CN204532332U - 水力冲孔出煤量测量装置 - Google Patents
水力冲孔出煤量测量装置 Download PDFInfo
- Publication number
- CN204532332U CN204532332U CN201520130084.0U CN201520130084U CN204532332U CN 204532332 U CN204532332 U CN 204532332U CN 201520130084 U CN201520130084 U CN 201520130084U CN 204532332 U CN204532332 U CN 204532332U
- Authority
- CN
- China
- Prior art keywords
- coal
- storage box
- hole
- hydraulic flushing
- coal storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本实用新型公开了一种水力冲孔出煤量测量装置,包括储煤箱、连接管、孔口固定器四部分,其中储煤箱的箱壁上设置有出水小孔,并在一个面上设有钢化玻璃刻度尺,另一个面的上端安装两个铰链下端安装固定把手。水力冲孔时,从钻孔中冲出的水和煤渣由孔口固定器经连接管进入储煤箱中,水通过出水小孔排除,煤渣则留到储煤箱中,冲孔结束后,通过读取钢化玻璃刻度尺的刻度计算出水力冲孔的出煤体积,打开固定把手将煤渣放出,测量结束。本实用新型是一种用于煤矿井下水力冲孔时出煤量测试装置,用于井下水力冲孔时出煤的自动收集和测量,为水力冲孔的优化提供较为准确的依据。
Description
技术领域
本实用新型涉及公开了一种水力冲孔出煤量测量装置可进行煤矿井下水力冲孔时的出煤量准确测量,从而实现自动收集水力冲孔出煤并准确测量出煤量体积,为后期的水力冲孔效果评价提供重要参数。
背景技术
水力冲孔是以保护岩柱或煤柱作为安全屏障,向有突出危险煤层打钻孔,并向钻孔内注入承受一定压力的水,利用喷嘴切割和高压水射流的冲击,破坏钻孔周围煤体中的应力和瓦斯平衡,使其处于不稳定状态,煤、水、瓦斯经过孔道向空外排出,孔道周围煤体剧烈向孔道方向移动,同时发生煤体的膨胀变形和顶底板的相向位移,引起在钻冲影响范围内地应力降低,煤层卸压,裂隙增加,使煤层透气性增大,促进瓦斯的解吸和排放,煤的强度增高和湿度增加,既消除了突出动力,又改变了突出煤层的性质,从而起到了在采掘作业时防止煤与瓦斯突出的作用。
1965年,重庆分院与南桐矿务局合作,在南桐鱼田堡矿首次试验水力冲孔防突措施并取得成功,随后又在广东梅田、四川华莹山南段、六枝矿、北票、焦作李封矿等地进行技术应用。经过五十多年的试验,实践证明水力冲孔是一种有效的防治煤与瓦斯突出的方法,但是水力冲孔的效果评价及影响因素一直困扰着国内学者,特别是出煤量的多少问题都没有一个统一的结论。这与井下水力冲孔施工时,冲孔出煤不易收集有关,井下环境恶劣,很多矿井都是通过人工估算冲孔出煤量,人为主观因素影响过大,致使后期的冲孔效果评价对比不明显。
实用新型内容
本实用新型涉及公开了一种水力冲孔出煤量测量装置可进行煤矿井下水力冲孔时的出煤量准确测量,从而实现自动收集并测量水力冲孔的出煤量体积及质量,为后期的水力冲孔效果评价提供重要参数。
为实现上述目的,本实用新型采用如下技术方案:一种水力冲孔出煤量测量装置,包括方形储煤箱、连接管、孔口固定器、排渣装置四部分,其中方形储煤箱的箱壁上设置有出水小孔,并在一个面上设有钢化玻璃刻度尺,另一个面安装排渣装置;水力冲孔时,从钻孔中冲出的水和煤渣由孔口固定器经连接管进入方形储煤箱中,水通过出水小孔排除,煤渣则留到方形储煤箱中,冲孔结束后,通过读取钢化玻璃刻度尺的刻度计算出水力冲孔的出煤体积,打开排渣装置上的固定把手将煤渣放出,测量结束。
所述方形储煤箱上部接有连接管,四周四个面均由设计有出水小孔的钢板组成。
所述钢化玻璃刻度尺安装在方形储煤箱侧面,其刻度由箱内的体积标定得出。
所述排渣装置由方形储煤箱上的铰链和固定把手组成。
所述孔口固定器是一个密封导流装置,引导反水和煤渣通过连接管进入方形储煤箱中。
使用时,待钻孔施工完毕开始冲孔时,将孔口固定器安装到钻孔的孔口,将连接管上端安装到孔口固定器,下端安装到方形储煤箱上,将方形储煤箱上的固定把手关闭,水力冲孔时,高压水从高压管进入冲孔管路中,高压水破煤后,水携带煤渣通过冲孔管路与钻孔的环空进入孔口固定装置,然后经连接管进入方形储煤箱中,水从方形储煤箱四周设计的出水小孔处排出,煤渣则留在方形储煤箱内部,待冲孔结束后,读取箱壁上嵌入的钢化玻璃刻度尺对应的体积,可以根据煤的密度计算冲孔出煤量的质量,测量结束,将固定把手打开,通过铰链打开方形储煤箱,排出煤渣,然后利用高压水冲洗方形储煤箱。
