CN204477698U - A kind of air compressor air feed is put from repacking - Google Patents
A kind of air compressor air feed is put from repacking Download PDFInfo
- Publication number
- CN204477698U CN204477698U CN201520016463.7U CN201520016463U CN204477698U CN 204477698 U CN204477698 U CN 204477698U CN 201520016463 U CN201520016463 U CN 201520016463U CN 204477698 U CN204477698 U CN 204477698U
- Authority
- CN
- China
- Prior art keywords
- air
- air compressor
- flow valve
- supply system
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drying Of Gases (AREA)
Abstract
The utility model discloses a kind of air compressor air feed to put from repacking, it is characterized in that: on the basis of original air compressor air supply system, separately set up a set of same model air compressor air supply system, former air compressor air supply system is made up of 1# air compressor, 1# air cooling driers, 1# gas holder, flow control valve and gas equipment.Now put from repacking and set up same a set of air compressor air supply system on this basis, and air supply system is connected, original air supply system storage volume is made to expand one times, change original air feed compression system is supported the gas consumption of three production lines present situation by running at full capacity, the gas consumption setting up two production lines again can be met again simultaneously, expand the throughput of company and the speed of launch products.
Description
Technical field
The utility model relates to air feed field, and a kind of air compressor air feed is put from repacking specifically.
Background technique
At present, manufacturing shop uses pulse pneumatic to be in harmonious proportion and production line filling, needs to use a large amount of pressurized air, uses the frequency of air compressor very high, particularly when many production lines run simultaneously, cause the overload operation of compressor, reduce the working life of air compressor, add maintenance cost, air quantity simultaneously due to compression is not enough, manufacturing mechanism cannot be made to reach optimum Working, not only expend electricity but also expend the operating time, add the cost of production of finished product simultaneously.
Summary of the invention
Technical problem to be solved in the utility model is exactly the deficiency overcoming above-mentioned existing production actual conditions, provide a kind of time saving and energy saving, raise the efficiency, the air compressor air feed in extension device working life puts from repacking.
The technical scheme in the invention for solving the above technical problem is: be provided with 1# air compressor, 1# Flow valve, 1# air cooling driers, 1# gas holder, 2# air compressor, 2# Flow valve, 2# air cooling driers, 2# gas holder, 3# Flow valve, 4# Flow valve, 5# Flow valve, 6# Flow valve, 7# Flow valve, gas equipment, it is characterized in that: 1# air compressor is connected with 1# air cooling driers by pipeline, pipeline is provided with 1# Flow valve, 1# air cooling driers is connected with 1# gas holder, 2# air compressor is connected with 2# air cooling driers by pipeline, pipeline is provided with 2# Flow valve, 2# air cooling driers is connected with 2# gas holder, 1# gas holder is connected with gas equipment by pipeline, pipeline is arranged in series 3# Flow valve and 5# Flow valve, 2# gas holder is connected with gas equipment by pipeline, pipeline is arranged in series 4# Flow valve and 6# Flow valve, also be provided with the pipeline that is provided with 7# Flow valve between 3# Flow valve and 5# Flow valve and between 4# Flow valve and 6# Flow valve, between gas holder with gas equipment two parallel pipelines are communicated.
The utility model is owing to taking said structure, original air supply system storage volume is made to expand one times, solve the problem of original air feed compression system overload operation, existing apparatus can meet the gas consumption setting up two production lines, the day throughput of production line also increases by 40% than when not reequiping, significantly enhance productivity, the product demand for market can fulfil production task ahead of schedule.Air compressor start running 30 minutes in full production, the pressurized air produced can for gas equipment 1 hour, decrease the number of starts of air compressor, extend the working life of equipment, reduce device maintenance expense, save the production time, also considerably reduced power consumption simultaneously, saved the cost of production of product oil.
Accompanying drawing explanation
Fig. 1 the utility model structural representation.
Be labeled as in figure: 1,1# air compressor, 2,1# Flow valve, 3,1# air cooling driers, 4,1# gas holder, 5,2# air compressor, 6,2# Flow valve, 7,2# air cooling driers, 8,2# gas holder, 9,3# Flow valve, 10,5# Flow valve, 11,7# Flow valve, 12,4# Flow valve, 13,6# Flow valve, 14, gas equipment.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described further:
As shown in the figure, the utility model relates to a kind of air compressor air feed and puts from repacking, it is characterized in that: on the basis of original air compressor air supply system, separately set up a set of air compressor air supply system, former air compressor air supply system is by 1# air compressor, 1# air cooling driers, 1# gas holder, flow control valve and gas equipment composition, now put from repacking and set up same a set of air compressor air supply system 2# air compressor on this basis, 2# air cooling driers, 2# gas holder, several Flow valves and gas equipment, and air supply system is connected, original air supply system storage volume is made to expand one times, change original air feed compression system is supported the gas consumption of three production lines present situation by running at full capacity.
