CN204608753U - A kind of combined steel plate pile - Google Patents

A kind of combined steel plate pile Download PDF

Info

Publication number
CN204608753U
CN204608753U CN201520258967.XU CN201520258967U CN204608753U CN 204608753 U CN204608753 U CN 204608753U CN 201520258967 U CN201520258967 U CN 201520258967U CN 204608753 U CN204608753 U CN 204608753U
Authority
CN
China
Prior art keywords
steel plate
pile
profile
stake
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520258967.XU
Other languages
Chinese (zh)
Inventor
殷雄
张红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shuntong Construction Group Co ltd
ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO LTD
Original Assignee
JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd
ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd, ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING Co Ltd filed Critical JIANGSU SHUNTONG CONSTRUCTION GROUP CO Ltd
Priority to CN201520258967.XU priority Critical patent/CN204608753U/en
Application granted granted Critical
Publication of CN204608753U publication Critical patent/CN204608753U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The purpose of this utility model is to provide a kind of combined steel plate pile, may be used for construction water-stop curtain supporting etc.A kind of combined steel plate pile, comprise H profile steel plate and U-shaped steel plate, the wing plate of H profile steel plate has circular tube structure, and U-shaped steel plate has round steel structure, and the buckle structure that H profile steel plate is formed by pipe and round steel with U-shaped steel plate is connected, and the spacing of pipe and round steel is 6 ~ 8mm.This combined steel plate pile is reasonable in design, and bending rigidity is large, and flexibly, frictional resistance is little, at utmost can avoid " with stake " phenomenon in installation and removal.

