CN204552757U - A kind of energy-saving tunnel and Double pilot tunnel - Google Patents
A kind of energy-saving tunnel and Double pilot tunnel Download PDFInfo
- Publication number
- CN204552757U CN204552757U CN201520141889.5U CN201520141889U CN204552757U CN 204552757 U CN204552757 U CN 204552757U CN 201520141889 U CN201520141889 U CN 201520141889U CN 204552757 U CN204552757 U CN 204552757U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- pilot tunnel
- steel bar
- cross bar
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model visits device before relating to a kind of tunnel piercing.A kind of energy-saving tunnel and Double pilot tunnel, comprise the left pilot tunnel and right pilot tunnel that lay respectively at the multiple-arch tunnel left and right sides, reinforced mesh, the Steel bar rack be pressed together on reinforced mesh, the stiffness steel plate being arranged on anchor pole end and the uniform cross bar be arranged on bottom Steel bar rack that described left pilot tunnel and right pilot tunnel include anchor pole, fit with tunnel top, described Steel bar rack is provided with a series of conduit along direction, tunnel, described cross bar two bottom sides is provided with rhone, is provided with prestressed draw-bar between described cross bar and Steel bar rack.Front-probe support of the present utility model is that follow-up digging provides good operating environment, the effective stability ensureing whole construction speed.
Description
Technical field
The utility model visits device before relating to a kind of tunnel piercing, is specifically related to a kind of energy-saving tunnel and Double pilot tunnel.
Background technology
In tunnel excavating process, because different landform also exists different harm, just imperative for visiting technology before tunnel, it effectively can not only ensure the Reasonable adjustment to whole mining process, the supporting of giving vent to anger can be carried out, for follow-up excavation provides condition more easily simultaneously.Existing pilot tunnel form mostly is simple supporting and protection structure, but is difficult to carry out good front-probe support in some rich water packsand areas.
Utility model content
The purpose of this utility model is for above-mentioned Problems existing and deficiency, provides the energy-saving tunnel and Double pilot tunnel of a kind of reasonable in design, stable mechanical property.
For achieving the above object, the technical scheme taked is:
A kind of energy-saving tunnel and Double pilot tunnel, comprise the left pilot tunnel and right pilot tunnel that lay respectively at the multiple-arch tunnel left and right sides, reinforced mesh, the Steel bar rack be pressed together on reinforced mesh, the stiffness steel plate being arranged on anchor pole end and the uniform cross bar be arranged on bottom Steel bar rack that described left pilot tunnel and right pilot tunnel include anchor pole, fit with tunnel top, described Steel bar rack is provided with a series of conduit along direction, tunnel, described cross bar two bottom sides is provided with rhone, is provided with prestressed draw-bar between described cross bar and Steel bar rack.
Described prestressed draw-bar comprises the adjusting nut of two pull bars being arranged on two ends, the dextrorotation screw thread being separately positioned on end corresponding to two pull bars and derotation screw thread and coupling setting.
Adopt technique scheme, acquired beneficial effect is:
The utility model reasonable in design, stable mechanical property, be applicable to rich water packsand area, draining can be carried out timely, ensure that the degree of deformation of whole supporting is little simultaneously, improve the stability of supporting, guarantee that construction safety is convenient, front-probe support of the present utility model is that follow-up digging provides good operating environment, the effective stability ensureing whole construction speed.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Sequence number in figure: 1 be left pilot tunnel, 2 be right pilot tunnel, 3 be anchor pole, 4 be reinforced mesh, 5 be Steel bar rack, 6 be stiffness steel plate, 7 be cross bar, 8 be conduit, 9 be rhone, 10 be pull bar, 11 for adjusting nut.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
See Fig. 1, a kind of energy-saving tunnel and Double pilot tunnel, comprise the left pilot tunnel 1 and right pilot tunnel 2 that lay respectively at the multiple-arch tunnel left and right sides, described left pilot tunnel 1 and right pilot tunnel 2 include anchor pole 3, the reinforced mesh 4 of fitting with tunnel top, be pressed together on the Steel bar rack 5 on reinforced mesh 4, be arranged on the stiffness steel plate 6 of anchor pole 3 end and the uniform cross bar 7 be arranged on bottom Steel bar rack 5, described Steel bar rack 5 is provided with a series of conduit 8 along direction, tunnel, described cross bar 7 two bottom sides is provided with rhone 9, prestressed draw-bar is provided with between described cross bar 7 and Steel bar rack 5, described prestressed draw-bar comprises two pull bars 10 being arranged on two ends, be separately positioned on dextrorotation screw thread and the derotation screw thread of the end of two pull bar 10 correspondences, and the adjusting nut 11 that coupling is arranged.
