CN204510293U - A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete - Google Patents

A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete Download PDF

Info

Publication number
CN204510293U
CN204510293U CN201520106642.XU CN201520106642U CN204510293U CN 204510293 U CN204510293 U CN 204510293U CN 201520106642 U CN201520106642 U CN 201520106642U CN 204510293 U CN204510293 U CN 204510293U
Authority
CN
China
Prior art keywords
steel
steel frame
loop
reaction force
large diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520106642.XU
Other languages
Chinese (zh)
Inventor
侯福昌
李结全
陈建文
戴恒
欧孝夺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Original Assignee
GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd filed Critical GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Priority to CN201520106642.XU priority Critical patent/CN204510293U/en
Application granted granted Critical
Publication of CN204510293U publication Critical patent/CN204510293U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to pile foundation engineering pile bearing capacity detection field, be specially a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete, comprise the identical upper steel frame of structure and lower steel frame, be loop configuration, its center is circular through hole, described loop configuration comprises interior steel loop and outer steel loop, and between described interior steel loop and outer steel loop, equidistant intervals is arranged and contacted steel disc and V-arrangement reinforcing rib; Be fixedly installed several jack between described upper steel frame and lower steel frame, the upper surface of the soffit of the V-arrangement reinforcing rib of steel frame and the V-arrangement reinforcing rib of lower steel frame is withstood at the top of described jack, bottom respectively.The utility model solves casing surrounding concrete in pile filling process and pours into uncompacted problem, pouring pile bearing capacity is detected more accurate.Adopt hollow out steel skeleton construction to save rolled steel dosage simultaneously; Adopt sound detecting pipe to replace displacement pipe to measure upper and lower plates displacement, simplify operating procedure and further save rolled steel dosage.