Description

A kind of combined steel plate pile
Technical field
The utility model relates to building field, is specifically related to a kind of combined steel plate pile, may be used for construction water-stop curtain supporting etc.
Background technology
Steel sheet pile, as traditional soil-baffling structure, has quick construction, safety, environmental protection, the advantage such as attractive in appearance, very extensive in sector applications such as traffic, water conservancy, municipal administrations.Conventional steel sheet pile model comprises U-shaped (as AU, PU series), Z-type (as AZ series) etc.But single steel sheet pile cross section composite bending modulus is relatively little, along with the increase of gear soil height, single steel sheet pile just can not meet the requirement of Strength and Dformation.In order to address this problem, there is now multiple combination steel sheet pile (as CAZ, HZ, CAU, CU series etc.) to increase the cross section bending rigidity of steel sheet pile.Different combined steel plate piles is applicable to different construction soil properties.In order to adapt to different construction soil properties, develop different combined steel plate piles significant.
" with stake " phenomenon allows a problem of constructor's headache when being construction supporting engineering." with stake " refers in combined steel plate pile work progress, the phenomenon that the main steel plate stake of formerly constructing can be sunk together along with the auxiliary steel sheet pile in rear construction." with stake " has relation with construction soil layer on the one hand, is not subject to corresponding resistance, does not have to enter bearing stratum bottom main steel plate stake; Relevant with the design of combined steel plate pile on the other hand, the frictional resistance of main steel plate stake and auxiliary steel sheet pile is excessive, and auxiliary steel sheet pile drives main steel plate stake to sink together.
Summary of the invention
The purpose of this utility model is to provide a kind of combined steel plate pile, and bending rigidity is large, and flexibly, frictional resistance is little, at utmost can avoid " with stake " phenomenon in installation and removal.
Above-mentioned purpose is achieved by the following technical solution:
A kind of combined steel plate pile, comprise H profile steel plate and U-shaped steel plate, the wing plate of H profile steel plate has circular tube structure, and U-shaped steel plate has round steel structure, and the buckle structure that H profile steel plate is formed by pipe and round steel with U-shaped steel plate is connected; The spacing d of pipe and round steel is 6 ~ 8mm.
Preferably, the spacing d of pipe and round steel is 7.5mm.This spacing d at utmost can avoid " with stake " phenomenon.
Preferably, adjacent H profile steel distance between plates is 1.6m.Under the combination of this spacing, combined steel plate wall bending rigidity is large.
The utility model has following beneficial effect:
1, add the cross section bending rigidity of steel sheet pile, the requirement of Strength and Dformation can be met, be beneficial to percolation-proof, leakproof soil;
2, bayonet type connects flexible, is easy to installation and removal, can Reusability, and utilization rate is high, reduces construction costs;
3, buckle structure is reasonable in design, and the spacing of pipe and round steel is suitable, at utmost can reduce the frictional resistance between the main steel plate stake of H type and U-shaped auxiliary steel sheet pile, at utmost avoids " with stake " phenomenon.
Accompanying drawing explanation
Fig. 1: combined steel plate forming pile generalized section;
Fig. 2: buckle structure schematic diagram.
1, H profile steel plate, 2, U-shaped steel plate, 3, wing plate, 4, buckle structure, 5, pipe, 6, round steel, d is spacing.
Detailed description of the invention
Below in conjunction with accompanying drawing illustratively the utility model.
Combined steel plate pile as shown in Figure 1, comprises H profile steel plate 1 and U-shaped steel plate 2, and the wing plate 3 of H profile steel plate 1 has pipe 5 structure, and U-shaped steel plate 2 has round steel 6 structure, and the buckle structure 4 that H profile steel plate 1 is formed by pipe 5 and round steel 6 with U-shaped steel plate 2 is connected.
As shown in Figure 2, the spacing d of pipe 5 and round steel 6 is 6 ~ 8mm to buckle structure.
The specific design combined steel plate pile of 7 kinds of different spacing d, spacing d is respectively 5mm, 6mm, 6.5mm, 7mm, 7.5mm, 8mm, 9mm.Often kind of combined steel plate pile H profile steel plate 20, U-shaped steel plate 19.To construct in identical soft soil layer water-stop curtain supporting with above-mentioned 7 kinds of combined steel plate piles respectively, investigate " with stake " phenomenon, operating procedure is as follows:
(1) levelling of the land: make place as far as possible smooth, to improve the efficiency of adjustment leading truck, ensures that there are enough intensity carrying leading truck deadweights in place simultaneously.
(2) install leading truck: lay leading truck, leading truck, when laying, utilizes level(l)ing device to make leading truck ensure planar horizontal, vertical up and down, error should be less than 5mm, and instrument or plumb bob can be utilized to carry out controlling (diagonal angle, two ends hanging wire is hammered into shape, can control up and down and level).
(3) H profile steel sheet pile is installed: first sling by H profile steel plate by the upper and lower two-layer H profile steel plate pilot hole of leading truck, do not bury, the location that means for adjusting limit of movement carries out H profile steel plate is utilized before burying, movable sheave in all means for adjusting limit of movements is all tightened up and withstands H profile steel plate, after bilevel pulley all tightens up and puts in place, slightly unclamp movable sheave, make to keep in touch face just between pulley and H profile steel plate, lifting machine hung H profile steel plate will keep stable as far as possible period, rocking of first mate can not be had, when everything in readiness, start lower H profile steel plate, first by H profile steel plate deadweight pile sinking, when continuing to sink, vibrating hammer is utilized to clamp H profile steel plate top vibration-sunk, in vibration-sunk process, the subsidence velocity of H profile steel plate can not be too fast, about about 2 ~ 3m per minute should be remained on, under vibration in heavy process, the change of movable pulley will be noted the moment, movable pulley face should be kept in the moment to touch H profile steel plate, keep rotating.When H profile steel panel vibration is to leading truck upper strata 0.6 ~ 0.8m, stops vibration, start the construction of next H type stake.The verticality of H profile steel plate strictly will be controlled when H profile steel sheet pile is installed.
(4) U-shaped steel sheet pile is installed: after the construction of H profile steel plate, start U-shaped steel sheet pile of constructing.Before construction, the round steel of U-shaped steel plate both sides should cut into an oblique angle, and coats butter, the frictional force of minimizing and round steel and pipe.During contraposition, if when U-shaped steel plate is greater than or less than H profile steel sheet pile spacing, can knocking with the iron hammer of 12P, making U-shaped steel plate to entering in H profile steel plate pipe.After U-shaped steel plate both sides round steel all enters H profile steel plate pipe, the gravity of self should be leaned on to do free pile sinking, period loop wheel machine and commander should note coordinate, moment adjustment loop wheel machine direction, allows U-shaped steel plate can freely smoothly by the upper and lower two-layer U-shaped steel plate pilot hole of leading truck, and a part of burying, when after burying no longer pile sinking time, start vibration-sunk, vibration processes can not be fast, keeps about 2 ~ 3m per minute.
Observe the different combined steel plate pile of 7 kinds of spacing when installing U-shaped steel sheet pile, whether H profile steel sheet pile can there is " with stake " phenomenon.The criterion of " with stake ": 1. serious: H profile steel sheet pile sinks with identical speed along with the sinking of U shaped steel plate pile; 2. general: H profile steel sheet pile sinks with relatively slow speed along with the sinking of U shaped steel plate pile.When " with stake " phenomenon is serious, construction should be stopped immediately, take measures to eliminate or can continue after slowing down; When " with stake " phenomenon is general, then can continue construction.Combined steel plate pile " with stake " the phenomenon statistics that 7 kinds of spacing are different is shown in form 1.
7 kinds of combined steel plate pile " with stake " phenomenon statistics that table 1 spacing is different
As can be seen from Table 1, when 6 ~ 8mm, all there is not serious " with stake " phenomenon in the spacing d between pipe and round steel, and especially when spacing d is 7.5mm, construction is the most smooth, and " with stake " phenomenon does not occur; Serious " with stake " phenomenon is all there occurs when spacing d is 5mm or 9mm.Comparing result shows, spacing d is excessive or too small serious " with stake " phenomenon all easily occurs.Because the frictional resistance between round steel and pipe enlarges markedly when spacing is too small, may be because pipe can not well assist leading truck to fix round steel when spacing is excessive, cause U-shaped steel plate generation deflection, the frictional resistance after deflection between round steel and pipe also obviously increases, and occurs " with stake ".

