CN204527543U - The water-bed leak stopping ship in storehouse, the pool - Google Patents
The water-bed leak stopping ship in storehouse, the pool Download PDFInfo
- Publication number
- CN204527543U CN204527543U CN201420735541.4U CN201420735541U CN204527543U CN 204527543 U CN204527543 U CN 204527543U CN 201420735541 U CN201420735541 U CN 201420735541U CN 204527543 U CN204527543 U CN 204527543U
- Authority
- CN
- China
- Prior art keywords
- pipe
- ship
- mouth
- guard frame
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses the water-bed leak stopping ship in storehouse, a kind of pool, comprise two sled ship, expansion link, sealed tube and guard frame, at the described leak stopping ship time of operation, leak stopping ship is drawn to the known place that leaks, storehouse, the pool, tight pipe is transferred to corresponding dimension location on sealed tube, tightening the nut on degree of tightness pipe, guard is mounted in water until water-bed, open light switch and camera, open and close husky valve and sand pumping machine switch, mud is extracted out outside guard frame, be eliminated totally until the mud in guard frame, open bleeder valve on discharge nozzle and early gate and Air compressor switch, by pipe in cement wash press-in to the bottom surface of guard frame, fill up behind leaky seam and guard frame bottom surface until cement wash, open late gate, after air, air inlet pipe enters in water repellant cabin, in being pressed into by water repellant, pipe is layered on the surface of cement wash to the bottom surface of guard frame, leak stopping terminates.With the water-bed leak stopping ship leak stopping of storehouse, the pool, water under not employment, safe and reliable, simple to operate, easy to use.
Description
Technical field
The utility model relates to a kind of water-bed repair outfit, particularly relates to the water-bed leak stopping ship in storehouse, a kind of pool.
Background technology
At present, in the dam, storehouse that China is built, have and much there is dissimilar leakage problems, its reason has: expand with heat and contract with cold and the differential settlement on basis; Do not reach compaction rate during disturbing concrete, create loose, the phenomenon such as doghole, honeycomb, define the passage of percolating water; Therefore, after the accurate detection of dam, storehouse seepage place is located, must administer comprehensively and effectively seepage place.
Summary of the invention
For above-mentioned prior art Problems existing, the utility model object is to provide a kind of pool storehouse leak stopping ship, and water under not employment, safe and reliable, simple to operate, easy to use.The technical solution of the utility model is: the water-bed leak stopping ship in storehouse, the pool, comprise two sled ship, expansion link, sealed tube and guard frame, material mouth before described two sled ship comprises, rear material mouth, water repellant cabin, rear air inlet pipe, late gate, Air compressor, sand pumping machine, close husky valve, steady arm, go out agent valve, air valve, computing machine, light switch, storage battery, mixed earth cabin, front air inlet pipe, early gate and discharge nozzle, described expansion link comprises cross bar, halliard, shaking tray and degree of tightness pipe, described sealed tube comprises seal cap, interior pipe and solid pipe cap, described guard frame comprises cross spring, camera, vertical pole, blue-ray light, cover, ring bar, inserted sheet, glue chain.Horizontally set water repellant cabin and mixed earth cabin in the left cabin of described two sled ship, in water repellant cabin, the middle-end of left section arranges the rear material mouth of with closure, the right section of left end being provided with the rear air inlet pipe of late gate is fixed in the induction opening of the right section of middle-end in water repellant cabin, what the left end mouth of pipe going out agent pipe gone out on agent valve was fixed on right surperficial bottom, water repellant cabin middle-end goes out in agent hole, the front end mouth of pipe going out agent pipe is connected with the rear foot mouth of pipe closing husky valve right-hand member four-way, mouth is expected before the middle-end in left section of mixed earth cabin arranges with closure, the right section of left end being provided with the front air inlet pipe of early gate is fixed in the induction opening of the right section of middle-end in mixed earth cabin, the rear end of discharge nozzle is provided with a valve, its left end mouth of pipe is fixed in the discharge opening of right surperficial bottom, mixed earth cabin middle-end, the rear end mouth of pipe of discharge nozzle is connected