CN204469154U - A kind of goal football - Google Patents

A kind of goal football Download PDF

Info

Publication number
CN204469154U
CN204469154U CN201520030135.2U CN201520030135U CN204469154U CN 204469154 U CN204469154 U CN 204469154U CN 201520030135 U CN201520030135 U CN 201520030135U CN 204469154 U CN204469154 U CN 204469154U
Authority
CN
China
Prior art keywords
hole
strut
tube connector
radial direction
root
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520030135.2U
Other languages
Chinese (zh)
Inventor
李春荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JINLING SPORTS EQUIPMENT CO Ltd
Original Assignee
JIANGSU JINLING SPORTS EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JINLING SPORTS EQUIPMENT CO Ltd filed Critical JIANGSU JINLING SPORTS EQUIPMENT CO Ltd
Priority to CN201520030135.2U priority Critical patent/CN204469154U/en
Application granted granted Critical
Publication of CN204469154U publication Critical patent/CN204469154U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Tents Or Canopies (AREA)

Abstract

本实用新型公开了一种足球门,包括门框、底框及两根撑杆,门框由两根立柱及横梁组成,每根立柱的上端分别装有上连接管、下端分别装有连接板,底框由两根水平纵杆及一根水平横杆组成,每根水平纵杆与其同侧的立柱上的连接板之间通过活动螺栓相固定,在每根水平纵杆的顶部分装有下连接管;所述两根撑杆分别门框的左右两侧,每根撑杆的上、下两端分别通过活动销轴与其同侧的上连接管及下连接管相固定;在底框的水平横杆上还设置有若干用以与地面相配合固定、且开有安装孔的安装板。本实用新型具有稳固性高的优点。

The utility model discloses a football goal, which comprises a door frame, a bottom frame and two struts. The door frame is composed of two columns and a beam. The frame is composed of two horizontal longitudinal rods and a horizontal horizontal rod. Each horizontal longitudinal rod and the connecting plate on the column on the same side are fixed by movable bolts. The top part of each horizontal longitudinal rod is equipped with a lower connection tube; the two struts are respectively on the left and right sides of the door frame, and the upper and lower ends of each strut are respectively fixed to the upper connecting pipe and the lower connecting pipe on the same side by movable pins; The rod is also provided with several mounting plates for cooperating with the ground and being fixed with mounting holes. The utility model has the advantage of high stability.

Description

一种足球门a football goal

技术领域 technical field

本实用新型涉及体育器械用品,具体涉及一种足球门。 The utility model relates to sports equipment, in particular to a football goal.

背景技术 Background technique

足球门是足球运动中不可缺少的体育器械,目前所使用的足球门的结构为:包括两根立柱,在两根立柱之间设置有横梁,横梁的两端分别与两根立柱的顶端相固定。上述足球门的缺点是:稳固性低,极易被运动的足球碰撞而倾斜甚至翻倒,进而影响足球运动的正常进行。 Soccer goal is an indispensable sports equipment in football. The structure of the football goal currently used is as follows: it includes two columns, a beam is arranged between the two columns, and the two ends of the beam are respectively fixed to the tops of the two columns. . The shortcoming of above-mentioned soccer goal is: stability is low, is very easy to be tilted or even overturned by the collision of moving football, and then affects the normal progress of football.

实用新型内容 Utility model content

本实用新型的目的是提供一种稳固性高的一种足球门。 The purpose of the utility model is to provide a football goal with high stability.

