CN204531333U - Novel building building site scaffold device - Google Patents

Novel building building site scaffold device Download PDF

Info

Publication number
CN204531333U
CN204531333U CN201520241660.9U CN201520241660U CN204531333U CN 204531333 U CN204531333 U CN 204531333U CN 201520241660 U CN201520241660 U CN 201520241660U CN 204531333 U CN204531333 U CN 204531333U
Authority
CN
China
Prior art keywords
insertion pipe
tube
vertical tube
oblique cutting
twin jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520241660.9U
Other languages
Chinese (zh)
Inventor
乔宝钧
胡振国
李东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520241660.9U priority Critical patent/CN204531333U/en
Application granted granted Critical
Publication of CN204531333U publication Critical patent/CN204531333U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

Novel building building site scaffold device.Its composition of this product comprises: center ball, center ball connects left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe, be connected by transverse tube between left insertion pipe with right insertion pipe, be connected by vertical tube between front insertion pipe with rear insertion pipe, be connected by standpipe between upper insertion pipe with lower insertion pipe, transverse tube, vertical tube, standpipe all connects an oblique cutting cover and No. two oblique cutting covers, be connected by inclined tube between an oblique cutting cover overlaps with No. two oblique cuttings, left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe, an oblique cutting cover, No. two oblique cutting covers all have twin jack, transverse tube, vertical tube, standpipe, inclined tube all has concentric twin jack, twin jack overlaps with concentric twin jack and inserts U-shaped plug-in unit and locate, U-shaped plug-in unit location adhesive grafting magnetic patch location.The utility model is used for scaffold.

Description

Novel building building site scaffold device
Technical field
the utility model relates to a kind of novel building building site scaffold device.
Background technology
existing building site is all that colligation connects with scaffold great majority, and assemble each time and all need No. eight a large amount of wires, No. eight wires are merely able to single use, waste larger, add building costs; And the assembling of scaffold and fractionation are all inconvenient, and speed is also slow.
Summary of the invention
the purpose of this utility model be to provide a kind of all parts can both reuse, assemble and fractionation speed all fast, convenient, the novel building building site scaffold device of use safety.
above-mentioned object is realized by following technical scheme:
a kind of novel building building site scaffold device, its composition comprises: center ball, and described center ball connects left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe, be connected by transverse tube between described left insertion pipe and described right insertion pipe, be connected by vertical tube between described front insertion pipe and described rear insertion pipe, be connected by standpipe between described upper insertion pipe and described lower insertion pipe, described transverse tube, described vertical tube, described standpipe all connects an oblique cutting cover and No. two oblique cutting covers, is connected, described left insertion pipe between a described oblique cutting cover overlaps with described No. two oblique cuttings by inclined tube, described right insertion pipe, described front insertion pipe, described rear insertion pipe, described upper insertion pipe, described lower insertion pipe, a described oblique cutting cover, No. two described oblique cutting covers all have twin jack, described transverse tube, described vertical tube, described standpipe, described inclined tube all has concentric twin jack, and described twin jack overlaps with described concentric twin jack and inserts U-shaped plug-in unit and locate, described U-shaped plug-in unit location adhesive grafting magnetic patch location.
described novel building building site scaffold device, described magnetic patch has two spliced eye, described U-shaped plug-in unit is irony plug-in unit, in two spliced eyes described in two ends insertions of described U-shaped plug-in unit, adhesive connects, the bottom of bottom standpipe described in connects base, described base is connected and fixed plate, and described fixed head has through hole, and described through hole connects ground connection expansion bolt.
described novel building building site scaffold device, the side of described transverse tube connects sleeve, connected by interior vertical tube between described sleeve, described sleeve has described twin jack, described interior vertical tube has described concentric twin jack, transverse tube described in 2, the vertical tube described in 2, the described inverted U-shaped elastic plugin of the equal clamping of interior vertical tube, described inverted U-shaped elastic plugin connecting pin pedal, described foot rest has permeable hole.
beneficial effect:
1. the utility model adopts center ball, left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe form one six and lead to fitting, all transverse tubes, vertical tube, standpipe can be connected, make its connection speed fast, convenient, by U-shaped plug-in unit location with magnetic patch with the use of, make it be connected firmly, stable, assembling and splitting all facilitates, speed is also fast.
connection between the U-shaped plug-in unit location that the utility model adopts and magnetic patch is easy, stable, firm, ensure that the stability that left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe are connected with between transverse tube, vertical tube, standpipe and safety.
base of the present utility model, fixed head, through hole, ground connection expansion bolt with the use of, make overall being connected firmly with ground of scaffold, make scaffold in use safety and stable more.
the oblique cutting cover that the utility model adopts, No. two oblique cutting covers, inclined tubes make the connection between transverse tube, vertical tube, standpipe more stable, use safety.
even if the foot rest that the utility model adopts has permeable hole ensure that use also can not be skidded in the rainy day, improves the safety of use, ensure that the life security of construction worker.
accompanying drawing illustrates:
accompanying drawing 1 is the structural representation of this product.
accompanying drawing 2 is top views of this product.
accompanying drawing 3 is front views of this product.
detailed description of the invention:
embodiment 1:
a kind of novel building building site scaffold device, its composition comprises: center ball 1, and described center ball connects left insertion pipe 2, right insertion pipe 3, front insertion pipe 4, rear insertion pipe 5, upper insertion pipe 6, lower insertion pipe 7, be connected by transverse tube 8 between described left insertion pipe and described right insertion pipe, be connected by vertical tube 9 between described front insertion pipe and described rear insertion pipe, be connected by standpipe 10 between described upper insertion pipe and described lower insertion pipe, described transverse tube, described vertical tube, described standpipe all connects an oblique cutting cover 11 and No. two oblique cutting covers 12, is connected, described left insertion pipe between a described oblique cutting cover overlaps with described No. two oblique cuttings by inclined tube 13, described right insertion pipe, described front insertion pipe, described rear insertion pipe, described upper insertion pipe, described lower insertion pipe, a described oblique cutting cover, No. two described oblique cutting covers all have twin jack 14, described transverse tube, described vertical tube, described standpipe, described inclined tube all has concentric twin jack, and described twin jack overlaps with described concentric twin jack and inserts U-shaped plug-in unit 15 and locate, and described U-shaped plug-in unit location adhesive grafting magnetic patch 16 is located.
embodiment 2:
novel building building site scaffold device described in embodiment 1, described magnetic patch has two spliced eye 17, described U-shaped plug-in unit is irony plug-in unit, in two spliced eyes described in two ends insertions of described U-shaped plug-in unit, adhesive connects, the bottom of bottom standpipe described in connects base 18, described base is connected and fixed plate 19, and described fixed head has through hole 20, and described through hole connects ground connection expansion bolt.
embodiment 3:
novel building building site scaffold device described in embodiment 2, the side of described transverse tube connects sleeve 21, connected by interior vertical tube 22 between described sleeve, described sleeve has described twin jack, described interior vertical tube has described concentric twin jack, transverse tube described in 2, the vertical tube described in 2, the described inverted U-shaped elastic plugin 23 of the equal clamping of interior vertical tube, described inverted U-shaped elastic plugin connecting pin pedal 24, described foot rest has permeable hole 25.

