CN204612447U - With the electric arc furnaces of fire door skimming device - Google Patents

With the electric arc furnaces of fire door skimming device Download PDF

Info

Publication number
CN204612447U
CN204612447U CN201520105437.1U CN201520105437U CN204612447U CN 204612447 U CN204612447 U CN 204612447U CN 201520105437 U CN201520105437 U CN 201520105437U CN 204612447 U CN204612447 U CN 204612447U
Authority
CN
China
Prior art keywords
fire door
electric arc
arc furnaces
cell body
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520105437.1U
Other languages
Chinese (zh)
Inventor
王培明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Xingtai Machinery and Mill Roll Co Ltd
Original Assignee
Sinosteel Xingtai Machinery and Mill Roll Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Xingtai Machinery and Mill Roll Co Ltd filed Critical Sinosteel Xingtai Machinery and Mill Roll Co Ltd
Priority to CN201520105437.1U priority Critical patent/CN204612447U/en
Application granted granted Critical
Publication of CN204612447U publication Critical patent/CN204612447U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of electric arc furnaces with fire door skimming device, comprise the three-phase alternating current eccentric-bottom electric arc furnaces be arranged on supporting seat, the slag ladle that electric arc furnaces comprises body of heater, is arranged on the fire door of body of heater side and is arranged on below fire door, the operating platform that fire door arranged outside and body of heater are separated, operating platform arranges slag trap near fire door side, slag trap comprises the notch that become by the Plate Welding rectangle cell body relative with fire door, the both sides of cell body arrange the side shield of vertical direction, filling fire resisting material in cell body; The utility model solves the race slag problem in electric arc furnaces stream slag process, ensures the safety of operating personnel and equipment.

