CN204532392U - A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage - Google Patents
A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage Download PDFInfo
- Publication number
- CN204532392U CN204532392U CN201520093305.1U CN201520093305U CN204532392U CN 204532392 U CN204532392 U CN 204532392U CN 201520093305 U CN201520093305 U CN 201520093305U CN 204532392 U CN204532392 U CN 204532392U
- Authority
- CN
- China
- Prior art keywords
- mouth
- hydraulic hose
- high pressure
- pressure valve
- strainer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000010354 integration Effects 0.000 claims description 5
- 238000012986 modification Methods 0.000 description 6
- 230000004048 modification Effects 0.000 description 6
- 230000008676 import Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000004873 anchoring Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 2
- 230000005520 electrodynamics Effects 0.000 description 2
- 239000003245 coal Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Earth Drilling (AREA)
Abstract
The utility model relates to a kind of tensioning system device of two-arm hydraulic anchor rod drill carriage, it is characterized in that, described tensioning system device comprises tensioner support, high pressure valve, pressure meter, strainer, booster and hydraulic hose, described high pressure valve is provided with high pressure valve A mouth and high pressure valve B mouth, described strainer is provided with strainer A mouth and filter B mouth, described hydraulic hose comprises hydraulic hose I, hydraulic hose II, hydraulic hose III, hydraulic hose IV, described hydraulic hose I is connected with strainer A mouth, described hydraulic hose IV one end connects filter B mouth, the other end connects booster, described hydraulic hose II is connected with high pressure valve A mouth, described hydraulic hose III is connected with high pressure valve B mouth.The ingenious practicality of whole Technical Design, makes full use of the confined space, rationally distributed, easy to operate, further increases advance and the mechanization degree of drill carriage.
Description
Technical field
The present invention relates to a kind of anchorage cable stretching equipment, relate in particular to a kind of tensioning system device of two-arm hydraulic anchor rod drill carriage.
Put.
Background technology
Coal in China industry used wood bracing frame shed ding support in the past, and this old-fashioned support pattern often cave in accident can occur.Compatriots are through the well-designed bolting with wire mesh formula supporting method occurring using in industry, and this method greatly reduces potential safety hazard.Bolting with wire mesh in the past needs several equipment, as monomer hydraulic or pneumatic roof bolter, and hand-held or power supporting leg type accessory anchor bolt drilling machine, hand, electrodynamic type or pneumatic type anchor cable tensioning machine tool and ladder.There is following technical problem in existing facility or ladder; 1) on market, existing hydraulic drill rig can only meet the anchoring installation of boring anchor bar anchor cable hole and anchor shaft anchor cable, and the stretch-draw that can not meet anchor cable is installed, very inconvenient; 2) what commonly use in prior art is hand, electrodynamic type or pneumatic type anchorage cable stretching machine, and longevity of service, exists certain potential safety hazard simultaneously; 3) inefficiency, labour intensity are large.Therefore, a kind of new technical scheme of exigence solves this technical problem.
Summary of the invention
The present invention is just for the deficiency existed in existing equipment and operation inconvenience, the device of the integrated tensioning system of a kind of two-arm colliery hydraulic anchor rod drill carriage is provided, this device achieves anchoring installation and the stretch-draw installation of anchor shaft anchor cable on the hydraulic anchor rod drill carriage of two-arm colliery, improve advance and the operating efficiency of drill carriage, rational in infrastructure, easy to operate, effectively reduce the labour intensity of operating personnel.
