CN204551234U - With the pile framework groups of springs box-like bridge road transition section structure of abutment split - Google Patents
With the pile framework groups of springs box-like bridge road transition section structure of abutment split Download PDFInfo
- Publication number
- CN204551234U CN204551234U CN201520246400.0U CN201520246400U CN204551234U CN 204551234 U CN204551234 U CN 204551234U CN 201520246400 U CN201520246400 U CN 201520246400U CN 204551234 U CN204551234 U CN 204551234U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- pile
- concrete prefabricated
- abutment
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
Pile framework groups of springs box-like bridge road transition section structure with abutment split, comprises abutment, beam body and roadbed body, also comprises pile, reinforced concrete frame and spring bundle after platform; After platform, pile is installed in after abutment, and reinforced concrete frame comprises reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop; Reinforced concrete prefabricated level board is connected by the first high-strength link bolt with pile upper end after platform, reinforced concrete prefabricated tilt prop is connected by the second high-strength link bolt with pile bottom after platform, and the other end of reinforced concrete prefabricated level board is connected by the strong link bolt of third high with the reinforced concrete prefabricated tilt prop other end; Roadbed body is fixed in reinforced concrete prefabricated tilt prop laminating; Spring bundle is arranged between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop.It solve the settlement difference technical problem that in traffic route, between special-shaped structure, stiffness difference occurs, by concrete frame and the sedimentation of spring beam control transition region.
Description
Technical field
The utility model relates to traffic engineering Bridge subgrade settlement difference control technology field, is specifically related to pile framework groups of springs box-like bridge road transition section structure that is a kind of and abutment split.
Background technology
In traffic engineering field, no matter be highway or railway, bridge (or tunnel, culvert) road changeover portion problem is just as one piece of persistent ailment recurrent exerbation and be difficult to thorough healing.End of the bridge " jumping car " phenomenon caused owing to there is settlement difference between abutment (tunnel or culvert) and roadbed, have a strong impact on the comfortableness of driving, reduce the traffic capacity of vehicle driving speed and road, simultaneously along with the further increase of sedimentation, strengthen the damage to vehicle and bridge abutment structure thing, bring huge potential safety hazard to traffic safety.
So to the traffic route be jointly made up of the different structure such as bridge, tunnel, culvert, roadbed and track, different structure influence each other and constitute smooth-going, a smooth circuit.In order to ensure its requirement that is smooth-going, smooth and comfortableness, the settlement difference along circuit longitudinal direction just strictly must be controlled, especially in tripe systems building joint.Owing to there are differences in the rigidity of structure between tripe systems building, in addition the difficulty that between the contact of tripe systems building, section exists when constructing, therefore, just settlement difference can be there is after construction between tripe systems building, structure different after circuit operation exacerbate settlement difference especially under the effect of traffic dynamic load, and particularly outstanding for the settlement difference of bridge (or tunnel, culvert) road changeover portion.
At present, at traffic engineering construction field, the measure that the settlement difference problem of administering bridge (or tunnel, culvert) road transition position is mainly taked has three: the first, measures of foundation treatment, mainly adopts cushion, reinforcing method etc. to process transition region soft foundation; Second arranges semi-rigid changeover portion, mainly selects high-quality, light filler fills transition region; 3rd, rebound method process transition region is set.Though these methods above-mentioned alleviate the excessive problem of transition region settlement difference to a certain extent, all can not tackle the problem at its root.
Summary of the invention
The technical problems to be solved in the utility model is to provide pile framework groups of springs box-like bridge road transition section structure that is a kind of and abutment split; This structure can reduce the sedimentation of changeover portion greatly, improves the resistance to overturning of changeover portion, can not effect a radical cure bridge (or tunnel, culvert) road transition region settlement difference problem to solve prior art.The technical scheme that the utility model provides explains with bridge basement transition stage.