Description

With the electric arc furnaces of fire door skimming device
Technical field
The utility model relates to a kind of electric arc furnaces, specifically a kind of electric arc furnaces with fire door skimming device.
Background technology
Electric arc furnaces is the device of smelting molten steel, reduces harmful element in molten steel during smelting mainly through slag-metal reaction, and the high-temperature slag reacted needs to flow out from fire door, and concentrating in slag car slag ladle, is operating platform outside fire door.
Because in molten bath, the extent of reaction is unbalanced, the intensity that slag springs up out fire door is different with stream slag angle, causes part slag to be flushed on operating platform, operating platform can be caused for a long time in the past to ftracture, jeopardize the personal security of use equipment; Simultaneously because slag body in stream slag process is arc line shaped flowing, and the continuing surface that slag is filled with is little, slag ladle cannot catch whole slag, front pit is caused to run slag, high-temperature slag easily burns slag car wire, and also easily burn the slag car motor time slag that overflows is serious, the slag car cannot overflow the track travel of slag, need waste to clear up for a long time, have a strong impact on production; The slag of repeat runs simultaneously causes slag car track to loosen, and increases the difficulty safeguarded.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of electric arc furnaces with fire door skimming device, solves the race slag problem in electric arc furnaces stream slag process, ensures the safety of operating personnel and equipment.
For solving the problems of the technologies described above, technical solution adopted in the utility model is:
With the electric arc furnaces of fire door skimming device, comprise the three-phase alternating current eccentric-bottom electric arc furnaces be arranged on supporting seat, the slag ladle that described electric arc furnaces comprises body of heater, is arranged on the fire door of body of heater side and is arranged on below fire door, the operating platform that described fire door arranged outside and body of heater are separated, described operating platform arranges slag trap near fire door side, described slag trap comprises the notch that become by the Plate Welding rectangle cell body relative with fire door, the both sides of described cell body arrange the side shield of vertical direction, filling fire resisting material in described cell body.
Further improvement of the utility model is: the refractory material of filling in described cell body is high-temperature cement or graphite electrode.
Further improvement of the utility model is: the cell body bottom surface of described slag trap is spill cambered surface, and the surface of described refractory material is the spill cambered surface corresponding with cell body bottom surface.
Further improvement of the utility model is: the length of described slag trap is 1800mm ~ 2200mm, and thickness is 200mm ~ 300mm, is highly 1800mm ~ 2200mm.
Further improvement of the utility model is: the upper end of described cell body arranges hanger, and the upper end, the back side of described cell body vertically arranges connection gripper shoe on the operational platform.
Further improvement of the utility model is: the both sides hinged brace with bolt hole respectively of described gripper shoe; Described brace is bolted on the operational platform.
Owing to adopting technique scheme, the beneficial effect that the utility model produces is:
Electric arc furnaces with fire door skimming device of the present utility model, by increasing slag trap on the operational platform, slag is allowed directly to be flushed on slag trap, change the flow direction of the slag gushed out from fire door, it is made to flow in slag ladle along slag trap, effectively avoid running slag accident, effectively reduce hot downtime.
Two side shields of the present utility model are separately positioned on the both sides of cell body, slag effectively can be stoped to both sides splash, improve the security of work.Cell body floor design is spill cambered surface, can reduce the splash of slag to both sides.The inner filling fire resisting material of slag trap cell body, refractory material can improve high temperature resistant, the shock-resistant ability of cell body, extends the service life of cell body; The graphite electrode that refractory material can select high-temperature cement or arrangement to place.The heat resistance of high-temperature cement is good, and service life is about average 30 stoves, again fills after high-temperature cement peels off completely, can continue to use.Graphite electrode is extruded by high-temperature calcination and forms good heat resistance, high temperature resistantly reaches more than 2000 degree, and be the conductor of electric arc furnaces electric discharge molten steel iron charge, erosion resistibility is fine, and antiscour heat, more than 1500 times, obtains good effect.
Cell body of the present utility model arranges hanger, old at cell body, damage time, utilize hanger to change very easily, decrease replacing construction, increase work efficiency.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is slag trap structural representation of the present utility model;
In the accompanying drawings: 1, supporting seat, 2, electric arc furnaces, 2-1, body of heater, 2-2, fire door, 3, slag ladle, 4, operating platform, 5, slag trap, 5-1, cell body, 5-2, side shield, 5-3, hanger, 5-4, gripper shoe, 5-4-1, brace.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further details:
With the electric arc furnaces of fire door skimming device, comprise the three-phase alternating current eccentric-bottom electric arc furnaces 2 be arranged on supporting seat 1, electric arc furnaces 2 comprises body of heater 2-1 and fire door 2-2, fire door 2-2 is arranged on the side of body of heater 2-1, the below of fire door 2-2 arranges slag ladle 3, the operating platform 4 that the arranged outside of fire door 2-2 and body of heater 2-1 are separated, operating platform 4 arranges slag trap 5 near fire door 2-2 side.By increasing slag trap 5 on operating platform 4, allowing slag directly be flushed on slag trap 5, changing the flow direction of the slag gushed out from fire door 2-2, make it flow in slag ladle 3 along slag trap 5, effectively avoid running slag accident, effectively reduce hot downtime.
Slag trap 5 comprises cell body 5-1, side shield 5-2, the upper end of cell body 5-1 arranges hanger 5-3, cell body 5-1 is become by Plate Welding, notch and the fire door 2-2 of cell body 5-1 are oppositely arranged, side shield 5-2 is arranged on the both sides of cell body 5-1, slag effectively can be stoped to both sides splash, improve the security of work.Hanger 5-3 is arranged in the middle of the upper end of cell body 5-1, old at cell body 5-1, damage time, utilize hanger 5-3 to change very easily, decrease replacing construction, increase work efficiency.Cell body 5-1 is connected on operating platform 4 by the vertically disposed gripper shoe 5-4 in upper end, the back side.The both sides hinged brace 5-4-1 with bolt hole respectively of gripper shoe 5-4; Brace 5-4-1 is bolted on operating platform 4, and bolt is connected firmly, easy accessibility, saves the working time.
The length of slag trap 5 is 1800mm ~ 2200mm, and width is 200mm ~ 300mm, is highly 1800mm ~ 2200mm.The bottom surface of cell body 5-1 is spill cambered surface, reduces the splash of slag to slag trap 5 both sides.
Arrange refractory material in cell body 5-1, refractory material can improve high temperature resistant, the shock-resistant ability of cell body 5-1, extends the service life of cell body 5-1; The graphite electrode that refractory material can select high-temperature cement or arrangement to place.The heat resistance of high-temperature cement is good, and service life is about average 30 stoves, again fills after high-temperature cement peels off completely, can continue to use.Graphite electrode is extruded by high-temperature calcination and forms good heat resistance, high temperature resistantly reaches more than 2000 degree, and be the conductor of electric arc furnaces electric discharge molten steel iron charge, erosion resistibility is fine, and antiscour heat, more than 1500 times, obtains good effect.

