一种高边坡支护结构 Download PDF

Info

Publication number
CN204590048U
CN204590048U CN201520271511.7U CN201520271511U CN204590048U CN 204590048 U CN204590048 U CN 204590048U CN 201520271511 U CN201520271511 U CN 201520271511U CN 204590048 U CN204590048 U CN 204590048U
Authority
CN
China
Prior art keywords
stand column
plane
column pile
advanced stand
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520271511.7U
Other languages
English (en)
Inventor
龙敏健
苗恩新
赵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201520271511.7U priority Critical patent/CN204590048U/zh
Application granted granted Critical
Publication of CN204590048U publication Critical patent/CN204590048U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本实用新型公开了一种高边坡支护结构,包括已开挖后的岩体,该岩体的开挖面为斜面和垂直面交叉显示,在斜面与垂直面之间设有水平面,在斜面上喷射混凝土层,锚杆通过斜面穿入岩体内,在垂直面上均匀布置超前立柱桩,冠梁设在超前立柱桩顶部实现超前立柱桩之间的固定,在超前立柱桩之间的垂直面上均布设有锚索钻孔,格构横跨在超前立柱桩上并与锚索钻孔对应,锚索通过锚索钻孔穿入岩体内并通过格构梁实现预紧张拉,然后在超前立柱桩间设置钢筋网片及喷射混凝土,本实用新型既可以起到控制边坡变形的效果,又可以减少土方开挖量,降低成本,符合国家节能降耗的要求。

Description

一种高边坡支护结构
技术领域
本实用新型涉及一种高边坡支护结构,属于土建技术领域。
背景技术
现有技术中,大部分施工现场都采用格构锚索结构、喷护锚索结构等,这虽然解决边坡施工问题,但存在施工周期长,边坡变形较大,影响周边环境安全等问题。现有技术中,大部分施工现场都采用格构锚索结构、喷护锚索结构等,这虽然解决边坡施工问题,但存在施工周期长,边坡变形较大,影响周边环境安全等问题。
实用新型内容
本实用新型的目的是:针对现有技术的缺陷,提供一种高边坡支护结构,解决高边坡稳定,确保周边环境安全,避免土体变形、坍塌,以克服现有边坡支护技术的不足。
本实用新型的技术方案
一种高边坡支护结构,包括已开挖后的岩体,该岩体的开挖面为斜面和垂直面交叉显示,在斜面与垂直面之间设有水平面,在斜面上喷射混凝土层,锚杆通过斜面穿入岩体内,在垂直面上均匀布置超前立柱桩,冠梁设在超前立柱桩顶部实现超前立柱桩之间的固定,在超前立柱桩之间的垂直面上均布设有锚索钻孔,格构横跨在超前立柱桩上并与锚索钻孔对应,锚索通过锚索钻孔穿入岩体内并通过格构梁实现预紧张拉,然后在超前立柱桩间设置钢筋网片及喷射混凝土。
由于采用了上述技术方案,与现有技术相比,本实用新型既可以起到控制边坡变形的效果,又可以减少土方开挖量,降低成本,符合国家节能降耗的要求。
附图说明
附图1是本实用新型结构立面示意图;
附图2是附图1的A-A剖视图。
具体实施方式
下面结合附图对本实用新型用作进一步的详细说明,但不作为对本实用新型的任何限制。
本实用新型的实施例:一种高边坡支护方法,该方法采用对高边坡进行放坡+喷锚结构工序和超前立柱桩+锚索结构工序交叉施工实现对高边坡的支护,在放坡+喷锚结构工序段和超前立柱桩+锚索结构工序段之间设置缓冲段,该缓冲段与水平线平行,放坡+喷锚结构工序和超前立柱桩+锚索结构工序。。
具体施工步骤为:
一、根据对实际高边坡结构进行分析,将高边坡划分为至少两段;
二、一级高边坡岩体放坡卸载,即对高边坡第一段进行岩体开挖进行放坡,其放坡角度小于实际岩体最大的放坡角度,然后对放坡后岩体进行混泥土喷护,然后进行锚杆施工;
二、在第一段放坡后岩体的底部竖直施工超前立柱桩,超前立柱桩均匀分布在岩体内,冠梁设在超前立柱桩顶部实现超前立柱桩之间的固定,然后对超前立柱桩一侧的待开挖岩体进行分层开挖;
三、对待开挖岩体当前层开挖后,进行锚索钻孔施工,该锚索钻孔位于超前立柱桩之间并穿入钢绞线索,然后进行锚索锚固注浆施工,格构梁横跨在超前立柱桩固定并与锚索钻孔对应,待格构梁达到设计强度,进行锚索预应力张拉施工,达到张拉应力后锚固,然后在超前立柱桩上之间进行钢筋网片绑扎和喷射混凝土施工,重复当前层工序完成超前立柱桩+锚索结构工序。
四、重复步骤二和步骤三的施工工序完后对高坡的支护。
根据上述施工方法所形成的一种高边坡支护结构,如附图所示,包括已开挖后的岩体1,该岩体的开挖面为斜面和垂直面交叉显示,在斜面与垂直面之间设有水平面,在斜面上喷射混凝土层8,锚杆7通过斜面穿入岩体1内,在垂直面上均匀布置超前立柱桩2,冠梁3设在超前立柱桩顶部2实现超前立柱桩2之间的固定,在超前立柱桩2之间的垂直面上均布设有锚索钻孔5,格构梁4横跨在超前立柱桩2上并与锚索钻孔5对应,锚索9通过锚索钻孔5穿入岩体1内并通过格构梁4实现预紧张拉,然后在超前立柱桩2间设置钢筋网片及喷射混凝土6。
本实施例中锚杆及锚索施工工序及与放坡面形成的角度都可采用现有技术进行,且本实施例中超前立柱桩的施工,锚索预紧张拉技术已为现有技术,本实施例就不再累述。