为实现上述目的,本实用新型采用了如下技术方案:所述的一种足球门,包括门框、底框及两根撑杆,所述门框由两根立柱及一根横梁组成,在每根立柱的上端分别安装开设有第一径向通孔的上连接管、下端分别安装开设有第一锁紧孔的连接板,所述底框由两根水平纵杆及一根水平横杆组成,底框的两根水平纵杆分别与两根立柱上的连接板相插接,底框的每根水平纵杆与连接板相对接的端部开设有第二锁紧孔,每根水平纵杆与对应连接板之间通过同时穿过第一锁紧孔与第二锁紧孔的活动螺栓相固定,在底框的每根水平纵杆的顶部分别安装开设有第二径向通孔的下连接管;所述两根撑杆分别门框的左右两侧,每根撑杆的上、下两端分别开设有第三径向通孔与第四径向通孔,每根撑杆的上、下两端分别与其同侧的上连接管及下连接管相套接,每根撑杆的上端与其相套接的上连接管之间通过同时穿过第一径向通孔与第三径向通孔的上活动销轴相固定,每根撑杆的下端与其相套接的下连接管之间通过同时穿过第二径向通孔及第四径向通孔的下活动销轴相固定;在底框的水平横杆上还设置有若干用以与地面相配合固定、且开有安装孔的安装板。 In order to achieve the above object, the utility model adopts the following technical scheme: the described football goal includes a door frame, a bottom frame and two struts, the door frame is composed of two uprights and a beam, and each upright The upper end of the upper end is respectively installed with the upper connecting pipe with the first radial through hole, and the lower end is respectively installed with the connecting plate with the first locking hole. The bottom frame is composed of two horizontal longitudinal bars and a horizontal horizontal bar. The two horizontal longitudinal rods of the frame are connected to the connecting plates on the two uprights respectively, and the end of each horizontal longitudinal rod of the bottom frame that is connected to the connecting plate is provided with a second locking hole, and each horizontal longitudinal rod is connected to the connecting plate The corresponding connecting plates are fixed by movable bolts passing through the first locking hole and the second locking hole at the same time, and the lower connection with the second radial through hole is respectively installed on the top of each horizontal longitudinal bar of the bottom frame. tube; the two struts are respectively on the left and right sides of the door frame, the upper and lower ends of each strut are respectively provided with a third radial through hole and a fourth radial through hole, and the upper and lower ends of each strut The two ends are respectively socketed with the upper connecting pipe and the lower connecting pipe on the same side, and the upper end of each strut and the upper connecting pipe which it is socketed with pass through the first radial through hole and the third radial through hole at the same time. The upper movable pin shaft of the hole is fixed, and the lower end of each strut and its lower connecting pipe are fixed by the lower movable pin shaft passing through the second radial through hole and the fourth radial through hole at the same time; On the horizontal bar of the bottom frame, there are also several mounting plates for cooperating with the ground and fixing with the ground, and having mounting holes.

进一步地,前述的一种足球门,其中:所述的上连接管呈阶梯形管状,当撑杆与上连接管相套接至撑杆的上端端面抵在上连接管的阶梯面上时,撑杆上端的第三径向通孔正好与上连接管的第一径向通孔相通。 Further, the aforementioned football goal, wherein: the upper connecting pipe is in the shape of a stepped tube, when the strut and the upper connecting pipe are sleeved until the upper end surface of the strut abuts against the stepped surface of the upper connecting pipe, The third radial through hole at the upper end of the strut just communicates with the first radial through hole of the upper connecting pipe.

进一步地,前述的一种足球门,其中:所述的下连接管呈阶梯形管状,当撑杆与下连接管相套接至撑杆的下端端面抵在下连接管的阶梯面上时,撑杆下端的第四径向通孔正好与下连接管的第二径向通孔相通。 Further, the aforementioned football goal, wherein: the lower connecting pipe is in the shape of a stepped tube, and when the strut and the lower connecting pipe are sleeved until the lower end surface of the strut abuts against the stepped surface of the lower connecting pipe, the strut The fourth radial through hole at the lower end of the rod just communicates with the second radial through hole of the lower connecting pipe.

通过上述技术方案的实施,本实用新型具有稳固性高、安装拆卸方便的优点。 Through the implementation of the above technical solution, the utility model has the advantages of high stability and convenient installation and disassembly.

附图说明 Description of drawings

图1为本实用新型所述的一种足球门的结构示意图。 Fig. 1 is a structural schematic diagram of a football goal described in the utility model.

图2为图1的俯视方向的结构示意图。 FIG. 2 is a schematic structural diagram of FIG. 1 in a plan view direction.

