CN204591345U - A kind of water-pumping/draining system for underground chamber collecting well - Google Patents
A kind of water-pumping/draining system for underground chamber collecting well Download PDFInfo
- Publication number
- CN204591345U CN204591345U CN201520129608.4U CN201520129608U CN204591345U CN 204591345 U CN204591345 U CN 204591345U CN 201520129608 U CN201520129608 U CN 201520129608U CN 204591345 U CN204591345 U CN 204591345U
- Authority
- CN
- China
- Prior art keywords
- water
- collecting well
- pumping
- draining
- electrically connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Non-Electrical Variables (AREA)
Abstract
The utility model discloses a kind of water-pumping/draining system for underground chamber collecting well, aim to provide a kind of easy to use, the water-pumping/draining system for underground chamber collecting well that cost is low.It comprises the water pump be installed in collecting well, is arranged at the fluid level controller in collecting well, the time recorder be electrically connected with fluid level controller, and the relay switch be electrically connected with time recorder and alarm buzzer; Described relay switch switches on power and is electrically connected with water pump.The utility model can reduce personnel's input effectively, reduces equipment cost.Its water-pumping/draining precise control, power consumption significantly reduces, and work plane draining is timely, improves the environment of work plane, reduces miscellaneous equipment running cost, reduces carbon emission, improve labor productivity, for green construction provides safeguard.
Description
Technical field
The utility model relates to underground chamber water-pumping/draining equipment technical field, especially relates to a kind of water-pumping/draining system for underground chamber collecting well.
Background technology
In Construction for Hydroelectric Project, particularly in construction schemes of underground structure group, because underground chamber is from many, usually there are tens tunnels, in every bar tunnel, seepage in underground, construction waste water, rainwater etc. are classified in no position and section, the draining general subsection setup branch collecting well of routine, then the water pump drainage of branch collecting well is focused in several center set water station, more concentrated being discharged to after sewage disposal system unification processes recycles or discharges.
Due to the branch collecting well nearly up to a hundred of a large underground hole group, nearly upper ten, center set well, traditional method guards water-pumping/draining specially at each point and center set well arrangement people, a cavity group usually needs the water-pumping/draining personnel of up to a hundred people or more, two classes or three-shift operation, and personnel put with many, water pump is due to the difference of personal management, the problem of anhydrous dry tap is very outstanding, and suction pump loss is large, and cost is very high.
Utility model content
The utility model overcomes shortcoming of the prior art, provides a kind of easy to use, the water-pumping/draining system for underground chamber collecting well that cost is low.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions:
A kind of water-pumping/draining system for underground chamber collecting well, comprise the water pump be installed in collecting well, be arranged at the fluid level controller in collecting well, the time recorder be electrically connected with fluid level controller, and the relay switch be electrically connected with time recorder and alarm buzzer; Described relay switch switches on power and is electrically connected with water pump.
Preferably, described fluid level controller is float-ball type controller.
Compared with prior art, the utility model tool has the following advantages:
The utility model can reduce personnel's input effectively, reduces equipment cost.Its water-pumping/draining precise control, power consumption significantly reduces, and work plane draining is timely, improves the environment of work plane, reduces miscellaneous equipment running cost, reduces carbon emission, improve labor productivity, for green construction provides safeguard.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not paying the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
For the water-pumping/draining system of underground chamber collecting well shown in Fig. 1, comprise the water pump 1 be installed in collecting well 10, be arranged at the fluid level controller 2 in collecting well 10, the time recorder 3 be electrically connected with fluid level controller 2, and the relay switch 4 be electrically connected with time recorder 3 and alarm buzzer 5; Described relay switch 4 switches on power and is electrically connected with water pump 1.
Wherein, described fluid level controller 2 preferably adopts float-ball type controller.
During use, when water level is elevated to the height of setting, electromagnetic relay starts power supply, and water pump is started working, and when water level is reduced to setting height, electromagnetic relay is cut off the electricity supply, and water pump stops water-pumping/draining.Time recorder can record water discharge time, and when the time exceedes setting-up time, alarm buzzer can be reported to the police, and to point out administrative staff to check, avoids the problems such as unexpected water outlet increasing to occur bringing adverse consequences.
The utility model can reduce personnel's input effectively, reduces equipment cost.Its water-pumping/draining precise control, power consumption significantly reduces, and work plane draining is timely, improves the environment of work plane, reduces miscellaneous equipment running cost, reduces carbon emission, improve labor productivity, for green construction provides safeguard.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (2)
1. the water-pumping/draining system for underground chamber collecting well, comprise the water pump be installed in collecting well, it is characterized in that: also comprise the fluid level controller be arranged in collecting well, the time recorder be electrically connected with fluid level controller, and the relay switch be electrically connected with time recorder and alarm buzzer; Described relay switch switches on power and is electrically connected with water pump.
2. according to claim 1 for the water-pumping/draining system of underground chamber collecting well, it is characterized in that: described fluid level controller is float-ball type controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520129608.4U CN204591345U (en) | 2015-03-06 | 2015-03-06 | A kind of water-pumping/draining system for underground chamber collecting well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520129608.4U CN204591345U (en) | 2015-03-06 | 2015-03-06 | A kind of water-pumping/draining system for underground chamber collecting well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204591345U true CN204591345U (en) | 2015-08-26 |
Family
ID=53927510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520129608.4U Expired - Fee Related CN204591345U (en) | 2015-03-06 | 2015-03-06 | A kind of water-pumping/draining system for underground chamber collecting well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204591345U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507327A (en) * | 2015-12-01 | 2016-04-20 | 上海隧道工程有限公司 | Slurry liquid level control system and control method |
CN106640188A (en) * | 2016-12-24 | 2017-05-10 | 中铁十八局集团有限公司 | Method for automatically pumping and draining water in tunnel from inclined shaft |
-
2015
- 2015-03-06 CN CN201520129608.4U patent/CN204591345U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507327A (en) * | 2015-12-01 | 2016-04-20 | 上海隧道工程有限公司 | Slurry liquid level control system and control method |
CN106640188A (en) * | 2016-12-24 | 2017-05-10 | 中铁十八局集团有限公司 | Method for automatically pumping and draining water in tunnel from inclined shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202766981U (en) | Automatic concrete pier spraying and maintaining system | |
CN204591345U (en) | A kind of water-pumping/draining system for underground chamber collecting well | |
CN204163745U (en) | A kind of tunnel props up hole counter-slope drainage system | |
CN104775474A (en) | Control system for lifting and reusing of rainwater | |
CN104429831A (en) | Greening irrigation device | |
CN207436229U (en) | A kind of anti-blocking cistern for hydraulic engineering | |
CN208678547U (en) | Screening system is crossed in a kind of underground goaf | |
CN204898785U (en) | Tower crane sprays water supply system | |
CN209670037U (en) | Cable hand wellhole self-draining arrangement | |
CN204125968U (en) | The anti-water collecting device of a kind of cable shaft | |
CN103121440A (en) | Vehicle tire cleaning system | |
CN218573979U (en) | Spray system for construction site | |
CN204728391U (en) | A kind of rainwater promotes and reuse control system | |
CN106925029B (en) | Cutting fluid concentrated supply and discharge and recovery system | |
CN105064304A (en) | Hydraulic grab bucket for mobile scraper trash-cleaning machine | |
CN105019547A (en) | Novel inspection well lid | |
CN204896358U (en) | Emergent storage device of glass steel sewage | |
CN206110310U (en) | Bury intelligent sewage lifting pump station of formula integration | |
CN204061124U (en) | A kind of alternating-current controller for driven high voltage water pump | |
CN204983113U (en) | Cover for manhole | |
CN204126343U (en) | A kind of channel-section steel rhone platform | |
CN204139198U (en) | Combination assembled mesolow electric fixtures basis | |
CN204059204U (en) | Aqueduct side wall top board Channel Maker via hole protective device | |
CN103394964B (en) | A kind of Digit Control Machine Tool with antirust flusher | |
CN214936960U (en) | Integrated system for dewatering and resource utilization of construction waste slurry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150826 Termination date: 20210306 |