CN204440807U - Simulated operation platform is driven on top - Google Patents

Simulated operation platform is driven on top Download PDF

Info

Publication number
CN204440807U
CN204440807U CN201520011543.3U CN201520011543U CN204440807U CN 204440807 U CN204440807 U CN 204440807U CN 201520011543 U CN201520011543 U CN 201520011543U CN 204440807 U CN204440807 U CN 204440807U
Authority
CN
China
Prior art keywords
switch
brake lever
operation platform
driven
simulated operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520011543.3U
Other languages
Chinese (zh)
Inventor
方伟
王世元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu petroleum equipment simulation technology Limited by Share Ltd
Original Assignee
Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd, Southwest Petroleum University filed Critical Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co Ltd
Priority to CN201520011543.3U priority Critical patent/CN204440807U/en
Application granted granted Critical
Publication of CN204440807U publication Critical patent/CN204440807U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of top and drive simulated operation platform, it comprises casing (1), Shou Dian district (3) and controls table section (2), the side of casing (1) is provided with brake lever mount pad (4), brake lever (5) is arranged on brake lever mount pad (4), controls table section (2) is uniform-distribution with each instrument, pilot lamp.The beneficial effects of the utility model are: top is driven simulated operation platform and can be shown parameters in real time, and be supplied to the platform of student's hands-on, operator's console is reasonable in design, power supply wiring, the inspection of line are conveniently, ventilating fan good in thermal property, brake lever design is on the right side of operator's console, easy to operate.

