CN204530434U - A kind of pontoon bridge being convenient to bridge construction - Google Patents
A kind of pontoon bridge being convenient to bridge construction Download PDFInfo
- Publication number
- CN204530434U CN204530434U CN201520241294.7U CN201520241294U CN204530434U CN 204530434 U CN204530434 U CN 204530434U CN 201520241294 U CN201520241294 U CN 201520241294U CN 204530434 U CN204530434 U CN 204530434U
- Authority
- CN
- China
- Prior art keywords
- bridge
- plank
- convenient
- montant
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of pontoon bridge being convenient to bridge construction, it relates to technical field of bridge construction, and it comprises base plate, dividing plate, cavity, empty oil drum, air bag, cystosepiment, plank, cable wire, anchor, cross bar and montant; Its reasonable in design, modern design is unique, overall structure is simple, a kind of pontoon bridge being convenient to bridge construction is provided, the main material such as plank, cable wire, empty oil drum that this pontoon bridge uses, can repeat to reuse on Other Engineering, build the passage of pier in water with lower cost, meet constructor, constructional materials, concrete conveying, be embodied as the advantage that Construction of Bridge Pier in Deep Water provides operating platform.
Description
Technical field:
The utility model relates to technical field of bridge construction, is specifically related to a kind of pontoon bridge being convenient to bridge construction.
Background technology:
Along with the extensive propelling of China's Transportation Infrastructure Construction, bridge spanning the sea, inland are across river, cross a river, be on the increase across the bridge construction of reservoir, great river, great river, large reservoir carry out in bridge construction, how to use the most simply, the safest, the most most economical way, when solving the bridge pier construction of deep water area, operating personnel leads to the current problem at subaqueous work scene, problem of materials is transported to job site, to problems such as structure delivering concretes, it is the important topic that worth unit in charge of construction constantly explores and sums up.
At present, a lot of units in charge of construction many employings steel trestle, steel pontoon bridge are as the occasional passage leading to pier in water, and in water, various working sources carried by pier, and these two kinds of facilities adopt when The water is deep and the current fast, and expense is all very high, is unfavorable for extensively promoting the use of.
Utility model content:
The purpose of this utility model is just to provide a kind of pontoon bridge being convenient to bridge construction to solve the problem, and solves occasional passage price in bridge construction high, is unfavorable for the problem extensively promoted.
In order to solve the problem, the utility model provides a kind of technical scheme: a kind of pontoon bridge being convenient to bridge construction, comprises base plate, dividing plate, cavity, empty oil drum, air bag, cystosepiment, plank, cable wire, anchor, cross bar and montant; Described plank is arranged on the top of base plate; Cavity is provided with between described base plate and plank; Two spaced dividing plates are fixedly connected with in described cavity; The left side of described cavity inside is provided with two empty oil drums; The right side of described cavity inside is provided with two empty oil drums equally; Cystosepiment is provided with between described empty oil drum; The center of described cavity inside is provided with air bag; The left and right sides of described plank is all fixedly connected with cable wire; The other end of described cable wire is fixedly connected with anchor; The upper surface of described plank is fixedly connected with several spaced montant; Several cross bar is fixedly connected with between described montant.
As preferably, described plank is solid rectangular plate.
As preferably, described cross bar and montant are solid bar, and the length of described cross bar is greater than the height of montant.
The beneficial effects of the utility model: its reasonable in design, modern design is unique, overall structure is simple, a kind of pontoon bridge being convenient to bridge construction is provided, the main material such as plank, cable wire, empty oil drum that this pontoon bridge uses, can repeat to reuse on Other Engineering, build the passage of pier in water with lower cost, meet constructor, constructional materials, concrete conveying, be embodied as the advantage that Construction of Bridge Pier in Deep Water provides operating platform.
Accompanying drawing illustrates:
For ease of illustrating, the utility model is described in detail by following concrete enforcement and accompanying drawing.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention:
As shown in Figure 1, this detailed description of the invention by the following technical solutions: a kind of pontoon bridge being convenient to bridge construction, comprises base plate 1, dividing plate 2, cavity 3, empty oil drum 4, air bag 5, cystosepiment 6, plank 7, cable wire 8, anchor 9, cross bar 10 and montant 11; Described plank 7 is arranged on the top of base plate 1; Cavity 3 is provided with between described base plate 1 and plank 7; Two spaced dividing plates 2 are fixedly connected with in described cavity 3; The left side of described cavity 3 inside is provided with two empty oil drums 4; The right side of described cavity 3 inside is provided with two empty oil drums 4 equally; Cystosepiment 6 is provided with between described empty oil drum 4; The center of described cavity 3 inside is provided with air bag 5; The left and right sides of described plank 7 is all fixedly connected with cable wire 8; The other end of described cable wire 8 is fixedly connected with anchor 9; The upper surface of described plank 7 is fixedly connected with several spaced montant 11; Several cross bar 10 is fixedly connected with between described montant 11.
Wherein, described plank 7 is solid rectangular plate; Described cross bar 10 and montant 11 are solid bar, and the length of described cross bar 10 is greater than the height of montant 11.
More than show and describe general principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (3)
1. be convenient to a pontoon bridge for bridge construction, it is characterized in that: comprise base plate (1), dividing plate (2), cavity (3), empty oil drum (4), air bag (5), cystosepiment (6), plank (7), cable wire (8), anchor (9), cross bar (10) and montant (11);
Described plank (7) is arranged on the top of base plate (1);
Cavity (3) is provided with between described base plate (1) and plank (7);
Two spaced dividing plates (2) are fixedly connected with in described cavity (3);
The left side of described cavity (3) inside is provided with two empty oil drums (4);
The right side of described cavity (3) inside is provided with two empty oil drums (4) equally;
Cystosepiment (6) is provided with between described empty oil drum (4);
The center of described cavity (3) inside is provided with air bag (5);
The left and right sides of described plank (7) is all fixedly connected with cable wire (8);
The other end of described cable wire (8) is fixedly connected with anchor (9);
The upper surface of described plank (7) is fixedly connected with several spaced montant (11);
Several cross bar (10) is fixedly connected with between described montant (11).
2. a kind of pontoon bridge being convenient to bridge construction according to claim 1, is characterized in that: described plank (7) is solid rectangular plate.
3. a kind of pontoon bridge being convenient to bridge construction according to claim 1, it is characterized in that: described cross bar (10) and montant (11) are solid bar, the length of described cross bar (10) is greater than the height of montant (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520241294.7U CN204530434U (en) | 2015-04-18 | 2015-04-18 | A kind of pontoon bridge being convenient to bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520241294.7U CN204530434U (en) | 2015-04-18 | 2015-04-18 | A kind of pontoon bridge being convenient to bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204530434U true CN204530434U (en) | 2015-08-05 |
Family
ID=53744456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520241294.7U Expired - Fee Related CN204530434U (en) | 2015-04-18 | 2015-04-18 | A kind of pontoon bridge being convenient to bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204530434U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812067A (en) * | 2017-01-11 | 2017-06-09 | 温州万里市政工程有限公司 | A kind of removable operation platform for bridge construction |
CN112281847A (en) * | 2020-11-03 | 2021-01-29 | 浙江省围海建设集团股份有限公司 | Mould bag concrete construction system and method |
-
2015
- 2015-04-18 CN CN201520241294.7U patent/CN204530434U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812067A (en) * | 2017-01-11 | 2017-06-09 | 温州万里市政工程有限公司 | A kind of removable operation platform for bridge construction |
CN106812067B (en) * | 2017-01-11 | 2019-02-01 | 温州万里市政工程有限公司 | A kind of removable operation platform for bridge construction |
CN112281847A (en) * | 2020-11-03 | 2021-01-29 | 浙江省围海建设集团股份有限公司 | Mould bag concrete construction system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204530434U (en) | A kind of pontoon bridge being convenient to bridge construction | |
CN202007379U (en) | Movable floating bridge convenient for deepwater bridge construction | |
CN203383135U (en) | Floating bridge capable of facilitating bridge construction | |
CN202688851U (en) | Floating bridge convenient for bridge construction | |
CN203128998U (en) | Temporary floating bridge for construction | |
CN204418658U (en) | Integrated hydraulic creeping formwork periphery protection unit | |
CN207376487U (en) | A kind of integral type glass sleeve repaired for binder and straining beam | |
CN203452077U (en) | Steering mechanism of pile driver and pile driver provided with steering mechanism | |
CN201863994U (en) | Ship hanging basket suspension mechanism | |
CN214729536U (en) | Construction platform for overwater trestle | |
CN202017342U (en) | Block traction drawing die for slope concrete pouring | |
CN202925911U (en) | Vertical pre-stress rib tensioning auxiliary tool | |
CN204021215U (en) | A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam | |
CN203878450U (en) | Novel ropeway bridge | |
CN202156527U (en) | Arrangement structure of launching combing type slideway infrastructure for 100,000-ton ship | |
CN207917641U (en) | It is a kind of can built by separate periods combined type pipe support | |
CN206722383U (en) | Field of civil engineering gang form | |
CN203904945U (en) | Integrated outside concrete formwork | |
CN205024573U (en) | Concrete trowelling machine that vibrates fast | |
CN104005388B (en) | A kind of all-in-one-piece outside concrete blinding | |
CN204475833U (en) | A kind of New Type Architecture Mode | |
CN205077855U (en) | Surbase steel mould is led to constructional steel | |
CN204296728U (en) | Subincline operation platform car | |
CN204590623U (en) | A kind of material transfer box for aluminum alloy mould plate system | |
CN203742440U (en) | Anchor-rod anchor-rope drill carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20160418 |
|
CF01 | Termination of patent right due to non-payment of annual fee |