CN204508110U - Cyclone type thermal powerplant coal bunker block clearing equipment - Google Patents

Cyclone type thermal powerplant coal bunker block clearing equipment Download PDF

Info

Publication number
CN204508110U
CN204508110U CN201520190830.5U CN201520190830U CN204508110U CN 204508110 U CN204508110 U CN 204508110U CN 201520190830 U CN201520190830 U CN 201520190830U CN 204508110 U CN204508110 U CN 204508110U
Authority
CN
China
Prior art keywords
coal bunker
coal
help
valve
ecp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520190830.5U
Other languages
Chinese (zh)
Inventor
李群辉
邹忠良
郝其昌
王晓峰
邱显冰
沈臻
李轶山
王一鸣
琚会生
刘锡水
吴凡
陶伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN TIANGONG TECHNOLOGY CO., LTD.
Original Assignee
MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN HEAVENLY TECHNOLOGY Co Ltd filed Critical MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority to CN201520190830.5U priority Critical patent/CN204508110U/en
Application granted granted Critical
Publication of CN204508110U publication Critical patent/CN204508110U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Transport Of Granular Materials (AREA)

Abstract

The utility model discloses a kind of cyclone type thermal powerplant coal bunker block clearing equipment and using method, belongs to the defeated coal technical field in power plant.This block clearing equipment comprises hyperbola coal bunker, gas transmission pipeline net work, air supply system, helps streaming system, signal acquiring system and control system; Streaming system is helped to comprise main control pipeline, point pilot piping, help stream main line and help flow point pipeline, help stream main line to help stream gas by point pilot piping respectively to the conveying of coal bunker coal breakage section, coal bunker reducer, coal bunker hyperbolic line segment and coal bunker transition phase, be respectively equipped with at coal bunker coal breakage section, coal bunker reducer, coal bunker hyperbolic line segment and coal bunker transition phase and help the ecp butterfly valve of stream, help flow nozzle group and nozzle; Signal acquiring system comprises disconnected coal signal transducer, weight sensor and tachogen, and control system comprises measuring instrument, digital intelligent regulating control and Programmable Logic Controller.The utility model has that structure is simple, operational vibration is little, degree of automation is high, cost is low and the block clearing technical characterstic such as thorough fast.

