CN204551234U - With the pile framework groups of springs box-like bridge road transition section structure of abutment split - Google Patents

With the pile framework groups of springs box-like bridge road transition section structure of abutment split Download PDF

Info

Publication number
CN204551234U
CN204551234U CN201520246400.0U CN201520246400U CN204551234U CN 204551234 U CN204551234 U CN 204551234U CN 201520246400 U CN201520246400 U CN 201520246400U CN 204551234 U CN204551234 U CN 204551234U
Authority
CN
China
Prior art keywords
reinforced concrete
pile
concrete prefabricated
abutment
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520246400.0U
Other languages
Chinese (zh)
Inventor
黄志军
徐实
宋小齐
陈云峰
蔺永春
高以键
吴云天
李育红
盛世勇
刘永宁
乔建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Railway Administration
Original Assignee
Lanzhou Railway Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Railway Administration filed Critical Lanzhou Railway Administration
Priority to CN201520246400.0U priority Critical patent/CN204551234U/en
Application granted granted Critical
Publication of CN204551234U publication Critical patent/CN204551234U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Pile framework groups of springs box-like bridge road transition section structure with abutment split, comprises abutment, beam body and roadbed body, also comprises pile, reinforced concrete frame and spring bundle after platform; After platform, pile is installed in after abutment, and reinforced concrete frame comprises reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop; Reinforced concrete prefabricated level board is connected by the first high-strength link bolt with pile upper end after platform, reinforced concrete prefabricated tilt prop is connected by the second high-strength link bolt with pile bottom after platform, and the other end of reinforced concrete prefabricated level board is connected by the strong link bolt of third high with the reinforced concrete prefabricated tilt prop other end; Roadbed body is fixed in reinforced concrete prefabricated tilt prop laminating; Spring bundle is arranged between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop.It solve the settlement difference technical problem that in traffic route, between special-shaped structure, stiffness difference occurs, by concrete frame and the sedimentation of spring beam control transition region.

