CN204608835U - Urban road manhole precast concrete pit shaft - Google Patents
Urban road manhole precast concrete pit shaft Download PDFInfo
- Publication number
- CN204608835U CN204608835U CN201520302552.8U CN201520302552U CN204608835U CN 204608835 U CN204608835 U CN 204608835U CN 201520302552 U CN201520302552 U CN 201520302552U CN 204608835 U CN204608835 U CN 204608835U
- Authority
- CN
- China
- Prior art keywords
- cylindrical shell
- pit shaft
- urban road
- manhole
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to a kind of urban road manhole precast concrete pit shaft, comprise cylindrical shell, described cylindrical shell is the cavity cylinder that upper and lower side is uncovered, be prefabricated with the reinforcing rib distributed axisymmetricly in cylindrical shell, described reinforcing rib upper end exposure, in cylindrical shell upper port, is prefabricated with seat ring in cylindrical shell lower port side, cylindrical shell on the downside of seat ring is inserting section, cylindrical shell upper port outer stretches out formation manhole cover base, and well lid is connected with manhole cover base by fast setting cement, described cylinder body outer wall offers tension groove.Owing to implementing technique scheme, the utility model is simple, quick at construction urban road in-site installation.The raising of prefabricated pit shaft concrete strength can solve the slump of manhole well head, damaged shortcoming, reaches the object be open to traffic in advance of urban road duration.The fixing safety that can ensure driving, pedestrian of walling crib.
Description
Technical field
The utility model relates to a kind of pit shaft that is quick, reliable in quality of constructing, and particularly relates to the precast concrete pit shaft used in a kind of urban road manhole construction operation.
Background technology
At present, along with the development of urban road construction, urban road underground utilities are more, existing serious at the breakage of manhole well head, sinking, walling crib, well lid Loss, more for driving, pedestrains safety hidden danger.Thus make manhole construction quality more and more important in urban road construction.Once cannot complete at urban road construction process check well, well room, pit shaft, walling crib, well lid, must carry out with road construction simultaneously.In prior art, adopt building block or cast-in-place pit shaft cannot be open to traffic fast with urban road again and merge mutually, be just open to traffic when concrete strength does not reach, cause the early stage very cracky of concrete, durability is low, causes walling crib, well lid comes off loss.
Summary of the invention
It is higher that the purpose of this utility model is to propose a kind of work efficiency, can directly install and use, the urban road manhole precast concrete pit shaft that intensity is high.
The purpose of this utility model is achieved in that urban road manhole precast concrete pit shaft, comprise cylindrical shell, described cylindrical shell is the cavity cylinder that upper and lower side is uncovered, the reinforcing rib distributed axisymmetricly is prefabricated with in cylindrical shell, described reinforcing rib upper end exposure is in cylindrical shell upper port, seat ring is prefabricated with in cylindrical shell lower port side, cylindrical shell on the downside of seat ring is inserting section, cylindrical shell upper port outer stretches out formation manhole cover base, well lid is connected with manhole cover base by fast setting cement, described cylinder body outer wall offers tension groove.
Owing to implementing technique scheme, the utility model is simple, quick at construction urban road in-site installation.The raising of prefabricated pit shaft concrete strength can solve the slump of manhole well head, damaged shortcoming, reaches the object be open to traffic in advance of urban road duration.The fixing safety that can ensure driving, pedestrian of walling crib.
Accompanying drawing illustrates: concrete structure of the present utility model is provided by following drawings and Examples:
Fig. 1 is urban road manhole precast concrete shaft structure schematic diagram.
Legend: 1. manhole cover base, 2. cylindrical shell, 3. reinforcing rib, 4. tension groove, 5. seat ring, 6. well room.
Detailed description of the invention:
The utility model by the restriction of following embodiment, can not determine concrete embodiment according to the technical solution of the utility model and actual conditions.
Embodiment
:as shown in Figure 1, urban road manhole precast concrete pit shaft comprises cylindrical shell 2, described cylindrical shell 2 is the cavity cylinder that upper and lower side is uncovered, the reinforcing rib 3 distributed axisymmetricly is prefabricated with in cylindrical shell 2, described reinforcing rib 3 upper end exposure, in cylindrical shell 2 upper port, is prefabricated with seat ring 5 in cylindrical shell 2 lower port side, and the cylindrical shell 2 on the downside of seat ring 5 is inserting section, cylindrical shell 2 upper port outer stretches out and forms manhole cover base 1, and well lid is connected with manhole cover base 1 by fast setting cement.Described cylindrical shell 2 outer wall offers tension groove 4, and when installing pit shaft, after around backfill pit shaft, tension groove 4 can be combined closely with backfilling material, pit shaft 2 and backfilling material is connected as a single entity, strengthens its compressive strength.
Described manhole cover base 1 inner port horn mouth, described manhole cover base 1 upper surface evenly offers striped, is conducive to being combined with fast setting cement.
Described tension groove 4 is coherent thread groove.
Described cylindrical shell 2 outer wall offers tension groove 4 along its circumference equi-spaced apart, and described tension groove 4 is closed annular.
During use, first excavate cement stabilizing layer, reach the condition possessing and install pit shaft, and clean out pit shaft 2 contact surface.The height of pit shaft 2 be well seat connect pit shaft bellmouth bottom to the height on design road surface, then deduct the thickness of walling crib.Pit shaft 2 is installed and is kept vertical.Pit shaft 2 and well lid adopt fast setting cement to be connected.Install pit shaft, around backfill pit shaft 2, backfilling material adopts 5% cement stabilized soil.Compacting adopts the compacting of vibration tamping machine, and degree of compaction reaches 95%.Carry out the work of road asphalt concrete speading, abolish cutting optimal and middle surface layer bituminous concrete and walling crib and well lid are installed.Walling crib and reinforcing rib 3 grafting, after grafting, reinforcing rib 3 still exposure, in walling crib upper end, then pounds curved reinforcing rib 3, makes walling crib and pit shaft 2 compact siro spinning technology.Pave upper layer bituminous concrete, the strict planeness controlling road surface and manhole.