Description

Cyclone type thermal powerplant coal bunker block clearing equipment
Technical field
The utility model belongs to the defeated coal technical field in power plant, is specifically related to a kind of blocking dredging device and using method of hyperbola coal bunker.
Background technology
In heat power plant boiler system, the normal operation of powder manufacturing apparatus is the key of boiler normal combustion, and the whether normal of coal supply is the key directly affecting pulverized coal preparation system, is the key ensureing Boiler Stable Combustion.Thus, in boiler normal course of operation, hyperbola run coal bin normal feed is vital.But in actual coal supply process, because the ashes of coal is high, viscosity is large, time have foreign material to be mixed into, particularly rainy season raw coal water ratio very high, humidity is very large, increase raw coal with the friction force between coal bunker wall, raw coal can not flow to discharging opening by deadweight, result in blockage scaffold, again because coal humidity is very large, the internal friction coefficient of coal is caused to increase, binding force strengthens, cause arcuation scaffold, discharging opening is unsettled, cause and remain in a standstill or cutout, cause the coal amount entering coal mill unstable, affect the operation of coal mill and follow-up equipment, cause boiler combustion unstable further, unit load shedding, reduce the safety and economic operation efficiency of boiler.Current coal bunker occurs that the method that chute blockage phenomenon adopts often has following several:
1, the method adopting sledgehammer manually to beat: sledgehammer easily smashes equipment, labour intensity is large, and even more rapping, coal cinder is more solid, and operating efficiency is low, easily causes personal safety accident.
2, the method for rapping pneumatic hammer rapping bulkhead is adopted.As Chinese patent 102275698A, the shortcoming of this kind of method be vibrate very large, sometimes the equipment of surrounding such as electric cabinet etc. has all been shattered, affect other equipment normally to run, work efficiency is not high, sometimes also there is the defect of shaking more real and more real, even make liner plate on coal bunker wall shake and get loose and cause more serious consequence.
3, the method for air bubble or dredging machine is used.As Chinese patent 101879937A, the method air bubble, when processing scaffold, when coal humidity is very large, after blowing out, only gets a cavity, can not all by material scattering.Be positioned at and blow out the material on mouthful top, do not fall down, especially blow out mouthful bottom obstructed time, after blowing out, material pressure more real.And dredging machine, there is its movable parts, only solve local stoppages problem, fragile.Not easy care.Air bubble and the common shortcoming of dredging machine are that efficiency is not high, and operating maintenance work capacity is very large.
4, on coal bunker wall, establish vent, in storehouse, spray pressurized air, dispel raw coal.As Chinese patent 103600938A, the greatest problem that the method exists is: in jet process, the quantity of electromagnetic valve is identical with the quantity of air nozzle, jet concentration of energy, and jet time is longer, in jet process, is easily formed and sprays gas hole, be difficult to dispel material.The electromagnetic valve that control used is jet, facts have proved that in this working environment, coal dust easily turns back in electromagnetic valve through nozzle, causes electromagnetic valve to damage.In jet pipeline, do not arrange deashing passage, gas ejector pipe easily blocks, et out of order.
Summary of the invention
The problems referred to above that the utility model exists for prior art, provide a kind of cyclone type thermal powerplant coal bunker block clearing equipment.This block clearing equipment fundamentally thoroughly can solve the coal bunker chute blockage fault because a variety of causes causes, and ensures the normal coal supply of feeder, and the normal operation of follow-up equipment.
The reason basis that coal bunker blocking scaffold occurs in analyzing in detail puts forward the utility model.The major cause that blocking occurs in coal bunker is: coal is with the friction drag of bulkhead, be greater than coal to conduct oneself with dignity the sliding force caused, impact and the principal element that causes are the inclination angle of bulkhead and the coal friction coefficient with bulkhead, the i.e. physicochemical property of both mating surfacess, as the affinity etc. that both degree of finish, grain shape, lumpiness, water ratio and wall material contact.The major cause that scaffold occurs in coal bunker is: coal dust is many and thin, and water ratio is high, very damp, the ratio of fine coal is very high, binding force is very large, and namely the internal friction coefficient of coal is very large, causes coal dust conglomeration, its principal element depends on the physicochemical property of coal itself, as surface finish, coal charge grain shape, lumpiness, the ratio of lumpiness composition, water ratio and the magnetic of material own etc.
Cyclone type thermal powerplant coal bunker block clearing equipment provided by the utility model comprises hyperbola coal bunker, gas transmission pipeline net work 1, air supply system, helps streaming system signal acquiring system and control system.
Described hyperbola coal bunker comprises coal bunker transition phase 15, coal bunker hyperbolic line segment 16, coal bunker reducer 20, flashboard valve 22, coal bunker coal breakage section 24 and feeder 25.
