CN204563615U - Toy castle - Google Patents

Toy castle Download PDF

Info

Publication number
CN204563615U
CN204563615U CN201520282643.XU CN201520282643U CN204563615U CN 204563615 U CN204563615 U CN 204563615U CN 201520282643 U CN201520282643 U CN 201520282643U CN 204563615 U CN204563615 U CN 204563615U
Authority
CN
China
Prior art keywords
high building
city wall
castle
groove
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520282643.XU
Other languages
Chinese (zh)
Inventor
毛姚春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QICAI WOODEN CRAFT CO Ltd
Original Assignee
ZHEJIANG QICAI WOODEN CRAFT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QICAI WOODEN CRAFT CO Ltd filed Critical ZHEJIANG QICAI WOODEN CRAFT CO Ltd
Priority to CN201520282643.XU priority Critical patent/CN204563615U/en
Application granted granted Critical
Publication of CN204563615U publication Critical patent/CN204563615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Toys (AREA)

Abstract

A kind of toy castle, comprise the first high building, the second high building, the 3rd high building, the 4th high building, be connected with city wall between high building, high building has groove, city wall connects high building by groove.The effect that the utility model is useful is: only needing city wall to be embedded high building during installation can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step, reinforcement block, observation tower, Hu Cheng hurdle can make toy castle more true to nature, simulation castle effect is better, is beneficial to the interest promoting children.

