CN204476400U - Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident - Google Patents
Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident Download PDFInfo
- Publication number
- CN204476400U CN204476400U CN201520122126.6U CN201520122126U CN204476400U CN 204476400 U CN204476400 U CN 204476400U CN 201520122126 U CN201520122126 U CN 201520122126U CN 204476400 U CN204476400 U CN 204476400U
- Authority
- CN
- China
- Prior art keywords
- drilling
- drill stem
- drilling tool
- special gas
- washout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to the drill stem washout testing and analysis system that wellbore construction prevents drilling tool accident.In wellbore construction, drilling tool accident can cause unit in charge of construction's heavy losses, brings loss even inestimable, in current oil drilling to unit in charge of construction's property and personal security, drill stem washout is generally only by artificial micro-judgment, inaccurate, not in time, easily cause drilling failure.The utility model proposes the drill stem washout testing and analysis system that wellbore construction prevents drilling tool accident, determination and analysis and balanced gas are integrated by this system, and accuracy of judgement is quick, error free.Comprise drilling tool, the special gas detector be connected with drilling tool, special gas detector connects drill stem washout analyzer, wherein, described drill stem washout analyzer is also connected with drilling circulation pump and special gas injector, described special gas injector one end is connected to drilling well by pipeline, and pipeline of leading up to is connected to drilling circulation pump.
Description
Technical field
The utility model is well drilling tool detection system technical field, particularly relates to the drill stem washout testing and analysis system that wellbore construction prevents drilling tool accident.
Background technology
In wellbore construction, drilling tool accident can cause unit in charge of construction's heavy losses, brings loss even inestimable, in current oil drilling to unit in charge of construction's property and personal security, drill stem washout is generally only by artificial micro-judgment, inaccurate, not in time, easily cause drilling failure.
Utility model content
For solving the deficiencies in the prior art, the utility model proposes the drill stem washout testing and analysis system that wellbore construction prevents drilling tool accident, determination and analysis and balanced gas are integrated by this system, and accuracy of judgement is quick, error free.
Be specially, wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident, comprise drilling tool, the special gas detector be connected with drilling tool, special gas detector connects drill stem washout analyzer, and wherein, described drill stem washout analyzer is also connected with drilling circulation pump and special gas injector, described special gas injector one end is connected to drilling well by pipeline, and pipeline of leading up to is connected to drilling circulation pump.
Preferably, described special gas injector both sides are respectively arranged with valve;
Accompanying drawing explanation
Fig. 1 is system annexation figure of the present utility model;
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is elaborated.
As shown in Figure 1, wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident, comprise drilling tool 10, the special gas detector 3 be connected with drilling tool 10, special gas detector 3 connects drill stem washout analyzer 2, wherein, described drill stem washout analyzer 2 is also connected with drilling circulation pump 1 and special gas injector 4, described special gas injector 4 one end is connected to drilling well 9 by pipeline 7, pipeline 7 of leading up to is connected to drilling circulation pump 1, and described special gas injector 4 both sides are respectively arranged with valve 5,6.
Its operating principle is, in wellbore construction, when normally working, by drilling equipment circulation of drilling fluid pump circulating mud, from drilling tool to shaft bottom, completes a circulation by being recycled to ground, if this circulation is a threshold range of setting-up time, then thinks that drilling tool is normal.
When ground installation works well, decline if run into drilling circulation pump 1 pump pressure, Open valve 5 and 6, starts special gas injector 4 and in ground pipeline 7, injects special gas to drilling well 9, participate in circulation.If there is thorn leakage can from drilling tool midway counter go out, the special gas arriving ground is poor if having time compared with normal time in the time of special gas detector 3, this information can be passed to drill stem washout analyzer 2 by special gas detector 3, obtain stinging leak source by drill stem washout analyzer 2, reach and accurately and timely prevent accident.
More than show and describe general principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (2)
1. wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident, it is characterized in that: comprise drilling tool (10), the special gas detector (3) be connected with drilling tool (10), special gas detector (3) connects drill stem washout analyzer (2), wherein, described drill stem washout analyzer (2) is also connected with drilling circulation pump (1) and special gas injector (4), described special gas injector (4) one end is connected to drilling well (9) by pipeline (7), pipeline (7) of leading up to is connected to drilling circulation pump (1).
