CN204584160U - The cooling system of warm forging machine - Google Patents

The cooling system of warm forging machine Download PDF

Info

Publication number
CN204584160U
CN204584160U CN201520193603.8U CN201520193603U CN204584160U CN 204584160 U CN204584160 U CN 204584160U CN 201520193603 U CN201520193603 U CN 201520193603U CN 204584160 U CN204584160 U CN 204584160U
Authority
CN
China
Prior art keywords
air chamber
rubber raft
rubber
cooling system
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520193603.8U
Other languages
Chinese (zh)
Inventor
霍帅
陈磊
汪伟
魏杰
洪其群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jing Zhi industrial Limited by Share Ltd
Original Assignee
Upper Nereid's Intelligence Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Upper Nereid's Intelligence Industrial Co Ltd filed Critical Upper Nereid's Intelligence Industrial Co Ltd
Priority to CN201520193603.8U priority Critical patent/CN204584160U/en
Application granted granted Critical
Publication of CN204584160U publication Critical patent/CN204584160U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of cooling system of warm forging machine, it comprises installing plate, total air chamber, communicate with total air chamber multiple in establish the rubber raft air chamber of rubber raft switch, and the control air chamber all to communicate with all rubber raft air chambers, each rubber raft air chamber all communicates as graphite valve air feed by the first tracheae with graphite valve, described graphite valve is also provided with the second tracheae be connected with described control air chamber to controlling air chamber and supplying gas, described control air chamber is also provided with the second magnetic valve opening bleeder pipe, control air chamber controls rubber raft air chamber opening and closing by the pressure size of therein, described total air chamber, rubber raft air chamber, control air chamber and graphite valve are all fixed on the same face of described installing plate.The utility model adopts and is fixed on the same face of installing plate by total air chamber, rubber raft air chamber, control air chamber and graphite valve, can make rubber raft air chamber outwardly like this, be easy to operating personnel's inspection and maintenance when installation.