图3为图 1的左视方向的结构示意图。 Fig. 3 is a schematic diagram of the structure in the left view direction of Fig. 1 .

图4为图3中所示的H部位的放大示意图。 FIG. 4 is an enlarged schematic view of the H portion shown in FIG. 3 .

图5为图3中所示的A部位的放大示意图。 FIG. 5 is an enlarged schematic view of part A shown in FIG. 3 .

图6为图3中所示的B部位的放大示意图。 FIG. 6 is an enlarged schematic view of part B shown in FIG. 3 .

图7为图3的分解结构示意图。 FIG. 7 is a schematic diagram of the exploded structure of FIG. 3 .

具体实施方式 Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.

如图1、图2、图3、图4、图5、图6、图7所示,所述的一种足球门,包括门框、底框及两根撑杆1,所述门框由两根立柱2及一根横梁3组成,在每根立柱2的上端分别安装开设有第一径向通孔4的上连接管5、下端分别安装开设有第一锁紧孔6的连接板7,所述底框由两根水平纵杆8及一根水平横杆9组成,底框的每根水平纵杆8的外端部分别开设有第二锁紧孔10,底框的两根水平纵杆8的外端部分别与两根立柱2上的连接板7相插接,每根水平纵杆8与对应连接板7之间通过同时穿过第一锁紧孔6与第二锁紧孔10的活动螺栓11相固定,在底框的每根水平纵杆8的顶部分别安装开设有第二径向通孔12的下连接管13;所述两根撑杆1分别门框的左右两侧,每根撑杆的上、下两端分别开设有第三径向通孔14与第四径向通孔15,每根撑杆1的上、下两端分别与其同侧的上连接管5及下连接管13相套接,每根撑杆1的上端与其相套接的上连接管5之间通过同时穿过对应第一径向通孔4与第三径向通孔14的上活动销轴16相固定,每根撑杆1的下端与其相套接的下连接管13之间通过同时穿过对应第二径向通孔12及第四径向通孔15的下活动销轴17相固定;在底框的水平横杆9上还设置有若干用以与地面相配合固定、且开有安装孔18的安装板19;在本实施例中,所述的上连接管5呈阶梯形管状,当撑杆1与对应上连接管5相套接时至撑杆1的上端端面抵在上连接管5的阶梯面上时,撑杆1上端的第三径向通孔14正好与上连接管5的第一径向通孔4相通,这样工作人员在安装时只需将撑杆1与上连接管5相插接后,再将上活动销轴16直接插入相通的第一径向通孔4及第三径向通孔14,即完成了撑杆1与门框的固定,不需要再人工移动撑杆1来调整至第三径向通孔14与第一径向通孔4相通,大大提高了安装效率;在本实施例中,所述的下连接管13呈阶梯形管状,当撑杆1与下连接管13相套接至撑杆1的下端端面抵在下连接管13的阶梯面上时,撑杆1下端的第四径向通孔15正好与下连接管13的第二径向通孔12相通,这样工作人员在安装时只需将撑杆1与下连接管13相插接后,再将下活动销轴17直接插入相通的第二径向通孔12及第四径向通孔15,即完成了撑杆1与底框的固定,不需要再人工移动撑杆1来调整至第四径向通孔15与第二径向通孔12相通,大大提高了安装效率; As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, and Fig. 7, the described football goal includes a door frame, a bottom frame and two struts 1, and the door frame consists of two The column 2 and a beam 3 are composed of an upper connecting pipe 5 provided with a first radial through hole 4 at the upper end of each column 2, and a connecting plate 7 provided with a first locking hole 6 at the lower end respectively. The bottom frame is composed of two horizontal longitudinal bars 8 and a horizontal cross bar 9. The outer ends of each horizontal longitudinal bar 8 of the bottom frame are respectively provided with second locking holes 10, and the two horizontal longitudinal bars of the bottom frame The outer ends of 8 are respectively inserted into the connecting plates 7 on the two columns 2, and each horizontal longitudinal bar 8 passes through the first locking hole 6 and the second locking hole 10 through the corresponding connecting plate 7 at the same time. The movable bolts 11 of the bottom frame are fixed, and the lower connecting pipes 13 with the second radial through holes 12 are respectively installed on the top of each horizontal longitudinal rod 8 of the bottom frame; the two braces 1 are respectively on the left and right sides of the door frame, The upper and lower ends of each strut are respectively