本实用新型具有制作成本低、操作简单、易于维护、便于搬运、井下适用地点广、可重复使用等特点。能够在不影响冲孔施工的前提下较为准备的测量水力冲孔的出煤量,从而针对不同的出煤量的效果考察中分析最优的水力冲孔施工工艺,进一步降低水力冲孔的施工成本和效率,实现施工精细化,降低成本高效率。
附图说明
图1是本实用新型的结构示意图。
图2是方形储煤箱排渣面示意图。
图3是方形储煤箱关闭状态示意图。
图4是方形储煤箱打开状态示意图。
具体实施方式
结合附图1~4,本实例以钻机水力冲孔为例介绍本实用的施工方式,钻机11打钻完成后,将高压进水管8接到钻杆10上,将孔口固定器7安装到钻孔9的孔口位置,固定完成后,将连接管6上端安装到孔口固定器7上,下端安装到方形储煤箱1上,将方形储煤箱1上的固定把手5关闭,水力冲孔时,高压水从高压管8和钻杆10到达水力冲孔位置,高压水破煤后,水携带这煤渣通过钻杆10与钻孔9的环空进入孔口固定装置7,然后经连接管6进入方形储煤箱1中,水从方形储煤箱1四周设计的出水小孔2处排出,煤渣则留在方形储煤箱内部,待冲孔结束后,读取箱壁上嵌入的钢化玻璃刻度尺3对应的体积,可以根据煤的密度计算冲孔出煤量的质量,测量结束,将固定把手5打开,通过铰链4打开方形储煤箱1,排出煤渣,然后利用高压水冲洗方形储煤箱1。
Claims (4)
1.一种水力冲孔出煤量测量装置,包括方形储煤箱、连接管、孔口固定器、排渣装置四部分,其中方形储煤箱的箱壁上设置有出水小孔,并在一个面上设有钢化玻璃刻度尺,另一个面安装排渣装置;水力冲孔时,从钻孔中冲出的水和煤渣由孔口固定器经连接管进入方形储煤箱中,水通过出水小孔排除,煤渣则留到方形储煤箱中,冲孔结束后,通过读取钢化玻璃刻度尺的刻度计算出水力冲孔的出煤体积,打开排渣装置上的固定把手将煤渣放出,测量结束。
2.如权利要求1所述的水力冲孔出煤量测量装置,其特征在于:所述方形储煤箱上部接有连接管,四周四个箱壁均由设计有出水小孔的钢板组成。
如权利要求1所述的水力冲孔出煤量测量装置,其特征在于:所述钢化玻璃刻度尺安装在方形储煤箱侧面,其刻度由箱内的体积标定得出。
3.如权利要求1所述的水力冲孔出煤量测量装置,其特征在于:所述排渣装置是由方形储煤箱上的铰链和固定把手组成。
4.如权利要求1所述的水力冲孔出煤量测量装置,其特征在于:所述孔口固定器是一个密封导流装置,引导水力冲孔出水和煤渣经连接管进入方形储煤箱中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520130084.0U CN204532332U (zh) | 2015-03-08 | 2015-03-08 | 水力冲孔出煤量测量装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520130084.0U CN204532332U (zh) | 2015-03-08 | 2015-03-08 | 水力冲孔出煤量测量装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204532332U true CN204532332U (zh) | 2015-08-05 |
Family
ID=53746354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520130084.0U Expired - Fee Related CN204532332U (zh) | 2015-03-08 | 2015-03-08 | 水力冲孔出煤量测量装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204532332U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105443039A (zh) * | 2015-12-29 | 2016-03-30 | 河南理工大学 | 新型水力扩孔扩煤量的计量系统及计量方法 |
CN105464596A (zh) * | 2015-12-29 | 2016-04-06 | 河南理工大学 | 水力扩孔卸压增透扩煤量的计量系统及计量方法 |
CN109184664A (zh) * | 2018-10-16 | 2019-01-11 | 辽宁工程技术大学 | 一种水力冲孔出煤量实时测定装置及其使用方法 |
-
2015