2. wellbore construction according to claim 1 prevents the drill stem washout testing and analysis system of drilling tool accident, it is characterized in that: described special gas injector (4) both sides are respectively arranged with valve (5,6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520122126.6U CN204476400U (en) | 2015-03-02 | 2015-03-02 | Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520122126.6U CN204476400U (en) | 2015-03-02 | 2015-03-02 | Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204476400U true CN204476400U (en) | 2015-07-15 |
Family
ID=53632202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520122126.6U Expired - Fee Related CN204476400U (en) | 2015-03-02 | 2015-03-02 | Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204476400U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108150157A (en) * | 2017-12-15 | 2018-06-12 | 中国石油集团川庆钻探工程有限公司 | Drill stem washout situation and the method for position are determined using tracer gas |
CN109113727A (en) * | 2018-08-27 | 2019-01-01 | 中海石油(中国)有限公司 | Drill Pipe Washout point position detecting device and detection method based on interval transit time |
-
2015
- 2015-03-02 CN CN201520122126.6U patent/CN204476400U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108150157A (en) * | 2017-12-15 | 2018-06-12 | 中国石油集团川庆钻探工程有限公司 | Drill stem washout situation and the method for position are determined using tracer gas |
CN109113727A (en) * | 2018-08-27 | 2019-01-01 | 中海石油(中国)有限公司 | Drill Pipe Washout point position detecting device and detection method based on interval transit time |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104632205B (en) | Fracture-cavity carbonate reservoir storage type distinguishing method | |
BR112016001685A2 (en) | methods and systems for evaluating rock permeability, porosity and fluid composition | |
BR112014018513A8 (en) | FLUID ANALYSIS SYSTEM FOR DETERMINING AT LEAST ONE CHARACTERISTIC OF A DRILLING FLUID AND METHOD OF OPERATION OF A DRILLING FLUID ANALYSIS SYSTEM | |
NZ701807A (en) | Methods and compositions for diagnosis and prognosis of renal injury and renal failure | |
NZ592365A (en) | Methods and compositions for diagnosis and prognosis of renal injury and renal failure | |
BR112014013215A2 (en) | use of downhole pressure measurements during drilling for detection and mitigation of inlet flows | |
EA201071257A1 (en) | METHOD AND TEST SYSTEM OF OIL WELLS BY FUELING WITH MIXING | |
BRPI0703390A2 (en) | method for testing fluid compatibility along the borehole extension in a well, method for performing fluid compatibility test over the borehole extension in a well, and tool along the borehole extension for conducting compatibility compatibility testing. fluids with a subterranean formation fluid | |
CN203275258U (en) | Rock core acidification flow testing device | |
CN204476400U (en) | Wellbore construction prevents the drill stem washout testing and analysis system of drilling tool accident | |
WO2020063603A1 (en) | Dynamic data processing method for oilfield development and production | |
BR112018007846A2 (en) | method and system for performing pressure tests. | |
BR112015008317A2 (en) | drilling motor arrangement and method for drilling a wellbore | |
CN104358559B (en) | Method for measuring effective coal-mine gas extraction radius | |
SA518400663B1 (en) | Automatic Pumping Control for Leak-Off Tests | |
NZ598741A (en) | Methods and composition for diagnosis and prognosis of renal injury and renal failure by performing assays to detect metalloproteinase inhibitor 4 on a body fluid sample | |
CN105569623B (en) | Well head combined measuring device and its method for water injection well | |
CN108915595B (en) | Well control management method for deepwater drilling | |
CN104674678A (en) | Design of cement grouting | |
CN103230728B (en) | Method for treating hydrogen sulfide on oil well site | |
BR112015015113A2 (en) | system and method for collecting representative formation fluid during downhole testing operations | |
BR112016025029A2 (en) | fluidic oscillator assembly for use in an underground well, method for use with a wellbore fluidic oscillator, and, well system | |
GB2553692A (en) | In-line viscometer for measuring the viscosity of drilling fluids | |
EA201800335A1 (en) | METHOD FOR AUTOMATIC MEASUREMENT OF THE DEGREE (COEFFICIENT) OF FILLING A DEEP PUMP CYLINDER | |
CN204286305U (en) | A kind of water mixing water nozzle on-site calibrator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20160302 |