CN204502316U - A kind of repairing Skidproof climbers - Google Patents

A kind of repairing Skidproof climbers Download PDF

Info

Publication number
CN204502316U
CN204502316U CN201520156619.1U CN201520156619U CN204502316U CN 204502316 U CN204502316 U CN 204502316U CN 201520156619 U CN201520156619 U CN 201520156619U CN 204502316 U CN204502316 U CN 204502316U
Authority
CN
China
Prior art keywords
briquetting
cingulum
climbers
pin
pedal assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520156619.1U
Other languages
Chinese (zh)
Inventor
巨慧敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520156619.1U priority Critical patent/CN204502316U/en
Application granted granted Critical
Publication of CN204502316U publication Critical patent/CN204502316U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a kind of repairing Skidproof climbers, briquetting and front briquetting all adopt vee-block thereafter, are beneficial to and increase the hold of climbers on the cement pole body of rod; Rear briquetting and front briquetting all adopt ferrous material to make, and the rubbing surface of rear briquetting and front briquetting adopts spine face, the icing body of rod enterprising rob repair operation time, the sharp portion on rear briquetting and front briquetting is relied on to penetrate ice inside, effectively stop skidding, the V-arrangement design of above-mentioned rear briquetting and front briquetting and the design of spine face, the effective guarantee operational security of staff; In addition, the utility model also improves pedal assembly, be two cingulum structures by single cingulum cooperating measure before this, the compactness that the pin enhancing staff is connected with pedal assembly, prevents the uncertainty because of pin power thrusts from causing climbers to be separated with pin with the inhomogeneities of exerting oneself.Difficult and the safety issue of the upper boom brought to staff when the utility model well solves cement pole body of rod icing.