Above technical characteristic constitutes most preferred embodiment of the present utility model, and it has stronger compliance and best implementation result, can increase and decrease inessential technical characteristic according to actual needs, meet the needs of different situations.
Claims (5)
1. a urban road manhole precast concrete pit shaft, comprise cylindrical shell, described cylindrical shell is the cavity cylinder that upper and lower side is uncovered, it is characterized in that: be prefabricated with the reinforcing rib distributed axisymmetricly in cylindrical shell, described reinforcing rib upper end exposure, in cylindrical shell upper port, is prefabricated with seat ring in cylindrical shell lower port side, cylindrical shell on the downside of seat ring is inserting section, cylindrical shell upper port outer stretches out formation manhole cover base, and well lid is connected with manhole cover base by fast setting cement, described cylinder body outer wall offers tension groove.
2. urban road manhole precast concrete pit shaft as claimed in claim 1, is characterized in that: described manhole cover base inner port is horn mouth.
3. urban road manhole precast concrete pit shaft as claimed in claim 1, is characterized in that: described manhole cover base upper surface evenly offers striped.
4. urban road manhole precast concrete pit shaft as claimed in claim 1, is characterized in that: described tension groove is coherent helix groove.
5. urban road manhole precast concrete pit shaft as claimed in claim 1, is characterized in that: described cylinder body outer wall offers tension groove along its circumference equi-spaced apart, and described tension groove is closed cannelure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520302552.8U CN204608835U (en) | 2015-05-12 | 2015-05-12 | Urban road manhole precast concrete pit shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520302552.8U CN204608835U (en) | 2015-05-12 | 2015-05-12 | Urban road manhole precast concrete pit shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204608835U true CN204608835U (en) | 2015-09-02 |
Family
ID=53961396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520302552.8U Active CN204608835U (en) | 2015-05-12 | 2015-05-12 | Urban road manhole precast concrete pit shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204608835U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759793A (en) * | 2016-12-30 | 2017-05-31 | 武汉兴天宇环境股份有限公司 | A kind of adjustable road surface sewage inspection well new device |
CN113914369A (en) * | 2021-10-08 | 2022-01-11 | 重庆永悦汇管廊科技有限公司 | Concrete inspection well |
-
2015
- 2015-05-12 CN CN201520302552.8U patent/CN204608835U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759793A (en) * | 2016-12-30 | 2017-05-31 | 武汉兴天宇环境股份有限公司 | A kind of adjustable road surface sewage inspection well new device |
CN113914369A (en) * | 2021-10-08 | 2022-01-11 | 重庆永悦汇管廊科技有限公司 | Concrete inspection well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806470B (en) | Mounting method produced by steel concrete manhole | |
CN110318393B (en) | Construction method of composite pile | |
CN204901197U (en) | Drainage pipe that diameter is 300 -600mm is with local slip casting prosthetic devices | |
CN104404983B (en) | A kind of ride well device and construction method thereof for jacking construction | |
CN104831752B (en) | Prefabricated inspection well and construction method thereof | |
CN203729424U (en) | Modified horseback-riding inspection well for top pipe construction | |
CN103993598A (en) | Crashed stone grouting pile with lead holes implanted in cloth bag and construction method | |
CN204608835U (en) | Urban road manhole precast concrete pit shaft | |
CN105002976A (en) | Prefabricated gutter inlet and construction method thereof | |
CN204185845U (en) | A kind of water-proof pile board wall supporting and protection structure | |
CN206956783U (en) | A kind of assembling type device for detecting manhole | |
CN203569575U (en) | Plastic blind ditch pipe sandless precipitation well | |
CN211395755U (en) | Prefabricated square inspection shaft | |
CN210163943U (en) | Reinforcing and upgrading structure for inspection well of white-to-black municipal administration road | |
CN208167805U (en) | A kind of prefabricated assembling type reinforced concrete inspection shaft | |
CN101250874B (en) | Cast-in-situ large diameter pipe pile valve pile shoe as well as use method | |
CN110055845A (en) | A kind of construction method that highway bridge and culvert two sides are soft soil roadbed | |
CN112726784B (en) | Full-prefabricated PC sewer inspection well component assembly structure and construction method | |
CN211312560U (en) | Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures | |
CN208857813U (en) | Ram vibration base expanding and base expanding post jacking hollow preformed pile | |
CN207469308U (en) | A kind of prefabricated assembled inspection shaft of circle | |
CN204530683U (en) | A kind of pile making device ramming expansion CFG stake for spiral pore-forming | |
CN108086322B (en) | Mud skin removing device and method for improving bearing capacity of cast-in-place pile by using same | |
CN112854409A (en) | Road rainwater well lifting device and lifting construction method | |
CN202023201U (en) | Top-down construction ultra-deep large-tonnage tower crane foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 830016, No. 456, Fu Chang Road, Urumqi Chang Road, the Xinjiang Uygur Autonomous Region, Urumqi Patentee after: XINJIANG COMMUNICATIONS CONSTRUCTION GROUP CO., LTD. Address before: 830016, No. 456, Fu Chang Road, Urumqi Chang Road, the Xinjiang Uygur Autonomous Region, Urumqi Patentee before: Xinjiang traffic construction (Group) Co., Ltd. |