CN204554369U - A kind of pipe network cruising inspection system based on CORS base station - Google Patents
A kind of pipe network cruising inspection system based on CORS base station Download PDFInfo
- Publication number
- CN204554369U CN204554369U CN201520238626.6U CN201520238626U CN204554369U CN 204554369 U CN204554369 U CN 204554369U CN 201520238626 U CN201520238626 U CN 201520238626U CN 204554369 U CN204554369 U CN 204554369U
- Authority
- CN
- China
- Prior art keywords
- pipe network
- cors
- pnm
- monitoring unit
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The utility model discloses a kind of pipe network cruising inspection system based on CORS base station, specifically comprise PNM deformation monitoring unit, pipe network data link, Cors data processing station, light-emitting diode display, solar panel, utility pole, top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge.Described PNM deformation monitoring unit is arranged on pipe network monitoring section, for collection tube net thermomechanical processing, described pipe network data link is installed in the soil layer between pipe network and earth's surface, for the data transmission between Cors data processing station and PNM deformation monitoring unit, described Cors data processing station is arranged on monitoring ground, for the treatment of with analysis pipe network Real-Time Monitoring thermomechanical processing, described LED data diply equpment is arranged on utility pole, the pipe network data collected can be reflected in real time, described solar panel is arranged on utility pole top, indispensable power support can be provided for system cloud gray model.The deformation that the utility model can complete pipe network equipment is is efficiently patrolled and examined and rushes to repair traffic control, improves tradition and patrols and examines inefficiency, maintenance situation not in time.
Description
Technical field:
The utility model relates generally to a kind of GPS monitoring technology, is specially a kind of pipe network cruising inspection system based on CORS base station.
Background technique:
Along with the pipe network equipment (combustion gas, tap water etc.) in life constantly increases and adjustment, pipe network system is increasingly sophisticated, huge.For the perfect management of pipe network system and the people's livelihood closely bound up, consider from the angle of stability and Security, need badly and day by day huge pipe network system reasonably patrolled and examined and manages.Effectively eliminate possible hidden danger or loss, and then reduce costs, improve the efficient management of job performance to its management objectives of work of patrolling and examining of pipeline and affiliated facility.Present stage the routine main management difficult point of patrolling and examining work have following some: (1) cannot grasp the on duty situation that puts in place of inspector at any time: thus cannot effectively ensure to patrol and examine staff's requirement according to plan, by the cycle, cruising is launched to all pipelines and affiliated facility on time, the quality of the work of patrolling and examining be can not be guaranteed, and the authenticity of pipeline state and facility operation data can not be guaranteed.(2) distribution situation of job site pipe network and facility cannot be understood in time: along with rapid urban, most company such as combustion gas, tap water has all established GIS pipeline distribution system or CAD pipe network figure, but still can occur by the serious accident caused of constructing, be because this resource of pipe network figure is not effectively used, grasp the pipe network of job site as patrol officer in time by handheld terminal and the distribution of facility will greatly reduce the generation of tragedy.(3) hidden danger situation cannot be grasped in time and tracking management: a lot of major accidents all never thoroughly causes because hidden danger can not get solution or solution in time, authorities also lack the platform effectively following the tracks of the process of check hidden danger, and the monitoring causing patrolling and examining hidden danger and the third party's construction finding pipeline facility cannot effective tracking management.(4) truly cannot grasp the situation jeopardizing pipeline and affiliated facility safe operation and record file reliably: Most users is also using the mode record of hand-written report record to patrol and examine information at present, preserve inconvenience, as typing archiving computer, there is loss of data again, the problem of typing mistake, work consuming is time-consuming and cannot embody truth.
(5) digital assay management cannot be carried out, aid decision has no way of implementing: cannot carry out effective statistic of classification analysis to the hidden danger found and equipment failure, the historical data such as operation conditions, Operational Limits of pipeline and affiliated facility cannot be utilized effectively, inquiry not easily, to the analysis of hidden danger type, equipment deficiency, and even tool is seasonal, the type selecting of interim focus arrangement and equipment, the arrangement that cannot effectively put in place.