provided with a third radial through hole 14 and a fourth radial through hole 15, and the upper and lower ends of each strut 1 are respectively connected to the upper connecting pipe 5 and The lower connecting pipe 13 is socketed, and the upper end of each strut 1 and its socketed upper connecting pipe 5 pass through the upper movable pin that passes through the corresponding first radial through hole 4 and the third radial through hole 14 at the same time. The shaft 16 is fixed, and the lower end of each strut 1 and the lower connecting pipe 13 that it is socketed in are connected by the lower movable pin shaft 17 that passes through the corresponding second radial through hole 12 and the fourth radial through hole 15 at the same time. Fixed; on the horizontal bar 9 of the bottom frame, there are also several mounting plates 19 for cooperating with the ground and having mounting holes 18; in this embodiment, the upper connecting pipe 5 is stepped Tubular, when the strut 1 is socketed with the corresponding upper connecting pipe 5 until the upper end surface of the strut 1 touches the stepped surface of the upper connecting pipe 5, the third radial through hole 14 at the upper end of the strut 1 is just in line with the upper The first radial through hole 4 of the connecting pipe 5 is connected, so that the staff only need to insert the strut 1 and the upper connecting pipe 5 during installation, and then directly insert the upper movable pin shaft 16 into the connected first radial direction. The through hole 4 and the third radial through hole 14 complete the fixing of the strut 1 and the door frame, and there is no need to manually move the strut 1 to adjust the third radial through hole 14 to communicate with the first radial through hole 4 , which greatly improves the installation efficiency; in this embodiment, the lower connecting pipe 13 is in a stepped tubular shape, when the support rod 1 and the lower connecting pipe 13 are socketed to the lower end surface of the support rod 1 against the bottom of the lower connecting pipe 13 When on the stepped surface, the fourth radial through hole 15 at the lower end of the strut 1 just communicates with the second radial through hole 12 of the lower connecting pipe 13, so that the staff only need to connect the strut 1 with the lower connecting pipe 13 during installation. After being plugged together, the lower movable pin shaft 17 is directly inserted into the connected second radial through hole 12 and the fourth radial through hole 15, and the fixing of the strut 1 and the bottom frame is completed, and no manual movement of the strut is required. Rod 1 is adjusted until the fourth radial through hole 15 communicates with the second radial through hole 12, which greatly improves the installation efficiency;