- 2015-03-08 CN CN201520130084.0U patent/CN204532332U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105443039A (zh) * | 2015-12-29 | 2016-03-30 | 河南理工大学 | 新型水力扩孔扩煤量的计量系统及计量方法 |
CN105464596A (zh) * | 2015-12-29 | 2016-04-06 | 河南理工大学 | 水力扩孔卸压增透扩煤量的计量系统及计量方法 |
CN105443039B (zh) * | 2015-12-29 | 2017-08-11 | 河南理工大学 | 新型水力扩孔扩煤量的计量系统及计量方法 |
CN105464596B (zh) * | 2015-12-29 | 2018-03-23 | 河南理工大学 | 水力扩孔卸压增透扩煤量的计量系统及计量方法 |
CN109184664A (zh) * | 2018-10-16 | 2019-01-11 | 辽宁工程技术大学 | 一种水力冲孔出煤量实时测定装置及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108952807B (zh) | 一种隧道断裂破碎带涌水的止水处置方法 | |
CN103411868A (zh) | 一种煤层透气性系数的测试方法 | |
CN102094678B (zh) | 岩溶隧道溃水风险的识别方法 | |
CN112392431A (zh) | 通过采动裂隙带内水平长钻孔动态保压注浆封堵裂隙防治煤层顶板水害技术 | |
CN204532332U (zh) | 水力冲孔出煤量测量装置 | |
CN105507938A (zh) | 钻孔内水力冲孔与预裂爆破联合增透抽采系统的施工方法 | |
Li et al. | The integrated drainage technique of directional high-level borehole of super large diameter on roof replacing roof extraction roadway: A case study of the underground Zhaozhuang Coal Mine | |
CN111456721A (zh) | 一种多级气囊快速封孔瓦斯压力测定装置及测定方法 | |
Kunyun et al. | The application of hydraulic fracturing outburst prevention measures | |
CN206707754U (zh) | 一种煤矿钻孔用注水排渣装置 | |
CN203490156U (zh) | 多分支钻孔煤层透气性系数分段、定点快速测定装置 | |
CN105507872A (zh) | 穿层钻孔内水力冲孔与预裂爆破联合增透抽采系统 | |
CN107795315A (zh) | 煤矿立井井筒水压参与下的煤层瓦斯压力测定装置及其煤层瓦斯压力测定方法 | |
CN106968664A (zh) | 一种工作面底板破坏带深度钻孔注水探测方法 | |
CN207526494U (zh) | 煤矿立井井筒水压参与下的煤层瓦斯压力测定装置 | |
CN102966376B (zh) | 一种矿体真空负压快速疏干法 | |
CN114814981B (zh) | 一种断层防水煤柱开采的注浆加固效果评估方法和系统 | |
CN203347790U (zh) | 一种抽水试验管路的同心式安装结构 | |
CN104929564A (zh) | 一种高压跑水孔注浆下料装置 | |
CN104631418A (zh) | 简易人力设备在城市地质勘察中排查地下管线的方法 | |
CN211851811U (zh) | 一种基于流量法测定煤层瓦斯含量的装置 | |
CN210714650U (zh) | 一种浅层地热能中增大换热面积装置 | |
CN209510288U (zh) | 一种煤矿井下导水钻孔封堵器 | |
CN208399335U (zh) | 一种裂隙岩体高压渗透特性测试装置 | |
CN102767368B (zh) | 基于聚氨酯加固井壁的模拟实验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20160308 |
|
CF01 | Termination of patent right due to non-payment of annual fee |