CN204620952U - Railway spike processing unit (plant) - Google Patents

Railway spike processing unit (plant) Download PDF

Info

Publication number
CN204620952U
CN204620952U CN201520331081.3U CN201520331081U CN204620952U CN 204620952 U CN204620952 U CN 204620952U CN 201520331081 U CN201520331081 U CN 201520331081U CN 204620952 U CN204620952 U CN 204620952U
Authority
CN
China
Prior art keywords
railway spike
head
lower bolster
round platform
nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520331081.3U
Other languages
Chinese (zh)
Inventor
赵艳霞
张仕江
张贵红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Panjiang Refined Coal Co Ltd
Original Assignee
Guizhou Panjiang Refined Coal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Panjiang Refined Coal Co Ltd filed Critical Guizhou Panjiang Refined Coal Co Ltd
Priority to CN201520331081.3U priority Critical patent/CN204620952U/en
Application granted granted Critical
Publication of CN204620952U publication Critical patent/CN204620952U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a kind of railway spike processing unit (plant), comprise cope match-plate pattern (6) and lower bolster (2), cope match-plate pattern (6) is provided with 3 and is distributed in the circumferentially same and head of a nail staking punch (7) at 120 degree, interval, (2) have a circular groove to lower bolster, be detachable round platform (3) in groove, detachable round platform (3) is connected with lower bolster (2) by bolt (4), detachable round platform (3) is provided with 3 and is distributed in the circumferentially same and head of a nail anvil block (1) at 120 degree, interval, head of a nail anvil block (1) has railway spike rod aperture (5).Pneumatic hammer directly forges and changes punching and shearing machine Mould Machining into by the utility model, reduces percent defective; Avoid manually using tool holder after using mould, reduce security risk, pneumatic hammer forges once can only process a railway spike, and utilize mould once can be shaping 3, improve production efficiency, the another remaining pipe nipple of processing anchor pole that uses carries out railway spike processing, greatly reduces input cost.

Description

Railway spike processing unit (plant)
Technical field
The utility model relates to a kind of railway spike processing unit (plant), the simple die of particularly railway spike shaping.
Background technology
Shaft production is because the reasons such as equipment and materials transport need lay a large amount of track, new laying and the maintenance of track must use railway spike, the long-term outsourcing of railway spike that former mining area uses, and there is a no small Master Cost, now in line with cost-saving theory, require that autonomous processing railway spike is for production and application.
Traditional processing railway spike beats with air compressor machine (pneumatic hammer), such operating process can produce some unfavorable factors, such as: 1. because workpiece is little, on anvil face, putting shakiness during the processing railway spike head of a nail needs manpower instrument to clamp to assist to forge, and waste product is easily caused because forging discontinuity, forge through test and be molded into power and be only 30%, not only time-consuming but also require great effort; 2., due to the regulation of company's special hilllock sole duty, cannot extract special manpower for a long time out and carry out this processing, the processing of short time cannot meet need of work; 3, artificial clamping with instrument assists to forge to there is certain potential safety hazard.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of railway spike processing unit (plant), reach minimizing manpower, the object reducing security risk and increase work efficiency.
The technical solution of the utility model is: a kind of railway spike processing unit (plant), comprise cope match-plate pattern and lower bolster, cope match-plate pattern is provided with 3 and is distributed in head of a nail staking punch that is circumferentially same and 120 degree, interval, lower bolster there is a circular groove, be detachable round platform in groove, detachable round platform is connected with lower bolster by bolt, detachable round platform is provided with 3 and is distributed in head of a nail anvil block that is circumferentially same and 120 degree, interval, head of a nail anvil block has railway spike rod aperture.In circumferentially same and 120 degree, interval distribution, ensure that railway spike is at same flat die, reduces askew, oblique possibility; Simplify the process of gap adjustment on the other hand.The purpose of design of detachable round platform is that the excessive defect rate that causes of wearing and tearing of certain a pair head of a nail staking punch and head of a nail anvil block after preventing long-time punching press increases.By demounting bolt, after rotating 120 degree, break-in a period of time, upper/lower die is made to reach a new punching press plane.
Described head of a nail staking punch diameter is greater than head of a nail anvil diameter, increases head of a nail staking punch and the acting surface following closely bar stock.
Described railway spike rod aperture is through hole, is conveniently ejected by the railway spike shaped by the oil cylinder below lower bolster.
During processing railway spike, first process railway spike bar stock with pneumatic hammer, recycle above-mentioned mould and coordinate pressure to carry out the processing of the railway spike head of a nail, finally utilize the oil cylinder of forcing press lower end to be ejected by the railway spike of institute's machine-shaping.
Advantages found of the present utility model exists: directly forged by pneumatic hammer and change punching and shearing machine Mould Machining into, reduce percent defective; Avoid manually using tool holder after using mould, reduce security risk, pneumatic hammer forges once can only process a railway spike, and utilize mould once can be shaping 3, improve production efficiency, the another remaining pipe nipple of processing anchor pole that uses carries out railway spike processing, greatly reduces input cost.
Compared with the prior art, the utility model decreases manpower, reduces security risk, improves operating efficiency.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is lower die structure schematic diagram of the present utility model;
Fig. 3 is upper and lower mold plane projection view of the present utility model.
Detailed description of the invention
As shown in Figures 1 to 3, a kind of railway spike processing unit (plant), comprise cope match-plate pattern 6 and lower bolster 2, cope match-plate pattern 6 is provided with 3 and is distributed in head of a nail staking punch 7 that is circumferentially same and 120 degree, interval, lower bolster 2 has a circular groove, be detachable round platform 3 in groove, detachable round platform 3 is connected with lower bolster 2 by bolt 4, detachable round platform 3 is provided with 3 and is distributed in head of a nail anvil block 1 that is circumferentially same and 120 degree, interval, head of a nail anvil block 1 has railway spike rod aperture 5.Head of a nail staking punch 7 diameter is greater than head of a nail anvil block 1 diameter.Railway spike rod aperture 5 is through hole.Wherein head of a nail staking punch 7 adopts diameter 100mm and 3, the round steel of 30mm length, and head of a nail anvil block 1 adopts diameter 80mm and 3 of 50mm length, and cope match-plate pattern 6 and lower bolster 2 select 2 of 20mm steel plate 500mm × 500mm., cope match-plate pattern 6 and lower bolster 2 are separately fixed at the upper/lower terminal of punching and shearing machine, the processed cab apron in oil cylinder top, process rear unlatching oil cylinder and are upwards released by railway spike, and all employing with punching and shearing machine coupling part is flexibly connected to dismantle the processing carrying out other workpiece.

