CN204569111U - A kind of hoistway door sill anchor fitting - Google Patents

A kind of hoistway door sill anchor fitting Download PDF

Info

Publication number
CN204569111U
CN204569111U CN201520285639.9U CN201520285639U CN204569111U CN 204569111 U CN204569111 U CN 204569111U CN 201520285639 U CN201520285639 U CN 201520285639U CN 204569111 U CN204569111 U CN 204569111U
Authority
CN
China
Prior art keywords
anchor fitting
sill
hoistway
toeguard
dill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520285639.9U
Other languages
Chinese (zh)
Inventor
刘理华
胡祖常
王国祥
张星亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ODERBURG ELEVATOR Co Ltd
Original Assignee
SHANGHAI ODERBURG ELEVATOR Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ODERBURG ELEVATOR Co Ltd filed Critical SHANGHAI ODERBURG ELEVATOR Co Ltd
Priority to CN201520285639.9U priority Critical patent/CN204569111U/en
Application granted granted Critical
Publication of CN204569111U publication Critical patent/CN204569111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hoistway door sill anchor fitting, comprise lading door dill, sill bracket, toeguard, anchor fitting, mud guard, described ground sill bracket is arranged at below lading door dill, described anchor fitting is fixedly connected on elevator hoistways joint face, described mud guard be fixed on ground sill bracket and fixing fill between, described toeguard and lading door dill lean on a side of hoistway to be bolted to connection.Compared with prior art, the beneficial effects of the utility model are: the utility model gear avoids the dust of floor gap to enter hoistway space, toeguard can block the gap between lift car door and lading door dill, avoid the personal injury of passenger, transverse shifting or move up and down and adapt to the installation site of sill, and easy installation and removal, the simple cost of structure are low, be suitable for promoting.

Description

A kind of hoistway door sill anchor fitting
Technical field
The utility model relates to a kind of Architectural Equipment technical field, specifically a kind of hoistway door sill anchor fitting.
Background technology
Elevator, in installation process, is provided with a sill below the door of the Room, thus enables hoistway door move switch gate action along the draw-in groove of sill, and sill is bolted on bracket, is fixed on concrete wall below bracket by anchor fitting.When hoistway door sill device general at present particularly relates to the hoistway structure of band bracket, the comparatively complicated and not easily installing/dismounting of the installation process of lading door dill device, be directed to different size requirement hoistway bracket structure, then need again make sill device in addition and install, cost is higher.And when body of wall beats expansion bolt often there is certain error in bolt between horizontal and vertical relative position, thus when analog bracket due to bolt between interval error cause being difficult to installing.
Utility model content
The purpose of this utility model is to provide a kind of hoistway door sill anchor fitting, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, the utility model provides following technical scheme:
A kind of hoistway door sill anchor fitting, comprise lading door dill, ground sill bracket, toeguard, anchor fitting, mud guard, described ground sill bracket is arranged at below lading door dill, described anchor fitting is fixedly connected on elevator hoistways joint face, described mud guard be fixed on ground sill bracket and fixing fill between, described toeguard and lading door dill lean on a side of hoistway to be bolted to connection, described anchor fitting comprises fixing chuck plate, bolt hole, top board, stay bearing plate and reinforcement gusset, fixing chuck plate is provided with some transverse row Strap bolts hole, stay bearing plate is provided with some longitudinal directions to arrangement bar shaped bolt hole, the lateral edges of stay bearing plate arranges reinforcement gusset, strengthen gusset upper end together with top board bottom welding.
As further program of the utility model: together with described fixing chuck plate is bolted with stay bearing plate.
Compared with prior art, the beneficial effects of the utility model are: the utility model mud guard can avoid the dust of floor gap to enter hoistway space, toeguard can block the gap between lift car door and lading door dill, thus avoid the personal injury of passenger, fixing chuck plate lateral displacement position adapts to the position of expansion bolt, the bolt hole changing the outfit different is longitudinally taked to adapt to the positional error of the position of expansion bolt, simultaneously can adapt to the installation site of sill by transverse shifting, the bolt hole of stay bearing plate takes longitudinal arrangement, the setting height(from bottom) that adjustment adapts to sill can be moved up and down, the lateral edges of stay bearing plate arranges reinforcement gusset, strengthen gusset upper end and improve the structural strength of holding in the palm code together with top board bottom welding.And easy installation and removal, the simple cost of structure are low, be suitable for promoting.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of hoistway door sill anchor fitting.
Fig. 2 is the structural representation of fixing dress in a kind of hoistway door sill anchor fitting.
Fig. 3 is the structural representation of partial fixing dress in a kind of hoistway door sill anchor fitting.
In figure: 1, hoistway joint face, 2, lading door dill, 3, sill bracket, 4, toeguard, 5, anchor fitting, 6, mud guard, 7, fixing chuck plate, 8, bolt hole, 9, top board, 10, stay bearing plate, 11, strengthen gusset.
Detailed description of the invention
Be described in more detail below in conjunction with the technical scheme of detailed description of the invention to this patent.
Refer to Fig. 1-3, a kind of hoistway door sill anchor fitting, comprise lading door dill 2, ground sill bracket 3, toeguard 4, anchor fitting 5, mud guard 6, described ground sill bracket 3 is arranged at below lading door dill, main support effect is play to lading door dill 2, described anchor fitting 5 is fixedly connected on elevator hoistways joint face 1, described mud guard 6 is fixed on ground sill bracket 3 and fixedly fills between 5, the dust of floor gap can be avoided to enter hoistway space, described toeguard 4 is bolted to connection with the side of lading door dill 2 by hoistway, when elevator parking position is than lading door dill position height, toeguard 4 can block the gap between lift car door and lading door dill, thus avoid the personal injury of passenger, described anchor fitting 5 comprises fixing chuck plate 7, bolt hole 8, top board 9, stay bearing plate 10 and reinforcement gusset 11, fixing chuck plate 7 is provided with some transverse row Strap bolts hole 8, stay bearing plate 10 is provided with some longitudinal directions to arrangement bar shaped bolt hole 8, together with fixing chuck plate 7 is bolted with stay bearing plate 10, fixing chuck plate 7 lateral displacement position adapts to the position of expansion bolt, longitudinally the bolt hole 8 changing the outfit different is taked to adapt to the positional error of the position of expansion bolt, simultaneously can adapt to the installation site of sill by transverse shifting, bolt hole 2 on stay bearing plate 4 takes longitudinal arrangement, holder code can be made to move up and down the setting height(from bottom) of adjustment adaptation sill, the lateral edges of stay bearing plate 10 is arranged strengthens gusset 11, strengthen gusset 11 upper end and improve the structural strength of holding in the palm code together with top board 9 bottom welding.
Principle of work of the present utility model is: the utility model mud guard can avoid the dust of floor gap to enter hoistway space, toeguard can block the gap between lift car door and lading door dill, thus avoid the personal injury of passenger, fixing chuck plate lateral displacement position adapts to the position of expansion bolt, the bolt hole changing the outfit different is longitudinally taked to adapt to the positional error of the position of expansion bolt, simultaneously can adapt to the installation site of sill by transverse shifting, the bolt hole of stay bearing plate takes longitudinal arrangement, the setting height(from bottom) that adjustment adapts to sill can be moved up and down, the lateral edges of stay bearing plate arranges reinforcement gusset, strengthen gusset upper end and improve the structural strength of holding in the palm code together with top board bottom welding.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment, in the ken that one skilled in the relevant art possesses, can also makes a variety of changes under the prerequisite not departing from this patent aim.

Claims (2)

1. a hoistway door sill anchor fitting, comprise lading door dill (2), ground sill bracket (3), toeguard (4), anchor fitting (5), mud guard (6), it is characterized in that, described ground sill bracket (3) is arranged at below lading door dill, described anchor fitting (5) is fixedly connected on elevator hoistways joint face (1), described mud guard (6) is fixed on ground sill bracket (3) and fixes and fills between (5), described toeguard (4) is bolted to connection with the side of lading door dill (2) by hoistway, described anchor fitting (5) comprises fixing chuck plate (7), bolt hole (8), top board (9), stay bearing plate (10) and reinforcement gusset (11), fixing chuck plate (7) is provided with some transverse row Strap bolts hole (8), stay bearing plate (10) is provided with some longitudinal directions to arrangement bar shaped bolt hole (8), the lateral edges of stay bearing plate (10) is arranged strengthens gusset (11), strengthen gusset (11) upper end together with top board (9) bottom welding.
2. a kind of hoistway door sill anchor fitting according to claim 1, is characterized in that, described fixing chuck plate (7) and stay bearing plate (10) are bolted together.
CN201520285639.9U 2015-05-06 2015-05-06 A kind of hoistway door sill anchor fitting Expired - Fee Related CN204569111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520285639.9U CN204569111U (en) 2015-05-06 2015-05-06 A kind of hoistway door sill anchor fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520285639.9U CN204569111U (en) 2015-05-06 2015-05-06 A kind of hoistway door sill anchor fitting

Publications (1)

Publication Number Publication Date
CN204569111U true CN204569111U (en) 2015-08-19

Family

ID=53861781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520285639.9U Expired - Fee Related CN204569111U (en) 2015-05-06 2015-05-06 A kind of hoistway door sill anchor fitting

Country Status (1)

Country Link
CN (1) CN204569111U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109607343A (en) * 2018-12-14 2019-04-12 华南理工大学 A kind of actual measurement device of skyscraper elevator stack effect

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109607343A (en) * 2018-12-14 2019-04-12 华南理工大学 A kind of actual measurement device of skyscraper elevator stack effect
CN109607343B (en) * 2018-12-14 2023-09-26 华南理工大学 Actual measurement device for chimney effect of elevator of high-rise building

Similar Documents

Publication Publication Date Title
CN105063726A (en) Traveling crane for electroplating
CN104179090A (en) Subway rail laying system
CN104863374B (en) Large-span steel slipping mechanism and its gliding method
CN204569111U (en) A kind of hoistway door sill anchor fitting
CN205527199U (en) Inorganic tenant ladder sedan -chair frame
CN103787203A (en) Support frame for mounting precast beam jack
CN207108181U (en) A kind of express elevator pit component mount
CN101628681B (en) Integration device of gantry crane and top of lift car
CN206172909U (en) Conveyer of cash brick
CN202117689U (en) Light-duty trolley which is matched with shield station-passing for structure formwork
CN201990905U (en) Concrete pouring construction mold for nonballast track slab base
CN203257106U (en) Multifunctional power-driven walking type walking system
CN204876521U (en) Novel lift scaffold device
CN206142627U (en) Sedan -chair bear building -up constructs
CN204939645U (en) Electroplating traveling crane
CN204023325U (en) A kind of subway system of laying a railway track
CN106836807A (en) It is a kind of can quick-assembling and mobile modular rack application method
CN205953278U (en) Home use elevator frame
CN106629323A (en) Rack base for fixing elevator guide rail
CN202730709U (en) Movable formwork for construction of dock wall
CN205204733U (en) Sunshade installation platform truck
CN205855871U (en) A kind of boom hoisting for hoisting prefabricated integrated sleeper bed
CN205739905U (en) A kind of guide rail bracket of elevator
CN206328020U (en) The frame seat of fixed cage guide
CN206338077U (en) The variable chassis of supporting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20180506