CN204549646U - A kind of cable disk erecting device - Google Patents

A kind of cable disk erecting device Download PDF

Info

Publication number
CN204549646U
CN204549646U CN201520253182.3U CN201520253182U CN204549646U CN 204549646 U CN204549646 U CN 204549646U CN 201520253182 U CN201520253182 U CN 201520253182U CN 204549646 U CN204549646 U CN 204549646U
Authority
CN
China
Prior art keywords
support
moving body
cable disk
erecting device
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520253182.3U
Other languages
Chinese (zh)
Inventor
汪银华
张痛快
古博今
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunlight Cable Co Ltd Of Zhoukou City
Original Assignee
Sunlight Cable Co Ltd Of Zhoukou City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunlight Cable Co Ltd Of Zhoukou City filed Critical Sunlight Cable Co Ltd Of Zhoukou City
Priority to CN201520253182.3U priority Critical patent/CN204549646U/en
Application granted granted Critical
Publication of CN204549646U publication Critical patent/CN204549646U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Guides For Winding Or Rewinding, Or Guides For Filamentary Materials (AREA)

Abstract

A kind of cable disk erecting device, the support comprising moving body and be obliquely installed, the width that the bottom of moving body is provided with runner support is identical with the diameter of cable disk, and fit in the front end of support and ground, the end of support and the upper surface of moving body fit.When cable disk is installed in pair twister by needs, by support, cable disk is rolled on moving body, moving body is moved near pair twister, promote cable disk under external force, cable disk is arranged on pair twister.The utility model structure is simple, and the moving body of setting and support, can carry out the installation of cable disk easily under the effect of a people, easy to use, reduces labour intensity.

Description

A kind of cable disk erecting device
Technical field
The utility model belongs to the installing area of cable disk in cable manufacturing process, is specifically related to a kind of cable disk erecting device.
Background technology
Cable, in the process manufactured, needs wire-wound to be located on drum, is arranged in pair twister subsequently, carries out pair twist by the drum being arranged with cable.
Because cable disk weight is comparatively large, need at least two people drum could be arranged in pair twister, but the drum mounting hole size on pair twister is limited, two people's operation inconvenience in the process of installing, cause whole installation process cumbersome, consuming time longer, and working strength is larger.
Utility model content
The utility model aims to provide the cable disk erecting device that a kind of structure is simple, facilitate cable disk to install.
For solving the problems of the technologies described above, the utility model provides following technical scheme: a kind of cable disk erecting device, innovation of the present utility model is: comprise the moving body that support and bottom are provided with runner, the width of support is identical with the width of cable disk, the upper surface of support is domatic, front end and the ground of support fit, and the upper surface of end and moving body fits.
Along stent length direction, support both sides are provided with chute, cable disk rolls and is arranged in chute.
Moving body upper surface is arranged at intervals with the backplate that 2 free ends stretch out moving body, and the distance between 2 backplates is less than the diameter of cable disk.
Stent ends is horizontally arranged with horizontal plate, and the lower surface of horizontal plate and the upper surface of moving body fit.
The middle part of support is provided with strut bar, and supporting bar top is fixedly connected with support, and strut bar bottom and ground fit.
Described runner is cardan wheel.
The front vertical of moving body is provided with push rod.
By above technical scheme, the beneficial effects of the utility model are: the moving body 1, arranged and support facilitate the installation of cable disk, reduce labour intensity; 2, the setting of chute, ensure that the sliding trace of cable disk on support, prevents the phenomenon of cable disk from slippage support; 3, the setting of backplate, ensure that the sliding trace of cable disk on moving body, prevents cable disk from slippage moving body; 4, the free end of backplate stretches out moving body, thus can extend in the mounting hole of pair twister by backplate, facilitates installation process; 5, the setting of stay bearing plate further ensures the balance of support; 6, arranging of horizontal plate can effectively prevent support from occurring the phenomenon of sliding, and facilitates cable disk and rolls on moving body; 7, cardan wheel setting party the turning to of moving body; The setting party of push rod the movement of moving body.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 bitmap 1 birds-eye view;
Fig. 3 is that drum is positioned at schematic diagram on moving body.
Detailed description of the invention
Cable disk erecting device as shown in Figure 1, Figure 2 and Figure 3, comprise bottom be provided with the moving body 1 of runner and be obliquely installed support 2, support 2 is obliquely installed to make its upper surface be domatic, and the width of support 2 is identical with the width of drum 8, thus ensure that the slip of drum 8 on support 2.
The runner that moving body 1 bottom is arranged has 4, and 4 runners are cardan wheel 4, facilitate the commutation of moving body 1 in moving process.The rear portion of moving body 1 is provided with push rod 6, and push rod 6 is vertically arranged on moving body 1, can be carried out the movement of moving body 1 by push rod 6 easily.The distance be arranged at intervals with between 2 backplates, 5,2 backplates 5 on the top of moving body 1 is less than the diameter of drum 8 thus is arranged between two backplates 5 by drum 8.
In the process used, drum 8 can be fastened between two backplates 5, thus when drum 8 is positioned on moving body 1, when installing on pair twister under the promotion of external force, drum 8 can not be rolled down from moving body 1.The free end of backplate 5 stretches out moving body 1, thus can extend in the mounting hole of pair twister by the free end of backplate 5 by the part utilizing this to stretch out, and facilitates the installation of drum 8.
Fit in the lower surface of the front end of support 2 and ground, the end of support 2 is horizontally arranged with horizontal plate 10, the lower surface of horizontal plate 10 and the upper surface of moving body 1 fit, by moving body 1, support 2 inclined shore is got up, in order to ensure the balance of support 2 further, the middle part of support 2 is provided with strut bar 3, and fit in the bottom of strut bar 3 and ground, top is fixedly connected with support 2.Be provided with chute 9 in the both sides of support 2, chute 9 is arranged along the length direction of support 2, and drum 8 is arranged in chute 9, and can roll along chute 9.
In the process used, drum 8 is rolled to the end of support 2 from the front end of support 2 along chute 9, effectively can prevent drum 8 in the process of rolling, support 2 occurring the skew of track, facilitates operation by arranging chute 9.The horizontal plate 10 that support 2 end is arranged, can easily by drum 8 to the promotion on moving body 1, because drum 8 weight is comparatively large, if there is no horizontal plate 10, when drum 8 arrives support 2 end, be easy to the phenomenon occurring sliding from support 2.
When drum 8 is installed in pair twister by needs; because having certain distance between drum 8 and pair twister; be fitted on moving body 1 by the horizontal plate 10 of the end by support 2; drum 8 is slided on moving body 1 along chute 9; drum 8 on moving body 1 under the protection of backplate 5; prevent and tumble from moving body 1; by moving body 1 is moved near pair twister; the free end of backplate 5 is extend in pair twister, promotes drum 8 under external force and drum 8 is arranged on pair twister.
The utility model structure is simple, and the moving body of setting and support, can carry out the installation of drum 8 easily under the effect of a people, easy to use, reduces labour intensity.

