CN204567724U - Civil engineering pipe storage loading-unloading vehicle - Google Patents

Civil engineering pipe storage loading-unloading vehicle Download PDF

Info

Publication number
CN204567724U
CN204567724U CN201520256003.1U CN201520256003U CN204567724U CN 204567724 U CN204567724 U CN 204567724U CN 201520256003 U CN201520256003 U CN 201520256003U CN 204567724 U CN204567724 U CN 204567724U
Authority
CN
China
Prior art keywords
bearing plate
sleeve pipe
civil engineering
unloading vehicle
storage loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520256003.1U
Other languages
Chinese (zh)
Inventor
杨楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qiqihar University
Original Assignee
Qiqihar University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qiqihar University filed Critical Qiqihar University
Priority to CN201520256003.1U priority Critical patent/CN204567724U/en
Application granted granted Critical
Publication of CN204567724U publication Critical patent/CN204567724U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

Civil engineering pipe storage loading-unloading vehicle.Can solve when traditional pipeline placing device exists pipeline handling and deposits easily move, easy tong and inconvenient operation when loading and unloading, the problem that wastes time and energy.Comprise bearing plate and be evenly located at least three cardan wheels of bearing plate lower surface, cardan wheel is located at bearing plate edge, and bearing plate is provided with securing device with each cardan wheel corresponding position; The front end, upper surface of bearing plate is provided with the expansion link vertical with bearing plate; Expansion link comprises N and saves sleeve pipe, wherein the sleeve pipe of least significant end is vertically fixed on bearing plate, the casing part of upper end is fastened in the sleeve pipe top of lower end, sleeve pipe is topmost connected with the Jack drive end be fixed on bearing plate, and each joint sleeve pipe is vertically connected with a strut bar respectively, strut bar is parallel with the front end edge of bearing plate; The rear end, upper surface of bearing plate is vertically fixed with baffle plate, is fixed with pushing hands on baffle plate with on a side in the same way, bearing plate rear end.Structure is simple, operation and easy to use and practical.

Description

Civil engineering pipe storage loading-unloading vehicle
Technical field
The utility model belongs to field of civil engineering, relates to a kind of engineering pipeline placing device, specifically civil engineering pipe storage loading-unloading vehicle.
Background technology
In building construction process, various different pipeline is absolutely necessary, but a lot of camp site is not owing to having the safety device of pipeline, just random for pipeline losing is placed on workyard or on brick and tile, make engineering ground in disorder, Occupation coefficient reduces, pipeline and brick and tile are fragile and the unified handling of pipeline and mobile inconvenience, also have a lot of workyard to employ some pipeline placing devices at present to deposit, handling and movement pipeline, but existing pipeline safety device is all adopt pipeline to be deposited on device, unload need artificially the pipeline of stacking to be lifted separation when unloading pipeline after, inconvenient operation, easy tong, waste time and energy, in order to conveniently moving, safety device lower surface all arranges roller, and does not have securing device, and when making pipeline to fill and deposits, safety device easily movement causes dress inconvenient operation, deposits easy activity.
Summary of the invention
Easily move for solving when traditional pipeline placing device exists pipeline handling and deposits, easy tong and inconvenient operation, the problem that wastes time and energy when loading and unloading, the utility model proposes a kind of not easily movable, easy to operate, time saving and energy saving and pipe storage loading-unloading vehicle that is not easily tong, its concrete technical scheme is as follows:
Civil engineering pipe storage loading-unloading vehicle, comprise bearing plate and be evenly located at least three cardan wheels of bearing plate lower surface, described cardan wheel is located at bearing plate edge, and bearing plate is provided with securing device with each cardan wheel corresponding position; The front end, upper surface of described bearing plate is provided with the expansion link vertical with bearing plate; Described expansion link comprises N and saves sleeve pipe, wherein the sleeve pipe of least significant end is vertically fixed on bearing plate, the casing part of upper end is fastened in the sleeve pipe top of lower end, sleeve pipe is topmost connected with the Jack drive end be fixed on bearing plate, and each joint sleeve pipe is vertically connected with a strut bar respectively, strut bar is parallel with the front end edge of bearing plate; The rear end, upper surface of bearing plate is vertically fixed with baffle plate, is fixed with pushing hands on baffle plate with on a side in the same way, bearing plate rear end.
Described cardan wheel is four.
Sleeve pipe in described expansion link is four joints.
Described securing device comprises the L-type position-limited lever be hinged on bearing plate.
Described Jack is jack.
The free end of described pushing hands is connected with Anti-slip cover.
The beneficial effects of the utility model: cardan wheel can carry out fastening by actv. by securing device, thus realize the firm of product and not easily activity; After when upper tubulature road, one end is put in bearing plate rear end, the other end is placed on the strut bar of bearing plate front end, thus avoid the problem of tong, in addition, when unloading pipeline, Jack is utilized first to be boosted by the sleeve pipe of top, thus facilitate workman to unload ground floor pipeline above, boost second section sleeve pipe more subsequently, facilitate workman to unload second layer pipeline, by that analogy, make operation and use extremely convenient, time saving and energy saving, avoid workman need to bend one's back carried after the troublesome operation problem of upper shoulder etc.; Structure is simple, operation and easy to use and practical.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-bearing plate, 2-cardan wheel, 3-securing device, 4-expansion link, 5-Jack, 6-strut bar, 7-baffle plate, 8-pushing hands, 10-Anti-slip cover.
Detailed description of the invention
For the ease of understanding, below in conjunction with Fig. 1, the utility model is further illustrated:
Embodiment 1: civil engineering pipe storage loading-unloading vehicle, comprise bearing plate 1 and be evenly located at least three cardan wheels 2 of bearing plate 1 lower surface, described cardan wheel 2 is located at bearing plate 1 edge, and bearing plate 1 is provided with securing device 3 with each cardan wheel 2 corresponding position, why traditional pipeline placing device does not have locking fastener device to be exactly because cardan wheel 2 is arranged on the position of lower end near middle part of bearing plate 1, cause it that securing device is installed also to be difficult to operate, therefore in order to install the securing device 3 preventing it from rolling can to cardan wheel 2, cardan wheel 2 is located at the edge of bearing plate 1, thus make to operate to securing device 3 to be more prone to, the front end, upper surface of described bearing plate 1 is provided with the expansion link 4 vertical with bearing plate 1, expansion link 4 no doubt can stretch, and in practice process, have employed telescopic expansion link 4, namely described expansion link 4 comprises N joint sleeve pipe, wherein the sleeve pipe of least significant end is vertically fixed on bearing plate 1, the casing part of upper end is fastened in the sleeve pipe top of lower end, that is the casing clamp of top merges in the sleeve pipe below being socketed in, its snap fit make use of one end be in inside another sleeve pipe below sleeve pipe to be provided with protruding structure realization, also other modes can be adopted to realize engaging, certain telescopic expansion link 4 device is ripe already, its structure also belongs to existing known technology, therefore too much introduction is not done here, wherein the sleeve pipe of the top is connected with Jack 5 drive end be fixed on bearing plate 1, this makes sleeve pipe topmost to be boosted during Jack 5 lifting, when casing shoe topmost arrives lower square casing medial roof end, square casing under pull-up is further moved up, until the cannula tip position of second from the bottom casing shoe arrival least significant end, what namely realize expansion link 4 stretches motion, each joint sleeve pipe is vertically connected with a strut bar 6 respectively, strut bar 6 is parallel with the front end edge of bearing plate 1, strut bar 6 is for supporting the pipeline needing handling to place, this structure coordinates with Jack 5 and realizes when unloading pipeline, can be separated downwards one by one from the pipeline of the superiors, actv. facilitates workman and unloads pipeline, the rear end, upper surface of bearing plate 1 is vertically fixed with baffle plate 7, baffle plate 7 for preventing in moving process, due to the acceleration/accel of artificial thrust cause pipe slides after move, be fixed with pushing hands 8 on baffle plate 7 with on a side in the same way, bearing plate 1 rear end.
Embodiment 2: further, in order to better realize the movement of this product, is set to four by described cardan wheel 2, thus actv. prevents gravity deflection from sinking the generation of phenomenon.
Embodiment 3: further, usually this product is when loading and unloading pipeline, carrying out moving and loading and unloading after placing 4 layers of pipeline is the transformation point of optimum efficiency, the number of plies too much can cause the excessive mobile inconvenience of the easy landing of pipeline, gravity and need to increase the wherein height of Jack 5, the number of plies crosses that I haven't seen you for ages makes workman load and unload and move the fussy degree needing repeatedly to carry out increasing work, best when the sleeve pipe therefore in described expansion link 4 is four joint.
Embodiment 4: further, described securing device 3 comprises the L-type position-limited lever be hinged on bearing plate 1, when deposit or upper tubulature road time, need this product firm, now by the articulated structure of L-type position-limited lever, rotated and fallen, thus make the free end of L-type position-limited lever snap in cardan wheel 2, and then limit the rolling of cardan wheel 2, reach firm effect, latching device can be set in L-type position-limited lever lower end in addition, L-type position-limited lever is in uprightly non-state locking when falling, can use it for like this and block pipeline, prevent pipeline left and right landing when mobile, play the effect that pipeline left and right sides is spacing, certainly prevent the landing of pipeline left and right from also having other a lot of mode, such as evenly offer the modes such as some grooves in strut bar 6 upper surface.
Embodiment 5: further, described Jack 5 is jack.
Embodiment 6: further, in order to provide better operating characteristic to workman, connects Anti-slip cover 10 by the free end of described pushing hands 8, can improve the efficiency that workman passes this product by actv..
Beneficial effect: structure is simple, operation and easy to use and practical; Actv. solve when traditional pipeline placing device exists pipeline handling and deposits easily move, easy tong and inconvenient operation when loading and unloading, the problem that wastes time and energy.

Claims (6)

1. civil engineering pipe storage loading-unloading vehicle, comprise bearing plate (1) and be evenly located at least three cardan wheels (2) of bearing plate (1) lower surface, it is characterized in that: described cardan wheel (2) is located at bearing plate (1) edge, and bearing plate (1) is upper and each cardan wheel (2) corresponding position is provided with securing device (3); The front end, upper surface of described bearing plate (1) is provided with the expansion link (4) vertical with bearing plate (1); Described expansion link (4) comprises N and saves sleeve pipe, wherein the sleeve pipe of least significant end is vertically fixed on bearing plate (1), the casing part of upper end is fastened in the sleeve pipe top of lower end, sleeve pipe is topmost connected with Jack (5) drive end be fixed on bearing plate (1), and each joint sleeve pipe is vertically connected with a strut bar (6) respectively, strut bar (6) is parallel with the front end edge of bearing plate (1); The rear end, upper surface of bearing plate (1) is vertically fixed with baffle plate (7), and baffle plate (7) above and on a side in the same way, bearing plate (1) rear end is fixed with pushing hands (8).
2. civil engineering pipe storage loading-unloading vehicle as claimed in claim 1, is characterized in that: described cardan wheel (2) is four.
3. civil engineering pipe storage loading-unloading vehicle as claimed in claim 1, is characterized in that: the sleeve pipe in described expansion link (4) is four joints.
4. civil engineering pipe storage loading-unloading vehicle as claimed in claim 1, is characterized in that: described securing device (3) comprises the L-type position-limited lever be hinged on bearing plate (1).
5. civil engineering pipe storage loading-unloading vehicle as claimed in claim 1, is characterized in that: described Jack (5) is jack.
6. civil engineering pipe storage loading-unloading vehicle as claimed in claim 1, is characterized in that: the free end of described pushing hands (8) is connected with Anti-slip cover (10).
CN201520256003.1U 2015-04-24 2015-04-24 Civil engineering pipe storage loading-unloading vehicle Expired - Fee Related CN204567724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520256003.1U CN204567724U (en) 2015-04-24 2015-04-24 Civil engineering pipe storage loading-unloading vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520256003.1U CN204567724U (en) 2015-04-24 2015-04-24 Civil engineering pipe storage loading-unloading vehicle

Publications (1)

Publication Number Publication Date
CN204567724U true CN204567724U (en) 2015-08-19

Family

ID=53860402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520256003.1U Expired - Fee Related CN204567724U (en) 2015-04-24 2015-04-24 Civil engineering pipe storage loading-unloading vehicle

Country Status (1)

Country Link
CN (1) CN204567724U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105947018A (en) * 2016-05-15 2016-09-21 烟台三新新能源科技有限公司 Mechanical multifunctional placing vehicle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105947018A (en) * 2016-05-15 2016-09-21 烟台三新新能源科技有限公司 Mechanical multifunctional placing vehicle
CN105947018B (en) * 2016-05-15 2018-06-12 江苏六鑫科教仪器设备有限公司 A kind of multi-functional putting vehicle of mechanization
CN108357587A (en) * 2016-05-15 2018-08-03 孙立民 A kind of multi-functional putting vehicle of mechanization
CN108406714A (en) * 2016-05-15 2018-08-17 孙立民 A kind of multi-functional putting vehicle of mechanization

Similar Documents

Publication Publication Date Title
CN206091365U (en) Construction is with adjustable elevator ramp
CN203669884U (en) Movable all-round steel pipe scaffold for tunnel lining construction
CN202175469U (en) Cable reel supporting device
CN112498434A (en) Handling device for construction
CN204567724U (en) Civil engineering pipe storage loading-unloading vehicle
CN201882523U (en) Pipe storage rack
CN205184745U (en) Operation platform for airplane assembling
CN208051895U (en) A kind of construction pipe fitting rack
CN203699719U (en) Multi-purpose tower crane
CN203682938U (en) Decorating crane
CN206273950U (en) Elevator regularization hoisting type operating platform
CN206969478U (en) A kind of improved road and bridge engineering pipe storage device
CN107499850A (en) A kind of conveying device for rolling stock maintenance production
CN205224701U (en) Two -layer every single move of pit parking equipment that simply goes up and down
CN203581022U (en) GIS (geographic information system) equipment conveying device
CN207580674U (en) A kind of building material lifting means
CN208200150U (en) A kind of crane support that load-bearing property is good
CN207363225U (en) A kind of floor tile is laid with auxiliary device
CN209582179U (en) Construction site placing of material device
CN203768789U (en) Combined type steel trestle for enabling roller compacted concrete to be stored in bin
CN206383999U (en) A kind of file administration data stroller
CN206308577U (en) A kind of ecological parking stall
CN205275117U (en) Pressure steel pipe's rack of unloading
CN210737601U (en) Wall form movable device
CN207905368U (en) A kind of building floor rapid construction trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20200424