To achieve these goals, the technical solution used in the present invention is, a kind of tensioning system device of two-arm hydraulic anchor rod drill carriage, it is characterized in that, described tensioning system device comprises tensioner support, high pressure valve, pressure meter, strainer, booster and hydraulic hose, described high pressure valve is provided with high pressure valve A mouth and high pressure valve B mouth, described strainer is provided with strainer A mouth and filter B mouth, described hydraulic hose comprises hydraulic hose I, hydraulic hose II, hydraulic hose III, hydraulic hose IV, described hydraulic hose I is connected with strainer A mouth, described hydraulic hose IV one end connects filter B mouth, the other end connects booster, described hydraulic hose II is connected with high pressure valve A mouth, described hydraulic hose III is connected with high pressure valve B mouth.This technical scheme relates to compact and reasonable, can realize boring anchor bar anchor cable hole, the anchoring installation of anchor shaft anchor cable and the stretch-draw of anchor cable to install, and utilize drill carriage self hydraulic power source by reaching the stretching force needed for various anchor cable specification after the reciprocal supercharging of import reciprocating-type supercharger.The ingenious practicality of whole Technical Design, easy to operate, further increase the mechanization degree of drill carriage.
As a modification of the present invention, described tensioning system device also comprises stretch-draw jack, and described stretch-draw jack comprises jack A mouth and jack B mouth, and described hydraulic hose III one end connects high pressure valve B mouth, the other end is connected with jack B mouth, forms an oil-feed and goes out oil return line.
As a modification of the present invention, described tensioning system device also comprises valve group, and described hydraulic hose I one end connects strainer A mouth, and the other end is connected to valve group and connects.
As a modification of the present invention, described tensioner support, high pressure valve, pressure meter, strainer, booster integrates, and forms integration module.When needs anchor cable, rotate high pressure valve switch knob to enable possition, by two-arm colliery hydraulic anchor rod drill carriage self hydraulic power source by reaching the stretching force needed for various anchor cable specification after the reciprocal supercharging of import reciprocating-type supercharger, described stretch-draw jack is made to realize free operant.Otherwise rotate high pressure valve switch knob to fastening position, disconnect hydraulic power source, stretch-draw jack quits work.
Relative to prior art, advantage of the present invention is as follows, 1), in this technical scheme, tensioning system and two-arm colliery hydraulic anchor rod drill carriage become one, and overall structure is simply compact, disassembly and assembly convenient maintenance and replacement; 2) tensioning equipment designed by this technical scheme makes full use of the confined space, handled easily; 3) this technical scheme improves advance and the operating efficiency of drill carriage, rational in infrastructure, easy to operate, effectively reduces the labour intensity of operating personnel, improves the mechanization degree of two-arm colliery hydraulic anchor rod drill carriage; 4) this technical scheme cost is lower, is convenient to application of shutting out on a large scale.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention.
In figure: 1-tensioner support, 2-high pressure valve, 3-pressure meter, 4-strainer, 5-hydraulic hose I, 6-hydraulic hose II, 7-hydraulic hose III, 8-hydraulic hose IV, 9-stretch-draw jack, 10-valve group, 11-booster.
Detailed description of the invention
In order to deepen the understanding of the present invention and understanding, below in conjunction with accompanying drawing, the invention will be further described and introduce.
embodiment 1:as Fig. 1, a kind of tensioning system device of two-arm hydraulic anchor rod drill carriage, described tensioning system device comprises tensioner support 1, high pressure valve 2, pressure meter 3, strainer 4, booster 11 and hydraulic hose, described high pressure valve 2 is provided with high pressure valve A mouth and high pressure valve B mouth, described strainer is provided with strainer A mouth and filter B mouth, described hydraulic hose comprises hydraulic hose I 5, hydraulic hose II 6, hydraulic hose III 7, hydraulic hose IV 8, described hydraulic hose I 5 is connected with strainer 4 A mouth, described hydraulic hose IV 8 one end connects strainer 4B mouth, the other end connects booster, described hydraulic hose II 6 is connected with high pressure valve 2 A mouth, described hydraulic hose III 7 is connected with high pressure valve 2 B mouth.This technical scheme relates to compact and reasonable, can realize boring anchor bar anchor cable hole, the anchoring installation of anchor shaft anchor cable and the stretch-draw of anchor cable to install, and utilize drill carriage self hydraulic power source by reaching the stretching force needed for various anchor cable specification after the reciprocal supercharging of import reciprocating-type supercharger.The ingenious practicality of whole Technical Design, easy to operate, further increase the mechanization degree of drill carriage.
