CN204479821U - A kind of power plant marches into the arena optical cable hauling-off gear - Google Patents

A kind of power plant marches into the arena optical cable hauling-off gear Download PDF

Info

Publication number
CN204479821U
CN204479821U CN201520224752.6U CN201520224752U CN204479821U CN 204479821 U CN204479821 U CN 204479821U CN 201520224752 U CN201520224752 U CN 201520224752U CN 204479821 U CN204479821 U CN 204479821U
Authority
CN
China
Prior art keywords
cable
steel pipe
protection steel
portal frame
optical cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520224752.6U
Other languages
Chinese (zh)
Inventor
赵艳
姚均天
单炜
孙平
李敏娟
王建文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Sinogy Electric Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520224752.6U priority Critical patent/CN204479821U/en
Application granted granted Critical
Publication of CN204479821U publication Critical patent/CN204479821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

The utility model discloses a kind of power plant to march into the arena optical cable hauling-off gear, comprise OPGW optical cable, cable splice closure, remaining cable frame, ADSS leading in cable, portal frame pillar, many group anchor ear fixtures and protection steel pipe; Cable splice closure is arranged on the top of portal frame pillar, and one end welding of OPGW optical cable is on cable splice closure, and the other end of OPGW optical cable upwards extends; Remaining cable frame is arranged on portal frame pillar; many groups anchor ear fixture is disposed on portal frame pillar respectively; one end of protection steel pipe is fixedly fitted on portal frame pillar by many group anchor ear fixtures; the top of one end welding ADSS leading in cable on cable splice closure of ADSS leading in cable is around the home on remaining cable frame, and the bottom of ADSS leading in cable is coaxially inserted in protection steel pipe.The remaining cable frame of the utility model introducing lays link and lays technique to circuit and carries out qualitative to quantitative restriction, makes optical cable information amount optimize transmissions.