When manufacturing shop gas equipment needs running, open 1#, 2# air compressor air supply system in advance to operate 30 minutes, by gas storage in 1#, 2# gas holder, when gas equipment needs air feed, can 3,4,5,7 Flow valves be opened according to PRODUCTION STATUS or open 3,4,5,6 Flow valves to meet gas equipment need of production.Existing air feed compression system can not only meet the supply of the gas consumption of existing three production lines, can meet again the gas consumption setting up two production lines more simultaneously, expand the throughput of company and the speed of launch products.
Claims (1)
1. an air compressor air feed is put from repacking, is provided with 1# air compressor, 1# Flow valve, 1# air cooling driers, 1# gas holder, 2# air compressor, 2# Flow valve, 2# air cooling driers, 2# gas holder, 3# Flow valve, 4# Flow valve, 5# Flow valve, 6# Flow valve, 7# Flow valve, gas equipment, it is characterized in that: 1# air compressor is connected with 1# air cooling driers by pipeline, pipeline is provided with 1# Flow valve, 1# air cooling driers is connected with 1# gas holder, 2# air compressor is connected with 2# air cooling driers by pipeline, pipeline is provided with 2# Flow valve, 2# air cooling driers is connected with 2# gas holder, 1# gas holder is connected with gas equipment by pipeline, pipeline is arranged in series 3# Flow valve and 5# Flow valve, 2# gas holder is connected with gas equipment by pipeline, pipeline is arranged in series 4# Flow valve and 6# Flow valve, also be provided with the pipeline that is provided with 7# Flow valve between 3# Flow valve and 5# Flow valve and between 4# Flow valve and 6# Flow valve, between gas holder with gas equipment two parallel pipelines are communicated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520016463.7U CN204477698U (en) | 2015-01-12 | 2015-01-12 | A kind of air compressor air feed is put from repacking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520016463.7U CN204477698U (en) | 2015-01-12 | 2015-01-12 | A kind of air compressor air feed is put from repacking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204477698U true CN204477698U (en) | 2015-07-15 |
Family
ID=53633489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520016463.7U Expired - Fee Related CN204477698U (en) | 2015-01-12 | 2015-01-12 | A kind of air compressor air feed is put from repacking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204477698U (en) |
-
2015
- 2015-01-12 CN CN201520016463.7U patent/CN204477698U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202595294U (en) | Delay control circuit for crust breaking partial pressure gas supply | |
CN202824153U (en) | Hydraulic control system for prestress oil cylinder of aluminum tape cast rolling machine | |
CN204284922U (en) | A kind of air compressor air feed is put from repacking | |
CN104595719A (en) | Air supply self changing device for air compressor | |
CN204477698U (en) | A kind of air compressor air feed is put from repacking | |
CN103062626A (en) | Intelligent dispatching device for local pneumatic pipe networks | |
CN202149359U (en) | Air supply system for air compressor | |
CN203274374U (en) | Ammonia refrigeration system pipeline series-parallel connection structure | |
CN203717298U (en) | Energy-saving device for air compressor | |
CN201353464Y (en) | Deduster blowing air tank structure | |
CN205424409U (en) | Efficient air compressor machine air feed control system | |
CN204172405U (en) | Die-cushion wind pressure adjusting device | |
CN202462768U (en) | Foam forming equipment capable of reducing steam consumption | |
CN202048367U (en) | Indirect air storage tank of air compressor | |
CN204061110U (en) | Gas compression unit | |
CN203215285U (en) | Gas supply system of workshop pipeline prefabricating production line | |
CN204285807U (en) | A kind of Pneumatic controller of water under high pressure stove | |
CN204200527U (en) | A kind of air compressor air supply system efficiently | |
CN203285747U (en) | Tandem type circulating water device for high-temperature centrifugal pump | |
CN202646236U (en) | Ultrahigh pressure pneumatic hydraulic station | |
CN102852911B (en) | Self-adaptive hydraulic system | |
CN204386841U (en) | A kind of air compressor air throttle control gear | |
CN204078675U (en) | Conveyor line cartoning sealing machine frequency conversion conveyer | |
CN202441604U (en) | Frequency conversion type screw air compressor system | |
CN107640307B (en) | Marine assembled air conditioner main and auxiliary energy regulation and control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20210112 |