Description

The cooling system of warm forging machine
Technical field
The utility model relates to warm forging machine, particularly relates to a kind of cooling system of warm forging machine.
Background technology
Lubrication and cooling is play vital effect to its work at present in warm forging machine normally works! Existing lubrication and cooling system architecture is more, and the installation site disunity of each structure, the end face being located at installing plate had, the bottom surface being located at installing plate had, installs and is placed between warm forging machine and installing plate, brings very burden to maintenance and maintenance.Especially the rubber valve in rubber valve air chamber is easy to damage, need to make regular check on and change, and existing rubber valve air chamber is positioned at the bottom surface of installing plate, be between installing plate and warm forging machine, changing position does not have enough spaces that maintenance master worker is operated, add operation easier, bring difficulty to maintenance process simulation.
Therefore, a kind of cooling system of the warm forging machine for ease of maintenaince maintained is needed.
Utility model content
The shortcoming of prior art in view of the above, the purpose of this utility model is the cooling system providing a kind of warm forging machine, for solving in prior art the problem being difficult to maintenance and maintenance.
For achieving the above object and other relevant objects, the utility model provides a kind of cooling system of warm forging machine, it comprises installing plate, total air chamber, communicate with total air chamber multiple in establish the rubber raft air chamber of rubber raft switch, and the control air chamber all to communicate with all rubber raft air chambers, each rubber raft air chamber all communicates as graphite valve air feed by the first tracheae with graphite valve, described graphite valve is also provided with the second tracheae be connected with described control air chamber to controlling air chamber and supplying gas, described control air chamber is also provided with the second magnetic valve opening bleeder pipe, control air chamber controls rubber raft air chamber opening and closing by the pressure size of therein, described total air chamber, rubber raft air chamber, control air chamber and graphite valve are all fixed on the same face of described installing plate.
Preferably, described total air chamber and all rubber raft air chambers are welded and fixed.
Preferably, described control air chamber is placed in the top of described total air chamber, controls air chamber and is connected with each described rubber raft air chamber by multiple integrated bending contiguous block, and be equipped with seal at the two ends of contiguous block.
Preferably, the two ends of described contiguous block are square box.
As mentioned above, the cooling system of warm forging machine of the present utility model, there is following beneficial effect: adopt and be fixed on the same face of installing plate by total air chamber, rubber raft air chamber, control air chamber and graphite valve, rubber raft air chamber can be made outwardly when installation like this, be easy to operating personnel's inspection and maintenance.
Accompanying drawing explanation
Fig. 1 is shown as the cooling system schematic diagram of warm forging machine of the present utility model.
Fig. 2 is shown as the side view of the cooling system of warm forging machine of the present utility model.
Element numbers explanation
1 controls air chamber
2 contiguous blocks
21 square boxs
3 rubber raft air chambers
4 total air chambers
5 first tracheaes
6 graphite valves
7 first magnetic valves
8 second tracheaes
9 check valves
10 installing plates
Detailed description of the invention
By particular specific embodiment, embodiment of the present utility model is described below, person skilled in the art scholar the content disclosed by this description can understand other advantages of the present utility model and effect easily.
Refer to Fig. 1 to Fig. 2.Notice, structure, ratio, size etc. that this description institute accompanying drawings illustrates, content all only in order to coordinate description to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the utility model, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the utility model can produce and the object that can reach, still all should drop on technology contents that the utility model discloses and obtain in the scope that can contain.Simultaneously, quote in this description as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the utility model, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the utility model.
As shown in Figures 1 and 2, the utility model provides a kind of cooling system of warm forging machine, it comprises installing plate 10, total air chamber 4, communicate with total air chamber 4 multiple in establish the rubber raft air chamber 3 of rubber raft switch, and the control air chamber 1 all to communicate with all rubber raft air chambers 3, each rubber raft air chamber 3 all communicates as graphite valve air feed by the first tracheae 5 with graphite valve 6, graphite valve 6 is also provided with and controls air chamber 1 and be connected to the second tracheae 8 controlling air chamber and supply gas, control air chamber 1 to be also provided with the second magnetic valve opening bleeder pipe, control air chamber 1 controls rubber raft air chamber 3 opening and closing by the pressure size of therein, total air chamber 4, rubber raft air chamber 3, control air chamber 1 and graphite valve 6 are all fixed on the same face of installing plate 10.The utility model adopts and is fixed on the same face of installing plate by total air chamber 4, rubber raft air chamber 3, control air chamber 1 and graphite valve 6, can make rubber raft air chamber outwardly like this, be easy to operating personnel's inspection and maintenance when installation.
For improving the sealing of whole cooling system, all rubber raft air chambers 3 are all welded and fixed with total air chamber 4, make both become to be integrated, save sealing between the two, improve the sealing of whole lubrication and cooling system, for ease of maintenaince and maintenance.
Above-mentioned control air chamber 1 is placed in the top of total air chamber 4, controls air chamber 1 and is connected with each rubber raft air chamber 3 by multiple integrated bending contiguous block 2, and be equipped with seal at the two ends of contiguous block 2.The utility model adopts the contiguous block 2 being easy to manufacture production to replace existing special bend pipe, arranges seal, guarantee the sealing of junction at two ends and control air chamber and rubber raft air chamber connecting place.Above-mentioned seal can be O type circle.For ease of fixing, the two ends of above-mentioned contiguous block are square box 21 (see Fig. 2), and the fixtures such as screw can be adopted itself and control air chamber, rubber raft air chamber to be fixedly linked, and bearing adopts seal to seal.This structure is easy to detachable maintaining.
For realizing gas circuit along logical, one direction is run, and above-mentioned first tracheae 5 is provided with check valve 9.
The operation principle of lubrication and cooling system of the present utility model is: the rubber raft in rubber raft air chamber 3 is opened after inflating by total air chamber 4, then by the first tracheae 5, check valve 9 enters graphite valve 6, graphite valve 6 is made outwards to be sprayed the graphite of cooling and lubricating by connected second magnetic valve 7, inflated in control air chamber 1 by the second tracheae 8 simultaneously, the rubber raft in rubber raft air chamber 3 can be made to close when controlling the pressure increase in air chamber 1 and reaching certain value, disconnect total air chamber 1 to graphite valve 6 air feed, when the first solenoid valves, control air chamber 1 outwards to exit, in it, pressure drop causes the rubber raft in rubber raft air chamber 3 to be opened, first magnetic valve power-off after opening, now recover total air chamber 4 to graphite valve 6 air feed, continue ejection graphite and be used for lubrication and cooling.Whole system is the outside ejection graphite of compartment, and the effect of rubber raft air chamber 3 is exactly sluice gate, the control of the controlled air chamber 1 of its opening and closing.Whole system need run gas, so its sealing requirements is higher, so reduce assembly and connection as far as possible, the utility model adopts the rubber raft air chamber of integral type and total air chamber just, improves the sealing of whole system.
In sum, the cooling system of the utility model warm forging machine, adopt and total air chamber, rubber raft air chamber, control air chamber and graphite valve are fixed on the same face of installing plate, rubber raft air chamber can be made outwardly when installation like this, be easy to operating personnel's inspection and maintenance.So the utility model effectively overcomes various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present utility model and effect thereof only, but not for limiting the utility model.Any person skilled in the art scholar all without prejudice under spirit of the present utility model and category, can modify above-described embodiment or changes.Therefore, such as have in art and usually know that the knowledgeable modifies or changes not departing from all equivalences completed under the spirit and technological thought that the utility model discloses, must be contained by claim of the present utility model.