Description

A kind of power plant marches into the arena optical cable hauling-off gear
Technical field
The utility model relates to power plant's circuit design field, particularly relates to a kind of power plant and to march into the arena optical cable hauling-off gear.
Background technology
The transmission of power plant's telecontrol information depends on OPWG optical cable carrier, is limited by space constraint, and optical cable of marching into the arena should adopt ADSS optical cable, and tradition is laid with continued access signal to noise ratio (S/N ratio) low, causes quantity of information to reduce.
Utility model content
The purpose of this utility model: provide a kind of power plant to march into the arena optical cable hauling-off gear, transmission can be optimized to optical cable information amount.
To achieve these goals, the technical solution of the utility model is:
A kind of power plant marches into the arena optical cable hauling-off gear, comprises OPGW optical cable, cable splice closure, remaining cable frame, ADSS leading in cable, portal frame pillar, many group anchor ear fixtures and protection steel pipe; Described cable splice closure is arranged on the top of described portal frame pillar, and one end welding of described OPGW optical cable is on described cable splice closure, and the other end of described OPGW optical cable upwards extends; Described remaining cable frame is arranged on described portal frame pillar, is positioned at the below of described cable splice closure, the described rounded structure of remaining cable frame; Described many groups anchor ear fixture is disposed on described portal frame pillar respectively, is positioned at the below of described remaining cable frame; One end of described protection steel pipe is fixedly fitted on described portal frame pillar by described many groups anchor ear fixture, and along described portal frame pillar to downward-extension, with the protection steel pipe described in the interval snap close of 0.5 meter between described anchor ear fixture; Described portal frame pillar is obliquely installed on the ground, and the length direction on the top of described protection steel pipe is parallel with the length direction of described portal frame pillar; One end welding of described ADSS leading in cable is on described cable splice closure; described ADSS leading in cable in described cable splice closure with described OPGW optical cable welding; the top of described ADSS leading in cable is around the home more than described on cable frame, and the bottom of described ADSS leading in cable is coaxially inserted in described protection steel pipe.
Above-mentioned power plant marches into the arena optical cable hauling-off gear, wherein, and one end side of resting on the ground of described protection steel pipe, and the floor level that goes out of protection steel pipe is 2.5 meters, the other end of described protection steel pipe is embedded in below ground.
Above-mentioned power plant marches into the arena optical cable hauling-off gear, wherein, and described protection steel pipe ground connection.
Above-mentioned power plant marches into the arena optical cable hauling-off gear, and wherein, described ADSS leading in cable is blocked by pitch spunyarn or waterproof material after penetrating described protection steel pipe.
The remaining cable frame of the utility model introducing lays link and lays technique to circuit and carries out qualitative to quantitative restriction, makes optical cable information amount optimize transmissions.
Accompanying drawing explanation
Fig. 1 is that a kind of power plant of the utility model marches into the arena the structural representation of optical cable hauling-off gear.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Refer to shown in accompanying drawing 1, a kind of power plant marches into the arena optical cable hauling-off gear, comprises OPGW optical cable 1, cable splice closure 2, remaining cable frame 3, ADSS leading in cable 8, portal frame pillar 5, many group anchor ear fixtures 6 and protection steel pipe 7; Described cable splice closure 2 is arranged on the top of described portal frame pillar 5, and one end welding of described OPGW optical cable 1 is on described cable splice closure 2, and the other end of described OPGW optical cable 1 upwards extends; Described remaining cable frame 3 is arranged on described portal frame pillar 5, is positioned at the below of described cable splice closure 2, the described rounded structure of remaining cable frame 3; Described many groups anchor ear fixture 6 is disposed on described portal frame pillar 5 respectively, is positioned at the below of described remaining cable frame 3; One end of described protection steel pipe 7 is fixedly fitted on described portal frame pillar 5 by described many groups anchor ear fixture 6, and along described portal frame pillar 5 to downward-extension, with the protection steel pipe 7 described in the interval snap close of 0.5 meter between described anchor ear fixture 6; Described portal frame pillar 5 is obliquely installed on the ground, and the length direction on the top of described protection steel pipe 7 is parallel with the length direction of described portal frame pillar 5; One end welding of described ADSS leading in cable 8 is on described cable splice closure 2; described ADSS leading in cable 8 in described cable splice closure 2 with described OPGW optical cable 1 welding; the top of described ADSS leading in cable 8 is around the home more than described on cable frame 3, and the bottom of described ADSS leading in cable 8 is coaxially inserted in described protection steel pipe 7.
One end side of resting on the ground of described protection steel pipe 7, and the floor level that goes out of protection steel pipe 7 is 2.5 meters, the other end of described protection steel pipe 7 is embedded in below ground.Radius of curvature R >=190 of burying of protection steel pipe 7.
Described protection steel pipe 7 ground connection.
Described ADSS leading in cable 8 is blocked by pitch spunyarn or waterproof material after penetrating described protection steel pipe 7.
ADSS leading in cable 8 needs to carry out the remaining cable frame 3 of remaining, remaining ADSS leading in cable 8 and curls, and is fixed on portal frame pillar 5.
In sum, the remaining cable frame of the utility model introducing lays link and lays technique to circuit and carries out qualitative to quantitative restriction, makes optical cable information amount optimize transmissions.
The foregoing is only preferred embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every equivalent structure transformation utilizing the utility model description to do; or directly or indirectly use the technical field being attached to other Related products, be all in like manner included in scope of patent protection of the present utility model.

Claims (4)

