CN204511330U - A kind of fastening Integral elastic centralizer - Google Patents

A kind of fastening Integral elastic centralizer Download PDF

Info

Publication number
CN204511330U
CN204511330U CN201520138126.5U CN201520138126U CN204511330U CN 204511330 U CN204511330 U CN 204511330U CN 201520138126 U CN201520138126 U CN 201520138126U CN 204511330 U CN204511330 U CN 204511330U
Authority
CN
China
Prior art keywords
ring
arc
rings
elastic centralizer
fastening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520138126.5U
Other languages
Chinese (zh)
Inventor
孙西宁
宋剑鸣
安然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shang Shan Petroleum Machinery Co Ltd
Original Assignee
Hebei Shang Shan Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shang Shan Petroleum Machinery Co Ltd filed Critical Hebei Shang Shan Petroleum Machinery Co Ltd
Priority to CN201520138126.5U priority Critical patent/CN204511330U/en
Application granted granted Critical
Publication of CN204511330U publication Critical patent/CN204511330U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of fastening Integral elastic centralizer, the many arc righting strips comprising two back-up rings at two ends and be connected between two back-up rings, described back-up ring is two semicircular ring, two semicircular ring one end Fixed hinges link together, the other end of back-up ring waits until the hinge of fastening in advance, be movably connected by pin axle, arc righting strip inside-out bends to arc surface, and described arc righting strip and two back-up rings are integrally formed.The back-up ring at described two ends is provided with the stop top wire hole preventing elastic centralizer installation stop jackscrew of upper and lower play on sleeve pipe.Described back-up ring and the arc righting strip of Duo Gen are by the overall stamping forming structure of a block plate.The utility model has free-open-close, the feature that uprighting force is strong.Due to its reasonable in design, not only reliability high and also can free-open-close connect, convenient and swift.

Description

A kind of fastening Integral elastic centralizer
Technical field
The elastic centralizer that the utility model relates to, especially a kind ofly fastens Integral elastic centralizer, and meeting integral-type centralizer can the function of free-open-close, can be used in various cementing operation.
Background technology
The centralizer of various forms and specification is one of instrument the most frequently used in current cementing operation, its main function ensures that sleeve pipe is placed in the middle in pit shaft, the righting strip of elastic centralizer, because having elasticity, compares and is applicable to the oil gas field that well interior diameter changes greatly or gradient is larger, to improve cementing quality.Existing elastic centralizer is woven by two back-up rings and several arc muscle or welded together, so its firmness affects by welding quality, may think that welding quality is bad and damage in using; Welded construction makes the bearing capacity of elastic centralizer righting strip reduce, and can not guarantee casing centralization; Product reliability is poor, and precision is low.
Utility model content
Technical problem to be solved in the utility model is, provide a kind of and fasten Integral elastic centralizer, solving existing elastic centralizer affects greatly by welding quality, and uprighting force is not enough; Change centralizer installation form, make centralizer can be fixed on a certain sleeve pipe and whether go up descend play.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of fastening Integral elastic centralizer, the many arc righting strips comprising two back-up rings at two ends and be connected between two back-up rings, described back-up ring is two semicircular ring, two semicircular ring one end Fixed hinges link together, the other end of back-up ring waits until the hinge of fastening in advance, insert hinge to be fastened by pin axle and be movably connected, arc righting strip inside-out bends to arc surface, and described arc righting strip and two back-up rings are integrally formed.
The back-up ring at described two ends is provided with the stop top wire hole preventing elastic centralizer installation stop jackscrew of upper and lower play on sleeve pipe.
Described back-up ring and the arc righting strip of Duo Gen are by the overall stamping forming structure of a block plate.
Described arc righting strip is 4-6 root.
The beneficial effects of the utility model are: have free-open-close, the feature that uprighting force is strong.Due to its reasonable in design, not only reliability high and also can free-open-close connect, convenient and swift.
Accompanying drawing explanation
Fig. 1 is that the utility model fastens Integral elastic centralizer structure figure;
In figure, 1. wait until the hinge of fastening in advance; 2. back-up ring; 3. arc righting strip; 4. stop top wire hole; 5. Fixed hinge.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in Figure 1, fastening Integral elastic centralizer of the present utility model, comprise two back-up rings 2 at two ends and be connected to many arc righting strips 3 between two back-up rings, described back-up ring 2 is two semicircular ring, two semicircular ring one end Fixed hinges 5 link together, the other end of back-up ring waits until the hinge 1 of fastening in advance, insert hinge to be fastened by pin axle 6 and be movably connected, arc righting strip 3 inside-out bends to arc surface, and described arc righting strip 3 and two back-up rings 2 are integrally formed.
The back-up ring 2 at described two ends is provided with the stop top wire hole 4 preventing elastic centralizer installation stop jackscrew of upper and lower play on sleeve pipe.
Described back-up ring 2 and the arc righting strip of Duo Gen 3 are by the overall stamping forming structure of a block plate.
Described arc righting strip 3 is 4-6 root.
The utility model strikes out two semi-circular shape by two pieces of spring steel plate entirety, and wherein every two hollow outs are by one righting strip interval; Every root righting strip inside-out is bent into circular arc structure, is used for increasing the uprighting force of centralizer; Back-up ring two ends are converted into hinge, are linked together by two semicircular ring one end Fixed hinges; The other end of back-up ring waits until the hinge of fastening in advance, links together during site operation with connecting pin, and meeting can the function of free-open-close and connection, convenient and swift; Two back-up ring increases stop top wire hole, can optionally centralizer is fixed on sleeve pipe, prevent centralizer upper and lower play on sleeve pipe.Due to its reasonable in design, not only reliability high and also can free-open-close connect, convenient and swift.
The overall centralizer of the utility model fastening type achieves the arc muscle of centralizer from structure design and two ends back-up ring is stamping forming overall structure, and good toughness, uprighting force are strong.In the back-up ring of two ends, add hinge and stop top wire hole, meeting centralizer can the ability of free-open-close, and can fix jackscrew by two ends and prevent the upper and lower play of centralizer; The utility model structure is simple, and easy to connect, righting intensity is high, is easy to promote.
In sum, content of the present utility model is not limited in the above-described embodiment, knowledgeable people in same area can propose other embodiment easily within technological guidance's thought of the present utility model, but this embodiment is all included within scope of the present utility model.

