CN204563615U - Toy castle - Google Patents
Toy castle Download PDFInfo
- Publication number
- CN204563615U CN204563615U CN201520282643.XU CN201520282643U CN204563615U CN 204563615 U CN204563615 U CN 204563615U CN 201520282643 U CN201520282643 U CN 201520282643U CN 204563615 U CN204563615 U CN 204563615U
- Authority
- CN
- China
- Prior art keywords
- high building
- city wall
- castle
- groove
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Toys (AREA)
Abstract
A kind of toy castle, comprise the first high building, the second high building, the 3rd high building, the 4th high building, be connected with city wall between high building, high building has groove, city wall connects high building by groove.The effect that the utility model is useful is: only needing city wall to be embedded high building during installation can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step, reinforcement block, observation tower, Hu Cheng hurdle can make toy castle more true to nature, simulation castle effect is better, is beneficial to the interest promoting children.
Description
Technical field
The utility model relates to a kind of toy, particularly relates to a kind of toy castle.
Background technology
At present, castle type toy common is on the market all be stacked up by building blocks usually, and the castle that building blocks are stacked up cannot simulate the form of castle in shape completely, profile lacks aesthetic feeling, and entertainment form is single, the easy botheration of children, is difficult to the interest promoting children.
Also have the castle toy goods of furniture for display rather than for use made of some plastic materials on the market, these toys are similar to castle in shape, but only have the effect of viewing and admiring and playing, cannot disassembly and assembly, and the easy botheration of children, is difficult to the interest promoting children.
Utility model content
The utility model will solve above-mentioned prior art Problems existing, provides a kind of toy castle, rational in infrastructure, can allow children's loose toy castle, can improve the manipulative ability of children, can improve the interest of children, interesting strong, meets the demand of children.
The utility model solves the technical scheme that its technical problem adopts: this toy castle, comprise castle main body, the left and right sides, front end of castle main body is respectively arranged with the first high building and the second high building, the left and right sides, rear end of castle main body is respectively arranged with the 3rd high building and the 4th high building, first high building, second high building, 3rd high building, the 4th high building state that is all square is arranged, first high building, second high building, 3rd high building, four surfaces of the 4th high building all have groove, front city wall is connected with between first high building and the second high building, front city wall has city gate, the two ends of front city wall are embedded into the first high building right flank groove respectively, in second high building left surface groove, left city wall is connected with between first high building and the 3rd high building, the two ends of left city wall are embedded into the first high building back side groove respectively, in 3rd high building front groove, right city wall is connected with between second high building and the 4th high building, the two ends of right city wall are embedded into the second high building back side groove respectively, in 4th high building front groove, rear city wall is connected with between 3rd high building and the 4th high building, the two ends of rear city wall are embedded into the 3rd high building right flank groove respectively, in 4th high building left surface groove.Such setting, front city wall be connected to the first high building and the second high building by embedded mode before, therefore, front city wall is dismountable, left city wall is connected between the first high building and the 3rd high building by embedded mode, therefore, left city wall is dismountable, right city wall is connected between the second high building and the 4th high building by embedded mode, therefore, right city wall is dismountable, rear city wall is connected between the 3rd high building and the 4th high building by embedded mode, therefore, rear city wall is dismountable, like this, owing to can dismantle between high building and city wall, and only need city wall to be embedded high building when installing and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective.
