CN204456666U - A kind of construction work adapter structure - Google Patents

A kind of construction work adapter structure Download PDF

Info

Publication number
CN204456666U
CN204456666U CN201520130365.6U CN201520130365U CN204456666U CN 204456666 U CN204456666 U CN 204456666U CN 201520130365 U CN201520130365 U CN 201520130365U CN 204456666 U CN204456666 U CN 204456666U
Authority
CN
China
Prior art keywords
opening
anchor head
adapter
construction work
standing screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520130365.6U
Other languages
Chinese (zh)
Inventor
宋萍萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luqiao Jiangxi Tunnel Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520130365.6U priority Critical patent/CN204456666U/en
Application granted granted Critical
Publication of CN204456666U publication Critical patent/CN204456666U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of construction work adapter structure, described adapter is located at each steel hinge line confluce in order to be connected and fixed each steel hinge line; Described adapter is provided with two anchor heads, and in order to connect the standing screw of two anchor heads, each anchor head is provided with an accommodation space and is positioned at two ends and first, second opening communicated with it, described holding space for holding has an intermediate plate in order to sandwiched steel strand, described steel strand are passed by the first opening of each anchor head respectively, described first opening is formed with the chamfering expanded outwardly, described standing screw is connected to the second opening of each anchor head, described standing screw is formed with a grouting guide hole, described grouting guide hole and each second opening mutual conduction.The utility model grouting is full real, and pulp-water can cladding steel twisted wire completely, can not have the corrosion factor such as air and aqueous vapor in adapter, can avoid producing anchor head or steel strand corrode through Long-Time Service.

Description

A kind of construction work adapter structure
Technical field
The utility model relates to construction engineering technical field, refers to a kind of construction work adapter structure especially.
Background technology
The defect on using is there is on the implementation in the adapter of prior art because structure design is not good, such as be in the milk unreal, pulp-water cladding steel twisted wire is incomplete, the corrosion factor such as air and aqueous vapor is there is in adapter, namely anchor head or steel strand corrosion is easily produced after Long-Time Service, even rupture, cause design pretightning force not reach requirement, jeopardize the problem of pre-fastening structure safety.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of construction work adapter structure, to solve the problems of the technologies described above.
For solveing the technical problem, embodiment of the present utility model provides a kind of construction work adapter structure, and described adapter is located at each steel hinge line confluce in order to be connected and fixed each steel hinge line; Described adapter is provided with two anchor heads, and in order to connect the standing screw of two anchor heads, each anchor head is provided with an accommodation space and is positioned at two ends and first, second opening communicated with it, described holding space for holding has an intermediate plate in order to sandwiched steel strand, described steel strand are passed by the first opening of each anchor head respectively, described first opening is formed with the chamfering expanded outwardly, described standing screw is connected to the second opening of each anchor head, described standing screw is formed with a grouting guide hole, described grouting guide hole and each second opening mutual conduction.
Also elastic parts is provided with between described intermediate plate and described second opening.
Described accommodation space is formed with groove and locates for described elastic parts.
Also pad is provided with between described intermediate plate and described elastic parts.
Described intermediate plate is taper, and described accommodation space forms the hypotenuse corresponding with described taper.
The beneficial effect of described technical scheme of the present utility model is as follows:
The utility model grouting is full real, and pulp-water can cladding steel twisted wire completely, can not have the corrosion factor such as air and aqueous vapor in adapter, can avoid producing anchor head or steel strand corrode through Long-Time Service.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the cross-sectional view of the utility model embodiment.
Fig. 3 is the decomposition texture schematic diagram of the utility model embodiment.
Fig. 4 is the cross-sectional view of the grouting of the utility model embodiment.
Fig. 5 is the anchor head of the utility model embodiment and the generalized section of steel strand.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearly, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
As shown in Figure 1 to Figure 3, the utility model provides a kind of construction work adapter structure, and described adapter 1 is located at each steel hinge line 21,22 confluce in order to be connected and fixed each steel hinge line 21,22, described adapter 1 is provided with two anchor heads 11, 12, and in order to connect two anchor heads 11, the standing screw 13 of 12, each anchor head 11, 12 are provided with an accommodation space 111, 121 and be positioned at two ends and communicate with it first, second opening 112, 113, 122, 123, described accommodation space 111, 121 are equipped with an intermediate plate 14 in order to sandwiched steel strand 21, 22, described intermediate plate 14 is in taper, described accommodation space 111, 121 form the hypotenuse a corresponding with described taper, described first opening 112, 122 are formed with the chamfering b expanded outwardly, described standing screw 13 is connected to the second opening 113 of each anchor head, 123, described standing screw 13 two ends are formed with spiro union portion 131, each anchor head second opening 113, 123 are formed with the corresponding section of being spirally connected c, described standing screw 13 is formed with a grouting guide hole 132, described grouting guide hole 132 and each second opening 113, 123 mutual conduction.
Also be provided with elastic parts 15 between described intermediate plate 14 and described second opening 113,123, be provided with pad 16 between described intermediate plate 14 and described elastic parts 15, described standing screw 13 is formed with groove 133 and locates for described elastic parts 15, during overall package, each steel strand 21, 22 one end are located in described intermediate plate 14, by described intermediate plate 14 together with steel strand 21, 22 accommodation spaces 111 being installed on each anchor head respectively, in 121, steel strand 21, 22 other ends are then by the first opening 112 of each anchor head, 122 pass, the blocking of described intermediate plate 14 is positioned the hypotenuse a place of described accommodation space, described intermediate plate 14 is placed with successively pad 16 and elastic parts 15, again a standing screw 13 is distinguished interlocking in the second opening 113 of each anchor head, 123 places, by the effect that described spiro union portion 131 and the section of being spirally connected c screw togather mutually, by each anchor head 11, 12 are connected and fixed by described standing screw 13, and then be connected and fixed each steel hinge line 21, 22, described elastic parts 15 can be positioned in groove 133, in addition, each anchor head 11,12 outside wall surface can be formed with two corresponding parallel edges 114,124, can instrument (such as spanner) be utilized to assemble during ease of assembly.
When being in the milk; be in the milk by the first opening 112,122; as shown in Figures 4 and 5; being beneficial to pulp-water 3 by the design of described chamfering b flows in adapter 1 from steel strand 21,22 fried dough twist gap g; and utilize described grouting guide hole 132 to be conducive to producing exhaust and full slurry, reach protection and antirust effect.
The above is preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from principle described in the utility model; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (5)