本实用新型的工作原理如下: The working principle of the utility model is as follows:

安装时,先将底框的两根水平纵杆8的外端部分别与门框的两根立柱2下端的连接板7相插接,当一根水平纵杆8外端部上的第二锁紧孔10与其同侧的连接板7上的第一锁紧孔6相对接连通后,再使活动螺栓11穿过对应的第一锁紧孔6与第二锁紧孔10,从而将该根水平纵杆8与门框相固定,接着再将另一根水平纵杆8外端部上的第二锁紧孔10与其同侧的连接板7上的第一锁紧孔6相对接连通后,再使活动螺栓11穿过对应的第一锁紧孔6与第二锁紧孔10,从而将该根水平纵杆8与门框相固定,通过将底框的两根水平纵杆8与门框相固定,从而完成底框与门框的固定操作;接着再将一根撑杆1的上端插入左侧立柱2上端的上连接管5,当撑杆1的上端端面抵在上连接管5的阶梯面上后,此时撑杆1上端的第三径向通孔14正好与上连接管5的第一径向通孔4相通,然后再将上活动销轴16直接插入相通的第一径向通孔4及第三径向通孔14,从而使撑杆1与门框相固定,接着再将撑杆1的下端插入左侧立柱2下端的下连接管13,当撑杆1的下端端面抵在下连接管13的阶梯面上后,此时撑杆1下端的第四径向通孔15正好与下连接管13的第二径向通孔12相通,接着再将下活动销轴17直接插入相通的第二径向通孔12与第四径向通孔15,从而使撑杆1与底框相固定,接着取另一根撑杆1重复上述撑杆安装步骤,完成该撑杆1的安装,接着再使用膨胀螺栓穿过安装板19上的安装孔18,从而使安装板19固定在地面上,从而完成足球门的安装;本实用新型的优点是:一方面,每根撑杆1将门框与底框相固定后,撑杆1、门框与底框三者之间形成了稳定地三角形结构,进而大大增加了门框的稳固性,同时,由于门框通过安装板能进一步稳固地支撑在地面上,从而有效地避免门框因足球的碰撞而倾斜甚至翻倒现象的发生,大大满足了足球比赛需求;另一方面,由于本足球门采用了门框、底框及撑杆三者拼装的方式,不仅安装拆卸方便,而且方便储存。 During installation, the outer ends of the two horizontal longitudinal rods 8 of the bottom frame are plugged with the connecting plates 7 at the lower ends of the two columns 2 of the door frame respectively, when the second lock on the outer ends of a horizontal longitudinal rod 8 After the tight hole 10 connects with the first locking hole 6 on the connecting plate 7 on the same side, the movable bolt 11 is passed through the corresponding first locking hole 6 and the second locking hole 10, so that the root The horizontal longitudinal rod 8 is fixed to the door frame, and then the second locking hole 10 on the outer end of another horizontal longitudinal rod 8 is connected to the first locking hole 6 on the connecting plate 7 on the same side. Make the movable bolt 11 pass through the corresponding first locking hole 6 and the second locking hole 10, thereby this root horizontal longitudinal bar 8 is fixed with the door frame, by connecting the two horizontal longitudinal bars 8 of the bottom frame with the door frame Then, insert the upper end of a strut 1 into the upper connecting pipe 5 on the upper end of the left column 2, when the upper end surface of the strut 1 touches the stepped surface of the upper connecting pipe 5 At this time, the third radial through hole 14 on the upper end of the strut 1 just communicates with the first radial through hole 4 of the upper connecting pipe 5, and then the upper movable pin shaft 16 is directly inserted into the connected first radial through hole. hole 4 and the third radial through hole 14, so that the strut 1 is fixed to the door frame, and then the lower end of the strut 1 is inserted into the lower connecting pipe 13 at the lower end of the left column 2, when the lower end surface of the strut 1 touches the lower After the step surface of the connecting pipe 13, the fourth radial through hole 15 at the lower end of the strut 1 just communicates with the second radial through hole 12 of the lower connecting pipe 13, and then the lower movable pin shaft 17 is directly inserted into the communicating The second radial through hole 12 and the fourth radial through hole 15, so that the strut 1 is fixed to the bottom frame, then take another strut 1 and repeat the above strut installation steps to complete the installation of the strut 1 , and then use the expansion bolt to pass through the mounting hole 18 on the mounting plate 19, so that the mounting plate 19 is fixed on the ground, thereby completing the installation of the football goal; the utility model has the advantages that: on the one hand, each strut 1 will After the door frame and the bottom frame are fixed, a stable triangular structure is formed between the strut 1, the door frame and the bottom frame, which greatly increases the stability of the door frame. On the other hand, because the football goal adopts the method of assembling the door frame, the bottom frame and the pole, Not only easy to install and disassemble, but also convenient to store.