Claims (7)

1. a cable disk erecting device, it is characterized in that: comprise the moving body that support and bottom are provided with runner, the width of support is identical with the width of cable disk, and the upper surface of support is domatic, front end and the ground of support fit, and the upper surface of end and moving body fits.
2. cable disk erecting device as claimed in claim 1, is characterized in that: along stent length direction, support both sides are provided with chute, and cable disk rolls and is arranged in chute.
3. cable disk erecting device as claimed in claim 2, is characterized in that: moving body upper surface is arranged at intervals with the backplate that 2 free ends stretch out moving body, and the distance between 2 backplates is less than the diameter of cable disk.
4. cable disk erecting device as claimed in claim 3, it is characterized in that: stent ends is horizontally arranged with horizontal plate, the lower surface of horizontal plate and the upper surface of moving body fit.
5. cable disk erecting device as claimed in claim 4, it is characterized in that: the middle part of support is provided with strut bar, and supporting bar top is fixedly connected with support, strut bar bottom and ground fit.
6. the cable disk erecting device as described in claim 1 to 5 any one, is characterized in that: described runner is cardan wheel.
7. cable disk erecting device as claimed in claim 6, is characterized in that: the front vertical of moving body is provided with push rod.
CN201520253182.3U 2015-04-24 2015-04-24 A kind of cable disk erecting device Expired - Fee Related CN204549646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520253182.3U CN204549646U (en) 2015-04-24 2015-04-24 A kind of cable disk erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520253182.3U CN204549646U (en) 2015-04-24 2015-04-24 A kind of cable disk erecting device

Publications (1)

Publication Number Publication Date
CN204549646U true CN204549646U (en) 2015-08-12

Family

ID=53824783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520253182.3U Expired - Fee Related CN204549646U (en) 2015-04-24 2015-04-24 A kind of cable disk erecting device

Country Status (1)

Country Link
CN (1) CN204549646U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335820A (en) * 2016-10-19 2017-01-18 郑州职业技术学院 Locking and self-discharging mechanism for wire reels
CN107973178A (en) * 2017-11-23 2018-05-01 广东亿洋管业科技有限公司 A kind of doubling frame semi-finished product moving-out device
CN109230810A (en) * 2018-09-12 2019-01-18 国网河北省电力有限公司沧州供电分公司 A kind of cable laying assistant conveyance device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335820A (en) * 2016-10-19 2017-01-18 郑州职业技术学院 Locking and self-discharging mechanism for wire reels
CN107973178A (en) * 2017-11-23 2018-05-01 广东亿洋管业科技有限公司 A kind of doubling frame semi-finished product moving-out device
CN109230810A (en) * 2018-09-12 2019-01-18 国网河北省电力有限公司沧州供电分公司 A kind of cable laying assistant conveyance device

Similar Documents

Publication Publication Date Title
CN204549646U (en) A kind of cable disk erecting device
CN202610297U (en) Anti-jump device for heat treatment of steel cord
CN203387992U (en) Movable adjusting supporting frame in plastic-covered tunnel
CN203932942U (en) A kind of drag chain bracket system
CN203714847U (en) Unloading and lifting device of wing wheel grain scraper
CN205519060U (en) Wire drawing machine ground roll pay -off
CN204646266U (en) The U-shaped steel bracket of a kind of mine with bearing diagonal
CN201853425U (en) Windproof advertisement board
CN202252346U (en) Drag chain support device
CN204038549U (en) A kind of automatic carriage
CN204941568U (en) A kind of tunnel lining trolley
CN205203735U (en) Have gyro wheel blowing frame
CN206346491U (en) A kind of bar frame colligation servicing unit
CN202892703U (en) Sliding safety pole for installing tension bar on fabricated building roof
CN203845512U (en) Driven unreeling frame for glass spacing paper
CN205495126U (en) Movable purifier
CN204057791U (en) A kind of tobacco rod dress roasting device
CN204898566U (en) Ball joint railing convenient to installation
CN203726817U (en) Embossing mold for tire
CN204205382U (en) A kind of circuit breaker propelling mechanism adjustment bracing or strutting arrangement
CN107103857A (en) A kind of windproof advertising board
CN207749904U (en) A kind of easy-to-mount security isolation column of road and bridge construction
CN204646273U (en) The U-shaped steel bracket of a kind of mine
CN202346354U (en) Pipe blanking cushioning device
CN203821710U (en) Fixing device of steel structure for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

CF01 Termination of patent right due to non-payment of annual fee