Description

Toy castle
Technical field
The utility model relates to a kind of toy, particularly relates to a kind of toy castle.
Background technology
At present, castle type toy common is on the market all be stacked up by building blocks usually, and the castle that building blocks are stacked up cannot simulate the form of castle in shape completely, profile lacks aesthetic feeling, and entertainment form is single, the easy botheration of children, is difficult to the interest promoting children.
Also have the castle toy goods of furniture for display rather than for use made of some plastic materials on the market, these toys are similar to castle in shape, but only have the effect of viewing and admiring and playing, cannot disassembly and assembly, and the easy botheration of children, is difficult to the interest promoting children.
Utility model content
The utility model will solve above-mentioned prior art Problems existing, provides a kind of toy castle, rational in infrastructure, can allow children's loose toy castle, can improve the manipulative ability of children, can improve the interest of children, interesting strong, meets the demand of children.
The utility model solves the technical scheme that its technical problem adopts: this toy castle, comprise castle main body, the left and right sides, front end of castle main body is respectively arranged with the first high building and the second high building, the left and right sides, rear end of castle main body is respectively arranged with the 3rd high building and the 4th high building, first high building, second high building, 3rd high building, the 4th high building state that is all square is arranged, first high building, second high building, 3rd high building, four surfaces of the 4th high building all have groove, front city wall is connected with between first high building and the second high building, front city wall has city gate, the two ends of front city wall are embedded into the first high building right flank groove respectively, in second high building left surface groove, left city wall is connected with between first high building and the 3rd high building, the two ends of left city wall are embedded into the first high building back side groove respectively, in 3rd high building front groove, right city wall is connected with between second high building and the 4th high building, the two ends of right city wall are embedded into the second high building back side groove respectively, in 4th high building front groove, rear city wall is connected with between 3rd high building and the 4th high building, the two ends of rear city wall are embedded into the 3rd high building right flank groove respectively, in 4th high building left surface groove.Such setting, front city wall be connected to the first high building and the second high building by embedded mode before, therefore, front city wall is dismountable, left city wall is connected between the first high building and the 3rd high building by embedded mode, therefore, left city wall is dismountable, right city wall is connected between the second high building and the 4th high building by embedded mode, therefore, right city wall is dismountable, rear city wall is connected between the 3rd high building and the 4th high building by embedded mode, therefore, rear city wall is dismountable, like this, owing to can dismantle between high building and city wall, and only need city wall to be embedded high building when installing and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective.
First high building left surface and the second high building right flank are all connected with step.Such setting, adds step and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
First high building front and the second high building front are all connected with reinforcement block.Such setting, adds reinforcement block and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
Equal Lian Jie You observation tower on the end face of the first high building, the second high building, the 3rd high building, the 4th high building.Such setting, Jia She observation tower can allow toy castle more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children
The left surface of the 3rd high building and the right flank of the 4th high building are all connected with Hu Cheng hurdle.Such setting, adds Hu Cheng hurdle and toy castle can be allowed more true to nature, and simulation castle effect is better, is beneficial to the interest promoting children.
The effect that the utility model is useful is: toy castle of the present utility model, rational in infrastructure, front city wall, rear city wall, left city wall, right city wall is all dismountable, therefore, only need during installation that city wall is embedded high building and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step, reinforcement block, observation tower, Hu Cheng hurdle can make toy castle more true to nature, simulation castle effect is better, be beneficial to the interest promoting children.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Description of reference numerals: castle main body 1, first high building 2, second high building the 3, three high building the 4, four high building 5, groove 6, front city wall 7, city gate 8, left city wall 9, right city wall 10, rear city wall 11, step 12, reinforcement block 13, hurdle, observation tower 14, Hu Cheng 15.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail:
With reference to accompanying drawing: this toy castle in the present embodiment, comprise castle main body 1, the left and right sides, front end of castle main body 1 is respectively arranged with the first high building 2 and the second high building 3, the left and right sides, rear end of castle main body 1 is respectively arranged with the 3rd high building 4 and the 4th high building 5, first high building 2, second high building 3, 3rd high building 4, 4th high building 5 state that is all square is arranged, first high building 2, second high building 3, 3rd high building 4, four surfaces of the 4th high building 5 all have groove 6, front city wall 7 is connected with between first high building 2 and the second high building 3, front city wall 7 has city gate 8, the two ends of front city wall 7 are embedded into the first high building 2 right flank groove 6 respectively, in second high building 3 left surface groove 6, left city wall 9 is connected with between first high building 2 and the 3rd high building 4, the two ends of left city wall 9 are embedded into the first high building 2 back side groove 6 respectively, in 3rd high building 4 front groove 6, right city wall 10 is connected with between second high building 3 and the 4th high building 5, the two ends of right city wall 10 are embedded into the second high building 3 back side groove 6 respectively, in 4th high building 5 front groove 6, rear city wall 11 is connected with between 3rd high building 4 and the 4th high building 5, the two ends of rear city wall 11 are embedded into the 3rd high building 4 right flank groove 6 respectively, in 4th high building 5 left surface groove 6.
First high building 2 left surface and the second high building 3 right flank are all connected with step 12.
First high building 2 front and the second high building 3 front are all connected with reinforcement block 13.
Equal Lian Jie You observation tower 14 on the end face of the first high building 2, second high building 3, the 3rd high building 4, the 4th high building 5.
The left surface of the 3rd high building 4 and the right flank of the 4th high building 5 are all connected with Hu Cheng hurdle 15.
Step 12 is connected on the first high building 2 left surface and the second high building 3 right flank by embedded mode.
Reinforcement block 13 is connected on the first high building 2 front and the second high building 3 front by embedded mode.
Observation tower 14 is connected on the end face of the first high building 2, second high building 3, the 3rd high building 4, the 4th high building 5 by embedded mode.
Hu Cheng hurdle 15 is connected on the left surface of the 3rd high building 4 and the right flank of the 4th high building 5 by embedded mode.
During use, first by the first high building 2, second high building 3, 3rd high building 4, 4th high building 5 is put by four positions, then respectively by front city wall 7, left city wall 9, right city wall 10, rear city wall 11 is embedded between high building respectively, and then step 12 is embedded on the first high building 2 left surface and the second high building 3 right flank respectively, reinforcement block 13 is embedded into respectively on the first high building 2 front and the second high building 3 front, observation tower 14 is embedded into respectively the first high building 2, second high building 3, 3rd high building 4, on the end face of the 4th high building 5, finally Hu Cheng hurdle 15 is embedded into respectively on the left surface of the 3rd high building 4 and the right flank of the 4th high building 5, complete the installation of toy castle, then various piece is taken apart and can realize dismounting, complete the disassembly process of toy castle.
The feature of the utility model embodiment is: front city wall 7, rear city wall 11, left city wall 9, right city wall 10 is all dismountable, therefore, only need during installation that city wall is embedded high building and can complete installation, during dismounting, city wall is separated with high building and can realizes dismantling, easy accessibility, and be easy to carry after dismounting, because dismounting is easy, while raising children manipulative ability, the interest of children can be promoted again, interesting strong, play effective, and added step 12, reinforcement block 13, observation tower 14, Hu Cheng hurdle 15 can make toy castle more true to nature, simulation castle effect is better, be beneficial to the interest promoting children.
Although the utility model has illustrated by reference to preferred embodiment and has described, those skilled in the art should understand, and in the scope of claims, can do the various change in form and details.