1. a construction work adapter structure, described adapter is located at each steel hinge line confluce in order to be connected and fixed each steel hinge line; It is characterized in that, described adapter is provided with two anchor heads, and in order to connect the standing screw of two anchor heads, each anchor head is provided with an accommodation space and is positioned at two ends and first, second opening communicated with it, described holding space for holding has an intermediate plate in order to sandwiched steel strand, described steel strand are passed by the first opening of each anchor head respectively, described first opening is formed with the chamfering expanded outwardly, described standing screw is connected to the second opening of each anchor head, described standing screw is formed with a grouting guide hole, described grouting guide hole and each second opening mutual conduction.
2. construction work adapter structure according to claim 1, is characterized in that, is also provided with elastic parts between described intermediate plate and described second opening.
3. construction work adapter structure according to claim 2, is characterized in that, described accommodation space is formed with groove and locates for described elastic parts.
4. construction work adapter structure according to claim 3, is characterized in that, be also provided with pad between described intermediate plate and described elastic parts.
5. construction work adapter structure according to claim 4, it is characterized in that, described intermediate plate is taper, and described accommodation space forms the hypotenuse corresponding with described taper.
CN201520130365.6U 2015-03-07 2015-03-07 A kind of construction work adapter structure Expired - Fee Related CN204456666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520130365.6U CN204456666U (en) 2015-03-07 2015-03-07 A kind of construction work adapter structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520130365.6U CN204456666U (en) 2015-03-07 2015-03-07 A kind of construction work adapter structure

Publications (1)

Publication Number Publication Date
CN204456666U true CN204456666U (en) 2015-07-08

Family

ID=53663573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520130365.6U Expired - Fee Related CN204456666U (en) 2015-03-07 2015-03-07 A kind of construction work adapter structure

Country Status (1)

Country Link
CN (1) CN204456666U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113950558A (en) * 2019-05-29 2022-01-18 威尔斯金属股份公司 One-key connector for preventing movement of reinforcing steel bar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113950558A (en) * 2019-05-29 2022-01-18 威尔斯金属股份公司 One-key connector for preventing movement of reinforcing steel bar

Similar Documents

Publication Publication Date Title
CN203783486U (en) Thread gluing prevention drill rod joint
CN204456666U (en) A kind of construction work adapter structure
CN205191035U (en) Pipeline socket joint connection structure
CN205240400U (en) Take skirt tower
CN203963301U (en) Thermal sensor water pump connecting head
CN204163386U (en) A kind of convenient disc type scaffold installed
CN204878535U (en) Wire rope's turn -bucklet
CN203893979U (en) Transition joint of pressure gauge
CN201330782Y (en) Stud in metric and English system
CN204826476U (en) Wood system handrail mosaic structure
CN205063847U (en) Joint hoop
CN205543279U (en) Insulating major structure of full insulation tubular busbar intermediate head of prefabricated formula high pressure
CN204357890U (en) A kind of anti-demounting bolt
CN203878765U (en) K type bamboo joint
CN204692845U (en) hydraulic oil pipe
CN209267146U (en) A kind of wedging docking facilities
CN207620932U (en) The anti-drop device of Bowl Plug
CN202812468U (en) Cable clamp
CN203051442U (en) Anticorrosive durable bolt
CN202769107U (en) Assembly pipe connector
CN202442048U (en) Universal tap water pipe joint
CN202360545U (en) Fixed double-end stud connecting piece
CN202812605U (en) Three-way pipe joint
CN203674408U (en) Anti-breaking expansion type plug pin
CN206707865U (en) A kind of natural gas engine and its cylinder head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Xiong Dongzi

Inventor before: Song Pingping

TR01 Transfer of patent right

Effective date of registration: 20161222

Address after: 330000 Jiangxi province Qingyunpu District of Nanchang City Yingbin Avenue No. 68

Patentee after: Xiong Dongzi

Address before: Zhenhai pier village of Xiangshan County in Zhejiang province 315700 Ningbo Xian Xiang 4 group

Patentee before: Song Pingping

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170112

Address after: 330000 Jiangxi province Qingyunpu District of Nanchang City Yingbin Avenue No. 68

Patentee after: Luqiao Jiangxi Tunnel Engineering Co., Ltd.

Address before: 330000 Jiangxi province Qingyunpu District of Nanchang City Yingbin Avenue No. 68

Patentee before: Xiong Dongzi

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20180307