Description

With the pile framework groups of springs box-like bridge road transition section structure of abutment split
Technical field
The utility model relates to traffic engineering Bridge subgrade settlement difference control technology field, is specifically related to pile framework groups of springs box-like bridge road transition section structure that is a kind of and abutment split.
Background technology
In traffic engineering field, no matter be highway or railway, bridge (or tunnel, culvert) road changeover portion problem is just as one piece of persistent ailment recurrent exerbation and be difficult to thorough healing.End of the bridge " jumping car " phenomenon caused owing to there is settlement difference between abutment (tunnel or culvert) and roadbed, have a strong impact on the comfortableness of driving, reduce the traffic capacity of vehicle driving speed and road, simultaneously along with the further increase of sedimentation, strengthen the damage to vehicle and bridge abutment structure thing, bring huge potential safety hazard to traffic safety.
So to the traffic route be jointly made up of the different structure such as bridge, tunnel, culvert, roadbed and track, different structure influence each other and constitute smooth-going, a smooth circuit.In order to ensure its requirement that is smooth-going, smooth and comfortableness, the settlement difference along circuit longitudinal direction just strictly must be controlled, especially in tripe systems building joint.Owing to there are differences in the rigidity of structure between tripe systems building, in addition the difficulty that between the contact of tripe systems building, section exists when constructing, therefore, just settlement difference can be there is after construction between tripe systems building, structure different after circuit operation exacerbate settlement difference especially under the effect of traffic dynamic load, and particularly outstanding for the settlement difference of bridge (or tunnel, culvert) road changeover portion.
At present, at traffic engineering construction field, the measure that the settlement difference problem of administering bridge (or tunnel, culvert) road transition position is mainly taked has three: the first, measures of foundation treatment, mainly adopts cushion, reinforcing method etc. to process transition region soft foundation; Second arranges semi-rigid changeover portion, mainly selects high-quality, light filler fills transition region; 3rd, rebound method process transition region is set.Though these methods above-mentioned alleviate the excessive problem of transition region settlement difference to a certain extent, all can not tackle the problem at its root.
Summary of the invention
The technical problems to be solved in the utility model is to provide pile framework groups of springs box-like bridge road transition section structure that is a kind of and abutment split; This structure can reduce the sedimentation of changeover portion greatly, improves the resistance to overturning of changeover portion, can not effect a radical cure bridge (or tunnel, culvert) road transition region settlement difference problem to solve prior art.The technical scheme that the utility model provides explains with bridge basement transition stage.
The utility model solves the problems of the technologies described above the technical scheme taked: a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split, comprise ground, abutment, beam body and roadbed body, it is characterized in that: also comprise pile, reinforced concrete frame and spring bundle after platform; After platform, pile is installed in after abutment, and reinforced concrete frame comprises reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop; Reinforced concrete prefabricated level board is connected by the first high-strength link bolt with pile upper end after platform, reinforced concrete prefabricated tilt prop is connected by the second high-strength link bolt with pile bottom after platform, and the other end of reinforced concrete prefabricated level board is connected by the strong link bolt of third high with the reinforced concrete prefabricated tilt prop other end; Roadbed body is fixed in reinforced concrete prefabricated tilt prop laminating; Spring bundle is arranged between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop.
Steel corrugated sleeve pipe is set with outside spring bundle; The utility model use high-strength link bolt after precast rc slab and platform during pile and member integrated make.
Because the inclined-plane of frame construction and reinforced concrete prefabricated tilt prop are connected with roadbed body, roadbed body is that frame construction provides strong support; The transition region sedimentation of bridge road is effectively controlled by reinforced concrete frame.Be arranged on the steel corrugated sleeve pipe be set with outside spring bundle between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop and spring bundle, effectively alleviate action of traffic loading power.The utility model solves the technical problem occurring settlement difference in traffic route between special-shaped structure because of stiffness difference.Its advantage is compared with prior art:
1) after steel concrete level board, reinforced concrete prefabricated tilt prop, spring Shu Yutai, pile forms a whole structure, effectively a traffic load part can be delivered to spring bundle from structure stress, a part is delivered to pile after platform, control the distortion of transition structure body, thus reduce the settlement difference between abutment and changeover portion; Changeover portion frame construction is triangular structure, from abutment to roadbed direction, distance between steel concrete tilt prop and steel concrete level board reduces gradually, the thickness of roadbed body increases gradually, achieve the transition gradually between transition section structure and roadbed body, thus effectively prevent the generation of secondary settlement between transition section structure body and roadbed body.
2) the triangle transition section structure that after platform, pile, reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop form, forms a cavity, is provided with the spring bundle protected by corrugated bushing in cavity; Effectively can overcome entity transition section structure body in the past to conduct oneself with dignity excessive drawback, thus reduce transition section structure itself because of the sedimentation caused of conducting oneself with dignity, reduce the pressure to the roadbed body connected with it; Simultaneously spring Shu Benshen stores the load energy that a part of upper load transmits, and top traffic loading can be avoided to satisfy the need element body pressure, reduce the distortion of roadbed body, thus realize the smooth transition of bridge road sedimentation; Facilitate maintenance.
3) the utility model scope of application is comparatively wide, and construction quality is controlled.The triangle transition section structure that after platform, pile, reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop form, is not only applicable to the transition between bridge road and roadbed, is suitable for and transition between tunnel and roadbed, between culvert and roadbed yet.
The predetermined level plate used due to the utility model and reinforced concrete prefabricated tilt prop are prefabrication and assembly construction, and the steel corrugated sleeve pipe of spring bundle and outside suit is also for install in advance; Effectively can control construction quality, overcome bridge road changeover portion construction quality in the past and be difficult to deficiency up to standard.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Description of reference numerals is as follows: 1-abutment; 2-reinforced concrete prefabricated level board; 3-reinforced concrete prefabricated tilt prop; 4-the first high-strength link bolt; Pile after 5-platform; 6-pile foundation; 7-spring bundle; 8-steel corrugated sleeve pipe; 9-roadbed body; 10-beam body; 11-ground; 12-the second high-strength link bolt; The strong link bolt of 13-third high; 14-cavity.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.As shown in Figure 1: a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split, comprise ground 11, abutment 1, beam body 10 and roadbed body 9, also comprise pile 5, reinforced concrete frame and spring bundle 7 after platform; After platform, pile 5 is installed in after abutment 1, and reinforced concrete frame comprises reinforced concrete prefabricated level board 2 and reinforced concrete prefabricated tilt prop 3; Reinforced concrete prefabricated level board 2 is connected by the first high-strength link bolt 4 with pile after platform 5 upper end, reinforced concrete prefabricated tilt prop 3 is connected by the second high-strength link bolt 12 with pile after platform 5 bottom, and the other end of reinforced concrete prefabricated level board 2 is connected by the strong link bolt 13 of third high with reinforced concrete prefabricated tilt prop 3 other end; Roadbed body 9 is fixed in reinforced concrete prefabricated tilt prop 3 laminating; Spring bundle 7 is arranged between reinforced concrete prefabricated level board 2 and reinforced concrete prefabricated tilt prop 3; Namely be connected by high strong spring bundle 7 between reinforced concrete prefabricated level board 2 with reinforced concrete prefabricated tilt prop 3.
As of the present utility model perfect, outside spring bundle 7, be set with steel corrugated sleeve pipe 8; Steel corrugated sleeve pipe plays a protective role to spring bundle; As of the present utility model perfect further, between abutment 1 and roadbed body 9, bottom is provided with pile foundation 6, and after platform, pile 5 bottom is arranged at pile foundation 6; Pile foundation 6 is made by building plain concrete, and pile foundation 6 provides effective support for pile after platform 5.
After platform, pile 5, reinforced concrete prefabricated level board 2 form a triangular cavity 14 with reinforced concrete prefabricated tilt prop 3, and the spring bundle 7 being set with steel corrugated sleeve pipe 8 is positioned at triangular cavity 14.
The triangular structure that after platform, pile 5, reinforced concrete prefabricated level board 2 are formed with reinforced concrete prefabricated tilt prop 3, from abutment to roadbed direction, distance between steel concrete tilt prop and steel concrete level board reduces gradually, the thickness of roadbed body increases gradually, make the transition gradually realized between transition section structure and roadbed body, effectively prevent from, between transition section structure body and roadbed body, secondary settlement occurs.
Each high-strength link bolt after precast rc slab and platform during pile and member integrated make; Abutment adopts the mode of concrete cast-in-situ, after steel concrete level board, steel concrete tilt prop, platform, pile adopts prefabrication system, when component strength reaches designing requirement, with the spring bundle being set with steel corrugated sleeve pipe, steel concrete level board is connected with steel concrete tilt prop, then connects assembling with high-strength link bolt.
The utility model construction in, first roadbed body layer-by-layer rolling is compacted to designing requirement, with this frame transitions section contact position, cut slope by after subgrade compaction, its gradient is consistent with the reinforced concrete prefabricated tilt prop gradient.Install again after roadbed body settlement stability and join reinforced concrete frame.