First high building left surface and the second high building right flank are all connected with step.Such setting, adds step and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
First high building front and the second high building front are all connected with reinforcement block.Such setting, adds reinforcement block and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
Equal Lian Jie You observation tower on the end face of the first high building, the second high building, the 3rd high building, the 4th high building.Such setting, Jia She observation tower can allow toy castle more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children
The left surface of the 3rd high building and the right flank of the 4th high building are all connected with Hu Cheng hurdle.Such setting, adds Hu Cheng hurdle and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
The effect that the utility model is useful is: toy castle of the present utility model, rational in infrastructure, front city wall, rear city wall, left city wall, right city wall is all dismountable, therefore, only need during installation that city wall is embedded high building and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step, reinforcement block, observation tower, Hu Cheng hurdle can make toy castle more true to nature, simulation castle effect is better, be beneficial to the interest promoting children.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Description of reference numerals: castle main body 1, first high building 2, second high building the 3, three high building the 4, four high building 5, groove 6, front city wall 7, city gate 8, left city wall 9, right city wall 10, rear city wall 11, step 12, reinforcement block 13, hurdle, observation tower 14, Hu Cheng 15.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail:
With reference to accompanying drawing: this toy castle in the present embodiment, comprise castle main body 1, the left and right sides, front end of castle main body 1 is respectively arranged with the first high building 2 and the second high building 3, the left and right sides, rear end of castle main body 1 is respectively arranged with the 3rd high building 4 and the 4th high building 5, first high building 2, second high building 3, 3rd high building 4, 4th high building 5 state that is all square is arranged, first high building 2, second high building 3, 3rd high building 4, four surfaces of the 4th high building 5 all have groove 6, front city wall 7 is connected with between first high building 2 and the second high building 3, front city wall 7 has city gate 8, the two ends of front city wall 7 are embedded into the first high building 2 right flank groove 6 respectively, in second high building 3 left surface groove 6, left city wall 9 is connected with between first high building 2 and the 3rd high building 4, the two ends of left city wall 9 are embedded into the first high building 2 back side groove 6 respectively, in 3rd high building 4 front groove 6, right city wall 10 is connected with between second high building 3 and the 4th high building 5, the two ends of right city wall 10 are embedded into the second high building 3 back side groove 6 respectively, in 4th high building 5 front groove 6, rear city wall 11 is connected with between 3rd high building 4 and the 4th high building 5, the two ends of rear city wall 11 are embedded into the 3rd high building 4 right flank groove 6 respectively, in 4th high building 5 left surface groove 6.
First high building 2 left surface and the second high building 3 right flank are all connected with step 12.
First high building 2 front and the second high building 3 front are all connected with reinforcement block 13.
Equal Lian Jie You observation tower 14 on the end face of the first high building 2, second high building 3, the 3rd high building 4, the 4th high building 5.
The left surface of the 3rd high building 4 and the right flank of the 4th high building 5 are all connected with Hu Cheng hurdle 15.
Step 12 is connected on the first high building 2 left surface and the second high building 3 right flank by embedded mode.
Reinforcement block 13 is connected on the first high building 2 front and the second high building 3 front by embedded mode.
Observation tower 14 is connected on the end face of the first high building 2, second high building 3, the 3rd high building 4, the 4th high building 5 by embedded mode.
Hu Cheng hurdle 15 is connected on the left surface of the 3rd high building 4 and the right flank of the 4th high building 5 by embedded mode.
During use, first by the first high building 2, second high building 3, 3rd high building 4, 4th high building 5 is put by four positions, then respectively by front city wall 7, left city wall 9, right city wall 10, rear city wall 11 is embedded between high building respectively, and then step 12 is embedded on the first high building 2 left surface and the second high building 3 right flank respectively, reinforcement block 13 is embedded into respectively on the first high building 2 front and the second high building 3 front, observation tower 14 is embedded into respectively the first high building 2, second high building 3, 3rd high building 4, on the end face of the 4th high building 5, finally Hu Cheng hurdle 15 is embedded into respectively on the left surface of the 3rd high building 4 and the right flank of the 4th high building 5, complete the installation of toy castle, then various piece is taken apart and can realize dismounting, complete the disassembly process of toy castle.
The feature of the utility model embodiment is: front city wall 7, rear city wall 11, left city wall 9, right city wall 10 is all dismountable, therefore, only need during installation that city wall is embedded high building and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step 12, reinforcement block 13, observation tower 14, Hu Cheng hurdle 15 can make toy castle more true to nature, simulation castle effect is better, be beneficial to the interest promoting children.
Although the utility model has illustrated by reference to preferred embodiment and has described, those skilled in the art should understand, and in the scope of claims, can do the various change in form and details.