Description

Simulated operation platform is driven on top
Technical field
It is by drilling technique field that the utility model relates to, and particularly simulated operation platform is driven on a kind of top.
Background technology
For many years, petroleum drilling is rely on the driven by rotary disc square kelly of rig and drilling tool, bit to carry out drilling operation always.In recent years, along with the development of drilling equipment technology, in order to meet the needs boring special well better, the eighties in 20th century, develop one abroad water swivel is combined with motor, drive drilling tool, bit on the top in derrick space, and the piercing drill can sent to downwards along the guide rail laid in derrick, be equipped with simultaneously drilling rod upper, unload screw thread device, can the rotation of completed well lower drill, circulating fluid, drilling rod unload, make a trip, limit plays the operations such as rotation below.Because this device is under the travelling sheave of rig, the position of driving is higher than former disk position, so be referred to as top-drive drilling.Top-drive drilling can connect column (three drilling rods form a root post) and creep into, connect, unload the routine operation of square kelly when eliminating rotary drilling, save rig time 20% ~ 25%, simultaneously, alleviate labor strength, decrease the personal injury of operator.When using top-drive device drilling well, drilling fluid capable of circulation, rotation drilling tool while drilling, the process of down hole problem and accident in favourable drilling well, highly beneficial to the wellbore construction of deep-well, special well.
Pushing up the advantage of driving impels it to come in the popularization of petroleum drilling industry fast, pushes up the knowledge that the operation of driving also becomes the necessary comprehensive system study of petroleum drilling industry practitioner.But, oil field is newly entered to the student of employee or oil relevant speciality, they do not have the understanding of perception to the process of the process of drilling well, the step of borehole operation and burst accident, once there is misoperation or careless, may major accident be caused, bring a large amount of loss.Therefore the pre-job training of drilling well practitioner and professional skill study very important, but the teaching of the Classroom theory of routine or laboratory operation image, true to nature not, can not carry out training on operation intuitively, make result of training poor, fall flat.
Top shows parameters when running is driven on top with driving the emulation of simulated operation platform height, can produce the experience effect similar to on-the-spot teaching, can improve student in conventional teaching and start few drawback, help student to understand the operations of pushing up and driving in teaching.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, simulated operation platform is driven on the top providing a kind of height artificial site top to drive running parameter, this operator's console can show each parameter of pushing up when driving work in real time, and reasonable in design, brake lever design operation is very convenient.
The purpose of this utility model is achieved through the following technical solutions: simulated operation platform is driven on top, and it comprises casing, Shou Dian district and controls table section, and the side of casing is provided with brake lever mount pad, and brake lever is arranged on brake lever mount pad;
The element controlled on table section arranges by upper, middle and lower, and top is from left to right arranged with: inner blowout preventer pilot lamp, hydraulic pump run indicator, swiveling head locking pilot lamp, suspension ring revolution switch, suspension ring mid level switch, brake indicating lamp, ready light, fault/alarm lamp; Middle part is from left to right arranged with: inner blowout preventer switch, hydraulic pump run switch, the tight lock-switch of swiveling head, back-up tong switch, suspension ring tilt switch, brake switch, reset/silence switch, torque meter and tachometer gage; Bottom is from left to right arranged with: emergency stop switch, auxiliary switch, fan switch, selection of Motor switch, operating selection switch, sense of rotation switch, torque wrench moment limit knob, drilling torque limits knob and Top Drive RPM setting knob.
Described box back surface is provided with access cover and power interface, and side is provided with radiator window.
The beneficial effects of the utility model are: top is driven simulated operation platform and can be shown parameters in real time, and be supplied to the platform of student's hands-on, operator's console is reasonable in design, power supply wiring, the inspection of line are conveniently, ventilating fan good in thermal property, brake lever design is on the right side of operator's console, easy to operate.
Accompanying drawing explanation
Fig. 1 is that operator's console structural drawing is driven on top;
Fig. 2 is for controlling table section component placement figure;
Fig. 3 is that operator's console schematic rear view is driven on top;
Fig. 4 is that operator's console side schematic view is driven on top;
In figure, 1-casing, 2-controls table section, 3-Shou Dian district, 4-brake lever mount pad, 5-brake lever, 6-inner blowout preventer pilot lamp, 7-hydraulic pump run indicator, 8-swiveling head locking pilot lamp, 9-suspension ring revolution switch, 10-suspension ring mid level switch, 11-brake indicating lamp, 12-ready light, 13-reset/silence switch, 14-fault/alarm lamp, 15-torque meter, 16-tachometer gage, 17-Top Drive RPM setting knob, 18-drilling torque limits knob, 19-torque wrench moment limits knob, 20-sense of rotation switch, 21-brake switch, 22-operating selection switch, 23-selection of Motor switch, 24-fan switch, 25-auxiliary switch, 26-emergency stop switch, the tight lock-switch of 27-swiveling head, 28-inner blowout preventer switch, 29-hydraulic pump run switch, 30-back-up tong switch, 31-suspension ring tilt switch, 32-access cover, 33-power interface, 34-radiator window.
Embodiment
Below in conjunction with accompanying drawing, the technical solution of the utility model is described in further detail, but protection domain of the present utility model is not limited to the following stated.
As shown in Figure 1 and Figure 2, simulated operation platform is driven on top, and it comprises casing 1, Shou Dian district 3 and controls table section 2, and the side of casing 1 is provided with brake lever mount pad 4, and brake lever 5 is arranged on brake lever mount pad 4;
The element controlled on table section 2 arranges by upper, middle and lower, and top is from left to right arranged with: inner blowout preventer pilot lamp 6, hydraulic pump run indicator 7, swiveling head locking pilot lamp 8, suspension ring revolution switch 9, suspension ring mid level switch 10, brake indicating lamp 11, ready light 12, fault/alarm lamp 14; Middle part is from left to right arranged with: the tight lock-switch 27 of inner blowout preventer switch 28, hydraulic pump run switch 29, swiveling head, back-up tong switch 30, suspension ring tilt switch 31, brake switch 21, reset/silence switch 13, torque meter 15 and tachometer gage 16; Bottom is from left to right arranged with: emergency stop switch 26, auxiliary switch 25, fan switch 24, selection of Motor switch 23, operating selection switch 22, sense of rotation switch 20, torque wrench moment limit knob 19, drilling torque limits knob 18 and Top Drive RPM setting knob 17.
As shown in Figure 3 and Figure 4, casing 1 back side is provided with access cover 32 and power interface 33, and side is provided with radiator window 34.