Description

A kind of repairing Skidproof climbers
Technical field
The utility model relates to a kind of line maintenance instrument, particularly one repairing Skidproof climbers.
Background technology
In circuit maintenance process, the climbers commonly used comprise pedal assembly, back elbow and front bend pipe, back elbow is arranged on pedal assembly, front bend pipe is plugged on back elbow, a front briquetting is set in the end of front bend pipe, briquetting after the end of back elbow arranges one, wherein, front briquetting and rear briquetting are oppositely arranged.At present, the rubbing surface of front briquetting and rear briquetting, namely the opposite face of the two all adopts elastomeric material to make, and the rubbing surface of front briquetting is plane, and the rubbing surface of rear briquetting is arcwall face.
In the winter time, to affect supply line's icing phenomenon serious by boisterous, cause some electrical power supply discontinuity, stepping in bar construction repairing process, because on the cement pole body of rod, icing phenomenon is serious, the rubbing surface of front briquetting and rear briquetting because of temperature low hardening, frictional force reduces, the rubbing surface adding briquetting of going forward is plane, cause the hold of climbers on the cement body of rod greatly to reduce, occur slip phenomenon, affect the construction safety of staff, extend circuit repairing electric power feeding time, add staff's upper boom difficulty.
In addition, pedal assembly of the prior art is made up of pin dish and cingulum, and be respectively equipped with a baffle plate composition with cingulum perforation in the both sides of pin dish, the two ends of cingulum are connected by padlock.Step on bar personnel in the process of stepping on bar, pin extend in cingulum.In repairing process, pin firmly raises climbers, and due to uncertainty and the inhomogeneities of exerting oneself of pin power thrusts, climbers may be subject to the active force away from the body of rod, when climbers are subject to the effect of power, climbers can occur and be separated with pin, thus cause climbers to fall.
Utility model content
For the above-mentioned technical problem existed in prior art, the utility model proposes a kind of repairing Skidproof climbers, be beneficial to the difficult and safety issue of the upper boom brought to staff when solving cement pole body of rod icing.
To achieve these goals, the utility model adopts following technical scheme:
A kind of repairing Skidproof climbers, comprise pedal assembly, back elbow and front bend pipe, back elbow is arranged on pedal assembly, front bend pipe is plugged on back elbow, briquetting after the end of back elbow arranges one, arranges a front briquetting in the end of front bend pipe, rear briquetting and front briquetting are oppositely arranged; Described rear briquetting and front briquetting all adopt vee-block, and the angular range of vee-block is 146 ° ~ 150 °; Described rear briquetting and front briquetting all adopt ferrous material to make, the rubbing surface of described rear briquetting is the spine face formed by the multiple sharp portions be arranged on rear briquetting, and the rubbing surface of described front briquetting is the spine face formed by the multiple sharp portions be arranged on front briquetting; Pedal assembly comprises pin dish, the first cingulum and the second cingulum, wherein, the two ends of the first cingulum are connected to the both sides of pin dish, the circulus being used for coordinating with the instep of operator is formed between pin dish with the first cingulum, the two ends of the second cingulum are connected on the first cingulum, and coordinate with the heel of described operator.
The utility model tool has the following advantages:
Climbers in the utility model, briquetting and front briquetting all adopt vee-block thereafter, are beneficial to and increase the hold of climbers on the cement pole body of rod; Rear briquetting and front briquetting all adopt ferrous material to make, and the rubbing surface of rear briquetting and front briquetting adopts spine face, the icing body of rod enterprising rob repair operation time, the sharp portion on rear briquetting and front briquetting is relied on to penetrate ice inside, effectively stop skidding, the V-arrangement design of above-mentioned rear briquetting and front briquetting and the design of spine face, the effective guarantee operational security of staff, is beneficial to when solving cement pole body of rod icing to the difficult problem of upper boom that staff brings; In addition, the utility model also improves pedal assembly, be two cingulum structures by single cingulum cooperating measure before this, the compactness that the pin enhancing staff is connected with pedal assembly, prevents the uncertainty because of pin power thrusts from causing climbers to be separated with pin with the inhomogeneities of exerting oneself.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation rushed to repair with Skidproof climbers in the utility model;
Wherein, 1-back elbow, bend pipe before 2-, briquetting after 3-, briquetting before 4-, 5,6-sharp portion, 7-pin dish, 8-first cingulum, 9-second cingulum.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described in further detail:
Shown in composition graphs 1, a kind of repairing Skidproof climbers, comprises pedal assembly, back elbow 1 and front bend pipe 2.
Back elbow 1 is arranged on pedal assembly, and front bend pipe 2 is plugged on back elbow 1.
Briquetting 3 after the end of back elbow 1 arranges one, arranges a front briquetting 4 in the end of front bend pipe 2, wherein, rear briquetting 3 is oppositely arranged with front briquetting 4.
Rear briquetting 3 and front briquetting 4 all adopt vee-block, and this kind of structural design is beneficial to and realizes the hold of climbers to cement pole.Prove through experiment, when the angular range of vee-block is 146 ° ~ 150 °, hold effect better.
Different from prior art, after in the present invention, briquetting 3 and front briquetting 4 all adopt ferrous material to make, and the rubbing surface of rear briquetting 3 is the spine face formed by the multiple sharp portions 5 be arranged on rear briquetting, the rubbing surface of front briquetting 4 is the spine face formed by the multiple sharp portions 6 be arranged on front briquetting.
Sharp portion 5,6 all in cone-shaped, and is evenly arranged on rear briquetting 3 and front briquetting 4 respectively.
Said structure designs, and make when in the face of the icing body of rod, rear briquetting 3 and front briquetting 4 rely on sharp portion 5,6 can easily penetrate ice inside, is beneficial to and increases climbers to the holding effect of the body of rod, effectively stopped skidding.
The V-arrangement design of above-mentioned rear briquetting 3 and front briquetting 4 and the design of spine face, the effective guarantee operational security of staff, is beneficial to when solving cement pole body of rod icing to the difficult problem of upper boom that staff brings.
Pedal assembly comprises pin dish 7, first cingulum 8 and the second cingulum 9.Wherein,
The two ends of the first cingulum 8 are connected to the both sides of pin dish 7, form the circulus being used for coordinating with the instep of operator between pin dish 7 with the first cingulum 8.
The two ends of the second cingulum 9 are connected on the first cingulum 8, and coordinate with the heel of described operator.
Above-mentioned design makes the pin of staff and climbers keep being connected.Operator is when stepping on bar, pin firmly raises climbers, and due to uncertainty and the inhomogeneities of exerting oneself of pin power thrusts, climbers may be subject to the active force away from electric pole, because the pin of operator keeps being connected with climbers, also can not there are climbers and be separated with pin in climbers when the effect being subject to power.
Certainly; more than illustrate and be only preferred embodiment of the present utility model; the utility model is not limited to enumerate above-described embodiment; should be noted that; any those of ordinary skill in the art are under the instruction of this description; made all equivalently to substitute, obvious variant, within the essential scope all dropping on this description, protection of the present utility model ought to be subject to.