Claims (1)

1.一种高边坡支护结构,包括已开挖后的岩体(1),其特征在于:该岩体的开挖面为斜面和垂直面交叉显示,在斜面与垂直面之间设有水平面,在斜面上喷射混凝土层(8),锚杆(7)通过斜面穿入岩体(1)内,在垂直面上均匀布置超前立柱桩(2),冠梁(3)设在超前立柱桩顶部(2)实现超前立柱桩(2)之间的固定,在超前立柱桩(2)之间的垂直面上均布设有锚索钻孔(5),格构梁(4)横跨在超前立柱桩(2)上并与锚索钻孔(5)对应,锚索(9)通过锚索钻孔(5)穿入岩体(1)内并通过格构梁(4)实现预紧张拉,然后在超前立柱桩(2)间设置钢筋网片及喷射混凝土(6)。
CN201520271511.7U 2015-04-30 2015-04-30 一种高边坡支护结构 Expired - Fee Related CN204590048U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520271511.7U CN204590048U (zh) 2015-04-30 2015-04-30 一种高边坡支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520271511.7U CN204590048U (zh) 2015-04-30 2015-04-30 一种高边坡支护结构

Publications (1)

Publication Number Publication Date
CN204590048U true CN204590048U (zh) 2015-08-26

Family

ID=53926217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520271511.7U Expired - Fee Related CN204590048U (zh) 2015-04-30 2015-04-30 一种高边坡支护结构

Country Status (1)

Country Link
CN (1) CN204590048U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105340614A (zh) * 2015-11-02 2016-02-24 棕榈园林股份有限公司 一种新型硬质边坡格构生态绿化结构及方法
CN105649091A (zh) * 2015-04-30 2016-06-08 中国建筑第四工程局有限公司 一种高边坡支护方法及结构
CN105821730A (zh) * 2016-05-12 2016-08-03 大连交通大学 应用于场地快速加宽的临时支护结构及其施工方法
CN105887895A (zh) * 2016-06-08 2016-08-24 贵州正业工程技术投资有限公司 一种利用岩溶破碎岩体加固支座的基坑支护装置
RU170657U1 (ru) * 2016-08-23 2017-05-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" (СамГТУ) Покрытие откосов

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649091A (zh) * 2015-04-30 2016-06-08 中国建筑第四工程局有限公司 一种高边坡支护方法及结构
CN105340614A (zh) * 2015-11-02 2016-02-24 棕榈园林股份有限公司 一种新型硬质边坡格构生态绿化结构及方法
CN105821730A (zh) * 2016-05-12 2016-08-03 大连交通大学 应用于场地快速加宽的临时支护结构及其施工方法
CN105887895A (zh) * 2016-06-08 2016-08-24 贵州正业工程技术投资有限公司 一种利用岩溶破碎岩体加固支座的基坑支护装置
RU170657U1 (ru) * 2016-08-23 2017-05-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" (СамГТУ) Покрытие откосов

Similar Documents

Publication Publication Date Title
CN204590048U (zh) 一种高边坡支护结构
CN204418187U (zh) 地铁保护区域土钉墙结合双排桩深基坑复合支护结构
CN102562074A (zh) 大断面隧道上硬下软复合地层的施工方法
CN205314115U (zh) 一种公路高陡边坡联合支护绿化结构
CN105649091A (zh) 一种高边坡支护方法及结构
CN105155548B (zh) 一种拉索式双排桩(墙)支护结构
CN102587922A (zh) 一种软弱破碎岩层斜交斜井上弧导挑顶施工方法
CN102373930A (zh) 一种软弱围岩大断面连拱隧道的快速施工方法
CN201991017U (zh) 基于拱盖法施工成型的地铁大跨度车站主体结构
CN105134269A (zh) 一种锚索穿棚协同承载的巷道围岩控制技术
CN204590038U (zh) 一种永久性基坑支护结构
CN109268027A (zh) 一种巷道顶角曲面围岩强化控制方法
CN205557537U (zh) 一种基坑支护结构
CN103114595A (zh) 支护桩预留核心土双支墩斜内撑基坑支护方法及装置
CN204851302U (zh) 矿山井下大跨度硐室起吊梁锚杆固定结构
CN108203984A (zh) 一种危岩体锚网支护方法
CN103939115A (zh) 一种半暗挖法施工棚洞的方法及结构
CN102493459A (zh) 用于在狭窄环境中施工深基础的建筑隔离支护施工方法
CN101545267B (zh) 大面积厂房设备基础闭口施工方法
CN104863613B (zh) 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法
CN106761742A (zh) 一种深部孤岛工作面沿空掘巷围岩稳定性控制方法
CN204040041U (zh) 一种设有竖向锚杆的前密后疏双排桩支护体系
CN104314571A (zh) 一种大断面隧道的三台阶六步超短台阶的施工方法
CN202595752U (zh) 一种深基坑支护结构
CN104612719A (zh) 一种软岩隧道洞口防坍塌处理方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20170430