CN204455791U - 一种多塔连跨斜拉桥 - Google Patents
一种多塔连跨斜拉桥 Download PDFInfo
- Publication number
- CN204455791U CN204455791U CN201520026398.6U CN201520026398U CN204455791U CN 204455791 U CN204455791 U CN 204455791U CN 201520026398 U CN201520026398 U CN 201520026398U CN 204455791 U CN204455791 U CN 204455791U
- Authority
- CN
- China
- Prior art keywords
- bridge
- tower
- girder
- company
- cable stayed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种多塔连跨斜拉桥,该多塔连跨斜拉桥包括N个依次连接的连跨,其中每个连跨包括一个主梁、个桥塔、多条连接桥塔和主梁的斜拉索,N和M均为自然数,且N≥2,M≥3。在每个连跨,主梁为连续结构,在相邻连跨之间设置能够释放主梁纵向相对线位移的刚性铰,以解决长主梁温度效应问题;与刚性铰相邻的桥塔为四塔腿花瓶型结构,以提高桥梁竖向刚度、减小桥塔基础规模;中间桥塔设置纵向和横向弹性约束装置、横向动力阻尼装置,其余桥塔设置纵向和横向动力阻尼装置、横向弹性约束装置,以改善桥梁的纵横向静动力受力性能。本实用新型能有效提高多塔斜拉桥的竖向刚度和静动力受力性能,减小基础规模,经济性好。
Description
技术领域
本实用新型涉及桥梁工程技术领域,具体涉及一种多塔连跨斜拉桥。
背景技术
多塔斜拉桥的跨越能力大,在跨越深山峡谷、江河海湾的桥梁方案中有很强的竞争力。在多塔斜拉桥中,多采用三塔斜拉桥方案,如意大利梅兹卡拉大桥、香港汀九大桥、岳阳洞庭湖大桥、夷陵长江大桥、滨洲黄河大桥、武汉二七长江大桥、韩国世丰大桥、苏格兰福斯大桥等。此外,世界上也修建了一些桥塔数量更多的多塔斜拉桥,如希腊里翁·安蒂里翁大桥为四塔斜拉桥、我国嘉绍大桥为六塔斜拉桥、法国米约大桥为七塔斜拉桥。目前,一些总长更长、跨径更大的多塔斜拉桥正在进行规划研究,如琼州海峡大桥等。
对于三塔斜拉桥,通常采用较高的中塔、边跨设置辅助墩、中塔与主梁固结、主跨跨中区段设置交叉索等方式来提高大桥的刚度,如意大利梅兹卡拉大桥、香港汀九大桥、岳阳洞庭湖大桥、夷陵长江大桥、滨洲黄河大桥、武汉二七长江大桥、韩国世丰大桥、苏格兰福斯大桥等。
对于一些桥塔数量更多的多塔斜拉桥,希腊里翁·安蒂里翁大桥的四个桥塔均采用了刚度较大的桥塔,并采用加筋土隔震基础来应对强震产生的基础错位和震动冲击。法国米约大桥的七个桥塔设置于山谷之中,桥面以下桥塔的墩柱采用双薄壁墩以适应纵向变形的需要;采用塔梁固结、桥塔处主梁设置双排支座,以提高主梁刚度,改善上塔柱的受力。我国嘉绍大桥总长2680m,为世界上最长的多塔斜拉桥,其在全桥跨中设置刚性铰,以减缓温度效应对长跨桥梁变形的影响,桥塔与主梁间设双排支座,二者之间采用半飘浮体系。
对于总长更大、跨度更大的多塔斜拉桥,其与常规多塔斜拉桥相比,桥梁结构的刚度更柔,在温度、大风、强震等静动力荷载作用下的静动力响应更大。为了有效提高超长、大跨多塔斜拉桥的结构刚度,有效控制大桥的静动力响应,减小桥塔的基础规模,必须尽快研发合理的结构体系,为超长、大跨多塔斜拉桥建设提供技术支撑。
实用新型内容
(一)要解决的技术问题
有鉴于此,本实用新型的主要目的是提供一种多塔连跨斜拉桥,以有效提高桥梁的结构刚度,控制桥梁结构的静动力响应,并减小桥塔基础的规模。
(二)技术方案
为达到上述目的,本实用新型提供了一种多塔连跨斜拉桥,该多塔连跨斜拉桥包括N个依次连接的连跨,其中每个连跨包括一个主梁、M个桥塔、多条连接桥塔和主梁的斜拉索,N和M均为自然数,且N≥2,M≥3;在每个连跨内,主梁为连续结构,在相邻连跨之间设置能够释放主梁纵向相对线位移的刚性铰,以解决长主梁温度效应问题;与刚性铰相邻的桥塔为四塔腿花瓶型结构,以提高桥梁竖向刚度、减小桥塔基础规模和增加景观效果;中间桥塔设置纵向和横向弹性约束装置、横向动力阻尼装置,其余桥塔设置纵向和横向动力阻尼装置、横向弹性约束装置,以改善桥梁的纵横向静动力受力性能。
上述方案中,所述每个连跨内的中间桥塔和四塔腿花瓶型桥塔,其下塔柱均采用钢-混凝土组合结构,以增强桥塔的承载能力。
(三)有益效果
从上述技术方案可以看出,本实用新型具有以下有益效果:
1、本实用新型提供的多塔连跨斜拉桥,主梁在每个连跨内为连续结构,在相邻连跨之间设置能够释放主梁纵向相对线位移的刚性铰,可以合理解决长主梁温度效应问题。
2、本实用新型提供的多塔连跨斜拉桥,每个连跨内与刚性铰相邻的桥塔为四塔腿花瓶型结构,以提高桥梁竖向刚度、减小桥塔基础规模和增加景观效果。同时,桥塔的下塔柱均采用钢-混凝土组合结构,能够大大提高桥塔下塔柱的承载能力,节约了工程成本。
3、本实用新型提供的多塔连跨斜拉桥,通过合理设置纵横向的弹性约束和动力阻尼装置,有效控制结构在静动力作用下的位移和内力响应,确保结构的安全性和舒适性。
附图说明
图1是依照本实用新型实施例的一种9塔3连跨斜拉桥的轴测图;
图2是依照本实用新型实施例的一种9塔3连跨斜拉桥的正视图;
图3是依照本实用新型实施例的四塔腿花瓶型桥塔与主梁纵横向约束的示意图;
图4是依照本实用新型实施例的中间桥塔与主梁纵横向约束的示意图。
附图标记:边塔1;中间桥塔2;四塔腿花瓶型桥塔3;斜拉索4;主梁5;刚性铰6;纵向弹性约束装置11;纵向动力阻尼装置12;横向弹性约束装置13;横向动力阻尼装置14。
具体实施方式
为使本实用新型的目的、技术方案和优点更加清楚明白,以下结合具体实施例,并参照附图,对本实用新型进一步详细说明。
本实用新型提供了一种多塔连跨斜拉桥,该多塔连跨斜拉桥包括N个依次连接的连跨,其中每个连跨包括一个主梁5、M个桥塔、多条连接桥塔和主梁的斜拉索4,N和M均为自然数,且N≥2,M≥3;在每个连跨内,主梁5为连续结构,在相邻连跨之间设置能够释放主梁5纵向相对线位移的刚性铰6,以解决长主梁5的温度效应问题;与刚性铰6相邻的桥塔为四塔腿花瓶型桥塔3,以提高桥梁竖向刚度、减小桥塔基础规模和增加景观效果;中间桥塔2设置有纵向弹性约束装置11、横向弹性约束装置13和横向动力阻尼装置14,其余位置的桥塔设置有纵向动力阻尼装置12、横向弹性约束装置13和横向动力阻尼装置14,以改善桥梁的纵横向静动力受力性能。
其中,每个连跨内的中间桥塔和四塔腿花瓶型桥塔,其下塔柱均采用钢-混凝土组合结构,以增强桥塔的承载能力。
如图1和图2所示,图1是依照本实用新型实施例的一种9塔3连跨斜拉桥的轴测图,图2是依照本实用新型实施例的一种9塔3连跨斜拉桥的正视图,在本实施例中,该多塔连跨斜拉桥包括三个依次连接的连跨,其中每个连跨包括一个主梁5、三个桥塔和多条斜拉索4,位于该9塔3连跨斜拉桥两端的桥塔又称为边塔1。
图1和图2所示的9塔3连跨斜拉桥,主梁5在每个连跨内为连续结构,在相邻连跨之间设置能够释放主梁5纵向相对线位移、约束主梁转角和剪切位移的刚性铰6,以合理解决长主梁5温度效应问题。每个连跨内,与刚性铰6相邻的桥塔为四塔腿花瓶型桥塔3,其余桥塔采用两塔腿花瓶型结构,以提高桥梁竖向刚度、减小桥塔基础规模和增加景观效果;每个连跨内的中间桥塔和四塔腿花瓶型桥塔,其下塔柱均采用钢-混凝土组合结构,以增强桥塔的承载能力。在每一连跨内,中间位置的桥塔(即中间桥塔2)设置有纵向弹性约束装置11、横向弹性约束装置13和横向动力阻尼装置14,如图4所示,其余位置的桥塔(即边塔1和四塔腿花瓶型桥塔3)设置有纵向动力阻尼装置12、横向弹性约束装置13和横向动力阻尼装置14,如图3所示,以改善桥梁的纵横向静动力受力性能。
以上所述的具体实施例,对本实用新型的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的具体实施例而已,并不用于限制本实用新型,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。
Claims (2)
1.一种多塔连跨斜拉桥,其特征在于,该多塔连跨斜拉桥包括N个依次连接的连跨,其中每个连跨包括一个主梁、M个桥塔、多条连接桥塔和主梁的斜拉索,N和M均为自然数,且N≥2,M≥3;
在每个连跨内,主梁为连续结构,在相邻连跨之间设置能够释放主梁纵向相对线位移的刚性铰,以解决长主梁温度效应问题;
与刚性铰相邻的桥塔为四塔腿花瓶型结构,以提高桥梁竖向刚度、减小桥塔基础规模和增加景观效果;
中间桥塔设置纵向和横向弹性约束装置、横向动力阻尼装置,其余桥塔设置纵向和横向动力阻尼装置、横向弹性约束装置,以改善桥梁的纵横向静动力受力性能。
2.根据权利要求1所述的多塔连跨斜拉桥,其特征在于,所述每个连跨内的中间桥塔和四塔腿花瓶型桥塔,其下塔柱均采用钢-混凝土组合结构,以增强桥塔的承载能力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520026398.6U CN204455791U (zh) | 2015-01-15 | 2015-01-15 | 一种多塔连跨斜拉桥 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520026398.6U CN204455791U (zh) | 2015-01-15 | 2015-01-15 | 一种多塔连跨斜拉桥 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204455791U true CN204455791U (zh) | 2015-07-08 |
Family
ID=53662700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520026398.6U Withdrawn - After Issue CN204455791U (zh) | 2015-01-15 | 2015-01-15 | 一种多塔连跨斜拉桥 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204455791U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594180A (zh) * | 2015-01-15 | 2015-05-06 | 中交公路长大桥建设国家工程研究中心有限公司 | 一种多塔连跨斜拉桥 |
CN106012796A (zh) * | 2016-07-20 | 2016-10-12 | 西安科技大学 | 一种斜拉索交叉型多塔斜拉桥 |