Claims (3)

1. simulated operation platform is driven on top, and it comprises casing (1), Shou Dian district (3) and controls table section (2), and it is characterized in that: the side of casing (1) is provided with brake lever mount pad (4), brake lever (5) is arranged on brake lever mount pad (4);
The element controlled on table section (2) arranges by upper, middle and lower, and top is from left to right arranged with: inner blowout preventer pilot lamp (6), hydraulic pump run indicator (7), swiveling head locking pilot lamp (8), suspension ring revolution switch (9), suspension ring mid level switch (10), brake indicating lamp (11), ready light (12), fault/alarm lamp (14); Middle part is from left to right arranged with: inner blowout preventer switch (28), hydraulic pump run switch (29), the tight lock-switch of swiveling head (27), back-up tong switch (30), suspension ring tilt switch (31), brake switch (21), reset/silence switch (13), torque meter (15) and tachometer gage (16); Bottom is from left to right arranged with: emergency stop switch (26), auxiliary switch (25), fan switch (24), selection of Motor switch (23), operating selection switch (22), sense of rotation switch (20), torque wrench moment limit knob (19), drilling torque limits knob (18) and Top Drive RPM setting knob (17).
2. simulated operation platform is driven on top according to claim 1, it is characterized in that: described casing (1) back side is provided with access cover (32) and power interface (33).
3. simulated operation platform is driven on top according to claim 1, it is characterized in that: described casing (1) side is provided with radiator window (34).
CN201520011543.3U 2015-01-08 2015-01-08 Simulated operation platform is driven on top Expired - Fee Related CN204440807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520011543.3U CN204440807U (en) 2015-01-08 2015-01-08 Simulated operation platform is driven on top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520011543.3U CN204440807U (en) 2015-01-08 2015-01-08 Simulated operation platform is driven on top

Publications (1)

Publication Number Publication Date
CN204440807U true CN204440807U (en) 2015-07-01

Family

ID=53608642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520011543.3U Expired - Fee Related CN204440807U (en) 2015-01-08 2015-01-08 Simulated operation platform is driven on top

Country Status (1)

Country Link
CN (1) CN204440807U (en)

Similar Documents

Publication Publication Date Title
CN201460863U (en) Managed pressure drilling system
CN103692560A (en) Rock sample cutting device capable of producing different joint angle and different joint connectivity rates
CN205638225U (en) Drilling equipment for building
CN104420861B (en) A method of control oil and gas well drilling reduces drill string viscosity resistance
CN205047152U (en) Full hydraulic rotary engineering driller
BR112019011865B1 (en) METHODS AND SYSTEMS FOR DRILLING WELL HOLES IN EARTH FORMATIONS
CN201763241U (en) Bushing & drilling-in dual purpose drilling machine
CN204440807U (en) Simulated operation platform is driven on top
CN104616552A (en) Top drive simulating system
CN105023501A (en) Petroleum drilling experiment teaching platform
CN104680917B (en) Drive simulation system and method in top
CN104400914B (en) A kind of device realizing lateral drilling blind hole in Small-deep Hole
CN105023502A (en) Workover work experimental teaching platform
CN104616582A (en) System and method for simulating installation and operation of land rig
CN213597887U (en) Drilling rig for geotechnical engineering investigation
CN212249836U (en) Drilling machine for hydraulic engineering construction
CN209132016U (en) A kind of road engineering detection Subgrade Compaction detection device
CN201090162Y (en) Well sleeve ground windowing facility
CN203679330U (en) Engineering water drill
CN204098777U (en) Coal bed gas well minitype motivation water tap
CN204200136U (en) Efficient well dressing tool
CN204155538U (en) A kind of oil-well rig drilling condition analogue means
CN206997828U (en) A kind of shipbuilding steel tube drilling device
CN206816177U (en) reaming tool
CN103775011B (en) wellbore pressure control system and control method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fang Wei

Inventor after: Wang Shiyuan

Inventor before: Fang Wei

Inventor before: Wang Shiyuan

COR Change of bibliographic data
CP01 Change in the name or title of a patent holder

Address after: No. 8 Road, Xindu Xindu District of Chengdu city of Sichuan Province in 610500

Patentee after: Southwest Petroleum University

Patentee after: Chengdu petroleum equipment simulation technology Limited by Share Ltd

Address before: No. 8 Road, Xindu Xindu District of Chengdu city of Sichuan Province in 610500

Patentee before: Southwest Petroleum University

Patentee before: Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co., Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20190108

CF01 Termination of patent right due to non-payment of annual fee