Claims (1)

1. a repairing Skidproof climbers, comprise pedal assembly, back elbow and front bend pipe, back elbow is arranged on pedal assembly, front bend pipe is plugged on back elbow, briquetting after the end of back elbow arranges one, arrange a front briquetting in the end of front bend pipe, rear briquetting and front briquetting are oppositely arranged; It is characterized in that, described rear briquetting and front briquetting all adopt vee-block, and the angular range of vee-block is 146 ° ~ 150 °; Described rear briquetting and front briquetting all adopt ferrous material to make, the rubbing surface of described rear briquetting is the spine face formed by the multiple sharp portions be arranged on rear briquetting, and the rubbing surface of described front briquetting is the spine face formed by the multiple sharp portions be arranged on front briquetting; Pedal assembly comprises pin dish, the first cingulum and the second cingulum, wherein, the two ends of the first cingulum are connected to the both sides of pin dish, the circulus being used for coordinating with the instep of operator is formed between pin dish with the first cingulum, the two ends of the second cingulum are connected on the first cingulum, and coordinate with the heel of described operator.
CN201520156619.1U 2015-03-15 2015-03-15 A kind of repairing Skidproof climbers Expired - Fee Related CN204502316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520156619.1U CN204502316U (en) 2015-03-15 2015-03-15 A kind of repairing Skidproof climbers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520156619.1U CN204502316U (en) 2015-03-15 2015-03-15 A kind of repairing Skidproof climbers

Publications (1)

Publication Number Publication Date
CN204502316U true CN204502316U (en) 2015-07-29

Family

ID=53700320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520156619.1U Expired - Fee Related CN204502316U (en) 2015-03-15 2015-03-15 A kind of repairing Skidproof climbers

Country Status (1)

Country Link
CN (1) CN204502316U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109550201A (en) * 2018-12-29 2019-04-02 国网山东省电力公司桓台县供电公司 Skidproof climbers for electric power
CN111864628A (en) * 2020-07-30 2020-10-30 武汉博腾电力工程有限公司 Automatic anti-skid strip pressing mechanism of pedal plate frame of foot fastener device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109550201A (en) * 2018-12-29 2019-04-02 国网山东省电力公司桓台县供电公司 Skidproof climbers for electric power
CN111864628A (en) * 2020-07-30 2020-10-30 武汉博腾电力工程有限公司 Automatic anti-skid strip pressing mechanism of pedal plate frame of foot fastener device
CN111864628B (en) * 2020-07-30 2022-01-07 南通固威机械科技有限公司 Automatic anti-skid strip pressing mechanism of pedal plate frame of foot fastener device

Similar Documents

Publication Publication Date Title
CN203201317U (en) Electronic padlock
CN204502316U (en) A kind of repairing Skidproof climbers
CN203589355U (en) Connection structure of power line plug and plugboard
CN204019400U (en) A kind of clamping device of installing for electric power apparatus examination
CN204517278U (en) Steel tower is placed the platoon hanger of insulating bar
CN201478721U (en) Brake pull rod
CN204193424U (en) A kind of new-type antiskid steps on bar instrument
CN204731462U (en) A kind of fixture for fixing optical cable reinforcement
CN204968300U (en) Fixing device of winding displacement
CN202423957U (en) Insulation splint
CN204040664U (en) Dish-type handle valve mechanical lock
CN204326665U (en) Taper cement pole is placed the shelf of Work tool
CN201167004Y (en) Double-umbrella type glass insulator steel feet
CN203456203U (en) Porcelain sleeve plastic chassis with horizontal rulers
CN204012570U (en) A kind of aerial cable fixture
CN203290977U (en) Gun-type reset pliers
CN204348442U (en) The dual-purpose head mechanism of bobbin loader detachable type
CN204012568U (en) Aerial cable fixture
CN204030419U (en) Power transmission line spacer detaching device
CN201882836U (en) Ratchet lever block for pulling wire
CN203617614U (en) Insulator pin puller
CN203522017U (en) Disconnection-preventing hook for insulation protective umbrella
CN202915727U (en) Fastener loosening prevention structure of electrode
CN204114351U (en) A kind of power board wire clamp
CN203502482U (en) High-voltage electroscope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20160315

CF01 Termination of patent right due to non-payment of annual fee