Summary of the invention:
For these reasons, the utility model provides a kind of pipe network cruising inspection system based on CORS base station, comprises PNM deformation monitoring unit, pipe network data link, Cors data processing station, light-emitting diode display, solar panel, utility pole, top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge.Described PNM deformation monitoring unit is arranged on pipe network monitoring section, for collection tube net thermomechanical processing; Described pipe network data link is installed in the soil layer between pipe network and earth's surface, described pipe network data link is installed in the soil layer between pipe network and earth's surface, for the data transmission between Cors data processing station and PNM deformation monitoring unit, described Cors data processing station is arranged on monitoring ground, for the treatment of with analysis pipe network Real-Time Monitoring thermomechanical processing; Described LED data diply equpment is arranged on utility pole, and the pipe network data collected can be reflected in real time, described solar panel is arranged on utility pole top, can provide indispensable power support for system cloud gray model.
Described PNM deformation monitoring unit comprises top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge, described top resistance strain gauge is arranged on pipe network top, for the strain force value in the online portion of collection tube, described low pressure meter is arranged on pipe network bottom, for the force value of collection tube portion off the net and soil layer, described left side displacement meter is arranged on the left of pipe network, for gathering pipe network shift value, described right side settlement gauge is arranged on the right side of pipe network, for gathering sedimentation value on the right side of pipe network.
The beneficial effects of the utility model: be the solution that the infrastructure device of pipe network system manages, Daily Round Check, hidden danger management and decision Analysis etc. provide complete set.Vital effect must be played in actual pressure management area, can increase work efficiency greatly.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model,
Fig. 2 is cross-section scheme of installation of the present utility model,
From Fig. 1 ~ 2,1 be PNM deformation monitoring unit, 2 be wherein pipe network data link, 3 be Cors data processing station, 4 be light-emitting diode display, 5 be solar panel, 6 be left side displacement meter, 7 be top resistance strain gauge, 8 be right side settlement gauge, 9 be low pressure meter, 10 for utility pole.
Embodiment:
Known with reference to figure 1 ~ 2, the utility model comprises PNM deformation monitoring unit, pipe network data link, Cors data processing station, light-emitting diode display, solar panel, utility pole, top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge.Described PNM deformation monitoring unit is arranged on pipe network monitoring section, for collection tube net thermomechanical processing, described pipe network data link is installed in the soil layer between pipe network and earth's surface, for the data transmission between Cors data processing station and PNM deformation monitoring unit, described Cors data processing station is arranged on monitoring ground, for the treatment of with analysis pipe network Real-Time Monitoring thermomechanical processing, described LED data diply equpment is arranged on utility pole, the pipe network data collected can be reflected in real time, described solar panel is arranged on utility pole top, indispensable power support can be provided for system cloud gray model, described top resistance strain gauge is arranged on pipe network top, for the strain force value in the online portion of collection tube, described low pressure meter is arranged on pipe network bottom, for the force value of collection tube portion off the net and soil layer, described left side displacement meter is arranged on the left of pipe network, for gathering pipe network shift value, described right side settlement gauge is arranged on the right side of pipe network, for gathering sedimentation value on the right side of pipe network.
The utility model gathers pipe network real time data by patrolling and examining, that both can understand patrol officer patrols and examines track and cyclic in-position measuring situation, can be grasped by the data such as frastructure state and parameter again, analyze facility operation situation, and the deformation real time data of pipe network can be monitored.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any reference character in claim should be considered as the claim involved by limiting.
The above; be only preferred embodiment of the present utility model; not in order to limit the utility model, every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solutions of the utility model.
Claims (2)
1., based on a pipe network cruising inspection system for CORS base station, it is characterized in that comprising PNM deformation monitoring unit, pipe network data link, Cors data processing station, light-emitting diode display, solar panel, utility pole, top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge, described PNM deformation monitoring unit is arranged on pipe network monitoring section, for collection tube net thermomechanical processing, described pipe network data link is installed in the soil layer between pipe network and earth's surface, for the data transmission between Cors data processing station and PNM deformation monitoring unit, described Cors data processing station is arranged on monitoring ground, for the treatment of with analysis pipe network Real-Time Monitoring thermomechanical processing, described LED data diply equpment is arranged on utility pole, the pipe network data collected can be reflected in real time, described solar panel is arranged on utility pole top, indispensable power support can be provided for system cloud gray model.