embodiment 2:as Fig. 1, as a modification of the present invention, described tensioning system device also comprises stretch-draw jack 9, and described stretch-draw jack comprises jack A mouth and jack B mouth, and described hydraulic hose III 7 one end connects high pressure valve 2 B mouth, and the other end is connected with jack B mouth.All the other structures are identical with embodiment 1 with advantage.
embodiment 3:as Fig. 1, as a modification of the present invention, described tensioning system device also comprises valve group 10), described hydraulic hose I 5 one end connects strainer 4 A mouth, and the other end is connected to valve group 10 and connects.All the other structures are identical with embodiment 1 with advantage.
embodiment 4:as Fig. 1, as a modification of the present invention, described tensioner support 1, high pressure valve 2, pressure meter 3, strainer 4, booster 11 integrates, and forms integration module.When needs anchor cable, rotate high pressure valve switch knob to enable possition, by two-arm colliery hydraulic anchor rod drill carriage self hydraulic power source by reaching the stretching force needed for various anchor cable specification after the reciprocal supercharging of import reciprocating-type supercharger, described stretch-draw jack is made to realize free operant.Otherwise rotate high pressure valve switch knob to fastening position, disconnect hydraulic power source, stretch-draw jack quits work.All the other structures are identical with embodiment 1 with advantage.
specific works principle:see Fig. 1, a kind of tensioning system device of two-arm hydraulic anchor rod drill carriage, comprises tensioner support 1, high pressure valve 2, pressure meter 3, strainer 4, hydraulic hose I 5, hydraulic hose II 6, hydraulic hose III 7, hydraulic hose IV 8, stretch-draw jack 9, valve group 10, booster 11; Described high pressure valve 2 is combined as an integration module with pressure meter 3, strainer 4, booster 11 and tensioner support 1, described hydraulic tube I 5 one end connection valve group 10, the other end connects strainer 4 A mouth, described hydraulic tube 8 one end connects strainer 4 B mouth, the other end is connected with booster 11, and described hydraulic hose II 6 one end connects high pressure valve 2 A mouth, and the other end is connected with stretch-draw jack 9 A mouth, described hydraulic tube 7 one end connects high pressure valve 2 B mouth, and the other end is connected with stretch-draw jack 9 B mouth; When wanting anchor cable, rotate high pressure valve switch knob to enable possition, by two-arm colliery hydraulic anchor rod drill carriage self hydraulic power source by reaching the stretching force needed for various anchor cable specification after the reciprocal supercharging of import reciprocating-type supercharger, described stretch-draw jack is made to realize free operant.Otherwise rotate high pressure valve switch knob to fastening position, disconnect hydraulic power source, stretch-draw jack quits work; The ingenious practicality of whole Technical Design, rational in infrastructure compact, easy to operate, further increase the mechanization of drill carriage and degree of first evolving.
It should be noted that above-described embodiment, be not used for limiting protection scope of the present invention, equivalents done on the basis of technique scheme or the alternative scope all falling into the claims in the present invention and protect.
Claims (4)
1. the tensioning system device of a two-arm hydraulic anchor rod drill carriage, it is characterized in that, described tensioning system device comprises tensioner support (1), high pressure valve (2), pressure meter (3), strainer (4), booster (11) and hydraulic hose, described high pressure valve (2) is provided with high pressure valve A mouth and high pressure valve B mouth, described strainer is provided with strainer A mouth and filter B mouth, described hydraulic hose comprises hydraulic hose I (5), hydraulic hose II (6), hydraulic hose III (7), hydraulic hose IV (8), described hydraulic hose I (5) is connected with strainer (4) A mouth, described hydraulic hose IV (8) one end connects strainer (4) B mouth, the other end connects booster, described hydraulic hose II (6) is connected with high pressure valve (2) A mouth, described hydraulic hose III (7) is connected with high pressure valve (2) B mouth.