Claims (6)

1. with the electric arc furnaces of fire door skimming device, comprise the three-phase alternating current eccentric-bottom electric arc furnaces (2) be arranged on supporting seat (1), described electric arc furnaces (2) comprises body of heater (2-1), be arranged on the fire door (2-2) of body of heater (2-1) side and be arranged on the slag ladle (3) of fire door (2-2) below, the operating platform (4) that described fire door (2-2) arranged outside and body of heater (2-1) are separated, it is characterized in that: described operating platform (4) is upper arranges slag trap (5) near fire door (2-2) side, described slag trap (5) comprises the notch that become by the Plate Welding rectangle cell body (5-1) relative with fire door (2-2), the both sides of described cell body (5-1) arrange the side shield (5-2) of vertical direction, described cell body (5-1) interior filling fire resisting material.
2. the electric arc furnaces with fire door skimming device according to claim 1, is characterized in that: the refractory material of filling in described cell body (5-1) is high-temperature cement or graphite electrode.
3. the electric arc furnaces with fire door skimming device according to claim 2, is characterized in that: cell body (5-1) bottom surface of described slag trap (5) is spill cambered surface, and the surface of described refractory material is the spill cambered surface corresponding with cell body (5-1) bottom surface.
4. the electric arc furnaces with fire door skimming device according to claim 1, is characterized in that: the length of described slag trap (5) is 1800mm ~ 2200mm, and thickness is 200mm ~ 300mm, is highly 1800mm ~ 2200mm.
5. the electric arc furnaces with fire door skimming device according to any one of claim 1 ~ 4, it is characterized in that: the upper end of described cell body (5-1) arranges hanger (5-3), the upper end, the back side of described cell body (5-1) vertically arranges the gripper shoe (5-4) be connected on operating platform (4).
6. the electric arc furnaces with fire door skimming device according to claim 5, is characterized in that: the both sides hinged brace with bolt hole (5-4-1) respectively of described gripper shoe (5-4); Described brace (5-4-1) is bolted on operating platform (4).
CN201520105437.1U 2015-02-13 2015-02-13 With the electric arc furnaces of fire door skimming device Active CN204612447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520105437.1U CN204612447U (en) 2015-02-13 2015-02-13 With the electric arc furnaces of fire door skimming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520105437.1U CN204612447U (en) 2015-02-13 2015-02-13 With the electric arc furnaces of fire door skimming device

Publications (1)

Publication Number Publication Date
CN204612447U true CN204612447U (en) 2015-09-02

Family

ID=53965001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520105437.1U Active CN204612447U (en) 2015-02-13 2015-02-13 With the electric arc furnaces of fire door skimming device

Country Status (1)

Country Link
CN (1) CN204612447U (en)

Similar Documents

Publication Publication Date Title
CN107699711B (en) Copper smelting method
CN104818497B (en) Electrolytic aluminum cathode carbon block preheating device and application method thereof
CN204612447U (en) With the electric arc furnaces of fire door skimming device
JP2781582B2 (en) Electrolyzer for metal refining
CN209820164U (en) High-speed cooling device for smelting of vacuum consumable electrode furnace
CN204421635U (en) A kind of Novel Titanium slag hearth
RU2532584C1 (en) Method for complex treatment of liquid metal in ladle-furnace unit
CN104357673A (en) Method for remelting and smelting metal electro slag
RU2722605C1 (en) Electrolysis unit for aluminum production
CN109883206B (en) High-speed cooling device for smelting of vacuum consumable furnace
EP0837145A1 (en) Device to support and swing the heart in an electric furnace
CN207143348U (en) A kind of high-efficiency and energy-saving type prebaked cell for aluminum-reduction
CN207365686U (en) A kind of single electrode direct current zinc metallurgy electric arc furnaces
RU126810U1 (en) DC ELECTRIC ARC FURNACE
CN203068965U (en) Integrated on-line degassing concentrated aluminum melting furnace
CN205641998U (en) Compound perpendicular water jacket of flash converting furnace
CN210718679U (en) Bottom ring for ferro-silicon-iron-ore heating furnace electrode holding system for coal source power generation with high power concentration and heat efficiency
JP2013024526A (en) Water-cooled h type steel
CN210036226U (en) Novel furnace body device of horizontal continuous charging electric arc furnace
RU2410444C1 (en) Dc arc steel furnace
RU2572949C2 (en) Dc arc furnace
CN218120647U (en) Rotary anode furnace fire door water cooling device
CN103122399B (en) Slag removal device for outlet of molten iron runner of iron making blast furnace
CN105755193A (en) Blast-furnace throat steel brick structure and construction method
CN202511613U (en) Single-stage arc melting furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant