CN204441744U - 一种集成式模块化变电站箱体 - Google Patents
一种集成式模块化变电站箱体 Download PDFInfo
- Publication number
- CN204441744U CN204441744U CN201520151183.7U CN201520151183U CN204441744U CN 204441744 U CN204441744 U CN 204441744U CN 201520151183 U CN201520151183 U CN 201520151183U CN 204441744 U CN204441744 U CN 204441744U
- Authority
- CN
- China
- Prior art keywords
- transformer station
- box
- integrated modular
- cable box
- modular transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Patch Boards (AREA)
Abstract
本实用新型公开一种集成式模块化变电站箱体,包括配电室箱体和电缆箱,所述电缆箱固定设置在配电室箱体下方,且位于地表的水泥基础层之上。本实用新型将电缆箱设置在地表的水泥基础层之上,避免了开挖深坑的施工步骤,极大地缩短了建设周期,降低建设成本,提高变电站运行的安全性和稳定性,同时减少和简化了售后服务难度。
Description
技术领域
本实用新型涉及高压(35kV,110kV)变电站基础建设技术领域,具体为一种集成式模块化变电站箱体。
背景技术
模块化变电站又叫预装式变电所或预装式模块化变电站,是一种集高压开关设备、低压配电装置和控制系统,按一定接线方案布置、工厂内预制的户外紧凑式高压输、配电设备。即将高压受电、低压配电、电力计量、智能控制等功能有机地组合在一起,安装在一个全封闭的配电室(以下简称“箱体”)内。在实际应用中,为了与外部电力变压器、各输出线路以及高压设备之间的相互连接,需要在箱体下方设置电缆布线的空间(俗称:电缆沟或电缆坑)。如图1,图2所示,传统的模块化变电站,会在箱体下方开挖一个深坑(通常深度达到1.8米以上)作为电缆布线和操作坑,电缆坑为钢筋混凝土砌成,因此整个施工工艺复杂,建设成本高,施工周期长,变电站运行的安全性和稳定性低。
实用新型内容
针对上述问题,本实用新型的目的在于提供一种施工简单,施工周期较短,建设成本低廉的模块化变电站箱体结构—集成式模块化变电站箱体,技术方案如下:
一种集成式模块化变电站箱体,包括配电室箱体和电缆箱,所述电缆箱固定设置在配电室箱体下方,且位于地表的水泥基础层之上。
本实用新型的有益效果是:本实用新型将电缆箱设置在地表的水泥基础层之上,避免了开挖深坑的施工步骤,极大地缩短了建设周期,降低建设成本,提高变电站运行的安全性和稳定性,同时减少和简化了售后服务难度。
附图说明
图1为传统的变电站箱体正视图。
图2为传统的变电站箱体侧视图。
图3为本实用新型集成式模块化变电站箱体正视图。
图4为本实用新型集成式模块化变电站箱体侧视图。
图中:1-配电室箱体;2-电缆箱;3-电缆沟;4-水泥基础层;5-传统的电缆布线坑;6-钢筋混凝土基础。
具体实施方式
下面结合附图和具体实施例对本实用新型做进一步说明:如图3,图4所示,一种集成式模块化变电站箱体,包括配电室箱体1和电缆箱2,所述电缆箱2固定设置在配电室箱体1下方,且位于地表的水泥基础层4之上,配电室箱体1底部与电缆箱2焊接在一起,或用螺栓连接在一起,构成一个整体。
电缆箱2和配电室箱体1以及电缆箱内各种电缆全部集成与水泥基础层4之上,整个箱体结构和内部的高压配电柜均为可移动、可拆卸的模块化单元式结构,该模块化的设置使变电站在修建、迁移和拆除时都很方便。修建施工时无需深挖基础修建钢筋混凝土基础坑,只需做较浅的开挖以铺设普通的水泥基础层4即可。故建设该结构的集成式模块化变电站箱体,可极大地缩短变电站施工周期;大幅度降低建站费用,节能降耗;由于电缆箱2位于水泥基础层4之上,因而不会产生坑内积水等普通变电站的天然危害,极大地提高变电站运行的安全性和稳定性。
Claims (1)
1.一种集成式模块化变电站箱体,其特征在于,包括配电室箱体(1)和电缆箱(2),所述电缆箱(2)固定设置在配电室箱体(1)下方,且位于地表的水泥基础层(4)之上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520151183.7U CN204441744U (zh) | 2015-03-17 | 2015-03-17 | 一种集成式模块化变电站箱体 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520151183.7U CN204441744U (zh) | 2015-03-17 | 2015-03-17 | 一种集成式模块化变电站箱体 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204441744U true CN204441744U (zh) | 2015-07-01 |
Family
ID=53609564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520151183.7U Expired - Fee Related CN204441744U (zh) | 2015-03-17 | 2015-03-17 | 一种集成式模块化变电站箱体 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204441744U (zh) |
-
2015
- 2015-03-17 CN CN201520151183.7U patent/CN204441744U/zh not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203734175U (zh) | 一种箱式变电站 | |
CN104737849A (zh) | 组合式可移动攀援植物高架桥柱绿化装置及方法 | |
CN201975713U (zh) | 新型箱式变电站 | |
CN204858370U (zh) | 110kV预制仓式集成变电站 | |
CN204441744U (zh) | 一种集成式模块化变电站箱体 | |
CN205583475U (zh) | 一种110kV预装式集成变电站 | |
CN202616640U (zh) | 箱式变电站 | |
CN201616609U (zh) | 一种风电专用塔筒变电站 | |
CN202384676U (zh) | 城市220kV全户内变电站的接地网 | |
CN203800454U (zh) | 立式箱式变电站 | |
CN203135287U (zh) | 智能型箱式变电站 | |
CN203788832U (zh) | 一种智能农田浇灌装置 | |
CN204103317U (zh) | 模块化变电站 | |
CN203180391U (zh) | 预装式变电站 | |
CN202772474U (zh) | 一种箱式变电站 | |
CN204597313U (zh) | 环形辐射状gis变电站结构 | |
CN204615229U (zh) | 方形辐射状gis变电站结构 | |
CN106558842A (zh) | 一种630kva变电箱及安装基础 | |
CN206076905U (zh) | 双回路500kV海缆终端站 | |
CN204947379U (zh) | 一种630kva变电箱及安装基础 | |
CN203800434U (zh) | 中压环网组合式变电站输配系统 | |
CN204167758U (zh) | 预制式全埋式箱式变电站 | |
CN203456828U (zh) | 架空导线式终端拉线装置 | |
CN204662563U (zh) | 一种箱泵一体化消防水箱 | |
CN204835327U (zh) | 110kV半敞开式集成变电站 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170926 Address after: 551700 Guizhou city of Bijie province Qianxi county circular economy Industrial Park (Gan Tang) Patentee after: GUIZHOU FIRST POWER MATCHING CO., LTD. Address before: 551500, Guizhou province Bijie District Qianxi Huadu Avenue Industrial Park 14-16 factory building (dismount ridge) Patentee before: Chen Qinya |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 Termination date: 20190317 |
|
CF01 | Termination of patent right due to non-payment of annual fee |