The utility model solves the problems of the technologies described above the technical scheme taked: a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split, comprise ground, abutment, beam body and roadbed body, it is characterized in that: also comprise pile, reinforced concrete frame and spring bundle after platform; After platform, pile is installed in after abutment, and reinforced concrete frame comprises reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop; Reinforced concrete prefabricated level board is connected by the first high-strength link bolt with pile upper end after platform, reinforced concrete prefabricated tilt prop is connected by the second high-strength link bolt with pile bottom after platform, and the other end of reinforced concrete prefabricated level board is connected by the strong link bolt of third high with the reinforced concrete prefabricated tilt prop other end; Roadbed body is fixed in reinforced concrete prefabricated tilt prop laminating; Spring bundle is arranged between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop.
Steel corrugated sleeve pipe is set with outside spring bundle; The utility model use high-strength link bolt after precast rc slab and platform during pile and member integrated make.
Because the inclined-plane of frame construction and reinforced concrete prefabricated tilt prop are connected with roadbed body, roadbed body is that frame construction provides strong support; The transition region sedimentation of bridge road is effectively controlled by reinforced concrete frame.Be arranged on the steel corrugated sleeve pipe be set with outside spring bundle between reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop and spring bundle, effectively alleviate action of traffic loading power.The utility model solves the technical problem occurring settlement difference in traffic route between special-shaped structure because of stiffness difference.Its advantage is compared with prior art:
1) after steel concrete level board, reinforced concrete prefabricated tilt prop, spring Shu Yutai, pile forms a whole structure, effectively a traffic load part can be delivered to spring bundle from structure stress, a part is delivered to pile after platform, control the distortion of transition structure body, thus reduce the settlement difference between abutment and changeover portion; Changeover portion frame construction is triangular structure, from abutment to roadbed direction, distance between steel concrete tilt prop and steel concrete level board reduces gradually, the thickness of roadbed body increases gradually, achieve the transition gradually between transition section structure and roadbed body, thus effectively prevent the generation of secondary settlement between transition section structure body and roadbed body.
2) the triangle transition section structure that after platform, pile, reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop form, forms a cavity, is provided with the spring bundle protected by corrugated bushing in cavity; Effectively can overcome entity transition section structure body in the past to conduct oneself with dignity excessive drawback, thus reduce transition section structure itself because of the sedimentation caused of conducting oneself with dignity, reduce the pressure to the roadbed body connected with it; Simultaneously spring Shu Benshen stores the load energy that a part of upper load transmits, and top traffic loading can be avoided to satisfy the need element body pressure, reduce the distortion of roadbed body, thus realize the smooth transition of bridge road sedimentation; Facilitate maintenance.
3) the utility model scope of application is comparatively wide, and construction quality is controlled.The triangle transition section structure that after platform, pile, reinforced concrete prefabricated level board and reinforced concrete prefabricated tilt prop form, is not only applicable to the transition between bridge road and roadbed, is suitable for and transition between tunnel and roadbed, between culvert and roadbed yet.
The predetermined level plate used due to the utility model and reinforced concrete prefabricated tilt prop are prefabrication and assembly construction, and the steel corrugated sleeve pipe of spring bundle and outside suit is also for install in advance; Effectively can control construction quality, overcome bridge road changeover portion construction quality in the past and be difficult to deficiency up to standard.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Description of reference numerals is as follows: 1-abutment; 2-reinforced concrete prefabricated level board; 3-reinforced concrete prefabricated tilt prop; 4-the first high-strength link bolt; Pile after 5-platform; 6-pile foundation; 7-spring bundle; 8-steel corrugated sleeve pipe; 9-roadbed body; 10-beam body; 11-ground; 12-the second high-strength link bolt; The strong link bolt of 13-third high; 14-cavity.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.As shown in Figure 1: a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split, comprise ground 11, abutment 1, beam body 10 and roadbed body 9, also comprise pile 5, reinforced concrete frame and spring bundle 7 after platform; After platform, pile 5 is installed in after abutment 1, and reinforced concrete frame comprises reinforced concrete prefabricated level board 2 and reinforced concrete prefabricated tilt prop 3; Reinforced concrete prefabricated level board 2 is connected by the first high-strength link bolt 4 with pile after platform 5 upper end, reinforced concrete prefabricated tilt prop 3 is connected by the second high-strength link bolt 12 with pile after platform 5 bottom, and the other end of reinforced concrete prefabricated level board 2 is connected by the strong link bolt 13 of third high with reinforced concrete prefabricated tilt prop 3 other end; Roadbed body 9 is fixed in reinforced concrete prefabricated tilt prop 3 laminating; Spring bundle 7 is arranged between reinforced concrete prefabricated level board 2 and reinforced concrete prefabricated tilt prop 3; Namely be connected by high strong spring bundle 7 between reinforced concrete prefabricated level board 2 with reinforced concrete prefabricated tilt prop 3.