The utility model reasonable in design, stable mechanical property, be applicable to rich water packsand area, draining can be carried out timely, ensure that the degree of deformation of whole supporting is little simultaneously, improve the stability of supporting, guarantee that construction safety is convenient, front-probe support of the present utility model is that follow-up digging provides good operating environment, the effective stability ensureing whole construction speed.
Claims (2)
1. an energy-saving tunnel and Double pilot tunnel, it is characterized in that, comprise the left pilot tunnel and right pilot tunnel that lay respectively at the multiple-arch tunnel left and right sides, reinforced mesh, the Steel bar rack be pressed together on reinforced mesh, the stiffness steel plate being arranged on anchor pole end and the uniform cross bar be arranged on bottom Steel bar rack that described left pilot tunnel and right pilot tunnel include anchor pole, fit with tunnel top, described Steel bar rack is provided with a series of conduit along direction, tunnel, described cross bar two bottom sides is provided with rhone, is provided with prestressed draw-bar between described cross bar and Steel bar rack.
2. energy-saving tunnel and Double pilot tunnel according to claim 1, it is characterized in that, described prestressed draw-bar comprises the adjusting nut of two pull bars being arranged on two ends, the dextrorotation screw thread being separately positioned on end corresponding to two pull bars and derotation screw thread and coupling setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520141889.5U CN204552757U (en) | 2015-03-13 | 2015-03-13 | A kind of energy-saving tunnel and Double pilot tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520141889.5U CN204552757U (en) | 2015-03-13 | 2015-03-13 | A kind of energy-saving tunnel and Double pilot tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204552757U true CN204552757U (en) | 2015-08-12 |
Family
ID=53827884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520141889.5U Active CN204552757U (en) | 2015-03-13 | 2015-03-13 | A kind of energy-saving tunnel and Double pilot tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204552757U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339002A (en) * | 2018-11-20 | 2019-02-15 | 黄河勘测规划设计有限公司 | Arch dam deep-hole structures on a kind of high waste stream |
-
2015
- 2015-03-13 CN CN201520141889.5U patent/CN204552757U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339002A (en) * | 2018-11-20 | 2019-02-15 | 黄河勘测规划设计有限公司 | Arch dam deep-hole structures on a kind of high waste stream |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204076498U (en) | A kind of Precast T-Beam beam rib steel-bar binding location moulding bed | |
CN204877484U (en) | A steel reinforcement cage structure for reducing shield structure discrepancy station degree of difficulty | |
CN204552757U (en) | A kind of energy-saving tunnel and Double pilot tunnel | |
CN204326059U (en) | A kind of soft soil layer diaphragm wall filling concrete constructing structure | |
CN203938196U (en) | A kind of device for transporting equipment of semi-underground powerhouse | |
CN204343283U (en) | Soft soil layer construction of diaphragm wall structure | |
CN204343338U (en) | A kind of construction of diaphragm wall reinforcing cage syndeton | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN204252165U (en) | The artificial upper pipe working well of a kind of two way alternate | |
CN204370390U (en) | A kind of phreatic high pressure pipeline drainage system structure | |
CN206299163U (en) | Mobile reinforcement processes factory building | |
CN205171382U (en) | Hyperboloid case beam side combination structure support device | |
CN204899034U (en) | Prefabricated wall post | |
CN206504010U (en) | A kind of omnipotent assembling support | |
CN205735439U (en) | A kind of Precast T-Beam is just giving oblique template Quick switching structure | |
CN204144874U (en) | Crag cabling arrangements | |
CN203214099U (en) | Drainage structure of subway deformation joint water receiving box | |
CN204742083U (en) | Drip irrigation device | |
CN203430051U (en) | Automatic concrete pouring device used for building construction | |
CN204645018U (en) | Injected foundation structure | |
CN203977545U (en) | Can be for the gutter structure of rapid construction | |
CN204001225U (en) | A kind of connector that is applicable to metal transverse slat metope Zhong Shu Purlin and horizontal purlin | |
CN203594470U (en) | Automatic drainage device for adverse slope of long and large tunnel | |
CN203345395U (en) | Mounting rack for large steel pipe | |
CN104996012A (en) | Land leveling device for grader |