Claims (4)

1. one kind fastens Integral elastic centralizer, comprise two back-up rings (2) being positioned at two ends and the many arc righting strips (3) be connected between two back-up rings, it is characterized in that, described back-up ring (2) is two semicircular ring, two semicircular ring one end Fixed hinge (5) link together, the other end of back-up ring waits until the hinge (1) of fastening in advance, insert hinge to be fastened by pin axle (6) and be movably connected, arc righting strip (3) inside-out bends to arc surface, described arc righting strip (3) and two back-up rings (2) are integrally formed.
2. fastening Integral elastic centralizer according to claim 1, is characterized in that, the back-up ring (2) at described two ends is provided with the stop top wire hole (4) preventing elastic centralizer installation stop jackscrew of upper and lower play on sleeve pipe.
3. fastening Integral elastic centralizer according to claim 1, is characterized in that, described back-up ring (2) and many arc righting strips (3) are by the overall stamping forming structure of a block plate.
4. fastening Integral elastic centralizer according to claim 1, is characterized in that, described arc righting strip (3) is 4-6 root.
CN201520138126.5U 2015-03-11 2015-03-11 A kind of fastening Integral elastic centralizer Expired - Fee Related CN204511330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520138126.5U CN204511330U (en) 2015-03-11 2015-03-11 A kind of fastening Integral elastic centralizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520138126.5U CN204511330U (en) 2015-03-11 2015-03-11 A kind of fastening Integral elastic centralizer

Publications (1)

Publication Number Publication Date
CN204511330U true CN204511330U (en) 2015-07-29

Family

ID=53709323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520138126.5U Expired - Fee Related CN204511330U (en) 2015-03-11 2015-03-11 A kind of fastening Integral elastic centralizer

Country Status (1)

Country Link
CN (1) CN204511330U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178883A (en) * 2015-11-03 2015-12-23 北京泓宇恒业科技发展有限公司 Integrated elastic centralizer
CN106917593A (en) * 2017-04-27 2017-07-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of sleeve outer wall anti-corrosion rigid centralizer and its installation application
CN108131105A (en) * 2018-02-08 2018-06-08 大庆宏富来电气设备制造有限公司 The oil pumping rod centering device of easy disassembly

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178883A (en) * 2015-11-03 2015-12-23 北京泓宇恒业科技发展有限公司 Integrated elastic centralizer
CN106917593A (en) * 2017-04-27 2017-07-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of sleeve outer wall anti-corrosion rigid centralizer and its installation application
CN106917593B (en) * 2017-04-27 2023-04-07 中国石油天然气集团有限公司 Rigid centralizer for corrosion prevention of outer wall of casing and installation application of rigid centralizer
CN108131105A (en) * 2018-02-08 2018-06-08 大庆宏富来电气设备制造有限公司 The oil pumping rod centering device of easy disassembly
CN108131105B (en) * 2018-02-08 2023-11-14 大庆恒驰电气有限公司 Sucker rod centralizer convenient to disassemble and assemble

Similar Documents

Publication Publication Date Title
CN204511330U (en) A kind of fastening Integral elastic centralizer
CN208023416U (en) A kind of Simple fast-dismounting type steel truss guide beam
CN204754796U (en) Roadway support is high -speed joint formula drilling rod for anchor
CN202501444U (en) Fixed curved pipe clamp served as sliding block in boiler
CN207639772U (en) Fixed hinged shaft crawler type watch chain
CN204041871U (en) For the chain of carpenter's log splitter
CN204098797U (en) A kind of upset end electric resistance welding connects heavy weight drill pipe
CN203948503U (en) A kind of universal joint
CN207393663U (en) A kind of photovoltaic bracket connects accessory
CN201973023U (en) Extension bar capable of being fast installed and dismounted
CN204038387U (en) The external hanging device of meshbeltfurnace chain
CN207485381U (en) Not damaged rubber dental lamina
CN204961569U (en) Pin
CN202810746U (en) Spring-clip fishing tool special for coring tool
CN201953320U (en) Bending-prevention and twisting-prevention telescopic rotating joint of sucker rod
CN207626701U (en) Crawler type watch chain with sealing of hole screw element
CN211414889U (en) Process equipment for aligning middle hole and hole of oil pipe
CN204179418U (en) A kind of anti-static grounding is inserted
CN201461858U (en) High-speed lifter chain
CN204920415U (en) Outer flange joint high strength concrete pole
CN204477183U (en) One can be located and easy-to-dismount chain
CN204083010U (en) Spring fastenings
CN204386503U (en) Centralizer in sleeve pipe
CN204139692U (en) A kind of steel tube tower
CN204137662U (en) A kind of attaching parts of sewage disposer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20170311

CF01 Termination of patent right due to non-payment of annual fee