Claims (5)

1. with the pile framework groups of springs box-like bridge road transition section structure of abutment split, comprise ground, abutment, beam body and roadbed body, it is characterized in that: also comprise pile (5), reinforced concrete frame and spring bundle (7) after platform; After platform, pile (5) is installed in after abutment (1), and reinforced concrete frame comprises reinforced concrete prefabricated level board (2) and reinforced concrete prefabricated tilt prop (3); Reinforced concrete prefabricated level board (2) is connected by the first high-strength link bolt (4) with pile after platform (5) upper end, reinforced concrete prefabricated tilt prop (3) is connected by the second high-strength link bolt (12) with pile after platform (5) bottom, and the other end of reinforced concrete prefabricated level board (2) is connected by the strong link bolt of third high (13) with reinforced concrete prefabricated tilt prop (3) other end; Roadbed body (9) is fixed in reinforced concrete prefabricated tilt prop (3) laminating; Spring bundle (7) is arranged between reinforced concrete prefabricated level board (2) and reinforced concrete prefabricated tilt prop (3).
2. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 1, is characterized in that: spring bundle (7) outside is set with steel corrugated sleeve pipe (8).
3. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 1 and 2, it is characterized in that: between abutment (1) and roadbed body (9), bottom is provided with pile foundation (6), after platform, pile (5) bottom is arranged at pile foundation (6).
4. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 3, is characterized in that: pile foundation (6) makes by building plain concrete.
5. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 4, it is characterized in that: after platform, pile (5), reinforced concrete prefabricated level board (2) form a triangular cavity (14) with reinforced concrete prefabricated tilt prop (3), and the spring bundle (7) being set with steel corrugated sleeve pipe (8) is positioned at triangular cavity (14).
CN201520246400.0U 2015-04-22 2015-04-22 With the pile framework groups of springs box-like bridge road transition section structure of abutment split Withdrawn - After Issue CN204551234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520246400.0U CN204551234U (en) 2015-04-22 2015-04-22 With the pile framework groups of springs box-like bridge road transition section structure of abutment split