Claims (3)

1. a novel building building site scaffold device, its composition comprises: center ball, is characterized in that: described center ball connects left insertion pipe, right insertion pipe, front insertion pipe, rear insertion pipe, upper insertion pipe, lower insertion pipe, be connected by transverse tube between described left insertion pipe and described right insertion pipe, be connected by vertical tube between described front insertion pipe and described rear insertion pipe, be connected by standpipe between described upper insertion pipe and described lower insertion pipe, described transverse tube, described vertical tube, described standpipe all connects an oblique cutting cover and No. two oblique cutting covers, is connected, described left insertion pipe between a described oblique cutting cover overlaps with described No. two oblique cuttings by inclined tube, described right insertion pipe, described front insertion pipe, described rear insertion pipe, described upper insertion pipe, described lower insertion pipe, a described oblique cutting cover, No. two described oblique cutting covers all have twin jack, described transverse tube, described vertical tube, described standpipe, described inclined tube all has concentric twin jack, and described twin jack overlaps with described concentric twin jack and inserts U-shaped plug-in unit and locate, described U-shaped plug-in unit location adhesive grafting magnetic patch location.
2. novel building building site according to claim 1 scaffold device, it is characterized in that: described magnetic patch has two spliced eye, described U-shaped plug-in unit is irony plug-in unit, in two spliced eyes described in two ends insertions of described U-shaped plug-in unit, adhesive connects, the bottom of bottom standpipe described in connects base, described base is connected and fixed plate, and described fixed head has through hole, and described through hole connects ground connection expansion bolt.
3. novel building building site according to claim 2 scaffold device, it is characterized in that: the side of described transverse tube connects sleeve, connected by interior vertical tube between described sleeve, described sleeve has described twin jack, described interior vertical tube has described concentric twin jack, transverse tube described in 2, the vertical tube described in 2, the described inverted U-shaped elastic plugin of the equal clamping of interior vertical tube, described inverted U-shaped elastic plugin connecting pin pedal, described foot rest has permeable hole.
CN201520241660.9U 2015-04-21 2015-04-21 Novel building building site scaffold device Expired - Fee Related CN204531333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520241660.9U CN204531333U (en) 2015-04-21 2015-04-21 Novel building building site scaffold device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520241660.9U CN204531333U (en) 2015-04-21 2015-04-21 Novel building building site scaffold device

Publications (1)

Publication Number Publication Date
CN204531333U true CN204531333U (en) 2015-08-05

Family

ID=53745361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520241660.9U Expired - Fee Related CN204531333U (en) 2015-04-21 2015-04-21 Novel building building site scaffold device

Country Status (1)

Country Link
CN (1) CN204531333U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439244A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 Scaffold for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439244A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 Scaffold for building

Similar Documents

Publication Publication Date Title
CN204531333U (en) Novel building building site scaffold device
CN103640528B (en) Automobile door plate assembling chute buckle
CN204487432U (en) New road Bridge guardrail fixture
CN202925879U (en) Multidirectional combined connector
CN204552037U (en) Combined inserting scaffold
CN203180269U (en) Five-hole socket
CN203152115U (en) Vertical greening combination suite
CN203287563U (en) Optical fiber adapter combination tool
CN203835010U (en) Safe electric pole
CN206768795U (en) Civil engineering built pile
CN204119903U (en) Improve tree root air-and water-permeable device
CN204071213U (en) Compression rack mudsill jockey
CN203262469U (en) Umbrella pin connection structure
CN203891267U (en) Wall surface baffle connector
CN205063325U (en) Novel scaffold
CN204590353U (en) Novel architecture curtain wall
CN204365338U (en) Combined test-tube frame
CN204129288U (en) Tail optical fiber management box
CN203951997U (en) Forestry maintenance and support device
CN204518805U (en) Be convenient to the livestock cultivation circle of veterinary work
CN204418478U (en) The A font building block that a kind of multiaspect connects
CN201228368Y (en) Interlocking close cap of ground fire hydrant
CN211010172U (en) Stable connecting device of aluminum-plastic pipe convenient to install and detach
CN210105477U (en) Novel combined iron horse
CN201548032U (en) Pile rack for piling floors

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20160421