CN204435913U - The separation buffer base of lifting works - Google Patents

The separation buffer base of lifting works Download PDF

Info

Publication number
CN204435913U
CN204435913U CN201420857023.XU CN201420857023U CN204435913U CN 204435913 U CN204435913 U CN 204435913U CN 201420857023 U CN201420857023 U CN 201420857023U CN 204435913 U CN204435913 U CN 204435913U
Authority
CN
China
Prior art keywords
works
bullet
base
coaming plate
separation buffer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420857023.XU
Other languages
Chinese (zh)
Inventor
刘超
宋峥嵘
李挺
杨风艳
陈品
尹宝瑞
鹿胜楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201420857023.XU priority Critical patent/CN204435913U/en
Application granted granted Critical
Publication of CN204435913U publication Critical patent/CN204435913U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of separation buffer base lifted with works, be provided with: a base plate, the coaming plate be connected on base plate, be connected to several risers above coaming plate equably, be placed on the bullet of riser upper end, the inside through bullet, and the works being placed on substrate supports; Wherein, in bullet and coaming plate, be placed with the fine sand with mobility.The utility model utilizes the mobility of fine sand to insert in time and lifts in the gap of rocking, can not only avoid in works lifting process with base generation rigid collision; And, can also avoid works in building course, due to deadweight, the increase problem of scale error in the works construction caused; Meanwhile, can also recycle, save expense, accelerate efficiency of construction.

Description

The separation buffer base of lifting works
Technical field
The utility model relates to the servicing unit of lifting, particularly relates to a kind of separation buffer base lifted with works.Belong to offshore engineering field.
Background technology
In the lifting operation process of ocean engineering structure, due to the impact by wind load and works bias, hung works to be supported on and to lift by crane in the process that is separated with base, being hung works can shake, its upright supports can with base for supporting generation rigid collision.In collision process, gently then can destroy the corrosion-inhibiting coating on works surface, heavy then upright supports can be made to deform destruction.
The rigid collision with base for supporting is supported in order to reduce suspended object in lifting operation process, generally by manpower by drawing the hawser pulling and fasten on suspended object or the mode increasing chock in the bottom that suspended object supports, to reduce the rigid collision between suspended object support with base for supporting.But, because manpower draws the mode pulling hawser to there is uncertainty, after generally wanting works lifting once, just can know the direction that hawser is dilatory, and now the surface-supported coating of works has been destroyed; And adopt the bottom supported at suspended object to increase the mode of chock, then need the bottom in advance chock being put into works support, because chock is softer, pressurized can be compressed, along with the construction of works, and the increase of scale error during this process can cause works to build.
Utility model content
Main purpose of the present utility model is the above-mentioned shortcoming overcoming prior art existence, and a kind of separation buffer base lifted with works is provided, it is by inserting the fine sand as buffer medium in the base, the mobility of fine sand is utilized to insert in the gap lifting and rock in time, can not only avoid in works lifting process with base generation rigid collision, destroy the corrosion-inhibiting coating of works; And, can also avoid works in building course, due to deadweight, the increase problem of scale error in the works construction caused.
The purpose of this utility model is realized by following technical scheme:
A kind of separation buffer base lifted with works, it is characterized in that: be provided with: a base plate, the coaming plate be connected on base plate, be connected to several risers above coaming plate equably, be placed on the bullet of riser upper end, the inside through bullet, and the works being placed on substrate supports; Wherein, in bullet and coaming plate, be placed with the fine sand with mobility.
Described base plate, coaming plate are circular, and riser is trapezoidal.
The horn mouth of described bullet is large head-up.
Described riser has the tapering matched with bullet.
The beneficial effects of the utility model: the utility model is owing to adopting technique scheme, it is by inserting the fine sand as buffer medium in the base, the mobility of fine sand is utilized to insert in the gap lifting and rock in time, can not only avoid in works lifting process with base generation rigid collision, destroy the corrosion-inhibiting coating of works; And, can also avoid works in building course, due to deadweight, the increase problem of scale error in the works construction caused; Meanwhile, can also recycle, save expense, accelerate efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the utility model STRUCTURE DECOMPOSITION schematic diagram.
Fig. 2 is the utility model overall structure schematic diagram.
Fig. 3 is the utility model elevational schematic view.
Elevational schematic view when Fig. 4 is the utility model use.
Major label description in figure:
1. bullet, 2. riser, 3. base plate, 4. coaming plate, 5. fine sand, 6. works support.
Detailed description of the invention
As shown in Fig. 1-Fig. 4, the utility model is provided with: a base plate 3, adopt welding manner to be connected to coaming plate 4 on base plate 3, adopt welding manner to be connected to several risers 2 above coaming plate 4 equably, to be placed on the bullet 1 of riser 2 upper end, the inside through bullet 1, and the works be placed on above base plate 3 supports 6; Wherein, in bullet 1 with coaming plate 4, the fine sand 5 with mobility is placed with.
When works is built, works is supported 6 and is placed in circular bottom plate 3 through bullet 1, and put into fine sand 5 at bullet 1 and coaming plate 4; During works lifting, works support 6 can produce rocks, gap can be produced between works support 6, bullet 1 and base plate 3, owing to having put into the fine sand 5 with mobility in bullet 1 with coaming plate 4, make fine sand 5 can insert works in time and support 6 with the gap of circular bottom plate 3, cushioning effect can be played preferably, avoid the rigid collision that works supports 6 and circular bottom plate 3.
Above-mentioned base plate 3, coaming plate 4 are circular, and riser 2 is trapezoidal.
The horn mouth of above-mentioned bullet 1 is large head-up.
Above-mentioned riser 2 has the tapering matched with bullet 1.
It is steel work that above-mentioned bullet 1, riser 2, base plate 3, coaming plate 4, works support 6.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, every above embodiment is done according to technical spirit of the present utility model any simple modification, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (4)