EP4099207A1 (en) * | 2021-02-02 | 2022-12-07 | China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd. | Method for determining longitudinal restraint stiffness between tower beams of three-tower cable-stayed bridge and for optimizing foundation |
-
2015
- 2015-01-15 CN CN201520026398.6U patent/CN204455791U/zh not_active Withdrawn - After Issue
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594180A (zh) * | 2015-01-15 | 2015-05-06 | 中交公路长大桥建设国家工程研究中心有限公司 | 一种多塔连跨斜拉桥 |
CN104594180B (zh) * | 2015-01-15 | 2016-04-13 | 中交公路长大桥建设国家工程研究中心有限公司 | 一种多塔连跨斜拉桥 |
CN106012796A (zh) * | 2016-07-20 | 2016-10-12 | 西安科技大学 | 一种斜拉索交叉型多塔斜拉桥 |
EP4099207A1 (en) * | 2021-02-02 | 2022-12-07 | China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd. | Method for determining longitudinal restraint stiffness between tower beams of three-tower cable-stayed bridge and for optimizing foundation |
EP4099207A4 (en) * | 2021-02-02 | 2024-05-15 | China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd. | METHOD FOR DETERMINING THE LONGITUDINAL RESTRAINT STIFFNESS BETWEEN TOWER BEAMS OF A THREE-TOWER CABLE-STAYED BRIDGE AND FOR FOUNDATION OPTIMIZATION |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104594180B (zh) | 一种多塔连跨斜拉桥 | |
CN208995896U (zh) | 空间桁架悬索桥 | |
CN204455791U (zh) | 一种多塔连跨斜拉桥 | |
CN103696356A (zh) | 一种设有双排支座体系的多塔斜拉桥 | |
CN104695341A (zh) | 一种用于加固大跨度连续梁桥的非自平衡张弦梁结构 | |
CN206545162U (zh) | 无背索斜塔斜拉异形拱桥 | |
CN202787047U (zh) | 一种上承式三角桁架钢桁结合梁 | |
CN101368370B (zh) | 大跨度斜拉桥悬臂施工用的抗风临时支墩及抗风方法 | |
CN204455790U (zh) | 改善横向动力受力性能的外边跨无斜拉索的斜拉桥 | |
CN106758752A (zh) | 斜塔斜拉异形拱桥及其施工方法 | |
CN103850173A (zh) | 一种用于控制悬索桥纵向和扭转静动力响应的系统 | |
CN103966942B (zh) | 一种用于控制三塔斜拉桥主梁和桥塔纵向响应的结构体系 | |
CN203625762U (zh) | 一种设有双排支座体系的多塔斜拉桥 | |
CN203603025U (zh) | 无碴轨道铁路曲线矮塔斜拉桥 | |
CN103422422B (zh) | 具有抑制纵向地震响应的多塔斜拉桥支承体系及工作方法 | |
CN109763417B (zh) | 一种斜拉钢桁架协作体系桥梁 | |
Ge et al. | Bluff body aerodynamics application in challenging bridge span length | |
CN108978436A (zh) | 空间桁架悬索桥 | |
CN201738231U (zh) | 柱板式空心高墩 | |
CN203923881U (zh) | 一种双塔三索面组合式索辅斜拉桥 | |
CN108374324B (zh) | 大桁拱桥 | |
CN207919315U (zh) | 四线高速铁路钢桁斜拉桥 | |
Sun et al. | Analysis strategy and parametric study of cable-stayed-suspension bridges | |
CN111608064B (zh) | 一种环排支座树桩花盆形托架的双幅四索面多塔斜拉桥 | |
CN210482044U (zh) | 一种自锚式悬索桥桥塔减震构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150708 Effective date of abandoning: 20160413 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |