CN204515525U - A kind of controller of new energy automobile and battery controller combined test system - Google Patents

A kind of controller of new energy automobile and battery controller combined test system Download PDF

Info

Publication number
CN204515525U
CN204515525U CN201420707499.5U CN201420707499U CN204515525U CN 204515525 U CN204515525 U CN 204515525U CN 201420707499 U CN201420707499 U CN 201420707499U CN 204515525 U CN204515525 U CN 204515525U
Authority
CN
China
Prior art keywords
test cabinet
entire car
controller
battery controller
controller test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420707499.5U
Other languages
Chinese (zh)
Inventor
宋冰
高力
刘义强
刘震
李亭亭
徐荣刚
张亚男
单红艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Brilliance Auto Group Holding Co Ltd
Original Assignee
Brilliance Auto Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brilliance Auto Group Holding Co Ltd filed Critical Brilliance Auto Group Holding Co Ltd
Priority to CN201420707499.5U priority Critical patent/CN204515525U/en
Application granted granted Critical
Publication of CN204515525U publication Critical patent/CN204515525U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to technical field of new energy, provide a kind of controller of new energy automobile and battery controller combined test system, comprise host computer, hub, entire car controller test cabinet, battery controller test cabinet, entire car controller direct fault location case, battery controller direct fault location case, entire car controller and battery controller.The utility model can avoid the manual tedious steps tested one by one the pin of entire car controller and battery controller, greatly shortens test period; Can solve when doing separately closed loop test to entire car controller or battery controller, between real controllers and Virtual Controller, communication function tests incomplete problem; Can solve when closed loop test is done separately to entire car controller or battery controller, affect the problem of the accuracy of controller test; Can the problem that exposes of Timeliness coverage to go forward side by side row relax, can Improving The Quality of Products effectively, shorten the product test cycle, save enterprise cost.

Description

A kind of controller of new energy automobile and battery controller combined test system
Technical field
The utility model relates to technical field of new energy, is specifically related to a kind of controller of new energy automobile and battery controller combined test system, for carrying out joint test to the entire car controller in new-energy automobile and battery controller.
Background technology
Along with the progress of society and the raising of people's living standard, the purchasing demand of people to automobile is more and more higher, so that China's automobile volume of production and marketing increases rapidly.People enjoy that automobile brings simultaneously easily, run into some more and more insupportable problems, as haze phenomenon is frequent all the more, the concentration of PM2.5 is increasing, and 50% of urban air pollution source is vehicle exhaust now.In this case, new-energy automobile is ready to appear, and the R&D direction of Ge great car load factory also tilts to new-energy automobile gradually.It is few that pure electric automobile not only consumes the energy, but also obtain extensive accreditation with the advantage of zero-emission.Therefore, in order to promote new-energy automobile industry better, a large amount of tests must be carried out to the performance of controller important in new-energy automobile and reliability, to ensure the security of vehicle.
Present stage, the common method of car load factory test controller is:
1. be that controller is powered with 12V power supply, by demarcating the validity of test controller output port to controller internal processes;
2. pair controller analog input interface is tested, and outside utilizes sensor to this controller input signal, by monitoring software observation controller built-in variable, checks that whether analog input is effective;
3. pair controller digital-quantity input interface is tested, 12V positive source is connected on switch one end, the switch other end is connected in controller digital-quantity input interface, opening and closing operations is carried out to switch, constantly give low and high level to controller, check that whether controller digital-quantity input interface is effective by monitoring software;
4. the transmitting-receiving of test controller power controller LAN (PT-CAN) interface, by network analysis testing tool CANalyer is connected on the PT-CAN interface of tested controller, in simulation PT-CAN, other controller nodes send information to tested controller, check that tested controller whether has response.
Can find out, this method of testing is very loaded down with trivial details, if have 100 interfaces to calculate by controller, only before test, wire harness prepares, sensor preparation etc., will take a long time, add and test one by one each interface, further increase the test period of controller, the time is the life of car load factory, this method of testing not only increases the operation cost of enterprise, has more delayed the release time of new product.
Indivedual car load factory upgrades in the method for original test controller, carries out closed loop test to single controller.For independent controller closed loop test system, in order to set up the complete test environment of single controller, need additionally to set up Virtual Controller, such test has obvious limitation:
1. cannot communication coordination function between complete test real controllers and another real controllers be associated, can only simulate by hardware closed-loop simulator the controller be associated and carry out indirect verification;
2. it is accurate that the function that cannot be associated with Virtual Controller to tested controller carries out test, because Virtual Controller simplifies the function of former real controllers, when testing, there is deviation with truth, causes testing out of true.
Utility model content
The technical problems to be solved in the utility model is: existing controller test system can not reproduce the real work situation of entire car controller and battery controller associated working, causes test result inaccurate.
For solving the problems of the technologies described above, the utility model provides following technical scheme:
A kind of controller of new energy automobile and battery controller combined test system, comprise host computer, hub, entire car controller test cabinet, battery controller test cabinet, entire car controller direct fault location case, battery controller direct fault location case, entire car controller and battery controller, host computer comprises host computer communication card;
Entire car controller test cabinet comprises: entire car controller test cabinet input and output I/O board, the comprehensive board of entire car controller test cabinet, entire car controller test cabinet controller local area network CAN interface board, entire car controller test cabinet primary processor and entire car controller test cabinet communication card;
Battery controller test cabinet comprises: battery controller test cabinet I/O board, the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet digital-to-analog conversion DAC board, battery controller test cabinet primary processor and battery controller test cabinet communication card;
Wherein, the host computer communication card of host computer is connected with entire car controller test cabinet communication card and battery controller test cabinet communication card respectively by hub; Entire car controller test cabinet communication card is connected with entire car controller test cabinet I/O board by entire car controller test cabinet primary processor, and battery controller test cabinet communication card is connected with battery controller test cabinet I/O board by battery controller test cabinet primary processor; Entire car controller test cabinet primary processor is connected with battery controller test cabinet primary processor;
Entire car controller test cabinet I/O board is also connected with the comprehensive board of entire car controller test cabinet, entire car controller test cabinet CAN interface board and entire car controller direct fault location case respectively;
Battery controller test cabinet I/O board is also connected with the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet DAC board and battery controller direct fault location case respectively;
Entire car controller direct fault location case is also connected with entire car controller, and battery controller direct fault location case is also connected with battery controller.
In preferred scheme, entire car controller test cabinet I/O board and battery controller test cabinet I/O board are the DS653 of De Sibaisi company; The comprehensive board of entire car controller test cabinet and the comprehensive board of battery controller test cabinet are the PCI6363 of NI company; Entire car controller test cabinet CAN interface board and battery controller test cabinet CAN interface board are the PCI8513 of NI company; Battery controller test cabinet DAC board is the PCI6713 of NI company; Entire car controller test cabinet primary processor and battery controller test cabinet primary processor are the PCI8135 of NI company; Entire car controller test cabinet communication card, battery controller test cabinet communication card and host computer communication card are the DS911 of De Sibaisi company; Hub is the DS830 of De Sibaisi company; The model that direct fault location case is Feng Qiu company is the direct fault location case of Breakout Box-80PIN; Host computer comprises the Controldesk software of De Sibaisi company.
In preferred scheme, host computer comprises: the management of the scheduling batteries model of element linked together, low pressure model of element, entire car controller model, controller local area network's CAN communication model and plant model.
By the utility model, the manual tedious steps that the pin of entire car controller and battery controller is tested one by one can be avoided completely, greatly shorten test period; For entire car controller, when doing independent closed loop test, battery controller belongs to Virtual Controller; For battery controller, when doing independent closed loop test, entire car controller belongs to Virtual Controller, and the utility model can solve when doing separately closed loop test to entire car controller or battery controller, the problem of the integrality difference of communication function test between real controllers and Virtual Controller; Can solve when closed loop test is done separately to entire car controller or battery controller, due to the simplification that Virtual Controller model is real controllers, cause the test of real controllers and Virtual Controller functions associated to occur cumulative errors, affect the problem of the accuracy of controller test.
The combined test system that the utility model provides, not only be conducive to the logic checking to controller internal processes, but also can to carrying out functional authorization, interface input and output when multi-controller and whole vehicle model integration testing, normal authentication, CAN communication are verified, can the problem that exposes of Timeliness coverage to go forward side by side row relax, can Improving The Quality of Products effectively, shorten the product test cycle, further, save enterprise cost.Therefore, the utility model has important practical value.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the controller of new energy automobile of the utility model embodiment and the structural representation of battery controller combined test system.
Fig. 2 is the structural representation of host computer.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
With reference to the structural representation shown in Fig. 1, provide a kind of controller of new energy automobile and battery controller combined test system in the present embodiment, comprise host computer, hub, entire car controller test cabinet, battery controller test cabinet, entire car controller direct fault location case, battery controller direct fault location case, entire car controller and battery controller.De Sibaisi Electromechanical Control technology (Shanghai) Co., Ltd. (hereinafter referred to as De Sibaisi), Beijing Feng Qiu Science and Technology Ltd. (hereinafter referred to as Feng Qiu company) and NI(American National instrument can be adopted) product of company to be to realize the present embodiment.
In host computer, insert host computer communication card, to communicate with hub;
Hub, by the communications cable, one end is connected to entire car controller test cabinet and battery controller test cabinet, and the other end is connected with the interface of host computer communication card;
Entire car controller test cabinet, inside comprises entire car controller test cabinet I/O(input and output) board, the comprehensive board of entire car controller test cabinet, entire car controller test cabinet CAN interface board, entire car controller test cabinet primary processor and entire car controller test cabinet communication card; The comprehensive board of entire car controller test cabinet integrates A/D(modulus) conversion, D/A(digital-to-analogue) conversion, PWM(pulse-length modulation) signal input and output, digital signal input and output, CAN communication function board; Entire car controller test cabinet CAN interface board, as the node of in CAN, has the function of equipment in testing CAN bus;
Battery controller test cabinet, inside comprises battery controller test cabinet I/O board, the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet DAC(digital-to-analog conversion) board, battery controller test cabinet primary processor and battery controller test cabinet communication card; The comprehensive board of battery controller test cabinet is the board integrating A/D conversion, D/A conversion, pwm signal input and output, digital signal input and output, CAN communication function; Battery controller test cabinet CAN interface board, as the node of in CAN, has the function of equipment in testing CAN bus; For battery controller test cabinet DAC board, because the D/A number of channels of the comprehensive board of battery controller test cabinet can not meet needed for battery controller, therefore increase DAC board;
Wherein, the host computer communication card of host computer is connected with entire car controller test cabinet communication card and battery controller test cabinet communication card respectively by hub; Entire car controller test cabinet communication card is connected with entire car controller test cabinet I/O board by entire car controller test cabinet primary processor, and battery controller test cabinet communication card is connected with battery controller test cabinet I/O board by battery controller test cabinet primary processor; Entire car controller test cabinet primary processor is connected with battery controller test cabinet primary processor;
Entire car controller test cabinet I/O board is also connected with the comprehensive board of entire car controller test cabinet, entire car controller test cabinet CAN interface board and entire car controller direct fault location case respectively;
Battery controller test cabinet I/O board is also connected with the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet DAC board and battery controller direct fault location case respectively;
Entire car controller direct fault location case is also connected with entire car controller, and battery controller direct fault location case is also connected with battery controller.
Entire car controller test cabinet and battery controller test cabinet, by Fiber connection, so that entire car controller test cabinet intercoms mutually with battery controller rack;
Entire car controller direct fault location case (Breakout Box) and battery controller fault case, the malfunction such as interface circuit short circuit, open circuit of entire car controller and battery controller can be simulated respectively, be arranged between corresponding controller and controller test rack; Direct fault location case is used for carrying out short circuit and/or open circuit process to corresponding controllers, and then carries out direct fault location, also for passing through PT-CAN forwarding information between direct fault location case and corresponding test cabinet I/O board.
Battery controller is made up of scheduling batteries unit and low pressure administrative unit, scheduling batteries unit, and the CAN information sent for receiving low pressure administrative unit also communicates with PT-CAN; Low pressure administrative unit, for gathering battery cell internal information, and sends to scheduling batteries unit by the battery cell internal information of collection.
The model of the I/O board of entire car controller test cabinet and battery controller test cabinet is the DS653 of De Sibaisi company; The model of the comprehensive board in entire car controller test cabinet and battery controller test cabinet is the PCI6363 of NI company; CAN interface board in entire car controller test cabinet and battery controller test cabinet is the PCI8513 of NI company; DAC board in battery controller test cabinet is the PCI6713 of NI company; In entire car controller test cabinet and battery controller test cabinet, primary processor is the PCI8135 of NI company; In entire car controller test cabinet, battery controller test cabinet and host computer, communication card is the DS911 of De Sibaisi company; The model of hub is the DS830 of De Sibaisi company; The direct fault location case of direct fault location case to be the model of Feng Qiu company be Breakout Box-80PIN; Host computer inside performs the Controldesk software of De Sibaisi company.
The controller of new energy automobile of the present embodiment and the hardware signal control mode of battery controller combined test system are: the PC control signal that entire car controller test cabinet primary processor utilizes entire car controller test cabinet communication card to receive hub to forward, entire car controller test cabinet primary processor inside comprises car load test environment model, PC control signal is sent to the comprehensive board of entire car controller test cabinet by entire car controller test cabinet I/O board by car load test environment model, PC control signal is sent to entire car controller direct fault location case by entire car controller test cabinet I/O board and is transmitted to entire car controller by the comprehensive board of entire car controller test cabinet,
Entire car controller responds PC control signal, and successively by entire car controller direct fault location case and entire car controller test cabinet I/O board, first response signal is sent to the comprehensive board of entire car controller test cabinet and entire car controller test cabinet CAN interface board, also the first response signal and CAN signal are delivered to entire car controller test cabinet primary processor;
Entire car controller test cabinet primary processor processes the first response signal and CAN signal, on the one hand the signal after process is fed back to host computer by entire car controller test cabinet communication card and hub to monitor, on the other hand the parameter signal of battery parameter etc. is sent in battery controller test cabinet;
Battery controller test cabinet primary processor is to the parameter signal of the battery parameter that the entire car controller test cabinet primary processor received sends etc., by battery controller test cabinet I/O board, parameter signal is sent to the comprehensive board of battery controller test cabinet and battery controller test cabinet DAC board, battery control information can be sent to battery controller by battery controller test cabinet I/O board by the comprehensive board of battery controller test cabinet and battery controller test cabinet DAC board, scheduling batteries unit in battery controller and low pressure administrative unit respond the battery control information received, and utilize battery controller direct fault location case and battery controller test cabinet I/O board to be transmitted to the comprehensive board of battery controller test cabinet and battery controller test cabinet CAN interface board by rigid line and CAN line the second response signal, second response signal is sent to battery controller test cabinet primary processor, second response signal is monitored to host computer by final battery controller test cabinet primary processor on the one hand, on the other hand the second response signal is sent to entire car controller test cabinet primary processor, by above similar approach, the second response signal is fed back to entire car controller, finally complete closed loop test.
Software in host computer can be write by Simulink, see Fig. 2, the software in host computer comprises the scheduling batteries model of element (BMU), low pressure management model of element (LMU), entire car controller model (VCU), CAN communication model and the plant model that link together.
The controller of new energy automobile of the present embodiment with the software-controlled manner of battery controller combined test system is: the input equipment be connected with host computer sends host computer operation signal to host computer, entire car controller model receives the initialize signal in host computer operation signal and plant model, generate and comprise the simulating signal of PC control signal and digital signal sends to entire car controller, after entire car controller response, first response signal of response is sent to entire car controller model, after first response signal is nursed one's health by entire car controller model, be sent in plant model, simultaneously, low pressure management model of element receives corresponding initialize signal in plant model, due to low pressure management model of element and scheduling batteries model of element rigid line direct-connected, low pressure management model of element responds initialize signal, the simulating signal of response and digital signal are sent in scheduling batteries model of element, after the conditioning of scheduling batteries model, be sent in plant model, plant model comprises: battery model, motor model, vehicle dynamic model, drive model or environmental model, or the combination of these models, all models in plant model respond to the received signal, by the bus that these models are arranged, the signal that entire car controller needs is sent to entire car controller model, CAN information in plant model is sent to CAN communication model, in CAN communication model, has virtual car load CAN transceiver, the CAN transceiver of BMU, the CAN transceiver of LMU,
Initialize signal comprises the information such as monomer voltage, monomer temperature, fan inside state of battery, is sent in low pressure management model of element; Plant model receives the signal of entire car controller model and the transmission of battery controller model, and responds the signal received, and the signal after response is finally fed back to entire car controller, software achieves closed loop test.
Technical scheme provided by the utility model have employed the dual closed loop test of hardware and software, effectively solves following problem:
1. to avoid in prior art the manual tedious steps that the pin of entire car controller and battery controller is tested one by one, provide the human-machine operation page (input equipment be connected with host computer and output device), complete the function of test controller easily, greatly increase work efficiency;
2. solve entire car controller and battery controller in the development and testing stage, test period is long, and expense expenditure is large, the problem of the human and material resources of waste car load factory;
3. when solving Single Controller closed loop test, cannot communication coordination function between complete test real controllers and Virtual Controller node;
4. effectively improve the accuracy of entire car controller and battery controller functional test.
And, the utility model utilizes host computer, entire car controller test cabinet, battery controller test cabinet, entire car controller, battery controller, closed loop test is carried out by hardware and software, in closed loop test system, effectively can verify the control strategy of real controllers, facilitate Test Engineer that the tactful leak found is fed back to tactful slip-stick artist in time.
The above; be only embodiment of the present utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; change can be expected easily or replace, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of described claim.

Claims (2)

1. a controller of new energy automobile and battery controller combined test system, it is characterized in that, comprise host computer, hub, entire car controller test cabinet, battery controller test cabinet, entire car controller direct fault location case, battery controller direct fault location case, entire car controller and battery controller, host computer comprises host computer communication card;
Entire car controller test cabinet comprises: entire car controller test cabinet input and output I/O board, the comprehensive board of entire car controller test cabinet, entire car controller test cabinet controller local area network CAN interface board, entire car controller test cabinet primary processor and entire car controller test cabinet communication card;
Battery controller test cabinet comprises: battery controller test cabinet I/O board, the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet digital-to-analog conversion DAC board, battery controller test cabinet primary processor and battery controller test cabinet communication card;
Wherein, the host computer communication card of host computer is connected with entire car controller test cabinet communication card and battery controller test cabinet communication card respectively by hub; Entire car controller test cabinet communication card is connected with entire car controller test cabinet I/O board by entire car controller test cabinet primary processor, and battery controller test cabinet communication card is connected with battery controller test cabinet I/O board by battery controller test cabinet primary processor; Entire car controller test cabinet primary processor is connected with battery controller test cabinet primary processor;
Entire car controller test cabinet I/O board is also connected with the comprehensive board of entire car controller test cabinet, entire car controller test cabinet CAN interface board and entire car controller direct fault location case respectively;
Battery controller test cabinet I/O board is also connected with the comprehensive board of battery controller test cabinet, battery controller test cabinet CAN interface board, battery controller test cabinet DAC board and battery controller direct fault location case respectively;
Entire car controller direct fault location case is also connected with entire car controller, and battery controller direct fault location case is also connected with battery controller.
2. controller of new energy automobile and battery controller combined test system according to claim 1, it is characterized in that, entire car controller test cabinet I/O board and battery controller test cabinet I/O board are the DS653 of De Sibaisi company; The comprehensive board of entire car controller test cabinet and the comprehensive board of battery controller test cabinet are the PCI6363 of NI company; Entire car controller test cabinet CAN interface board and battery controller test cabinet CAN interface board are the PCI8513 of NI company; Battery controller test cabinet DAC board is the PCI6713 of NI company; Entire car controller test cabinet primary processor and battery controller test cabinet primary processor are the PCI8135 of NI company; Entire car controller test cabinet communication card, battery controller test cabinet communication card and host computer communication card are the DS911 of De Sibaisi company; Hub is the DS830 of De Sibaisi company; The model that direct fault location case is Feng Qiu company is the direct fault location case of Breakout Box-80PIN; Host computer comprises the Controldesk software of De Sibaisi company.
CN201420707499.5U 2014-11-24 2014-11-24 A kind of controller of new energy automobile and battery controller combined test system Expired - Fee Related CN204515525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420707499.5U CN204515525U (en) 2014-11-24 2014-11-24 A kind of controller of new energy automobile and battery controller combined test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420707499.5U CN204515525U (en) 2014-11-24 2014-11-24 A kind of controller of new energy automobile and battery controller combined test system

Publications (1)

Publication Number Publication Date
CN204515525U true CN204515525U (en) 2015-07-29

Family

ID=53713477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420707499.5U Expired - Fee Related CN204515525U (en) 2014-11-24 2014-11-24 A kind of controller of new energy automobile and battery controller combined test system

Country Status (1)

Country Link
CN (1) CN204515525U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244687A (en) * 2019-06-04 2019-09-17 中国第一汽车股份有限公司 A kind of test macro of camera controller
CN110928275A (en) * 2019-12-12 2020-03-27 重庆长安新能源汽车科技有限公司 Multi-controller combined HIL (high-level hierarchical level) rack message frame loss fault injection test system and method
CN112198868A (en) * 2020-10-10 2021-01-08 武汉洋葱云网技术有限公司 Method for detecting input and output signals of whole electric vehicle controller

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110244687A (en) * 2019-06-04 2019-09-17 中国第一汽车股份有限公司 A kind of test macro of camera controller
CN110928275A (en) * 2019-12-12 2020-03-27 重庆长安新能源汽车科技有限公司 Multi-controller combined HIL (high-level hierarchical level) rack message frame loss fault injection test system and method
CN110928275B (en) * 2019-12-12 2022-07-01 重庆长安新能源汽车科技有限公司 Multi-controller combined HIL (high-level hierarchical level) rack message frame loss fault injection test system and method
CN112198868A (en) * 2020-10-10 2021-01-08 武汉洋葱云网技术有限公司 Method for detecting input and output signals of whole electric vehicle controller
CN112198868B (en) * 2020-10-10 2023-04-25 武汉洋葱云网技术有限公司 Detection method for input and output signals of electric vehicle controller

Similar Documents

Publication Publication Date Title
CN104503424A (en) New energy automobile overall controller and battery controller joint test system
CN102073017B (en) Intelligent testing platform of battery management system and testing method
CN108919778B (en) electric automobile vehicle control unit testing arrangement
CN105416086B (en) Plug-in hybrid-power automobile energy management strategies hardware-in-loop simulation platform
CN105159188B (en) A kind of new energy vehicle heterogeneous network emulator and control method
CN103631147B (en) Train network control system semi-physical comprehensive simulation test platform and test method
CN201576208U (en) Simulation testing system of electric vehicle controller
CN106444420B (en) A kind of locomotive semi-hardware type simulation test system and method
CN206400286U (en) A kind of test system based on hardware in loop equipment
CN203689120U (en) New energy vehicle battery management system master and slave control board hardware-in-the-loop test system
CN102880171B (en) A kind of hardware in loop experimental system of vehicle control unit of electric vehicle
CN111007840A (en) Whole vehicle controller hardware-in-loop test platform and method
CN104062969A (en) Hardware-in-loop simulation testing system and testing method for automobile
CN102081145B (en) Functional verification platform of battery management system
CN107911260A (en) A kind of vehicle test system based on OSEC network managements
CN205121329U (en) Electric motor car hardware is at ring test system
CN104503771B (en) A kind of train network control system integrating and developing platform
CN112147981A (en) dSPACE HIL-based electric vehicle power-on and power-off logic test method and test system
CN112036023B (en) Software integrated generation system of generator transformer set protection device
CN204515525U (en) A kind of controller of new energy automobile and battery controller combined test system
CN104572108B (en) A kind of train network control system software development methodology
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN110631843A (en) Test system and method for rail transit vehicle
CN204790554U (en) Bus controller quality testing arrangement based on car CAN network bus
CN206411509U (en) Vehicle multi-controller emulation test system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20211124