Claims (4)

1. the cooling system of a warm forging machine, it is characterized in that, comprise installing plate (10), total air chamber (4), communicate with total air chamber (4) multiple in establish the rubber raft air chamber (3) of rubber raft switch, and the control air chamber (1) all to communicate with all rubber raft air chambers (3), each rubber raft air chamber (3) all communicates as graphite valve air feed by the first tracheae (5) with graphite valve (6), described graphite valve (6) is also provided with the second tracheae (8) be connected with described control air chamber (1) to controlling air chamber and supplying gas, described control air chamber (1) is also provided with the second magnetic valve opening bleeder pipe, control air chamber (1) controls rubber raft air chamber (3) opening and closing by the pressure size of therein, described total air chamber (4), rubber raft air chamber (3), control air chamber (1) and graphite valve (6) are all fixed on the same face of described installing plate (10).
2. the cooling system of warm forging machine according to claim 1, is characterized in that: described total air chamber (4) and all rubber raft air chambers (3) are welded and fixed.
3. the cooling system of warm forging machine according to claim 1, it is characterized in that: described control air chamber (1) is placed in the top of described total air chamber (4), control air chamber (1) to be connected with each described rubber raft air chamber (3) by multiple integrated bending contiguous block (2), and be equipped with seal at the two ends of contiguous block (2).
4. the cooling system of warm forging machine according to claim 3, is characterized in that: the two ends of described contiguous block (2) are square box (21).
CN201520193603.8U 2015-04-01 2015-04-01 The cooling system of warm forging machine Active CN204584160U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520193603.8U CN204584160U (en) 2015-04-01 2015-04-01 The cooling system of warm forging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520193603.8U CN204584160U (en) 2015-04-01 2015-04-01 The cooling system of warm forging machine

Publications (1)

Publication Number Publication Date
CN204584160U true CN204584160U (en) 2015-08-26

Family

ID=53920358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520193603.8U Active CN204584160U (en) 2015-04-01 2015-04-01 The cooling system of warm forging machine

Country Status (1)

Country Link
CN (1) CN204584160U (en)

Similar Documents

Publication Publication Date Title
CN205607606U (en) Solenoid valve water leakage detection device
CN107020326A (en) A kind of continuous die mould of part
CN204584160U (en) The cooling system of warm forging machine
CN203809781U (en) Air cylinder driving type high and low pressure valve
CN103672123A (en) Buffer type large-torque spring restoration executing mechanism
CN104307953B (en) A kind of multistage relief circuit for large-tonnage full-automatic hydraulic fine impact machine controls system
CN204584159U (en) The lubrication and cooling system of warm forging machine
CN201826840U (en) Double-heightening system of coal-winning machine
CN202228460U (en) Oil way valve block integration device
CN104438348B (en) Hydraulic control device of rolling bending system of rolling mill
CN205423381U (en) Servomotor and back flush hydraulic system thereof
CN103574112B (en) A kind of pressure regulator valve of oil system peculiar to vessel
CN203978985U (en) A kind of integral multi-way reversing valve for fork truck
CN203196605U (en) Cooling water control system of cubic press
CN104175079B (en) A kind of gas meter pipeline ball valve manufacturing process
CN203286005U (en) Cartridge valve using two kinds of separated hydraulic media
CN204371810U (en) Based on the full-automatic pressure machine hydraulic system that PLC controls
CN204716989U (en) Pressure electromagnetic valve for adjusting
CN204004706U (en) The solenoid valve that control accuracy is high
CN203627993U (en) Buffering large-torque spring restoration executing mechanism
CN203979457U (en) A kind of gate valve
KR20130038636A (en) Hydroforming device
CN204805205U (en) Oil circuit piece
CN203830705U (en) Special cooling system for small sliding block oil cylinders at front end and rear end of cylinder cover casting die
CN202719196U (en) Air release control valve for pneumatic internal clamp of pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200433, room 101, building D, building 128, No. 11 Xiang Yin Road, Shanghai, Yangpu District

Patentee after: Shanghai Jing Zhi industrial Limited by Share Ltd

Address before: 200433, room 1, building 128, No. 101-2 Xiang Yin Road, Shanghai, Yangpu District

Patentee before: Upper Nereid's intelligence Industrial Co., Ltd.