with the forward foot in a step mouth of pipe closing husky valve right-hand member four-way, after left section of two sled ship middle deck, plate arranges sand pumping machine, the upper end of interior pipe connects a threeway, the rear foot of threeway is connected with the lower end mouth of pipe of air valve, the left foot of threeway is connected with the right crus of diaphragm mouth of pipe sand output line on sand pumping machine closing husky valve right-hand member four-way, sand pumping machine arranges Air compressor on left section of header board of two sled ship middle deck, the source switch of sand pumping machine is arranged on before the source switch of bench board Air compressor, the source switch of Air compressor is arranged on before bench board computing machine, the freeing pipe of Air compressor connects a threeway, the left foot of threeway connects again a threeway, the forward foot in a step of this threeway is connected with the early gate right-hand member mouth of pipe, the rear foot of this threeway is connected with the late gate right-hand member mouth of pipe, the right crus of diaphragm of threeway on Air compressor freeing pipe is connected with the air valve left end mouth of pipe, triangle polyester fibre device is fixed on the back segment of two sled ship middle deck operator's station, the signal wire (SW) of the camera in guard frame is connected with the signal switcher on operator's station through interior pipe, signal switcher is connected with the computing machine on operator's station, at the rear of computing machine, light switch is set as end, to control four blue-ray lights in guard frame, front and back section in the right cabin of two sled ship is respectively arranged a storage battery, two storage battery parallel connections are Air compressor afterwards, sand pumping machine, computing machine and blue-ray light provide required power supply.Described expansion link arranges four joints altogether, one joint cross bar hole lower end, upper end arranges a thimble, the built-in bearing of upper peristoma of two joints, the lower end of one joint is fixed in the inner ring of bearing, two joint upper end outer rims fix a thimble, two joints are inserted in three joints, three joints are inserted in four joints, the upper end of three joints and four joints is set to " cross " cut, the upper end of three joints and four joints respectively arranges a nut matched with " cross " cut, the large ring of two " 8 " word rings is inserted in the annular groove of nut loins respectively, the lower end of four joints is fixed on the leading portion of stage casing, deck, two sled ship right cabin middle-end, the left wall of four joint epimeres arranges a shaking tray, one end of halliard is around in the notch of shaking tray, the wire loop of the other end on expansion link is connected with degree of tightness pipe with the pulley groove of the right section of cross bar left end penetrated in a joint upper end hole, degree of tightness pipe box is on sealed tube.Described sealed tube is set to plastics or snake-like hose, with seal cap sealed tube lower end is fixed on guard frame suitable for reading in, with solid pipe cap, sealed tube upper end is fixed in the medium pore of ceiling board in two sled ship, interior pipe, camera signals line and blue-ray light power lead are inserted in sealed tube, the upper end mouth of pipe of interior pipe connects a threeway, and the lower end mouth of pipe of interior pipe extend into end section in guard frame.Vertical pole 25 in described guard frame 31 arranges 12, every root is cut into four sections, five rings are arranged to by ring bar 28, wherein two rings, every ring in three rings and Fourth Ring is evenly cut into 12 sections, two rings, three rings and Fourth Ring are connected a cross spring 23 with the place of joining of 12 vertical poles 25 is each, the upper end of 12 vertical pole 25 sections of top is evenly connected to the lower edge of apical ring in ring bar 28, five rings is evenly cut into 12 sections, section is connected with a screw thread spring with between section, the lower end of 12 vertical pole 25 hypomeres is evenly connected on the mid point of the upper limb at every section, five rings in ring bar 28, 12 symmetrical corrosion-resistant steel inserted sheets 29 evenly connect on the lower edge at five rings, tetragonal the right and left of 12 inserted sheets 29 connects with glue chain 30, waterproof cover 27 is enclosed within the outside face of guard frame 31, in guard frame 31, two sections of vertical pole about 25 two respectively arrange a camera 24, in guard frame 31, in three sections of vertical pole 25, three, interval arranges a LED blue-ray light 26.