Description

A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete
Technical field
The utility model relates to pile foundation engineering pile bearing capacity detection field, especially a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete.
Background technology
At present, large diameter pile self-reaction force checkout gear for detecting foundation pile supporting capacity is installed in castinplace pile, but the end face of common loads case and bottom surface are steel plate on market, and upper and lower displacement pipe and the sound detecting pipe for ultrasound examination is had respectively on top, end steel plate, in the process of pile concrete perfusion, steel plate has a certain impact to concrete flowing, easily causes the phenomenons such as the upper and lower certain limit laitance of casing is detained, air is not easily discharged.Barrier effect due to steel plate and load box can cause load box surrounding concrete to pour into leakiness, casing and concrete stress surface uneven, when finally may cause detection, load box unbalance stress causes leakage of oil, so that test failure; In addition, uncompacted concrete can affect the performance of bearing capacity of pile simultaneously.Displacement pipe and sound detecting pipe are arranged respectively, cause steel wasting phenomenon.
Utility model content
The purpose of this utility model is: for the deficiencies in the prior art, a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete is provided, solve casing surrounding concrete in pile filling process and pour into uncompacted problem, pouring pile bearing capacity is detected more accurate, adopt hollow out steel skeleton construction to save rolled steel dosage simultaneously; Adopt sound detecting pipe to replace displacement pipe to measure upper and lower plates displacement, simplify operating procedure and further save rolled steel dosage.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete, comprise steel frame and lower steel frame, several jack are fixedly installed between described upper steel frame and lower steel frame, described upper steel frame is identical with lower steel skeleton construction, be loop configuration, its center is circular through hole, and described loop configuration comprises interior steel loop and outer steel loop, and between described interior steel loop and outer steel loop, equidistant intervals is arranged and contacted steel disc and V-arrangement reinforcing rib; The upper surface of the soffit of the V-arrangement reinforcing rib of steel frame and the V-arrangement reinforcing rib of lower steel frame is withstood at the top of described jack, bottom respectively.
Owing to adopting said structure, upper and lower skeleton arranges V-arrangement reinforcing rib and contact steel disc composition by equidistant intervals between interior steel loop and outer steel loop, forms engraved structure, not only save steel, and be convenient to later stage oil pipe, sound detecting pipe, also have other detect needed for the layout of equipment, operating space is wide; And this structure is convenient to concrete flowing when filling concrete, large diameter pile self-reaction force checkout gear surrounding concrete is made more easily to reach closely knit, make load box uniform force, solve casing surrounding concrete in pile filling process and pour into uncompacted problem, pouring pile bearing capacity is detected more accurate.
As preferred version of the present utility model, the quantity of described jack is identical with the V-arrangement reinforcing rib quantity on upper steel frame or lower steel frame.
Owing to adopting said structure, between V-arrangement reinforcing rib jack being arranged on upper and lower steel frame, and adopt V-arrangement reinforcing rib, increase the receiving area of jack, improve the strength and stiffness of whole device.
Further, connected by oil pipe between each jack.
As preferred version of the present utility model, also comprise at least two sound detecting pipes, the upper end of each sound detecting pipe described is welded on the outer steel loop inwall of steel frame, and the lower end of described sound detecting pipe is welded on the outer steel loop inwall of lower steel frame.
Owing to adopting said structure, save the setting of displacement protection tube, sound detecting pipe and displacement protection tube unite two into one; not only save steel, also simplify operating procedure, first carry out ultrasound examination pile body integrity; then carry out the bearing capacity that self-balancing experiment detects stake again, reach cost-saving object.
Further, containing two displacement silks in each sound detecting pipe described, i.e. top offset silk and bottom offset silk, one end of described top offset silk is welded on the inwall of sound detecting pipe and the outer steel loop intersection of upper steel frame, and one end of described bottom offset silk is welded on the inwall of sound detecting pipe and the outer steel loop intersection of lower steel frame.
Owing to adopting said structure, save the setting of displacement protection tube, sound detecting pipe is replaced displacement protection tube, not only save steel, also simplify operating procedure, the change of the setting position convenient observation displacement of displacement silk.
As preferred version of the present utility model, several connecting elementss of uniform welding between the outer steel loop of described upper steel frame and the outer steel loop of lower steel frame, upper several connecting elementss of uniform welding between the interior steel loop of described upper steel frame and the interior steel loop of lower steel frame.
Further, described connecting elements is welded on inside and outside steel loop and the junction contacting steel disc.
Owing to adopting said structure, by increasing connecting elements, increasing the stability of whole large diameter pile self-reaction force checkout gear, ensureing that large diameter pile self-reaction force checkout gear does not damage in lifting and transportation.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are:
The utility model adopts the steel skeleton construction up and down of engraved structure, improve upper plate and the lower shoe structure of large diameter pile self-reaction force checkout gear, solve in pile filling process and cause the uncompacted problem of large diameter pile self-reaction force checkout gear circumfusion because of the stop of steel plate, pouring pile bearing capacity is detected more accurate, also ensured that the integrality of concrete pile body is not subject to the impact of self-balancing experiment.In addition, displacement protection tube and sound detecting pipe unite two into one by this device, cost-saving while being convenient to perfusion.
Accompanying drawing explanation
Fig. 1 is a kind of top view being convenient to the large diameter pile self-reaction force checkout gear of pouring concrete of the utility model;
Fig. 2 is the A-A sectional view of Fig. 1;
In figure: in 1-jack, 2-, steel loop, 3-contact steel disc, 4-outer steel loop, 5-connecting elements, 6-displacement silk, 7-sound detecting pipe, 8-oil pipe, 9-top offset silk, 10-bottom offset silk, 11-oil-in, 12-oil-out, 13-through hole, 14-V shape reinforcing rib.
Detailed description of the invention
Be described in further detail detailed description of the invention of the present utility model below in conjunction with accompanying drawing, wherein in institute's drawings attached, identical label represents same or similar parts, and the accompanying drawing in manual is reduced form, only for understanding concrete structure of the present utility model.Following examples only for clearly the technical solution of the utility model being described, and can not limit protection domain of the present utility model.
As shown in Figure 1 and Figure 2, a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete, comprise steel frame and lower steel frame, several jack 1 are fixedly installed between described upper steel frame and lower steel frame, described upper steel frame is identical with lower steel skeleton construction, is loop configuration, and its center is circular through hole 13, described loop configuration comprises interior steel loop 2 and outer steel loop 4, and between described interior steel loop 2 and outer steel loop 4, equidistant intervals is arranged and contacted steel disc 3 and V-arrangement reinforcing rib 14; The upper surface of the soffit of the V-arrangement reinforcing rib 14 of steel frame and the V-arrangement reinforcing rib 14 of lower steel frame is withstood at the top of described jack 1, bottom respectively.
Wherein, the quantity of described jack is identical with the V-arrangement reinforcing rib quantity on upper steel frame or lower steel frame.Between the V-arrangement reinforcing rib 14 jack 1 being arranged on upper and lower steel frame, and adopt V-arrangement reinforcing rib, increase the receiving area of jack, improve the strength and stiffness of whole device.
Wherein, connected by oil pipe 8 between several jack 1 described.The jack 1 of the quantity such as 3,4,5,6 can be selected according to actual needs.Jack 1 simultaneously upwards load application downwards when detecting.
Present embodiment specifically also comprises at least two sound detecting pipes 7, and the upper end of each sound detecting pipe 7 described is welded on outer steel loop 4 inwall of steel frame, and the lower end of described sound detecting pipe 7 is welded on outer steel loop 4 inwall of lower steel frame.Can preferred 3 sound detecting pipes, be evenly distributed on annular steel frame.
In present embodiment, containing two displacement silks 6 in each sound detecting pipe 7, i.e. top offset silk 9 and bottom offset silk 10, one end of described top offset silk 9 is welded on the inwall of sound detecting pipe and outer steel loop 4 intersection of upper steel frame, and one end of described bottom offset silk 10 is welded on the inwall of sound detecting pipe and outer steel loop 4 intersection of lower steel frame.
In addition, several connecting elementss 5 of uniform welding between the outer steel loop 4 of described upper steel frame and the outer steel loop 4 of lower steel frame, upper several connecting elementss 5 of uniform welding between the interior steel loop 2 of described upper steel frame and the interior steel loop 2 of lower steel frame.Described connecting elements 5 is welded on interior steel loop 2, outer steel loop 4 and the junction contacting steel disc 3.
The operating principle of the present embodiment: during installation, is embedded in pile body balance point position by this device.Upper steel frame is connected with pile body top and pile body bottom respectively with lower steel frame.During detection, from oil-feed port fuel feeding, jack 1 is steel frame and lower steel frame load application upwards, upper steel frame and lower steel frame drive again upper and lower pile body to divide generation length travel, top offset silk 9, bottom offset silk 10 are by the straight-through top of sound detecting pipe 7, just can obtain pile body shifting at pile body top by top offset silk 9, bottom offset silk 10, thus obtain the relation of pile bearing capacity and displacement.

