grooved piston rod 3 are on the same axis; wherein, the long and short threaded connecting rods are round rods with threaded sections at both ends.

使用时,在地面上将液压油缸2通过固定片6固定在底座1上,将长螺纹连接杆的一端安装上连接块8,短螺纹连接杆的两端均安装上连接块8;使用吊车配合将该液压插拔销机构通过底座1上的底座螺栓7将该机构固定在销轴支架上;将液压油缸2与起重机本身工作所用的液压控制回路或便携式液压动力站通过油管连接。 During use, the hydraulic cylinder 2 is fixed on the base 1 through the fixing plate 6 on the ground, and the connecting block 8 is installed on one end of the long threaded connecting rod, and the connecting block 8 is installed on both ends of the short threaded connecting rod; The hydraulic plug-in pin mechanism is fixed on the pin support through the base bolt 7 on the base 1; the hydraulic cylinder 2 is connected with the hydraulic control circuit or portable hydraulic power station used for the crane itself through oil pipes.

插销轴过程:先将长螺纹连接杆的另一端安装上大件销轴,接着将短螺纹连接杆的一端的连接块8设置在带槽活塞杆3的槽中,将短螺纹连接杆的另一端的连接块8和长螺纹连接杆上的连接块8放入连接套5的矩形凹槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆3在同一轴线方向上且该销轴对准销轴孔;然后启动动力源液压动力包,通过控制液压油缸2的换向阀实现该液压插拔销机构的伸缸工作,完成销轴的安装;接着取下连接套5,先配合吊车卸下带有短螺纹连接杆的液压插拔销机构,然后取下与大件销轴连接的长螺纹连接杆。 Pin shaft process: first install the other end of the long threaded connecting rod on a large pin shaft, then set the connecting block 8 at one end of the short threaded connecting rod in the groove of the piston rod 3 with grooves, and install the other end of the short threaded connecting rod The connecting block 8 at one end and the connecting block 8 on the long threaded connecting rod are put into the rectangular groove of the connecting sleeve 5, so that the large pin, the long threaded connecting rod, the short threaded connecting rod, and the grooved piston rod 3 are on the same axis. direction and the pin shaft is aligned with the pin shaft hole; then start the hydraulic power package of the power source, realize the cylinder extension work of the hydraulic plug-in pin mechanism by controlling the reversing valve of the hydraulic cylinder 2, and complete the installation of the pin shaft; then remove the Connecting sleeve 5, first cooperate crane to unload the hydraulic pressure plug-in pin mechanism that has short threaded connecting rod, then take off the long threaded connecting rod that is connected with large pin.

拔销轴过程:先将长螺纹连接杆的另一端设置在需要拔出的大件销轴上,接着将短螺纹连接杆的一端的连接块8设置在带槽活塞杆3的槽中,将短螺纹连接杆的另一端的连接块8和长螺纹连接杆上的连接块8放入连接套5的矩形凹槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆3在同一轴线方向上;然后启动动力源液压动力包,通过控制液压油缸2的换向阀实现该液压插拔销机构的缩缸工作,完成销轴的卸下;接着取下连接套5,先取下长螺纹连接杆,然后配合吊车卸下带有短螺纹连接杆的液压插拔销机构。 The process of pulling out the pin shaft: first set the other end of the long threaded connecting rod on the large pin shaft to be pulled out, then set the connecting block 8 at one end of the short threaded connecting rod in the groove of the grooved piston rod 3, and place the The connecting block 8 on the other end of the short threaded connecting rod and the connecting block 8 on the long threaded connecting rod are put into the rectangular groove of the connecting sleeve 5, so that the large pin, the long threaded connecting rod, the short threaded connecting rod, the grooved Piston rod 3 is in the same axis direction; then start the power source hydraulic power pack, realize the shrinking work of the hydraulic plug-in pin mechanism by controlling the reversing valve of hydraulic cylinder 2, and complete the unloading of the pin shaft; then remove the connecting sleeve 5. First remove the long threaded connecting rod, and then cooperate with the crane to remove the hydraulic plug-in mechanism with the short threaded connecting rod.

实施例2 Example 2

与实施例1的结构和操作相同,对目前现有的MYQ型5000t门式起重机的部分大件销轴进行插拔,液压油缸2选用的技术参数是:压力分级为E16MPa,缸径为63mm,杆径为32mm,最大行程为400mm;该液压油缸2的控制及使用的动力源取用MYQ型5000t门式起重机CY10油缸工作所用的液压控制回路。 The structure and operation are the same as those in Example 1. Some of the large pins of the existing MYQ 5000t gantry crane are plugged and pulled out. The technical parameters selected for the hydraulic cylinder 2 are: the pressure classification is E16MPa, the cylinder diameter is 63mm, and the rod The diameter is 32mm, and the maximum stroke is 400mm; the control and power source of the hydraulic cylinder 2 is the hydraulic control circuit used for the work of the CY10 cylinder of the MYQ 5000t gantry crane.