Accompanying drawing explanation
Fig. 1 is the structural representation of the water-bed leak stopping ship in storehouse, the utility model pool.In figure: 1 is two sled ship; 2 is front material mouth; 3 is rear material mouth; 4 is water repellant cabin; 5 is rear air inlet pipe; 6 is late gate; 7 is Air compressor; 8 is sand pumping machine; 9 for closing husky valve; 10 is steady arm; 11 for going out agent valve; 12 is air valve; 13 is cross bar; 14 is computing machine; 15 is light switch; 16 is expansion link; 17 is halliard; 18 is shaking tray; 19 is storage battery; 20 is sealed tube; 21 is degree of tightness pipe; 22 is seal cap; 23 is cross spring; 24 is camera; 25 is vertical pole; 26 is blue-ray light; 27 is cover; 28 is ring bar; 29 is inserted sheet; 30 is glue chain; 31 is guard frame; 32 is mixed earth cabin; 33 is front air inlet pipe; 34 is early gate; 35 is discharge nozzle; 36 is solid pipe cap; 37 is interior pipe.
Detailed description of the invention
As shown in Figure 1, the water-bed leak stopping ship in storehouse, the pool, comprise two sled ship 1, expansion link 16, sealed tube 20 and guard frame 31, material mouth 2 before described two sled ship 1 comprises, rear material mouth 3, water repellant cabin 4, rear air inlet pipe 5, late gate 6, Air compressor 7, sand pumping machine 8, close husky valve 9, steady arm 10, go out agent valve 11, air valve 12, computing machine 14, light switch 15, storage battery 19, mixed earth cabin 32, front air inlet pipe 33, early gate 34 and discharge nozzle 35, described expansion link 16 comprises cross bar 13, halliard 17, shaking tray 18 and degree of tightness pipe 21, described sealed tube 20 comprises seal cap 22, interior pipe 37 and solid pipe cap 36, described guard frame 31 comprises cross spring 23, camera 24, vertical pole 25, blue-ray light 26, cover 27, ring bar 28, inserted sheet 29, glue chain 30, described two sled ship 1 is set to the two sled paddling boats preparing to apply for a patent, horizontally set water repellant cabin 4 and mixed earth cabin 32 in the left cabin of two sled ship 1, in water repellant cabin 4, the middle-end of left section arranges the rear material mouth 3 of with closure, the right section of left end being provided with the rear air inlet pipe 5 of late gate 6 fixes (sealing) in the induction opening of the 4 right sections of middle-ends in water repellant cabin, what the left end mouth of pipe going out agent pipe gone out on agent valve 11 was fixed on right surperficial bottom, water repellant cabin 4 middle-end goes out in agent hole, the front end mouth of pipe going out agent pipe is connected with the rear foot mouth of pipe closing husky valve 9 right-hand member four-way, mouth 2 is expected before the middle-end in left section of mixed earth cabin 32 arranges with closure, the right section of left end being provided with the front air inlet pipe 33 of early gate 34 fixes (sealing) in the induction opening of the 32 right sections of middle-ends in mixed earth cabin, discharge nozzle 35(rear end is provided with a valve) the left end mouth of pipe be fixed in the discharge opening of right surperficial bottom, mixed earth cabin 32 middle-end, the rear end mouth of pipe of discharge nozzle 35 is connected with the forward foot in a step mouth of pipe closing husky valve 9 right-hand member four-way, after left section of two sled ship 1 middle deck, plate arranges sand pumping machine 8, the upper end of interior pipe 37 connects a threeway, the rear foot of threeway is connected with the lower end mouth of pipe of air valve 12, the left foot of threeway is connected with the right crus of diaphragm mouth of pipe sand output line on sand pumping machine 8 closing husky valve 9 right-hand