Claims (3)

1. a combined steel plate pile, comprise H profile steel plate (1) and U-shaped steel plate (2), it is characterized in that: the wing plate (3) of H profile steel plate (1) has pipe (5) structure, U-shaped steel plate (2) has round steel (6) structure, and the buckle structure (4) that H profile steel plate (1) is formed by pipe (5) and round steel (6) with U-shaped steel plate (2) is connected; The spacing d of pipe (5) and round steel (6) is 6 ~ 8mm.
2. combined steel plate pile according to claim 1, is characterized in that: the spacing d of described pipe (5) and round steel (6) is 7.5mm.
3. combined steel plate pile according to claim 1 and 2, is characterized in that: adjacent H profile steel plate (1) spacing is 1.6m.
CN201520258967.XU 2015-04-27 2015-04-27 A kind of combined steel plate pile Expired - Fee Related CN204608753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520258967.XU CN204608753U (en) 2015-04-27 2015-04-27 A kind of combined steel plate pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520258967.XU CN204608753U (en) 2015-04-27 2015-04-27 A kind of combined steel plate pile

Publications (1)

Publication Number Publication Date
CN204608753U true CN204608753U (en) 2015-09-02

Family

ID=53961314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520258967.XU Expired - Fee Related CN204608753U (en) 2015-04-27 2015-04-27 A kind of combined steel plate pile

Country Status (1)

Country Link
CN (1) CN204608753U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023017A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 UH goes along with sb. to guard him water sealing structure and its construction method
CN107023018A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 Can be recycled, built-up type all-steel foundation pit enclosure support system and its construction method
CN107326896A (en) * 2017-08-29 2017-11-07 南京市测绘勘察研究院股份有限公司 One kind combination steel construction support pile and construction method
CN108166479A (en) * 2017-12-22 2018-06-15 中国建筑股份有限公司 Combined steel sheet pile building enclosure and its construction method
CN111501775A (en) * 2020-04-14 2020-08-07 中国一冶集团有限公司 Comprehensive system and method for supporting mucky soil layer deep foundation pit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023017A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 UH goes along with sb. to guard him water sealing structure and its construction method
CN107023018A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 Can be recycled, built-up type all-steel foundation pit enclosure support system and its construction method
CN107326896A (en) * 2017-08-29 2017-11-07 南京市测绘勘察研究院股份有限公司 One kind combination steel construction support pile and construction method
CN108166479A (en) * 2017-12-22 2018-06-15 中国建筑股份有限公司 Combined steel sheet pile building enclosure and its construction method
CN108166479B (en) * 2017-12-22 2023-08-01 中国建筑股份有限公司 Combined steel sheet pile enclosure structure and construction method thereof
CN111501775A (en) * 2020-04-14 2020-08-07 中国一冶集团有限公司 Comprehensive system and method for supporting mucky soil layer deep foundation pit

Similar Documents

Publication Publication Date Title
CN204608753U (en) A kind of combined steel plate pile
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN107059906A (en) A kind of method that utilization underground shaft robot applies major diameter open caisson
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN104032743B (en) Steel pile casting under deep water, torrent and inclined rock base condition transfers inserted to play method
CN102660951B (en) Piling locating guide frame for integrally finishing construction of H-sections and steel sheet piles
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN101503879A (en) Pre-control method for preventing inclination of sinking well
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN103321212A (en) One-column-one-pile post inserting method construction process
CN102561387A (en) Reverse construction method of underground core-tube diaphragm wall
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN204715364U (en) A kind of foundation pit support device
CN208201658U (en) A kind of steel trestle rapid construction device
CN201232180Y (en) Novel sheet-pile wall
CN205742151U (en) A kind of continuous underground wall structure of adverse construction method
CN205688448U (en) A kind of foundation pit support device utilizing karst fragmented rock body to reinforce bearing
CN209323529U (en) A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN106120802A (en) It is close to the most wired large-span continuous beam deep water foundation excavation method under water
CN202718104U (en) Squeezing-expanding support plate steel pipe filling pile
CN207176687U (en) A kind of cut-pff wall built-in slip casting pipe positioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215300 No. 1158 Xiao Li Road, Kunshan, Jiangsu, Suzhou

Co-patentee after: JIANGSU SHUNTONG CONSTRUCTION GROUP Co.,Ltd.

Patentee after: Zhenhua Group (Kunshan) Construction Engineering Co.,Ltd.

Address before: 215300 No. 1158 Xiao Li Road, Kunshan, Jiangsu, Suzhou

Co-patentee before: JIANGSU SHUNTONG CONSTRUCTION GROUP Co.,Ltd.

Patentee before: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

CF01 Termination of patent right due to non-payment of annual fee