Claims (3)

1. a railway spike processing unit (plant), it is characterized in that: comprise cope match-plate pattern (6) and lower bolster (2), cope match-plate pattern (6) is provided with 3 and is distributed in the circumferentially same and head of a nail staking punch (7) at 120 degree, interval, (2) have a circular groove to lower bolster, be detachable round platform (3) in groove, detachable round platform (3) is connected with lower bolster (2) by bolt (4), detachable round platform (3) is provided with 3 and is distributed in the circumferentially same and head of a nail anvil block (1) at 120 degree, interval, head of a nail anvil block (1) has railway spike rod aperture (5).
2. a kind of railway spike processing unit (plant) according to claim 1, is characterized in that: described head of a nail staking punch (7) diameter is greater than head of a nail anvil block (1) diameter.
3. a kind of railway spike processing unit (plant) according to claim 1 and 2, is characterized in that: described railway spike rod aperture (5) is through hole.
CN201520331081.3U 2015-05-21 2015-05-21 Railway spike processing unit (plant) Expired - Fee Related CN204620952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520331081.3U CN204620952U (en) 2015-05-21 2015-05-21 Railway spike processing unit (plant)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520331081.3U CN204620952U (en) 2015-05-21 2015-05-21 Railway spike processing unit (plant)

Publications (1)

Publication Number Publication Date
CN204620952U true CN204620952U (en) 2015-09-09

Family

ID=54040015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520331081.3U Expired - Fee Related CN204620952U (en) 2015-05-21 2015-05-21 Railway spike processing unit (plant)

Country Status (1)

Country Link
CN (1) CN204620952U (en)

Similar Documents

Publication Publication Date Title
CN104209702B (en) Abnormity nut cold-heading device and production technology thereof
CN104384427A (en) Method for forming precision forge piece of wind power generation spindle
CN204620952U (en) Railway spike processing unit (plant)
CN101972829A (en) Semi-closed forging device for universal joint and forging method thereof
CN104368670A (en) Stainless steel tube welding tube opening stamping die
CN202591508U (en) Combined die for hot-extrusion upsetting
CN103639219B (en) A kind of once-forming method obtaining high-strength low carbon steel round head rivet
CN104588987A (en) High-low screw work piece manufacturing technique
CN204523943U (en) The quick trimming device of copper joint of pressure gage overlap
CN103272983A (en) Group riveting device for clinch nuts
CN204074898U (en) The practical punch die of portable multifunctional
CN202591497U (en) Gantry-type horizontal hot extrusion hydraulic machine
CN106180531B (en) A kind of half-shaft blank hydraulic press forging system and processing method
CN204523975U (en) A kind of drift of super thick mild steel punch die
CN204934283U (en) A kind of book joint setting machine
CN210160333U (en) Device for multi-directional die forging spraying and cooling die
CN203610943U (en) Tool capable of fast disassembling work roller jaw of straightening machine
CN203817259U (en) Large-diameter special steel circular ring, cylinder or round bar forge piece forging die
CN103302224A (en) Manufacturing process of screw nut
CN202087703U (en) Machining mould module of slotted nut
CN201702242U (en) Double-oil-cylinder numerical control busbar punching machine
CN203526431U (en) Special oil hydraulic forging press for piston rod
CN204094412U (en) Abnormity nut cold-heading device
CN205056095U (en) High pressure roller mill feed gate
CN204276639U (en) Forging deep hole drift

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909