Claims (5)

1. a toy castle, it is characterized in that: comprise castle main body (1), the left and right sides, front end of described castle main body (1) is respectively arranged with the first high building (2) and the second high building (3), the left and right sides, rear end of described castle main body (1) is respectively arranged with the 3rd high building (4) and the 4th high building (5), described first high building (2), second high building (3), 3rd high building (4), 4th high building (5) state that is all square is arranged, described first high building (2), second high building (3), 3rd high building (4), four surfaces of the 4th high building (5) all have groove (6), front city wall (7) is connected with between described first high building (2) and the second high building (3), described front city wall (7) has city gate (8), the two ends of described front city wall (7) are embedded into the first high building (2) right flank groove (6) respectively, in second high building (3) left surface groove (6), left city wall (9) is connected with between described first high building (2) and the 3rd high building (4), the two ends of described left city wall (9) are embedded into the first high building (2) back side groove (6) respectively, in 3rd high building (4) front groove (6), right city wall (10) is connected with between described second high building (3) and the 4th high building (5), the two ends of described right city wall (10) are embedded into the second high building (3) back side groove (6) respectively, in 4th high building (5) front groove (6), rear city wall (11) is connected with between described 3rd high building (4) and the 4th high building (5), the two ends of described rear city wall (11) are embedded into the 3rd high building (4) right flank groove (6) respectively, in 4th high building (5) left surface groove (6).
2. toy castle according to claim 1, is characterized in that: described first high building (2) left surface and the second high building (3) right flank are all connected with step (12).
3. toy castle according to claim 1, is characterized in that: described first high building (2) front and the second high building (3) front are all connected with reinforcement block (13).
4. toy castle according to claim 1, is characterized in that: equal Lian Jie You observation tower (14) on the end face of described first high building (2), the second high building (3), the 3rd high building (4), the 4th high building (5).
5. toy castle according to claim 1, is characterized in that: the left surface of described 3rd high building (4) and the right flank of the 4th high building (5) are all connected with Hu Cheng hurdle (15).
CN201520282643.XU 2015-05-04 2015-05-04 Toy castle Expired - Fee Related CN204563615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520282643.XU CN204563615U (en) 2015-05-04 2015-05-04 Toy castle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520282643.XU CN204563615U (en) 2015-05-04 2015-05-04 Toy castle

Publications (1)

Publication Number Publication Date
CN204563615U true CN204563615U (en) 2015-08-19

Family

ID=53856310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520282643.XU Expired - Fee Related CN204563615U (en) 2015-05-04 2015-05-04 Toy castle

Country Status (1)

Country Link
CN (1) CN204563615U (en)

Similar Documents

Publication Publication Date Title
CN204563615U (en) Toy castle
CN201760078U (en) Magic ruler toy with reliable structure
CN202909458U (en) Magnetic combination building block toy
CN203447774U (en) Building block toy connecting structure
CN202478605U (en) Nut combined toy
CN203355298U (en) Combined building block structure
CN201823316U (en) Regular cube combination building block
CN203281008U (en) Assorted toy
CN205569736U (en) Spliced toy
CN205329964U (en) Building block
CN200951323Y (en) Building block
CN220459906U (en) Magnetic building block
CN203303659U (en) Building block burr puzzle toy
CN204619378U (en) The toy that toy component and this toy component are formed
CN202605738U (en) Building block toy
CN204709809U (en) A kind of Puzzle provided with elements movable in relation to each other
CN205055444U (en) Building block
CN103316483A (en) Bamboo building block intelligence toy
CN204543575U (en) A kind of block toy room
CN203944131U (en) 11 rod master craftsman of the Spring and Autumn period locks
CN202342895U (en) Building block toy
CN202044792U (en) Movable castle toy
CN202666413U (en) Combined toy plugin block
CN203303657U (en) Boxed splicing toy
CN206273312U (en) A kind of building blocks and its connector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20190504