As of the present utility model perfect, outside spring bundle 7, be set with steel corrugated sleeve pipe 8; Steel corrugated sleeve pipe plays a protective role to spring bundle; As of the present utility model perfect further, between abutment 1 and roadbed body 9, bottom is provided with pile foundation 6, and after platform, pile 5 bottom is arranged at pile foundation 6; Pile foundation 6 is made by building plain concrete, and pile foundation 6 provides effective support for pile after platform 5.
After platform, pile 5, reinforced concrete prefabricated level board 2 form a triangular cavity 14 with reinforced concrete prefabricated tilt prop 3, and the spring bundle 7 being set with steel corrugated sleeve pipe 8 is positioned at triangular cavity 14.
The triangular structure that after platform, pile 5, reinforced concrete prefabricated level board 2 are formed with reinforced concrete prefabricated tilt prop 3, from abutment to roadbed direction, distance between steel concrete tilt prop and steel concrete level board reduces gradually, the thickness of roadbed body increases gradually, make the transition gradually realized between transition section structure and roadbed body, effectively prevent from, between transition section structure body and roadbed body, secondary settlement occurs.
Each high-strength link bolt after precast rc slab and platform during pile and member integrated make; Abutment adopts the mode of concrete cast-in-situ, after steel concrete level board, steel concrete tilt prop, platform, pile adopts prefabrication system, when component strength reaches designing requirement, with the spring bundle being set with steel corrugated sleeve pipe, steel concrete level board is connected with steel concrete tilt prop, then connects assembling with high-strength link bolt.
The utility model construction in, first roadbed body layer-by-layer rolling is compacted to designing requirement, with this frame transitions section contact position, cut slope by after subgrade compaction, its gradient is consistent with the reinforced concrete prefabricated tilt prop gradient.Install again after roadbed body settlement stability and join reinforced concrete frame.
Claims (5)
1. with the pile framework groups of springs box-like bridge road transition section structure of abutment split, comprise ground, abutment, beam body and roadbed body, it is characterized in that: also comprise pile (5), reinforced concrete frame and spring bundle (7) after platform; After platform, pile (5) is installed in after abutment (1), and reinforced concrete frame comprises reinforced concrete prefabricated level board (2) and reinforced concrete prefabricated tilt prop (3); Reinforced concrete prefabricated level board (2) is connected by the first high-strength link bolt (4) with pile after platform (5) upper end, reinforced concrete prefabricated tilt prop (3) is connected by the second high-strength link bolt (12) with pile after platform (5) bottom, and the other end of reinforced concrete prefabricated level board (2) is connected by the strong link bolt of third high (13) with reinforced concrete prefabricated tilt prop (3) other end; Roadbed body (9) is fixed in reinforced concrete prefabricated tilt prop (3) laminating; Spring bundle (7) is arranged between reinforced concrete prefabricated level board (2) and reinforced concrete prefabricated tilt prop (3).
2. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 1, is characterized in that: spring bundle (7) outside is set with steel corrugated sleeve pipe (8).
3. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 1 and 2, it is characterized in that: between abutment (1) and roadbed body (9), bottom is provided with pile foundation (6), after platform, pile (5) bottom is arranged at pile foundation (6).
4. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 3, is characterized in that: pile foundation (6) makes by building plain concrete.
5. a kind of pile framework groups of springs box-like bridge road transition section structure with abutment split according to claim 4, it is characterized in that: after platform, pile (5), reinforced concrete prefabricated level board (2) form a triangular cavity (14) with reinforced concrete prefabricated tilt prop (3), and the spring bundle (7) being set with steel corrugated sleeve pipe (8) is positioned at triangular cavity (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520246400.0U CN204551234U (en) | 2015-04-22 | 2015-04-22 | With the pile framework groups of springs box-like bridge road transition section structure of abutment split |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520246400.0U CN204551234U (en) | 2015-04-22 | 2015-04-22 | With the pile framework groups of springs box-like bridge road transition section structure of abutment split |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204551234U true CN204551234U (en) | 2015-08-12 |
Family
ID=53826367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520246400.0U Withdrawn - After Issue CN204551234U (en) | 2015-04-22 | 2015-04-22 | With the pile framework groups of springs box-like bridge road transition section structure of abutment split |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204551234U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775351A (en) * | 2015-04-22 | 2015-07-15 | 兰州铁路局 | Pile column, framework and spring combined bridge-road transition section structure separated from bridge abutment |
-
2015
- 2015-04-22 CN CN201520246400.0U patent/CN204551234U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775351A (en) * | 2015-04-22 | 2015-07-15 | 兰州铁路局 | Pile column, framework and spring combined bridge-road transition section structure separated from bridge abutment |
CN104775351B (en) * | 2015-04-22 | 2016-06-01 | 兰州铁路局 | With the stake post framework spring assembly box-like bridge road transition section structure of abutment split |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103485279B (en) | For the wet seam of cross-saddle single-track traffic | |
CN101550769B (en) | Movable trestle | |
CN104775351B (en) | With the stake post framework spring assembly box-like bridge road transition section structure of abutment split | |
CN103161101A (en) | Straddle type monorail transportation rigid framework system | |
CN106978777B (en) | A kind of make-shift bridge device | |
CN205012214U (en) | Chain formula attachment strap structure based on seamless bridge | |
CN104790290B (en) | The framework groups of springs box-like bridge road transition section structure linked into an integrated entity with abutment | |
CN107100092A (en) | The quick bridge widening structure and installation method of a kind of uninterrupted traffic | |
CN108060634A (en) | Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method | |
CN204589786U (en) | A kind of composite roof truss Shi Qiao road transition section structure of the one with abutment | |
CN204551234U (en) | With the pile framework groups of springs box-like bridge road transition section structure of abutment split | |
CN104514202B (en) | A kind of Single column pier beam bridge antidumping reinforcement means | |
CN105178171A (en) | Chain type butt strap structure based on seamless bridge | |
CN105220622A (en) | T beam widens reinforcing construction and construction method thereof | |
CN203834340U (en) | Open type bond beam truss bridge | |
CN104775353B (en) | With the stake post frame-combined bridge road transition section structure of abutment split | |
CN204551233U (en) | The framework groups of springs box-like bridge road transition section structure linked into an integrated entity with abutment | |
CN204551243U (en) | The framework rise of a truss strong spring modular bridge road transition section structure be separated with abutment | |
CN210262769U (en) | Hollow slab bridge reinforcing and widening structure | |
CN204551235U (en) | With the framework rise of a truss strong spring modular bridge road transition section structure of abutment one | |
CN204551232U (en) | With the pile of abutment split frame-combined bridge road transition section structure | |
CN101935977B (en) | Assembly type hollow slab bridge adopting bracket to replace ribbet to transmit force | |
CN104775352B (en) | With the high-strength spring assembly of the framework truss box-like bridge road transition section structure of abutment one | |
CN104775357B (en) | The framework rise of a truss strong spring modular bridge road transition section structure separated with abutment | |
CN105002818B (en) | The frame type bridge road transition section structure linked into an integrated entity with abutment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150812 Effective date of abandoning: 20160601 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |