CN204590237U - One day font building iron structure bracing frame - Google Patents

One day font building iron structure bracing frame Download PDF

Info

Publication number
CN204590237U
CN204590237U CN201520238099.9U CN201520238099U CN204590237U CN 204590237 U CN204590237 U CN 204590237U CN 201520238099 U CN201520238099 U CN 201520238099U CN 204590237 U CN204590237 U CN 204590237U
Authority
CN
China
Prior art keywords
bracing frame
base
day font
building iron
iron structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520238099.9U
Other languages
Chinese (zh)
Inventor
方新刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongjia County Li Li Construction Co., Ltd.
Original Assignee
方新刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 方新刚 filed Critical 方新刚
Priority to CN201520238099.9U priority Critical patent/CN204590237U/en
Application granted granted Critical
Publication of CN204590237U publication Critical patent/CN204590237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses one day font building iron structure bracing frame, bracing frame entirety is day font frame construction, comprise base, and the first bracing frame be arranged on base, and the second bracing frame be arranged on the first bracing frame, described base is provided with spud pile, described first bracing frame, position control is respectively equipped with in described second bracing frame and described base, described base and described second bracing frame be arranged in parallel, the right and left between described base and described second bracing frame is provided with support column, the utility model has good antiseptic property and heat insulation, sound insulation, discharge water moistureproof bridge cut-off function, efficiently solve gap and the noise of steel work breathing generation, also add support bearing ability, and improve antidetonation adaptability to changes, absorbent properties, significant effect is played to the scientific of firm structure house, and applied range.

Description

One day font building iron structure bracing frame
Technical field
The utility model relates to one day font building iron structure bracing frame.
Background technology
At present, steel structural integrated house builds quick, efficient, energy-conservation, safety and comfort with it, especially anti-seismic performance is excellent, become the development trend that housing industry is inevitable, but at present steel house also improves the stage in development, traditional steel work be mainly divided into general steel work based on E steel column and E, Z steel column; Anticorrosion based on common rust preventive paint; Another kind is the ultralight steel of thin-walled; Also has a kind of rectangle steel being developed recently and getting up, traditional above-mentioned three kinds on anticorrosion, on the life-span, on in-site installation, use on scientific rationality and also there is many deficiencies, as generous in general steel construction wall, anticorrosion difference, difficult, the cold-heat bridge of expanding with heat and contract with cold are difficult to resolve certainly; Poor, the easy wriggling of the ultralight hardness of steel of thin-walled, complex process; Rectangle steel inwall is short for service life, builds the deficiencies such as limitation is large, anticorrosion difficulty.
Summary of the invention
The technical problems to be solved in the utility model be to provide a kind of there is good antiseptic property and heat insulation, sound insulation, discharge water moistureproof bridge cut-off function, efficiently solve gap and the noise of steel work breathing generation, also add support bearing ability, and improve antidetonation adaptability to changes, absorbent properties, significant effect is played to the scientific of firm structure house, and the day font building iron structure bracing frame of applied range.
For solving the problem, the utility model adopts following technical scheme: one day font building iron structure bracing frame of the present utility model, bracing frame entirety is day font frame construction, comprise base, and the first bracing frame be arranged on base, and the second bracing frame be arranged on the first bracing frame, described base is provided with spud pile, described first bracing frame, position control is respectively equipped with in described second bracing frame and described base, described base and described second bracing frame be arranged in parallel, the right and left between described base and described second bracing frame is provided with support column.
As preferably technical scheme, described spud pile is provided with vibration abatement, and described spud pile is provided with more than one, and described support column is provided with two.
As preferably technical scheme, in described position control, be provided with position adjustments hole.
As preferably technical scheme, described first bracing frame, described second bracing frame and described susceptor surface are equipped with anticorrosive coat.
The beneficial effect of the utility model a kind of day font building iron structure bracing frame is: the gap and the noise that efficiently solve steel work breathing generation, also add support bearing ability, and improve antidetonation adaptability to changes, absorbent properties, significant effect is played to the scientific of firm structure house, and applied range.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is the structural representation of the utility model a kind of day font building iron structure bracing frame.
Detailed description of the invention
As shown in Figure 1, one day font building iron structure bracing frame, bracing frame entirety is day font frame construction, comprise base 1, and the first bracing frame 2 be arranged on base 1, and the second bracing frame 3 be arranged on the first bracing frame 2, described base 1 is provided with spud pile 4, described first bracing frame 2, position control 5 is respectively equipped with in described second bracing frame 3 and described base 1, described base 1 be arranged in parallel with described second bracing frame 3, the right and left between described base 1 and described second bracing frame 3 is provided with support column 8, to increase the support bearing ability of this steel structure bracing frame.
Described spud pile 4 is provided with vibration abatement 6, and described spud pile 4 is provided with more than one, and vibration abatement 6 plays shockproof effect, what steel structure bracing frame was installed is more stable, and in this enforcement example, described spud pile 4 is provided with three, described support column 8 is provided with two, makes support bearing ability larger.
Be provided with position adjustments hole 7 in described position control 5, carry out adjusting position adjustment hole 7 by position control 5, thus reach the height of adjusting support frame and fix.
Described first bracing frame 2, described second bracing frame 3 and seating face of the described end 1 are equipped with anticorrosive coat, and anticorrosive coat plays corrosion-resisting function to supporting frame with steel structure, extend the application life of supporting frame with steel structure.
Further, supporting frame with steel structure refers to the form of structure bearing and transmit load be formed by connecting by connector with steel plate and Re Zha, clod wash or fabricated structural shape.The comprehensive advantages such as steel structure system has from heavy and light, batch production manufacture, quick for installation, short construction period, anti-seismic performance are good, gain quick return in investment, low in the pollution of the environment, compared with reinforced concrete structure, have more the unique advantage of development in " high, large, light " three, in the world, particularly developed countries and regions, steel work obtains rationally, widely applying in building engineering field.
The utility model a kind of day, font building iron structure bracing frame had the following advantages: have good antiseptic property and heat insulation, sound insulation, discharge water moistureproof bridge cut-off function, efficiently solve gap and the noise of steel work breathing generation, also add support bearing ability, and improve antidetonation adaptability to changes, absorbent properties, significant effect is played to the scientific of firm structure house, and applied range.
The above, be only detailed description of the invention of the present utility model, but protection domain of the present utility model is not limited thereto, and any change of expecting without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.