1. one kind lifts the separation buffer base with works, it is characterized in that: be provided with: a base plate, the coaming plate be connected on base plate, be connected to several risers above coaming plate equably, be placed on the bullet of riser upper end, the inside through bullet, and the works being placed on substrate supports; Wherein, in bullet and coaming plate, be placed with the fine sand with mobility.
2. the separation buffer base of lifting works according to claim 1, is characterized in that: described base plate, coaming plate are for circular, and riser is trapezoidal.
3. the separation buffer base of lifting works according to claim 1, is characterized in that: the horn mouth of described bullet is large head-up.
4. the separation buffer base of lifting works according to claim 1, is characterized in that: described riser has the tapering matched with bullet.
CN201420857023.XU 2014-12-30 2014-12-30 The separation buffer base of lifting works Expired - Fee Related CN204435913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420857023.XU CN204435913U (en) 2014-12-30 2014-12-30 The separation buffer base of lifting works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420857023.XU CN204435913U (en) 2014-12-30 2014-12-30 The separation buffer base of lifting works

Publications (1)

Publication Number Publication Date
CN204435913U true CN204435913U (en) 2015-07-01

Family

ID=53603798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420857023.XU Expired - Fee Related CN204435913U (en) 2014-12-30 2014-12-30 The separation buffer base of lifting works

Country Status (1)

Country Link
CN (1) CN204435913U (en)

Similar Documents

Publication Publication Date Title
CN204875484U (en) Oscillating is suitable for landing stage of oceanic tide
CN104016243B (en) Boiler cable shaft hanging apparatus
CN204435913U (en) The separation buffer base of lifting works
CN204023540U (en) A kind of drilling platform
CN203005696U (en) Gravity anchor
CN103803394B (en) Hoisting method for erecting large box-type steel structure derrick by sleeving concrete well tower outside
CN204239987U (en) A kind of alignment tool of main equipment
CN202322211U (en) Water lifting platform
CN202152456U (en) Float-load coupling device of ocean platform upper portion assembling block
CN105507901A (en) Splitting machine for large rock or ore of mines
CN204198242U (en) A kind of mill hanging apparatus
CN205276309U (en) Anti ice tension leg wind turbine foundation of floating
CN204475350U (en) Bored pile construction system under high-voltage line
CN204038832U (en) A kind of steady tank arrangement for shaft cage guide
CN202295244U (en) Floating-raft-type buffer recovery platform
CN201573763U (en) Support tool for embarkation and connection of dock
CN202611730U (en) Detachable lock plate
CN204278712U (en) The protective device of intaglio printing plate roller
CN205802034U (en) Switch board transport shock absorbing apparatus
CN204875663U (en) Be adapted to landing stage of oceanic tide
CN205369252U (en) A novel electricelectric power driver for high -speed railway construction
CN204266127U (en) Large sections hoisting mechanism
CN203979880U (en) A kind of gas holder of standard modular
CN203836501U (en) Underground fastener device
CN102963500A (en) Dragging-prevention device for fishing boat

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20211230

CF01 Termination of patent right due to non-payment of annual fee