Claims (6)

1.一种液压插拔销机构,适用于门式起重机多种大件销轴的安装与拆除,其特征是:包括底座、液压油缸、固定片、连接杆、三个连接块和连接套; 1. A hydraulic plug-in pin mechanism, which is suitable for the installation and removal of various large pin shafts of gantry cranes, and is characterized in that it includes a base, a hydraulic cylinder, a fixed piece, a connecting rod, three connecting blocks and a connecting sleeve; 所述底座上设有多个底座螺栓,用于将底座与大件销轴的销轴支架固定连接; The base is provided with a plurality of base bolts for fixedly connecting the base with the pin support of the large pin; 所述固定片为两端设有通孔的U型金属片,用于配合螺栓将液压油缸固定在底座上; The fixing piece is a U-shaped metal piece with through holes at both ends, which is used to fix the hydraulic cylinder on the base with bolts; 所述液压油缸包括带槽活塞杆、换向阀块、液控单向阀;带槽活塞杆前端设置有膨胀头,膨胀头设置有可以容纳连接块的凹槽,通过凹槽实现带槽活塞杆与螺纹连接杆的卡式连接;该液压油缸的控制及使用的动力源能够取用门式起重机本身工作所用的液压控制回路;换向阀块设置在液压控制回路上,换向阀块上设置有操作杆,通过操作杆来实现带槽活塞杆的双向作用;液控单向阀设置在液压油缸的伸缸和缩缸油口,在液压油缸不工作时提供液压锁定功能; The hydraulic cylinder includes a grooved piston rod, a reversing valve block, and a hydraulic control check valve; the front end of the grooved piston rod is provided with an expansion head, and the expansion head is provided with a groove that can accommodate the connecting block, and the grooved piston is realized through the groove. The card connection between the rod and the threaded connecting rod; the control of the hydraulic cylinder and the power source used can use the hydraulic control circuit used by the gantry crane itself; the reversing valve block is set on the hydraulic control circuit, and the reversing valve block An operating rod is provided to realize the two-way action of the grooved piston rod through the operating rod; the hydraulic control check valve is arranged at the oil port of the hydraulic cylinder for extending and retracting, and provides hydraulic locking function when the hydraulic cylinder is not working; 所述连接块为设有螺纹通孔的矩形块; The connecting block is a rectangular block provided with a threaded through hole; 所述连接套为侧面设有U型槽的圆柱形结构,该U型槽上设有矩形凹槽; The connecting sleeve is a cylindrical structure with a U-shaped groove on the side, and a rectangular groove is arranged on the U-shaped groove; 所述连接杆包括长螺纹连接杆和短螺纹连接杆;长螺纹连接杆的一端连接大件销轴,另一端连接连接块一;短螺纹连接杆的两端分别连接连接块二和连接块三;长螺纹连接杆上的连接块一和短螺纹连接杆的连接块二均设置在连接套的矩形凹槽内,短螺纹连接杆的连接块三设置在带槽活塞杆的槽中,使大件销轴、长螺纹连接杆、短螺纹连接杆、带槽活塞杆在同一轴线上。 The connecting rod includes a long threaded connecting rod and a short threaded connecting rod; one end of the long threaded connecting rod is connected to a large pin, and the other end is connected to connecting block one; the two ends of the short threaded connecting rod are respectively connected to connecting block two and connecting block three The connecting block one on the long threaded connecting rod and the connecting block two of the short threaded connecting rod are all arranged in the rectangular groove of the connecting sleeve, and the connecting block three of the short threaded connecting rod is arranged in the groove of the grooved piston rod, so that the large Pin shaft, long threaded connecting rod, short threaded connecting rod, and grooved piston rod are on the same axis. 2.根据权利要求1所述液压插拔销机构,其特征是:所述的液压油缸的小腔油口设置安全阀用于避免压力超载,该小腔油口的尺寸能够满足相应起吊和回落速度下的流量要求。 2. The hydraulic plugging pin mechanism according to claim 1, characterized in that: the small cavity oil port of the hydraulic cylinder is provided with a safety valve to avoid pressure overload, and the size of the small cavity oil port can meet the corresponding lifting and falling Flow requirements at speed. 3.根据权利要求1所述液压插拔销机构,其特征是:所述的液压油缸设有接头,该接头与液压动力站液压油管接头相配。 3. The hydraulic plugging pin mechanism according to claim 1, characterized in that: the hydraulic cylinder is provided with a joint, and the joint is matched with the hydraulic oil pipe joint of the hydraulic power station. 4.根据权利要求1所述液压插拔销机构,其特征是:所述的长、短螺纹连接杆均为两端设有螺纹段的圆杆。 4. The hydraulic plugging pin mechanism according to claim 1, characterized in that: said long and short threaded connecting rods are round rods with threaded sections at both ends. 5.根据权利要求1所述液压插拔销机构,其特征是:在连接长螺纹连接杆上的连接块一和短螺纹连接杆的连接块二时,连接套凹槽开口一侧朝下以防掉落。 5. The hydraulic plugging pin mechanism according to claim 1, characterized in that: when connecting the connecting block 1 on the long threaded connecting rod and the connecting block 2 on the short threaded connecting rod, the opening side of the groove of the connecting sleeve faces down to Anti-drop. 6.根据权利要求1所述液压插拔销机构,其特征是:所述的带槽活塞杆的强度能够承受由于大件销轴与销轴孔孔不重合产生的额外负载。 6. The hydraulic pin insertion mechanism according to claim 1, characterized in that: the strength of the grooved piston rod can withstand the extra load caused by the misalignment of the large pin shaft and the pin shaft hole.
CN201520237520.4U 2015-04-20 2015-04-20 A kind of hydraulic pressure pin inserting-drawing mechanism Expired - Lifetime CN204621504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520237520.4U CN204621504U (en) 2015-04-20 2015-04-20 A kind of hydraulic pressure pin inserting-drawing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520237520.4U CN204621504U (en) 2015-04-20 2015-04-20 A kind of hydraulic pressure pin inserting-drawing mechanism