2. a kind of described pipe network cruising inspection system based on CORS base station according to claim 1, it is characterized in that described PNM deformation monitoring unit comprises top resistance strain gauge, low pressure meter, left side displacement meter, right side settlement gauge, described top resistance strain gauge is arranged on pipe network top, for the strain force value in the online portion of collection tube, described low pressure meter is arranged on pipe network bottom, for the force value of collection tube portion off the net and soil layer, described left side displacement meter is arranged on the left of pipe network, for gathering pipe network shift value, described right side settlement gauge is arranged on the right side of pipe network, for gathering sedimentation value on the right side of pipe network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520238626.6U CN204554369U (en) | 2015-04-21 | 2015-04-21 | A kind of pipe network cruising inspection system based on CORS base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520238626.6U CN204554369U (en) | 2015-04-21 | 2015-04-21 | A kind of pipe network cruising inspection system based on CORS base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204554369U true CN204554369U (en) | 2015-08-12 |
Family
ID=53829476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520238626.6U Expired - Fee Related CN204554369U (en) | 2015-04-21 | 2015-04-21 | A kind of pipe network cruising inspection system based on CORS base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204554369U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109140236A (en) * | 2018-09-13 | 2019-01-04 | 上海万朗水务科技有限公司 | Pipe network managing and control system is managed based on intelligent pipeline |
CN111059997A (en) * | 2019-12-30 | 2020-04-24 | 中铁十二局集团有限公司 | High pier pumping concrete pump pipe detection system and detection method |
-
2015
- 2015-04-21 CN CN201520238626.6U patent/CN204554369U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109140236A (en) * | 2018-09-13 | 2019-01-04 | 上海万朗水务科技有限公司 | Pipe network managing and control system is managed based on intelligent pipeline |
CN111059997A (en) * | 2019-12-30 | 2020-04-24 | 中铁十二局集团有限公司 | High pier pumping concrete pump pipe detection system and detection method |
CN111059997B (en) * | 2019-12-30 | 2021-11-12 | 中铁十二局集团有限公司 | High pier pumping concrete pump pipe detection system and detection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202082628U (en) | Real-time data interaction gas pipe network polling system | |
CN203849605U (en) | Smart pipe network | |
CN104880986A (en) | System and method for comprehensive pipe gallery management based on BIM | |
CN103595813A (en) | Intelligent pipe network application system and obtaining method thereof | |
CN202383503U (en) | Safety monitoring equipment for underground comprehensive pipe networks | |
CN202662054U (en) | Mountain fire disaster monitoring and early-warning analysis system based on power grid GIS (Gas Insulated Switchgear) | |
CN103412550A (en) | Long-distance automation monitoring method of electric power tunnel pipe-jacking construction | |
CN204554369U (en) | A kind of pipe network cruising inspection system based on CORS base station | |
CN103310294A (en) | Energy performance contracting system | |
CN106682461A (en) | Big data analysis system applying computer verification code technique | |
CN110737738A (en) | energy loss prevention early warning system based on GIS and big data analysis | |
CN111024820B (en) | Health monitoring system for offshore wind power blade and data processing method thereof | |
CN104778541A (en) | Management control system for underground electric power pipe network | |
CN105631569A (en) | Electrical rail traction station monitoring and early warning method and system based on power grid GIS | |
CN201780489U (en) | Online monitoring system for combined heat and power generation units in power plants | |
CN202939473U (en) | Energy-saving technology modification and water-saving project information management system for enterprise | |
CN104537579A (en) | Smart distribution grid greenness assessment method | |
CN204229525U (en) | A kind of total pollution discharge quantity control system by wiping card | |
CN204649244U (en) | A kind of oil pipeline oil quality on-line monitoring system | |
CN110348716A (en) | A kind of the backstage control platform and method of controller switching equipment | |
CN113565702A (en) | In-service wind power plant multidimensional intelligent evaluation system | |
CN206846313U (en) | High consequence data acquisition and analysis system of gas pipeline | |
CN211596911U (en) | Pipe network pressure acquisition and analysis system | |
Rongrong et al. | Application of intelligent safety supervision based on artificial intelligence technology | |
CN104732074A (en) | Bridge structure damage recognition system based on big data concept |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20190421 |
|
CF01 | Termination of patent right due to non-payment of annual fee |