1. power plant marches into the arena an optical cable hauling-off gear, it is characterized in that: comprise OPGW optical cable, cable splice closure, remaining cable frame, ADSS leading in cable, portal frame pillar, many group anchor ear fixtures and protection steel pipe; Described cable splice closure is arranged on the top of described portal frame pillar, and one end welding of described OPGW optical cable is on described cable splice closure, and the other end of described OPGW optical cable upwards extends; Described remaining cable frame is arranged on described portal frame pillar, is positioned at the below of described cable splice closure, the described rounded structure of remaining cable frame; Described many groups anchor ear fixture is disposed on described portal frame pillar respectively, is positioned at the below of described remaining cable frame; One end of described protection steel pipe is fixedly fitted on described portal frame pillar by described many groups anchor ear fixture, and along described portal frame pillar to downward-extension, with the protection steel pipe described in the interval snap close of 0.5 meter between described anchor ear fixture; Described portal frame pillar is obliquely installed on the ground, and the length direction on the top of described protection steel pipe is parallel with the length direction of described portal frame pillar; One end welding of described ADSS leading in cable is on described cable splice closure; described ADSS leading in cable in described cable splice closure with described OPGW optical cable welding; the top of described ADSS leading in cable is around the home more than described on cable frame, and the bottom of described ADSS leading in cable is coaxially inserted in described protection steel pipe.
2. power plant according to claim 1 marches into the arena optical cable hauling-off gear, it is characterized in that: one end side of resting on the ground of described protection steel pipe, and the floor level that goes out of protection steel pipe is 2.5 meters, and the other end of described protection steel pipe is embedded in below ground.
3. power plant according to claim 1 marches into the arena optical cable hauling-off gear, it is characterized in that: described protection steel pipe ground connection.
4. power plant according to claim 1 marches into the arena optical cable hauling-off gear, it is characterized in that: described ADSS leading in cable is blocked by pitch spunyarn or waterproof material after penetrating described protection steel pipe.
CN201520224752.6U 2015-04-15 2015-04-15 A kind of power plant marches into the arena optical cable hauling-off gear Expired - Fee Related CN204479821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520224752.6U CN204479821U (en) 2015-04-15 2015-04-15 A kind of power plant marches into the arena optical cable hauling-off gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520224752.6U CN204479821U (en) 2015-04-15 2015-04-15 A kind of power plant marches into the arena optical cable hauling-off gear

Publications (1)

Publication Number Publication Date
CN204479821U true CN204479821U (en) 2015-07-15

Family

ID=53635607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520224752.6U Expired - Fee Related CN204479821U (en) 2015-04-15 2015-04-15 A kind of power plant marches into the arena optical cable hauling-off gear

Country Status (1)

Country Link
CN (1) CN204479821U (en)

Similar Documents

Publication Publication Date Title
CN204479821U (en) A kind of power plant marches into the arena optical cable hauling-off gear
CN204257260U (en) A kind of indoor easily contained cable
CN204256230U (en) A kind of self-supporting skeleton type leading-in optic cable
CN201499331U (en) Parallel electric heat tracing cable
CN203895883U (en) Joinable electric wire conduit
CN206804952U (en) Optical cable and communications cable component
CN203553787U (en) Cable coiling and uncoiling wire clamp
CN204359982U (en) Intermediate distrubuting frame
CN202534990U (en) Equipment used for laying cables in underground tunnel
CN203930125U (en) Jumping fiber is strengthened in shaping protection
CN203299426U (en) Layer stranded type to-the-home cable
US8925900B2 (en) Method for arranging a plurality of wires in pipe
CN205910389U (en) Install optic fibre reason line ware in screen
CN205193321U (en) Compound fiber reel
CN103233678B (en) A kind of scalable vertical ladder
CN202372684U (en) Self-supported outdoor communication optical cable
CN206906665U (en) Wound form fixture and its covered wire cable make somebody a mere figurehead frock
CN204479820U (en) A kind of plant stand optical cable introducing device
CN201477249U (en) Lateral pressure resistant indoor access optical cable
CN202453552U (en) Communication outdoor optical cable with termite jacket
CN203165555U (en) Novel low-attenuation optical fiber composite overhead ground wire
CN202047612U (en) Combined courtyard-type building
CN202302335U (en) Combined sheath bend capable of being assembled and disassembled
CN203311052U (en) Optical fiber cable used in sewage pipe
CN202948182U (en) Anti-bending optical cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160203

Address after: 200000 Shanghai city Pudong New Area old town Nangang Road No. 1765 room 153

Patentee after: China Sinogy Electric Engineering Co., Ltd.

Address before: 200061 Shanghai, Zhongshan North Road, No. E, block, building 4, building 1715

Patentee before: Yu Hanhua

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20200415