Publications (1)

Publication Number Publication Date
CN204621504U true CN204621504U (en) 2015-09-09

Family

ID=54040565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520237520.4U Expired - Lifetime CN204621504U (en) 2015-04-20 2015-04-20 A kind of hydraulic pressure pin inserting-drawing mechanism

Country Status (1)

Country Link
CN (1) CN204621504U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263397A (en) * 2017-07-21 2017-10-20 江苏集萃智能制造技术研究所有限公司 A kind of disassembling bolts impactor
CN109746661A (en) * 2019-03-14 2019-05-14 开滦(集团)有限责任公司技术中心 Dress pin assembly is quickly pulled out suitable for hydraulic support
CN110253267A (en) * 2019-07-23 2019-09-20 山东科技大学 A large-scale pin dismantling equipment and its application
CN111958540A (en) * 2020-08-19 2020-11-20 张毅 Conveniently adjust fixed connection round pin body that can quick replacement round pin head
CN114029719A (en) * 2021-10-29 2022-02-11 山东省公路桥梁建设集团有限公司 Hydraulic plug pin shaft device and using method thereof
CN114526310A (en) * 2022-03-07 2022-05-24 中信机电制造公司科研设计院 Pneumatic pin penetrating device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263397A (en) * 2017-07-21 2017-10-20 江苏集萃智能制造技术研究所有限公司 A kind of disassembling bolts impactor
CN109746661A (en) * 2019-03-14 2019-05-14 开滦(集团)有限责任公司技术中心 Dress pin assembly is quickly pulled out suitable for hydraulic support
CN110253267A (en) * 2019-07-23 2019-09-20 山东科技大学 A large-scale pin dismantling equipment and its application
CN110253267B (en) * 2019-07-23 2024-03-22 山东科技大学 Dismounting device for large pin shaft and application thereof
CN111958540A (en) * 2020-08-19 2020-11-20 张毅 Conveniently adjust fixed connection round pin body that can quick replacement round pin head
CN114029719A (en) * 2021-10-29 2022-02-11 山东省公路桥梁建设集团有限公司 Hydraulic plug pin shaft device and using method thereof
CN114029719B (en) * 2021-10-29 2022-11-18 山东省公路桥梁建设集团有限公司 Hydraulic plug pin shaft device and using method thereof
CN114526310A (en) * 2022-03-07 2022-05-24 中信机电制造公司科研设计院 Pneumatic pin penetrating device

Similar Documents

Publication Publication Date Title
CN204621504U (en) A kind of hydraulic pressure pin inserting-drawing mechanism
CN103009174B (en) The axial slip of large-sized rotor tipping arrangement, radially location and clamping device
CN101289945B (en) Laneway flexible conduit wiring conveying monorail crane
CN201220896Y (en) Two-stage telescoping built-in oil conduit supporting leg
CN201711735U (en) Device for assembly and disassembly of excavator crawler connecting pin
CN208628807U (en) Folding storage formula motor bearings hydraulic dismounting device
CN203654287U (en) Pile casing pulling device
CN204700825U (en) Fluid coupling provision for disengagement
CN220449675U (en) Novel tube panel pull-open device
CN203076871U (en) Coupling dismounting device
CN202621637U (en) Hydraulic locking device
CN207616487U (en) A kind of special equipment hydraulic screw extractor
CN201220337Y (en) Special-purpose tool for disassembling hydraulic coupling and brake disc
CN205616481U (en) Counterweight hanging device and crane
CN107825396A (en) Robot for carrying high-voltage porcelain insulator in electric power operation
CN203765273U (en) Assembling and disassembling device for pin shaft connection
CN211701387U (en) Intensive bus duct hoisting device
CN203889954U (en) Depinning device for standard joint of tower crane
CN210600817U (en) Fixing device for mechanical experiment of high stability ability
CN103669352A (en) Protective casing lifting equipment
CN209408375U (en) A kind of drawing horse device with pressure monitoring device
CN202214199U (en) Counterweight self-dismounting device and crane provided with counterweight self-dismounting device
CN102583168B (en) Engineering machine and pin inserting and pulling device thereof
CN203428806U (en) Shaft plugging and unplugging device for truss arm and crane
CN103894820A (en) Assembling and disassembling device for pin shaft connection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150909