Described air supply system comprises as the first manual ball valve 2 of source of the gas total valve, minimal pressure hold-off valve 3, inlet manifold road 5, storage tank 6, outlet pipe 8 and the ecp ball valve 9 as total valve of giving vent to anger; The pressurized air of described air supply system is divided into two tunnels by described gas transmission pipeline net work 1 after described first manual ball valve 2 access helps streaming system, one tunnel enters described storage tank 6 through described minimal pressure hold-off valve 3 successively, enter through described vent pipe 8, second manual ball valve 7 and ecp ball valve 9 and help stream main line 11, another road enters main control pipeline 31 through the 4th manual ball valve 35, source of the gas process three linked piece 34 and two-position two-way solenoid valve 33 successively.
The described streaming system that helps comprises main control pipeline 31, point pilot piping 19, helps stream main line 11, helps flow point pipeline 12, helps stream with automatically controlled Pneumatic butterfly valve 14, helps flow nozzle group 18, helps flow nozzle 17, is with the compression indicator 4, second of signal transmitter to be with compression indicator 32, first ecp actr 10, the second ecp actr 13 of signal transmitter as the two-position two-way solenoid valve 33, first of electronic gas source switch; Described two-position two-way solenoid valve 33, second is with the compression indicator 32 of signal transmitter and the first ecp actr 10 to be arranged in main control pipeline 31, first band signal transmitter compression indicator 4 be arranged on vent pipe 8, described second ecp actr 13, help stream be arranged on point pilot piping 19 with automatically controlled Pneumatic butterfly valve 14.
The described stream main line 11 that helps helps stream gas by point pilot piping 19 respectively to the conveying of described coal bunker coal breakage section 24, coal bunker reducer 20, coal bunker hyperbolic line segment 16 and coal bunker transition phase 15, is respectively equipped with and helps the ecp butterfly valve 14 of stream, help flow nozzle group 18 and help flow nozzle 17 at described coal bunker coal breakage section 24, coal bunker reducer 20, coal bunker hyperbolic line segment 16 and coal bunker transition phase 15; Be provided with one in described coal bunker coal breakage section 24 and help flow nozzle group, this helps flow nozzle group to be provided with two nozzles; Be provided with one at coal bunker reducer 20 and help flow nozzle group, this helps flow nozzle group to be provided with 4 nozzles; Be provided with 3 at coal bunker hyperbolic line segment 16 and help flow nozzle group, often group is provided with 6 nozzles; Be provided with one at coal bunker transition phase 15 and help flow nozzle group, this helps flow nozzle group to be provided with 6 nozzles; Often organize the position of nozzle, by spiral trajectory and circumference uniform, 6 nozzle block established altogether by each coal bunker, and the open area of each nozzle divides equally by the butterfly valve area of this group, and the area summation namely often organizing nozzle equals controlled butterfly valve open area; Describedly help one end of flow nozzle group 18 pipeline to connect manual ball valve to be used for putting residual gas in storehouse, described in help the flow nozzle group 18 pipeline other end to fill detouchable stifle 21.
Described signal acquiring system comprises disconnected coal signal transducer 26, weight sensor 27 and tachogen 28, described disconnected coal signal transducer 26 is arranged on the exit of feeder 25, described weight sensor 27 and described tachogen 28 are arranged on the belt feeder 29 of defeated coal, and described disconnected coal signal transducer 26, weight sensor 27, tachogen 28 and baroceptor are connected with control system by signal wire (SW).
Described control system comprises measuring instrument, digital intelligent regulating control 39, Programmable Logic Controller 38 and associated electrical components, and described ecp ball valve 9 is the total gas source valves helping streaming system, and described two-position two-way solenoid valve 33 is total gas source switch of control system.
Using method of the present utility model is specific as follows:
(1) before start, adjust setting: help gas pressure to be not less than 0.3MPa, control air pressure and be not less than 0.4MPa, help stream order to be from coal flow path direction from bottom to top, start helps stream successively, help stream duration of ventilation not to be greater than 3 seconds/time at every turn, help stream interval time not to be less than 4 seconds/time, every layer is helped stream number of times not limit continuously, suitable serviceability temperature at every turn, more than 0 DEG C less than 30 DEG C, proportion, the water ratio of material are not limit; Utilize the original gas transmission pipeline net work gas source feed of thermal powerplant, its supply gas pressure is at more than 0.6MPa, and the total air demand of full factory is at 40m 3/ more than min.
(2) the pipe network pressurized air of calming the anger of plant area, two tunnels are divided into after the first manual ball valve 2 accesses air supply system, one tunnel enters storage tank 6 (storage tank can for 2 unit gas) through minimal pressure hold-off valve 3, again through vent pipe, help stream manual ball valve, ecp ball valve, enter and help stream main line 11, another Lu Jing tetra-manual ball valve 35, source of the gas process triplet 34, bi-bit bi-pass normally closed electromagnetism 33, enter main control pipeline 31; Described minimal pressure hold-off valve 3, response pressure is set to 0.4MPa, and when namely bleed pressure reaches 0.4MPa, this valve can be opened, to storage tank air feed, when air pressure is lower than 0.4MPa, this valve cuts out automatically in action of the spring, stops to storage tank air feed, this ensures that there the minimal pressure controlling gas circuit, remain on more than 0.4MPa, ensure that to help to flow through in journey can not affect ductwork pressure with during gas instantaneously in a large number, ensure that other unit gas are normal.
(3) by helping stream main line 11 to help stream gas by controlling branch pipeline 19 to the conveying of described coal bunker coal breakage section 24, coal bunker reducer 20, coal bunker hyperbolic line segment 16 and coal bunker transition phase 15, described nozzle block pipeline, one end connects manual ball valve and is used for putting residual gas in storehouse (not being at every turn bring down stocks all to exit), other end dress detouchable stifle 21, be used for if desired removing coal dust in pipe, prevent time permanent coal dust blocking pipeline.
(4) when disconnected coal, the baffle angle of disconnected coal signal projector 26 changes, and sends signal to the PLC in control box, control to help streaming system to open or close relevant electric control valve by the program of setting, lead in coal bunker and help stream pressurized air, carry out helping stream, remove blocking; When the belt feeder of defeated coal, because coal stream changes, when conveying coal amount changes, weight sensor on belt feeder and tachometer generator will send signal and deliver to (belt scale metering instrument 40) in defeated coal measuring instrument, again this signal is delivered in digital intelligent regulating control 39, digital intelligent regulating control 39 by this signal with definite value amount, to compare calculating, the control signal sending 4 ~ 20mA, to frequency converter 37, removes the revolution controlling variable-frequency motor 36, when recording coal-feeding quantity and being less than definite value amount, then control motor revving up, increase coal-feeding quantity, anti-person, on the contrary; Until measured amount equals or close to definite value amount time, stop speed governing, belt feeder operates in the coal-feeding quantity value of setting, so just reaches defeated coal even, required operational throughput operates, and eliminates because coal bunker blanking is uneven, and affects quality of pc.
The utility model arranges and helps flow nozzle on the bulkhead of coal bunker, it helps flow nozzle to be along coal bunker axis direction, with spiral trajectory oriented nozzles position, at the nozzle of the radial direction circumference uniform distribution varying number of helix line, nozzle is the angle along helical angle, be close to the downward tilted direction of bulkhead to spray, make to pass in the middle of the gap of jet-stream wind between coal and bulkhead, its objective is and reduce coal with the friction coefficient between bulkhead, reduce friction force, thus the coal in storehouse under self gravitation effect, can slide down to coal bunker discharging opening along bulkhead, removes blocking scaffold.Because all nozzles are all spray along bulkhead with helical angle direction, in course of injection, air-flow in storehouse can form whirlwind, this whirlwind produces component upwards in rotary course, this component can make material upward movement in storehouse, make the scaffold arch lack of equilibrium formed in storehouse, and collapse, remove arcuation scaffold.The utility model and Chinese patent 103600938A have essential distinction, and above-mentioned analysis can clearly be observed in playback at a slow speed at the model test high-speed photograph of to.
The utility model have structure simple and there is no that movable parts, operational vibration are little, simple to operation, degree of automation is high, cost is low and block clearing fast thoroughly, the technical characterstic such as safety and environmental protection, the utility model is one of best coal bunker block clearing equipment of current result of use.
Accompanying drawing explanation
Fig. 1: the utility model cyclone type thermal powerplant coal bunker block clearing device structure schematic diagram.
Fig. 2: the control principle schematic diagram of the utility model block clearing equipment.
In figure: 1: gas transmission pipeline net work; 2: the first manual ball valves; 3: minimal pressure hold-off valve; The compression indicator of 4: the first band signal transmitters; 5: inlet manifold road; 6: storage tank; 7: the second manual ball valves; 8: freeing pipe; 9: ecp ball valve; 10: the first ecp actrs; 11: help stream main line; 12: help flow point pipeline; 13: the second ecp actrs; 14: ecp butterfly valve; 14-0: the seven ecp butterfly valve; 14-1: the first ecp butterfly valve; 14-2: the second ecp butterfly valve; 14-3: the three ecp butterfly valve; 14-4: the four ecp butterfly valve; 14-5: the five ecp butterfly valve; 14-6: the six ecp butterfly valve; 15: coal bunker transition phase; 16: coal bunker hyperbolic line segment; 17: help flow nozzle; 18: help flow nozzle group; 19: control branch pipeline; 20: coal bunker reducer; 21: stifle; 22: flashboard valve; 23: the three manual ball valves; 24: coal bunker coal breakage section; 25: feeder; 26: disconnected coal signal transducer; 27: weight sensor; 28: tachogen; 29: belt feeder; 30: master helps stream pipeline; 31: main control pipeline; The compression indicator of 32: the second band signal transmitters; 33: two-position two-way solenoid valve; 34: source of the gas process three linked piece; 35: the four manual ball valves; 36: variable-frequency motor; 37: frequency converter; 38: Programmable Logic Controller; 39: digital intelligent regulating control; 40: belt scale metering instrument; 41: electric cabinet.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further details.
Cyclone type thermal powerplant coal bunker block clearing equipment provided by the utility model comprises hyperbola coal bunker, gas transmission pipeline net work 1, air supply system, helps streaming system, helps current control pipeline system, signal acquiring system and control system.Gas transmission pipeline net work 1 is the total working source of the gas as the utility model cyclone type thermal powerplant coal bunker block clearing equipment, and the pressure gas of gas transmission pipeline net work 1 comes to power plant total compression air station, and its total air demand is at 40m 3/ min, pressure is not less than 0.6MPa.First manual ball valve 2 is the total gas source valve originally helping streaming system, after entering native system, be divided into two-way, one tunnel enters minimal pressure hold-off valve 3, minimal pressure hold-off valve 3, operation pressure is set in 0.4Mpa, when bleed pressure is more than 0.4MPa, then the spring of this valve is compressed, pressure gas enters storage tank 6 through air inlet pipe 5, storage tank 6 is as the accumulator of native system, its effect is that when helping stream, air feed is maximum instantaneously, energy can be made to concentrate abrupt release, and the effect of minimal pressure hold-off valve 3 is when helping stream gas, bleed pressure can be kept to be not less than 0.4MPa, help stream moment, calm the anger pipe network fluctuation of pressure or decline can not be caused.In storage tank 6, pressure gas is through freeing pipe 8, second manual ball valve 7, enter ecp ball valve 9 through the table 4 of calming the anger of the first band signal transmitter, and ecp ball valve 9, as helping stream pipeline total gas source switch, is controlled by electric cabinet 41.After ecp ball valve 9 is opened, pressure gas can enter main helping and flow pipeline 30, can help stream for each layer gas.Master helps stream pipeline 30 upwards to connect and helps flow point pipeline 12, through ecp butterfly valve 14 (totally 6) to helping flow nozzle group 18 (totally 6 groups) air feed, through helping flow nozzle jet in storehouse.Nozzle block 18, the 3rd manual ball valve 23 (totally 6) is equipped with in one end, and the other end is equipped with stifle 21 (totally 6), and the two composition path can remove the dust foreign material in pipe.Nozzle on coal spout 24 is 2, and the nozzle on adapter bonnet 20 is 4, and on coal bunker hyperbolic line segment 16, have three nozzle block, often group has 6, nozzle, on transition phase 15, has one group of nozzle block, 6 nozzles; Total system has 30 nozzles.The open area summation often organizing nozzle is the open area of place group butterfly valve (thus can calculate the diameter of each nozzle).
Helical trajectory location is pressed at axial direction in the installation site of nozzle, and circumference presses nozzle quantity circumference uniform distribution, and the pitch of helix line is determined by the height of place section.On hyperbolic line segment 16, be provided with three groups, then helix line pitch is 1/3 of place section, the injection direction of nozzle, be be close to bulkhead along the lift angle of helix line oliquely downward to spray, its objective is and jet-stream wind is passed through between material and bulkhead in storehouse, reduce material with the friction coefficient of bulkhead and lower material with the friction drag between bulkhead, can make material under the effect of self gravitation, flow to discharging opening and eliminate sticky wall scaffold.Another object is that jet-stream wind can make jet-stream wind rotate along bulkhead by the injection of helical angle direction, in storehouse, form cyclonic airflow, can form component upwards under this airflow function, this power can destroy the scaffold arch in storehouse, material unsettled in storehouse can get off immediately in avalanche, removes arcuation scaffold.Above-mentioned phenomenon, in the model test of to, adopts high-speed photograph can see clearly in playback at a slow speed.
Enter the first manual ball valve 2, another road is for controlling source of the gas loop, pressure gas enters the 4th manual ball valve 5, after source of the gas process triplet 34, enter two-position two-way solenoid valve valve 33, two-position two-way solenoid valve 33 is total gas source switch of control loop, controlled by control box, after unlatching, pressure gas is through the compression indicator 32 of the second band signal transmitter, enter main control pipeline 31, can to the first ecp actr 10 (1) of each valve and the second ecp actr 13 (having 6 the second ecp actrs 13) air feed, control respective valve closes.
The collection of control signal.The disconnected coal signal transducer 26 arranged by the discharge outlet of the feeder 25 below coal spout 24 sends signal, when there is disconnected coal, the baffle angle of disconnected coal signal transducer 26 changes, disconnected coal signal is passed in Programmable Logic Controller (PLC) 38, Programmable Logic Controller 38 can go by the program finished in advance to control corresponding first ecp butterfly valve 14-1, second ecp butterfly valve 14-2, 3rd ecp butterfly valve 14-3, 4th ecp butterfly valve 14-4, 5th ecp butterfly valve 14-5, the ventilation order of the 6th ecp butterfly valve 14-6, duration of ventilation, ventilation interval time, ventilation number of times etc., complete the blocking cleaning work of coal bunker, 7th ecp butterfly valve 14-0 is as subsequent use.
Coal bunker is in blanking operation, and stream is unstable, in order to reach coal-feeding quantity feed in the numerical value of setting, is reached by the rotating speed of closed loop adjustment belt feeder 29.When belt scale metering instrument 40 shows coal amount lower than setting coal amount, weight sensor 27 and tachogen 28 will send respective signal in belt scale metering instrument 40, again this signal is sent in digital intelligent regulating control 39, through calculating and with the comparison of definite value amount after send control signal to frequency converter 37, the variable-frequency motor controlling belt feeder 29 is accelerated to rotate by frequency converter 37, increase coal-feeding quantity, until coal amount reaches set amount.

Claims (2)

1. cyclone type thermal powerplant coal bunker block clearing equipment, is characterized in that this block clearing equipment comprises hyperbola coal bunker, gas transmission pipeline net work (1), air supply system, helps streaming system, signal acquiring system and control system, described hyperbola coal bunker comprises coal bunker transition phase (15), coal bunker hyperbolic line segment (16), coal bunker reducer (20), flashboard valve (22), coal bunker coal breakage section (24) and feeder (25), described air supply system comprises as first manual ball valve (2) of source of the gas total valve, minimal pressure hold-off valve (3), inlet manifold road (5), storage tank (6), outlet pipe (8) and the ecp ball valve (9) as total valve of giving vent to anger, the pressurized air of described air supply system is divided into two tunnels by described gas transmission pipeline net work (1) after the access of described first manual ball valve (2) helps streaming system, one tunnel enters described storage tank (6) through described minimal pressure hold-off valve (3) successively, enter through described vent pipe (8), the second manual ball valve (7) and ecp ball valve (9) and help stream main line (11), another road enters main control pipeline (31) through the 4th manual ball valve (35), source of the gas process three linked piece (34) and two-position two-way solenoid valve (33) successively, the described streaming system that helps comprises main control pipeline (31), divide pilot piping (19), help stream main line (11), help flow point pipeline (12), ecp butterfly valve (14), help flow nozzle group (18), help flow nozzle (17), as the two-position two-way solenoid valve (33) of electronic gas source switch, the compression indicator (4) of the first band signal transmitter, the compression indicator (32) of the second band signal transmitter, first ecp actr (10) and the second ecp actr (13), described two-position two-way solenoid valve (33), compression indicator (32) and the first ecp actr (10) of the second band signal transmitter are arranged in described main control pipeline (31), the compression indicator (4) of described first band signal transmitter is arranged on described vent pipe (8), described second ecp actr (13), ecp butterfly valve (14) is arranged on a point pilot piping (19), described in help stream main line (11) by point pilot piping (19) respectively to described coal bunker coal breakage section (24), coal bunker reducer (20), coal bunker hyperbolic line segment (16) and coal bunker transition phase (15) conveying help stream gas, described coal bunker coal breakage section (24), coal bunker reducer (20), coal bunker hyperbolic line segment (16) and coal bunker transition phase (15) are respectively equipped with described ecp butterfly valve (14), help flow nozzle group (18) and help flow nozzle (17), described signal acquiring system comprises disconnected coal signal transducer (26), weight sensor (27) and tachogen (28), described disconnected coal signal transducer (26) is arranged on the exit of described feeder (25), described weight sensor (27) and described tachogen (28) are arranged on the belt feeder (29) of defeated coal, and described disconnected coal signal transducer (26), weight sensor (27) and tachogen (28) are connected with control system by signal wire (SW), described control system comprises measuring instrument, digital intelligent regulating control (39), Programmable Logic Controller (38) and associated electrical components, described ecp ball valve (9) is the total gas source valve helping streaming system, and described two-position two-way solenoid valve (33) is total gas source switch of control system.
2. cyclone type thermal powerplant coal bunker block clearing equipment according to claim 1, help flow nozzle group (18) described in it is characterized in that and help flow nozzle (17) to arrange as follows: be provided with one described coal bunker coal breakage section (24) and help flow nozzle group, this helps flow nozzle group to be provided with two nozzles; Be provided with one described coal bunker reducer (20) and help flow nozzle group, this helps flow nozzle group to be provided with 4 nozzles; Be provided with 3 described coal bunker hyperbolic line segment (16) and help flow nozzle group, often group is provided with 6 nozzles; Be provided with one described coal bunker transition phase (15) and help flow nozzle group, this helps flow nozzle group to be provided with 6 nozzles; Often organize the position of nozzle, by spiral trajectory and circumference uniform, 6 nozzle block established altogether by each coal bunker, and the open area of each nozzle divides equally by the butterfly valve area of this group, and the area summation namely often organizing nozzle equals controlled butterfly valve open area; Describedly help one end of flow nozzle group (18) pipeline to connect manual ball valve to be used for putting residual gas in storehouse, described in help flow nozzle group (18) the pipeline other end to fill detouchable stifle (21).
CN201520190830.5U 2015-03-31 2015-03-31 Cyclone type thermal powerplant coal bunker block clearing equipment Withdrawn - After Issue CN204508110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520190830.5U CN204508110U (en) 2015-03-31 2015-03-31 Cyclone type thermal powerplant coal bunker block clearing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520190830.5U CN204508110U (en) 2015-03-31 2015-03-31 Cyclone type thermal powerplant coal bunker block clearing equipment