Claims (4)

1. one kind day font building iron structure bracing frame, it is characterized in that: bracing frame entirety is day font frame construction, comprise base, and the first bracing frame be arranged on base, and the second bracing frame be arranged on the first bracing frame, described base is provided with spud pile, position control is respectively equipped with in described first bracing frame, described second bracing frame and described base, described base and described second bracing frame be arranged in parallel, and the right and left between described base and described second bracing frame is provided with support column.
2. according to claim 1 day font building iron structure bracing frame, it is characterized in that: described spud pile is provided with vibration abatement, described spud pile is provided with more than one, and described support column is provided with two.
3. according to claim 1 day font building iron structure bracing frame, is characterized in that: be provided with position adjustments hole in described position control.
4. according to claim 1 day font building iron structure bracing frame, is characterized in that: described first bracing frame, described second bracing frame and described susceptor surface are equipped with anticorrosive coat.
CN201520238099.9U 2015-04-18 2015-04-18 One day font building iron structure bracing frame Expired - Fee Related CN204590237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520238099.9U CN204590237U (en) 2015-04-18 2015-04-18 One day font building iron structure bracing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520238099.9U CN204590237U (en) 2015-04-18 2015-04-18 One day font building iron structure bracing frame

Publications (1)

Publication Number Publication Date
CN204590237U true CN204590237U (en) 2015-08-26

Family

ID=53926403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520238099.9U Expired - Fee Related CN204590237U (en) 2015-04-18 2015-04-18 One day font building iron structure bracing frame

Country Status (1)

Country Link
CN (1) CN204590237U (en)

Similar Documents

Publication Publication Date Title
CN201459992U (en) Skirting board structure for integrated suspended ceiling
CN204590237U (en) One day font building iron structure bracing frame
CN204590243U (en) A kind of I shape building iron structure bracing frame
CN207485029U (en) A kind of pedestal of modularization mobile house
CN203891241U (en) Combined steel structure
CN203080396U (en) H-shaped steel-structure bridge
CN201933622U (en) Deformation joint device of interior wall
CN109750812B (en) Assembled integrated dry wall board system
CN203113511U (en) I-shaped steel structural supporting frame and supporting beam composed of same
CN202248259U (en) C-shaped steel structure supporting frame
CN204199618U (en) Buckle-groove type calcium sulfate net floor
CN203079591U (en) Crane wall-attaching steel-structure switch connection support
CN203307933U (en) Reinforcing connecting part of steel structure
CN203160414U (en) Steel-structured supporting frame in divided rectangle shape and house support thereof
CN204531170U (en) A kind of high stability i shaped steel structure
CN203160413U (en) Steel structured supporting frame shaped like a transverse Chinese character 'ri'
CN204139408U (en) Metal honeycomb plate curtain wall gland-type installs node
CN203129325U (en) V-shaped steel-structure supporting frame
CN219654158U (en) Wallboard hanging structure
CN204235169U (en) A kind of installing plate
CN204225272U (en) A kind of combined type adjustable steel structure assembly
CN203160449U (en) I-shaped anti-vibration steel structure
CN203859392U (en) Cross beam applied to low-voltage power distribution cabinet
CN202343772U (en) Backing plate of stamping die
CN203160416U (en) Combined type steel structure support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Huang Xiudao

Inventor before: Fang Xingang

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160422

Address after: The streets Nancheng Yongjia County of Wenzhou City, Zhejiang province 325100 longxiangjie Road No. 55

Patentee after: Yongjia County Li Li Construction Co., Ltd.

Address before: 311824 Zhejiang city of Shaoxing province Zhuji city town in Pu Jie College Road No. 2

Patentee before: Fang Xingang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20170418