Claims (7)

1. be convenient to the large diameter pile self-reaction force checkout gear of pouring concrete for one kind, comprise steel frame and lower steel frame, it is characterized in that: between described upper steel frame and lower steel frame, be fixedly installed several jack (1), described upper steel frame is identical with lower steel skeleton construction, be loop configuration, its center is circular through hole (13), described loop configuration comprises interior steel loop (2) and outer steel loop (4), and between described interior steel loop (2) and outer steel loop (4), equidistant intervals is arranged and contacted steel disc (3) and V-arrangement reinforcing rib (14); The upper surface of the soffit of the V-arrangement reinforcing rib (14) of steel frame and the V-arrangement reinforcing rib (14) of lower steel frame is withstood at the top of described jack, bottom respectively.
2. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 1, is characterized in that: the quantity of described jack (1) is identical with V-arrangement reinforcing rib (14) quantity on upper steel frame or lower steel frame.
3. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 1 and 2, is characterized in that: by oil pipe (8) series connection between described several jack (1).
4. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 1, it is characterized in that: also comprise at least two sound detecting pipes (7), the upper end of described each sound detecting pipe (7) is welded on outer steel loop (4) inwall of steel frame, and the lower end of described sound detecting pipe (7) is welded on outer steel loop (4) inwall of lower steel frame.
5. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 4, it is characterized in that: containing two displacement silks (6) in described each sound detecting pipe (7), i.e. top offset silk (9) and bottom offset silk (10), one end of described top offset silk (9) is welded on the inwall of sound detecting pipe (7) upper end, and one end of described bottom offset silk (10) is welded on the inwall of sound detecting pipe (7) lower end.
6. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 1 or 2 or 4 or 5, it is characterized in that: several connecting elementss of uniform welding (5) between the outer steel loop (4) of described upper steel frame and the outer steel loop (4) of lower steel frame, upper several connecting elementss of uniform welding (5) between the interior steel loop (2) of described upper steel frame and the interior steel loop (2) of lower steel frame.
7. a kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete according to claim 6, is characterized in that: described connecting elements (5) is welded on inside and outside steel loop (2,4) and the junction contacting steel disc (3).
CN201520106642.XU 2015-02-13 2015-02-13 A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete Expired - Fee Related CN204510293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520106642.XU CN204510293U (en) 2015-02-13 2015-02-13 A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520106642.XU CN204510293U (en) 2015-02-13 2015-02-13 A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete

Publications (1)

Publication Number Publication Date
CN204510293U true CN204510293U (en) 2015-07-29

Family

ID=53708285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520106642.XU Expired - Fee Related CN204510293U (en) 2015-02-13 2015-02-13 A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete

Country Status (1)

Country Link
CN (1) CN204510293U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674859A (en) * 2015-02-13 2015-06-03 广西瑞宇建筑科技有限公司 Large-diameter pile self-reaction force detection device convenient for pouring concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674859A (en) * 2015-02-13 2015-06-03 广西瑞宇建筑科技有限公司 Large-diameter pile self-reaction force detection device convenient for pouring concrete

Similar Documents

Publication Publication Date Title
CN106638730B (en) Load box is used in the extrudable pile foundation self-balancing test resetted of piston mode
WO2017107959A1 (en) Simple connection device for use in vertical uplift resistance static load test of foundation pile
CN102121254B (en) Load box for testing bearing capacity of steel pipe pile
CN103422517B (en) Superposing type pile body self-rebound force balance loading case
CN104328810B (en) Prefabricated tubular pile single pile foundation bearing capacity detection improvement method
CN103147465B (en) Load box for testing open caisson with self-balancing method
CN101260676A (en) Pipe pile and reaction frame connecting method and single tube pile pressure-resistant static load test method
CN108894258B (en) Method for testing pile-soil load sharing ratio of pile group foundation
CN204510293U (en) A kind of large diameter pile self-reaction force checkout gear being convenient to pouring concrete
CN208668486U (en) A kind of self-balancing approach pile measurement device
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
CN215253055U (en) Asymmetric lattice load box
CN104480977B (en) A kind of Rock Bolt Foundation resistance to plucking loading test device
CN203238621U (en) Grouting pile provided with double layers of tensile bars
CN104674859B (en) A kind of reflexive force checking device of large diameter pile being easy to concrete cast
CN207685875U (en) Increase steady type load box
CN202073098U (en) Anti-deflection pipe thread connector flow guiding device
CN203403448U (en) Foundation pile bearing capacity detecting medium exchanging and filling device
CN203420294U (en) Stacked pile body self-reaction force balance load box
CN109914490A (en) A kind of club-footed pile vertical compression bearingtest system and method
CN202688990U (en) Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark
CN103207030A (en) Measuring device of cross-section temperature field of double circular steel tube concrete column and mounting method thereof
CN208219623U (en) A kind of reusable foundation pile pile cover
CN206593972U (en) A kind of monitor station detected for well lid
CN207794156U (en) Displacement silk device in pre-buried type

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Large-diameter pile self-reaction force detection device convenient for pouring concrete

Effective date of registration: 20160927

Granted publication date: 20150729

Pledgee: China Co truction Bank Corp Nanning hi tech sub branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY CO., LTD.

Registration number: 2016990000832

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180523

Granted publication date: 20150729

Pledgee: China Co truction Bank Corp Nanning hi tech sub branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY CO., LTD.

Registration number: 2016990000832

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20180213