Publications (1)

Publication Number Publication Date
CN204508110U true CN204508110U (en) 2015-07-29

Family

ID=53706104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520190830.5U Withdrawn - After Issue CN204508110U (en) 2015-03-31 2015-03-31 Cyclone type thermal powerplant coal bunker block clearing equipment

Country Status (1)

Country Link
CN (1) CN204508110U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111093358A (en) * 2017-06-02 2020-05-01 凯斯纽荷兰(中国)管理有限公司 Crop elevator and combine
CN111545053A (en) * 2020-05-14 2020-08-18 中国科学院过程工程研究所 Vortex type soot blowing assembly, SCR reaction device comprising same and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111093358A (en) * 2017-06-02 2020-05-01 凯斯纽荷兰(中国)管理有限公司 Crop elevator and combine
CN111545053A (en) * 2020-05-14 2020-08-18 中国科学院过程工程研究所 Vortex type soot blowing assembly, SCR reaction device comprising same and method

Similar Documents

Publication Publication Date Title
CN104773478A (en) Cyclone-type blockage removal equipment for coal bunker of thermal power plant and using method of equipment
CN101607223B (en) Ultra-fine powder processing device
CN108840106B (en) A kind of visualization long range concentrated phase positive pneumatic transport experimental rig
CN202860499U (en) System for catalyst metering and automatic charging of FCC (fluid catalytic cracking) device
CN208683557U (en) Visualize raw coal bin anti-blocking device
CN105773835A (en) Ceramic raw material mixed-grinding concentrated preparation process and device
CN103420052B (en) Program-controlled coal discharging device for raw coal bunker
CN204508110U (en) Cyclone type thermal powerplant coal bunker block clearing equipment
CN104627684B (en) A kind of method of online anti-station boiler primary air piping plugging
CN205471659U (en) Clear stifled device of coal breakage pipe under air knife rotary -cut formula
CN205797372U (en) Conical ball mill machine production line
CN203737132U (en) Vibration-type spiral dust generator
CN104001613A (en) Mineral separator and use method thereof
CN103600938A (en) Automatic coal dredging device for raw coal conveying system in thermal power plant
CN105731081A (en) Air knife rotary cutting type coal falling pipe cleaning-up device
CN202606401U (en) Full-automatic powder deslagging machine
CN204388581U (en) A kind of quantitative feed system of dry method cement rotary kiln raw material of improvement
CN102923482B (en) Pebble coal positive-pressure pneumatic conveyor
CN104858033A (en) Grinding method
CN104001611A (en) Mineral separator
CN203450637U (en) Program-controlled coal discharging device for raw coal cabin
CN204933623U (en) A kind of charging rate adjustable air-flow eddy flow micro mist equipment
CN203140074U (en) Automatic air lock discharging device for vertical slag roller mill
CN105056833B (en) The flat-die biomass granulating equipment of granular powder rate process control
CN203830120U (en) Mineral separator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Patentee after: MAANSHAN TIANGONG TECHNOLOGY CO., LTD.

Address before: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Patentee before: Maanshan Heavenly Technology Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20150729

Effective date of abandoning: 20160831

C25 Abandonment of patent right or utility model to avoid double patenting