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520246400.0U CN204551234U (en) 2015-04-22 2015-04-22 With the pile framework groups of springs box-like bridge road transition section structure of abutment split

Publications (1)

Publication Number Publication Date
CN204551234U true CN204551234U (en) 2015-08-12

Family

ID=53826367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520246400.0U Withdrawn - After Issue CN204551234U (en) 2015-04-22 2015-04-22 With the pile framework groups of springs box-like bridge road transition section structure of abutment split

Country Status (1)

Country Link
CN (1) CN204551234U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775351A (en) * 2015-04-22 2015-07-15 兰州铁路局 Pile column, framework and spring combined bridge-road transition section structure separated from bridge abutment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775351A (en) * 2015-04-22 2015-07-15 兰州铁路局 Pile column, framework and spring combined bridge-road transition section structure separated from bridge abutment
CN104775351B (en) * 2015-04-22 2016-06-01 兰州铁路局 With the stake post framework spring assembly box-like bridge road transition section structure of abutment split

Similar Documents

Publication Publication Date Title
CN103485279B (en) For the wet seam of cross-saddle single-track traffic
CN101550769B (en) Movable trestle
CN104775351B (en) With the stake post framework spring assembly box-like bridge road transition section structure of abutment split
CN103161101A (en) Straddle type monorail transportation rigid framework system
CN106978777B (en) A kind of make-shift bridge device
CN205012214U (en) Chain formula attachment strap structure based on seamless bridge
CN104790290B (en) The framework groups of springs box-like bridge road transition section structure linked into an integrated entity with abutment
CN107100092A (en) The quick bridge widening structure and installation method of a kind of uninterrupted traffic
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
CN204589786U (en) A kind of composite roof truss Shi Qiao road transition section structure of the one with abutment
CN204551234U (en) With the pile framework groups of springs box-like bridge road transition section structure of abutment split
CN104514202B (en) A kind of Single column pier beam bridge antidumping reinforcement means
CN105178171A (en) Chain type butt strap structure based on seamless bridge
CN105220622A (en) T beam widens reinforcing construction and construction method thereof
CN203834340U (en) Open type bond beam truss bridge
CN104775353B (en) With the stake post frame-combined bridge road transition section structure of abutment split
CN204551233U (en) The framework groups of springs box-like bridge road transition section structure linked into an integrated entity with abutment
CN204551243U (en) The framework rise of a truss strong spring modular bridge road transition section structure be separated with abutment
CN210262769U (en) Hollow slab bridge reinforcing and widening structure
CN204551235U (en) With the framework rise of a truss strong spring modular bridge road transition section structure of abutment one
CN204551232U (en) With the pile of abutment split frame-combined bridge road transition section structure
CN101935977B (en) Assembly type hollow slab bridge adopting bracket to replace ribbet to transmit force
CN104775352B (en) With the high-strength spring assembly of the framework truss box-like bridge road transition section structure of abutment one
CN104775357B (en) The framework rise of a truss strong spring modular bridge road transition section structure separated with abutment
CN105002818B (en) The frame type bridge road transition section structure linked into an integrated entity with abutment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150812

Effective date of abandoning: 20160601

C25 Abandonment of patent right or utility model to avoid double patenting