2. the tensioning system device of a kind of two-arm hydraulic anchor rod drill carriage according to claim 1, it is characterized in that, described tensioning system device also comprises stretch-draw jack (9), described stretch-draw jack comprises jack A mouth and jack B mouth, described hydraulic hose III (7) one end connects high pressure valve (2) B mouth, and the other end is connected with jack B mouth.
3. the tensioning system device of a kind of two-arm hydraulic anchor rod drill carriage according to claim 1 and 2, it is characterized in that, described tensioning system device also comprises valve group (10), described hydraulic hose I (5) one end connects strainer (4) A mouth, and the other end is connected to valve group (10) and connects.
4. the tensioning system device of a kind of two-arm hydraulic anchor rod drill carriage according to claim 3, it is characterized in that, described tensioner support (1), high pressure valve (2), pressure meter (3), strainer (4), booster (11) integrates, form integration module
Integration module is arranged on the medial surface of large arm, the lower left of valve group (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520093305.1U CN204532392U (en) | 2015-02-10 | 2015-02-10 | A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520093305.1U CN204532392U (en) | 2015-02-10 | 2015-02-10 | A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204532392U true CN204532392U (en) | 2015-08-05 |
Family
ID=53746414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520093305.1U Expired - Fee Related CN204532392U (en) | 2015-02-10 | 2015-02-10 | A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204532392U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695989A (en) * | 2015-02-10 | 2015-06-10 | 盐城恒越电气有限公司 | Stretching-drawing system device for two-arm hydraulic anchor rod drill rig |
-
2015
- 2015-02-10 CN CN201520093305.1U patent/CN204532392U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695989A (en) * | 2015-02-10 | 2015-06-10 | 盐城恒越电气有限公司 | Stretching-drawing system device for two-arm hydraulic anchor rod drill rig |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201220896Y (en) | Two-stage telescoping built-in oil conduit supporting leg | |
CN204532392U (en) | A kind of tensioning system device of two-arm hydraulic anchor rod drill carriage | |
CN104196446A (en) | Six-arm full hydraulic anchor rod and anchor cable drill carriage used in cooperation with continuous miner | |
CN204024469U (en) | The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses | |
CN104695989A (en) | Stretching-drawing system device for two-arm hydraulic anchor rod drill rig | |
CN201756925U (en) | Safety polished rod clip for pumping unit well | |
CN204152428U (en) | A kind of narrow fuselage four arm anchor shaft anchor cable drill carriage | |
CN202850854U (en) | Two-stage pressure system for rotary drilling rig | |
CN201650317U (en) | Hydraulic mine roadway timbering machine | |
CN204492675U (en) | A kind of gas-liquid mixed power drill | |
CN205400768U (en) | Anchor rope integration platform truck | |
CN201581806U (en) | Coal face projection prevention hydraulic drill system | |
CN212583616U (en) | Efficient drilling machine | |
CN204827484U (en) | Colliery is supporting device in pit | |
CN202742018U (en) | Special chain tightener for scraper conveyor | |
CN206455976U (en) | A kind of workbench applied to punch press | |
CN201164985Y (en) | Sealing member change apparatus for reciprocating type plunger pump | |
CN201934017U (en) | Walking device for mineral boring machine | |
CN205778531U (en) | A kind of raise boring machine towards low stoop way | |
CN205630460U (en) | Tool for pulling out locating pin | |
CN204691800U (en) | A kind of canopy head lifting apparatus | |
CN204344122U (en) | A kind of large-scale development machine bolting with wire mesh device | |
CN209021982U (en) | A kind of tooling to assemble drill carriage buffer unit | |
CN112225140B (en) | Supporting platform for mining machinery operation and using method thereof | |
CN203783450U (en) | All-angle emulsion drilling rig for coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160826 Address after: 224011 Jiangsu province Yancheng City District Longgang Town Hing Road No. 50 Patentee after: JIANGSU ZINGO HEAVY INDUSTRY CO.,LTD. Address before: 224011 Jiangsu province Yancheng City District Longgang Town Hing Road No. 50 Patentee before: YANCHENG HENGYUE ELECTRIC CO.,LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 |
|
CF01 | Termination of patent right due to non-payment of annual fee |