member four-way, sand pumping machine 8 arranges Air compressor 7 on left section of header board of two sled ship 1 middle deck, the source switch of sand pumping machine 8 is arranged on before the source switch of bench board Air compressor 7, the source switch of Air compressor 7 is arranged on before bench board computing machine 14, the freeing pipe of Air compressor 7 connects a threeway, the left foot of threeway connects again a threeway, the forward foot in a step of this threeway is connected with the early gate 34 right-hand member mouth of pipe, the rear foot of this threeway is connected with the late gate 6 right-hand member mouth of pipe, the right crus of diaphragm of threeway on Air compressor 7 freeing pipe is connected with the air valve 12 left end mouth of pipe, steady arm 10(is set to known triangle polyester fibre device) be fixed on the back segment of two sled ship 1 middle deck operator's station, the signal wire (SW) of the camera 24 in guard frame 31 is connected with the signal switcher on operator's station through interior pipe 37, signal switcher is connected with the computing machine 14 on operator's station, at the rear of computing machine 14, light switch 15 is set as end, to control four blue-ray lights 26 in guard frame 31, front and back section in the right cabin of two sled ship 1 is respectively arranged a storage battery 19, be Air compressor 7 after two storage batterys 19 are in parallel, sand pumping machine 8, computing machine 14 and blue-ray light 26 provide required power supply, described expansion link 16 arranges four joints altogether, one joint cross bar hole lower end, upper end arranges a thimble, the built-in bearing of upper peristoma of two joints, the lower end of one joint is fixed in the inner ring of bearing, two joint upper end outer rims fix a thimble, two joints are inserted in three joints, three joints are inserted in four joints, the upper end of three joints and four joints is set to " cross " cut, the upper end of three joints and four joints respectively arranges a nut matched with " cross " cut, the large ring of two " 8 " word rings is inserted in respectively the annular groove interior (ring is rotatable) of nut loins, the lower end of four joints is fixed on the leading portion of stage casing, deck, two sled ship 1 right cabin middle-end, the left wall of four joint epimeres arranges a shaking tray 18, one end of halliard 17 is around in the notch of shaking tray 18, the wire loop of the other end on expansion link 16 is connected with degree of tightness pipe 21 with the pulley groove of right section of cross bar 13 left end penetrated in a joint upper end hole, degree of tightness pipe 21 is enclosed within sealed tube 20, described sealed tube 20 is set to internal diameter and is greater than interior pipe 37, the plastics of camera 24 signal wire (SW) and blue-ray light 26 power lead external diameter sum or snake-like hose, put on from the lower end of sealed tube 20 to upper end and measure chi, with seal cap 22 sealed tube 20 lower end is fixed on guard frame 31 suitable for reading in, with solid pipe cap 36 sealed tube 20 upper end fixed (sealing) in two sled ship 1 ceiling board medium pore in, interior pipe 37, camera 24 signal wire (SW) and blue-ray light 26 power lead are inserted in sealed tube 20, the upper end mouth of pipe of interior pipe 37 connects a threeway, the lower end mouth of pipe of interior pipe 37 extend into end section in guard frame 31, described guard frame 31 is set to truncated cone-shaped, vertical pole 25 wherein arranges 12, every root is cut into four sections, every segment length 40cm, five rings are arranged to by ring bar 28, ring bar 28 arranges apical ring (diameter 10cm), two rings (diameter 30cm), three rings (diameter 60cm), Fourth Ring (diameter 120cm), five rings (diameter 240cm), wherein two rings, every ring in three rings and Fourth Ring is evenly cut into 12 sections, two rings, three rings and Fourth Ring are connected a cross spring 23 with the place of joining of 12 vertical poles 25 is each, the upper end of 12 vertical pole 25 sections of top is evenly connected to the lower edge of apical ring in ring bar 28, five rings is evenly cut into 12 sections, section is connected with a screw thread spring with between section, the lower end of 12 vertical pole 25 hypomeres is evenly connected on the mid point of the upper limb at every section, five rings in ring bar 28, 12 symmetrical corrosion-resistant steel inserted sheet 29(epimeres are square, hypomere is triangle, leg-of-mutton both sides are set to sword) evenly connect on the lower edge at five rings, tetragonal the right and left glue chain 30(12 of 12 inserted sheets 29) connect, waterproof cover 27 is enclosed within the outside face of guard frame 31, the mouth of finding a view two sections of vertical pole about 25 two respectively being arranged a camera 24(camera 24 in guard frame 31 is downward), in guard frame 31, in three sections of vertical pole 25, three, interval arranges a LED blue-ray light 26(8W), during operation, leak stopping ship is drawn to storehouse, the pool and visit the place that leaks of leaking ship and leaning out with known, measure triangle polyester fibre device on spy leakage ship with the triangle polyester fibre device on leak stopping ship and locate the data recorded, the depth of water that on ship, on signal wire (SW), yardstick is recorded is leaked according to visiting, tight pipe 21 is transferred to corresponding dimension location on sealed tube 20, tightening the nut on degree of tightness pipe 21, guard frame 31 is inserted in water until water-bed, open light switch 15 and camera 24, with shaking tray 18 left and right adjusting cross bar 13 and the halliard 17 of expansion link 16, guard frame 31 times inserted sheets 29 accurately being inserted in the mud around water-bed leakage point (because of cross spring 23 and glue chain 30 flexible, as leaked, earth's surface, place is slightly uneven, the attitude of guard frame 31 can change automatically), open air valve 12, close late gate 6, early gate 34, go out agent valve 11, bleeder valve on discharge nozzle 35 and close husky valve 9, open Air compressor 7 source switch, air enters through interior pipe 37, in guard frame 31, mud in guard frame 31 is suspended, close Air compressor 7 switch enclosure air valve 12 again, open and close husky valve 9 and sand pumping machine 8 switch, mud is extracted out outside guard frame 31, be eliminated totally until the mud in guard frame 31, husky valve 9 and sand pumping machine 8 are closed in closedown, open bleeder valve on discharge nozzle 35 and early gate 34 and Air compressor 7 switch, before air, air inlet pipe 33 enters in mixed earth cabin 32, by pipe 37 in cement wash press-in to the bottom surface of guard frame 31, fill up behind leaky seam and guard frame 31 bottom surface until cement wash, close early gate 34, open late gate 6, after air, air inlet pipe 5 enters in water repellant cabin 4, in being pressed into by water repellant, pipe 37 is layered on the surface of cement wash to the bottom surface of guard frame 31, behind the surface that water repellant is paved with cement wash, sealed tube 20 is packed up from ship, in the left section of upper surface that guard frame 31 is placed on, leak stopping terminates.With the water-bed leak stopping ship leak stopping of storehouse, the pool, water under not employment, safe and reliable, simple to operate, easy to use.