Claims (3)

1. a goal football, it is characterized in that: comprise doorframe, underframe and two struts, described doorframe is made up of two root posts and a crossbeam, the upper tube connector offering the first radial direction through hole is installed respectively in the upper end of every root post, lower end installs the connecting plate offering the first locking hole respectively, described underframe is made up of two horizontal vertical poles and a horizontal cross bar, the outer end of the horizontal vertical pole of every root of underframe offers the second locking hole respectively, the outer end of two horizontal vertical poles of underframe plugs with the connecting plate on two root posts respectively, the horizontal vertical pole of every root is fixed by the movable bolt passing the first locking hole and the second locking hole simultaneously with between corresponding connecting plate, at the top of the horizontal vertical pole of every root of underframe, the lower tube connector offering the second radial direction through hole is installed respectively, the left and right sides of described two struts difference doorframe, the upper/lower terminal of every root strut offers the 3rd radial direction through hole and the 4th radial direction through hole respectively, the upper/lower terminal of every root strut socket-connects with the upper tube connector of its homonymy and lower tube connector respectively, by fixing through the upper active pin shaft of the first radial direction through hole and the 3rd radial direction through hole simultaneously between the upper end of every root strut and its upper tube connector socket-connected, by fixing through the lower active pin shaft of the second radial direction through hole and the 4th radial direction through hole simultaneously between the lower end of every root strut and its lower tube connector socket-connected, the horizontal cross bar of underframe is also provided with some in order to match with ground fixing and to have the installing plate of installing hole.
2. a kind of goal football according to claim 1, it is characterized in that: described upper tube connector is stairstepping tubulose, when strut and the upper tube connector upper end end face socket-connected to strut is against on the cascaded surface of upper tube connector, the 3rd radial direction through hole of strut upper end just in time communicates with the first radial direction through hole of upper tube connector.
3. a kind of goal football according to claim 1, it is characterized in that: described lower tube connector is stairstepping tubulose, when strut and the lower tube connector lower end surface socket-connected to strut is against on the cascaded surface of lower tube connector, the 4th radial direction through hole of strut lower end just in time communicates with the second radial direction through hole of lower tube connector.
CN201520030135.2U 2015-01-16 2015-01-16 A kind of goal football Expired - Lifetime CN204469154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520030135.2U CN204469154U (en) 2015-01-16 2015-01-16 A kind of goal football

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520030135.2U CN204469154U (en) 2015-01-16 2015-01-16 A kind of goal football

Publications (1)

Publication Number Publication Date
CN204469154U true CN204469154U (en) 2015-07-15

Family

ID=53624890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520030135.2U Expired - Lifetime CN204469154U (en) 2015-01-16 2015-01-16 A kind of goal football

Country Status (1)

Country Link
CN (1) CN204469154U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104548536A (en) * 2015-01-16 2015-04-29 江苏金陵体育器材股份有限公司 Football goal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104548536A (en) * 2015-01-16 2015-04-29 江苏金陵体育器材股份有限公司 Football goal

Similar Documents

Publication Publication Date Title
CN105952200B (en) A kind of telescopic chorus/group photo platform
CN110748001A (en) Steel structure net rack
CN104548536B (en) a football goal
KR200465958Y1 (en) a structure for supporting of solar module
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN203062760U (en) Assembled steel bar processing platform
CN111788969A (en) An agricultural recyclable greenhouse
CN205604836U (en) Iron art tent
CN206923053U (en) A kind of integrated base station of Fast Construction
CN203885140U (en) Mortise and tenon joint frame and tenon and tenon joint display rack
CN204972923U (en) Folding football door
CN201981702U (en) Upright post of multispan greenhouse
CN220377770U (en) Finalized assembly type operation platform
CN208105278U (en) A kind of foundation pit adjustable support frame
CN206381571U (en) A kind of packaged type goal football
CN107676113B (en) Telescopic tunnel supporting operation trolley
CN223621312U (en) Easy-to-detach stand connecting structure
CN219011506U (en) A repeatable disassembled and assembled steel structure of an energy-saving integrated house
CN205116859U (en) Modularization roofing communication tower
CN221031367U (en) Scaffold frame jacking of adjustable
CN218541692U (en) Movable anti-smashing shed
CN219548596U (en) An easy-to-assemble construction fence
CN204940827U (en) A kind of scaffold oblique pull fixed head for building
CN202834637U (en) Installing frame for light-emitting diode (LED) box body
CN205153497U (en) Scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150715

CX01 Expiry of patent term