Claims (5)
1. a toy castle, it is characterized in that: comprise castle main body (1), the left and right sides, front end of described castle main body (1) is respectively arranged with the first high building (2) and the second high building (3), the left and right sides, rear end of described castle main body (1) is respectively arranged with the 3rd high building (4) and the 4th high building (5), described first high building (2), second high building (3), 3rd high building (4), 4th high building (5) state that is all square is arranged, described first high building (2), second high building (3), 3rd high building (4), four surfaces of the 4th high building (5) all have groove (6), front city wall (7) is connected with between described first high building (2) and the second high building (3), described front city wall (7) has city gate (8), the two ends of described front city wall (7) are embedded into the first high building (2) right flank groove (6) respectively, in second high building (3) left surface groove (6), left city wall (9) is connected with between described first high building (2) and the 3rd high building (4), the two ends of described left city wall (9) are embedded into the first high building (2) back side groove (6) respectively, in 3rd high building (4) front groove (6), right city wall (10) is connected with between described second high building (3) and the 4th high building (5), the two ends of described right city wall (10) are embedded into the second high building (3) back side groove (6) respectively, in 4th high building (5) front groove (6), rear city wall (11) is connected with between described 3rd high building (4) and the 4th high building (5), the two ends of described rear city wall (11) are embedded into the 3rd high building (4) right flank groove (6) respectively, in 4th high building (5) left surface groove (6).
2. toy castle according to claim 1, is characterized in that: described first high building (2) left surface and the second high building (3) right flank are all connected with step (12).
3. toy castle according to claim 1, is characterized in that: described first high building (2) front and the second high building (3) front are all connected with reinforcement block (13).
4. toy castle according to claim 1, is characterized in that: equal Lian Jie You observation tower (14) on the end face of described first high building (2), the second high building (3), the 3rd high building (4), the 4th high building (5).
5. toy castle according to claim 1, is characterized in that: the left surface of described 3rd high building (4) and the right flank of the 4th high building (5) are all connected with Hu Cheng hurdle (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520282643.XU CN204563615U (en) | 2015-05-04 | 2015-05-04 | Toy castle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520282643.XU CN204563615U (en) | 2015-05-04 | 2015-05-04 | Toy castle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204563615U true CN204563615U (en) | 2015-08-19 |
Family
ID=53856310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520282643.XU Expired - Fee Related CN204563615U (en) | 2015-05-04 | 2015-05-04 | Toy castle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204563615U (en) |
-
2015
- 2015-05-04 CN CN201520282643.XU patent/CN204563615U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204563615U (en) | Toy castle | |
CN201760078U (en) | Magic ruler toy with reliable structure | |
CN202909458U (en) | Magnetic combination building block toy | |
CN203447774U (en) | Building block toy connecting structure | |
CN202478605U (en) | Nut combined toy | |
CN203355298U (en) | Combined building block structure | |
CN201823316U (en) | Regular cube combination building block | |
CN203281008U (en) | Assorted toy | |
CN205569736U (en) | Spliced toy | |
CN205329964U (en) | Building block | |
CN200951323Y (en) | Building block | |
CN220459906U (en) | Magnetic building block | |
CN203303659U (en) | Building block burr puzzle toy | |
CN204619378U (en) | The toy that toy component and this toy component are formed | |
CN202605738U (en) | Building block toy | |
CN204709809U (en) | A kind of Puzzle provided with elements movable in relation to each other | |
CN205055444U (en) | Building block | |
CN103316483A (en) | Bamboo building block intelligence toy | |
CN204543575U (en) | A kind of block toy room | |
CN203944131U (en) | 11 rod master craftsman of the Spring and Autumn period locks | |
CN202342895U (en) | Building block toy | |
CN202044792U (en) | Movable castle toy | |
CN202666413U (en) | Combined toy plugin block | |
CN203303657U (en) | Boxed splicing toy | |
CN206273312U (en) | A kind of building blocks and its connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20190504 |