Claims (4)
1. the water-bed leak stopping ship in storehouse, the pool, comprise two sled ship (1), expansion link (16), sealed tube (20) and guard frame (31), it is characterized in that: water repellant cabin (4) and mixed earth cabin (32) are set in the left cabin of described two sled ship (1), in the middle-end of water repellant cabin (4) left section, rear material mouth (3) is set, the right section of left end being provided with the rear air inlet pipe (5) of late gate (6) is fixed in the induction opening of water repellant cabin (4) right section of middle-end, what the left end mouth of pipe going out agent pipe gone out on agent valve (11) was fixed on water repellant cabin (4) right surperficial bottom middle-end goes out in agent hole, the front end mouth of pipe going out agent pipe is connected with the rear foot mouth of pipe closing husky valve (9) right-hand member four-way, the front material mouth (2) of with closure is set in the middle-end of mixed left section of earth cabin (32), the right section of left end being provided with the front air inlet pipe (33) of early gate (34) is fixed in the induction opening of mixed earth cabin (32) right section of middle-end, the rear end of discharge nozzle (35) is arranged a valve, its left end mouth of pipe is fixed in the discharge opening of mixed earth cabin (32) right surperficial bottom middle-end, the rear end mouth of pipe of discharge nozzle (35) is connected with the forward foot in a step mouth of pipe closing husky valve (9) right-hand member four-way, after left section of two sled ship (1) middle deck, plate arranges sand pumping machine (8), the upper end of interior pipe (37) connects a threeway, the rear foot of threeway is connected with the lower end mouth of pipe of air valve (12), the left foot of threeway is connected with the right crus of diaphragm mouth of pipe sand output line on sand pumping machine (8) closing husky valve (9) right-hand member four-way, sand pumping machine (8) arranges Air compressor (7) on left section of header board of two sled ship (1) middle deck, the freeing pipe of Air compressor (7) connects a threeway, the left foot of threeway connects again a threeway, the forward foot in a step of this threeway is connected with early gate (34) the right-hand member mouth of pipe, the rear foot of this threeway is connected with late gate (6) the right-hand member mouth of pipe, the right crus of diaphragm of threeway on Air compressor (7) freeing pipe is connected with air valve (12) the left end mouth of pipe, steady arm (10) is fixed on the back segment of two sled ship (1) middle deck operator's station, the signal wire (SW) of the camera (24) in guard frame (31) is connected with the signal switcher on operator's station through interior pipe (37), signal switcher is connected with the computing machine (14) on operator's station, at the rear of computing machine (14), light switch (15) is set as end, each in front and back section in two sled ship (1) right cabin the storage battery (19) that current consumer on a ship provides power supply is set.
2. the water-bed leak stopping ship in storehouse, the pool according to claim 1, it is characterized in that: described expansion link (16) arranges four joints altogether, the upper limb often saved arranges an Overline ring, the left wall of four joint epimeres arranges a shaking tray (18), one end of halliard (17) is around in the notch of shaking tray (18), the wire loop that the other end often saves through expansion link penetrates in the pulley groove of cross bar (13) left end in a joint upper end hole be connected with degree of tightness pipe (21) with right section, and degree of tightness pipe (21) is enclosed within sealed tube (20).
3. the water-bed leak stopping ship in storehouse, the pool according to claim 1, it is characterized in that: described sealed tube (20) is set to plastics or snake-like hose, with seal cap (22) sealed tube (20) lower end is fixed on guard frame (31) suitable for reading in, with solid pipe cap (36), sealed tube (20) upper end is fixed in the medium pore of ceiling board in two sled ship (1), interior pipe (37), camera (24) signal wire (SW) and blue-ray light (26) power lead are inserted in sealed tube (20), the upper end mouth of pipe of interior pipe (37) connects a threeway, the lower end mouth of pipe of interior pipe (37) extend into guard frame (31) interior end section.
4. the water-bed leak stopping ship in storehouse, the pool according to claim 1, it is characterized in that: the vertical pole (25) in described guard frame (31) arranges 12, every root is cut into four sections, five rings are arranged to by ring bar (28), wherein two rings, every ring in three rings and Fourth Ring is evenly cut into 12 sections, two rings, three rings and Fourth Ring are connected a cross spring (23) with the place of joining of 12 vertical poles (25) is each, the upper end of 12 vertical pole (25) top sections is evenly connected to the lower edge of apical ring in ring bar (28), five rings is evenly cut into 12 sections, section is connected with a screw thread spring with between section, the lower end of 12 vertical pole (25) hypomeres is evenly connected on the mid point of the upper limb at every section, five rings in ring bar (28), 12 symmetrical corrosion-resistant steel inserted sheets (29) evenly connect on the lower edge at five rings, tetragonal the right and left of 12 inserted sheets (29) connects with glue chain (30), waterproof cover (27) is enclosed within the outside face of guard frame (31), in guard frame (31), two two sections, vertical pole (25) left and right is upper respectively arranges a camera (24), in guard frame (31), in three sections of vertical pole (25), three, interval arranges a LED blue-ray light (26).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420735541.4U CN204527543U (en) | 2014-11-27 | 2014-11-27 | The water-bed leak stopping ship in storehouse, the pool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420735541.4U CN204527543U (en) | 2014-11-27 | 2014-11-27 | The water-bed leak stopping ship in storehouse, the pool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204527543U true CN204527543U (en) | 2015-08-05 |
Family
ID=53741576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420735541.4U Expired - Fee Related CN204527543U (en) | 2014-11-27 | 2014-11-27 | The water-bed leak stopping ship in storehouse, the pool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204527543U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108254128A (en) * | 2018-01-12 | 2018-07-06 | 王加志 | The calibration method and device of grinding wheel static balancing |
CN114084304A (en) * | 2022-01-10 | 2022-02-25 | 启东市新创船舶配件有限公司 | Leakage blocking device for bulkhead of small and medium-sized ship |
-
2014
- 2014-11-27 CN CN201420735541.4U patent/CN204527543U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108254128A (en) * | 2018-01-12 | 2018-07-06 | 王加志 | The calibration method and device of grinding wheel static balancing |
CN114084304A (en) * | 2022-01-10 | 2022-02-25 | 启东市新创船舶配件有限公司 | Leakage blocking device for bulkhead of small and medium-sized ship |
CN114084304B (en) * | 2022-01-10 | 2022-03-29 | 启东市新创船舶配件有限公司 | Leakage blocking device for bulkhead of small and medium-sized ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102537667B (en) | Underground water pipe leakage detection positioning system and method thereof | |
CN201444106U (en) | Gas tightness detection device of balanced valve | |
CN108709694B (en) | Water tightness testing device and testing method suitable for tunnel shield arc-shaped duct piece | |
CN109595425A (en) | A kind of pipeline rehabilitation device and method | |
CN204527543U (en) | The water-bed leak stopping ship in storehouse, the pool | |
CN103644940A (en) | Coal seam gas pressure, gas flow and crustal stress monitoring device and monitoring method | |
CN204477708U (en) | A kind of leakage inspector | |
WO2015069315A8 (en) | Buried pipeline repair system | |
CN209181961U (en) | A kind of cable watertightness soak test slot | |
CN103363221A (en) | Socket pipe allowing rapid detection on water leakage of bell socket | |
CN107489169A (en) | Water-bag type regulator and pressure regulation method | |
CN208968842U (en) | Deep-water pressure environmental test chamber | |
CN207600673U (en) | A kind of steel pipe seam tests device for detecting leakage | |
CN209688339U (en) | A kind of pipeline rehabilitation device | |
CN208547561U (en) | A kind of concrete carbonic acid erosion test case | |
CN204359487U (en) | Anterior shield soil pressure case measures frock | |
CN204298747U (en) | The assembled cover case apparatus of bridge water pile foundation examination and repair | |
CN102269640B (en) | Tight coupling device for detecting leakage of water dispenser | |
CN102635361B (en) | Construction method for holing and welling of shield machine | |
CN207585851U (en) | A kind of the equipment of valve pressure testing | |
CN208366539U (en) | A kind of sealing test device for embedded navaid lamps and lanterns | |
CN208442268U (en) | A kind of Large-scale High-Pressure yoke configurations of fast opening and closing | |
CN106193121A (en) | A kind of immersed tube tunnel tube coupling antipriming | |
CN204535937U (en) | A kind of underground heat device for detecting leak point | |
CN206958615U (en) | A kind of steel sleeve steel bilayer high temperature oil pipeline inner tube leakage simulation monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20161127 |