CN204417993U - For the steel bow bridge construction of war Fast Installation - Google Patents
For the steel bow bridge construction of war Fast Installation Download PDFInfo
- Publication number
- CN204417993U CN204417993U CN201520002882.5U CN201520002882U CN204417993U CN 204417993 U CN204417993 U CN 204417993U CN 201520002882 U CN201520002882 U CN 201520002882U CN 204417993 U CN204417993 U CN 204417993U
- Authority
- CN
- China
- Prior art keywords
- bridge
- bow
- steel
- pier
- steel bow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 46
- 239000010959 steel Substances 0.000 title claims abstract description 46
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000009417 prefabrication Methods 0.000 claims abstract description 3
- 238000000034 method Methods 0.000 claims description 3
- 239000000178 monomer Substances 0.000 claims description 2
- 238000003466 welding Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001066 destructive effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
Abstract
The utility model belongs to bridge engineering field, particularly for the steel bow bridge construction of war Fast Installation, is mainly used in steel bow bridge.This technology adopts the form of bow to realize crossing over linking-up road by steel bow bridge bridge, Prefabrication bridge plate element body and bridge pier in workshop, and bridge plate element body is installed in combination in workshop, after having combined, steel is bent the bridge body of a bridge and bridge pier and be transported to the place needing to build bridge, connect bridge pier and bridge, complete the construction of steel bow bridge.The utility model both ensure that the supporting capacity of steel bow bridge, met the needs of driving, can install fast again, save time, for army provides advantage in the middle of war.
Description
Technical field
The utility model belongs to bridge engineering field, is particularly applied in the steel bow bridge construction for war Fast Installation.
Background technology
The mankind are unwilling to see the generation of war, and war both caused large destruction to environment, also caused serious destructive destruction to the mankind.When country is subject to other countries' invasion, in order to the interests of the motherland people, the generation as far as possible averted a war, haves no alternative but when cannot avoid to launch a war.When there is war, the time is valuable, especially when road conditions be not suitable for army's vehicle by time, creating conditions in the shortest time, it is most important to make that the road is clear.In order to the problem that solving road is unobstructed, the utility model provides the steel bow bridge construction for war Fast Installation, can meet the needs of vehicle to run, can install fast again, for army races against time, provide advantage.
Utility model content
The utility model object is to provide the steel bow bridge construction for war Fast Installation, is mainly used for steel bow bridge, at clutch Fast Installation steel bow bridge, can meet the unobstructed of road in warfare by the utility model.
The technical solution adopted in the utility model is: steel bow bridge bridge adopts the form of bow to realize crossing over linking-up road, Prefabrication bridge plate element body and bridge pier in workshop, and bridge plate element body is installed in combination in workshop, after having combined, steel is bent the bridge body of a bridge and bridge pier and be transported to the place needing to build bridge, connect bridge pier and bridge, complete the construction of steel bow bridge.
The form of described bow, namely steel bow bridge adopts bow inverted pattern, and the steel bow bridge body of a bridge is equivalent to the bow arm bent, and bridge pier is played a supporting role.
Described bridge plate element body, namely forms the minimum combination monomer of the body of a bridge.
Bridge plate element body is installed in described combination, namely adopts welding method to be coupled together by bridge plate element body and forms the steel bow bridge body of a bridge.
The utility model is applicable to steel bow bridge, the form of bow is adopted to realize crossing over linking-up road by steel bow bridge bridge, the body of a bridge is equivalent to the bow arm bent, bridge pier supports the body of a bridge and shares the effect to the power that the body of a bridge produces in vehicle travel process, both ensure that the supporting capacity of steel bow bridge, and met the needs of driving, can install fast again, save time, for army provides advantage in the middle of war.
Accompanying drawing explanation
Fig. 1 is bridge plate element body structural representation.
Fig. 2 is bridge plate element body combination schematic diagram.
Fig. 3 is bridge pier cross-sectional view.
Fig. 4 is steel bow bridge construction schematic diagram.
Reference numeral: 1, seamless steel pipe; 2, H profile steel; 3, H profile steel diagonal brace; 4, bridge pier crossbeam; 5, pier column; 6, bridge pier bottom girder; 7, the steel bow bridge body of a bridge; 8, bridge pier.
Detailed description of the invention
Below with reference to accompanying drawing, the utility model is described in detail.But embodiment of the present utility model is not limited in this.
First the bridge plate element body of span determination appropriate size size needed for bridge, according to Fig. 1, seamless steel pipe 1 and H profile steel 2 are welded into frame construction, and by H profile steel diagonal brace 3 scarfweld in frame construction, bend the design parameters of bridge bridge according to combining bridge plate element body shown in Fig. 2 according to steel; Bridge pier crossbeam 4, pier column 5 and bridge pier bottom girder 6 weld together by bridge pier 8 according to Fig. 3, and according to Fig. 4, complete the prefabricated of bridge pier 8.After the steel bow bridge body of a bridge 7 completes with bridge pier 8 is prefabricated, be transported to needs build a bridge and locate, steel bent the bridge body of a bridge 7 and be welded to connect with bridge pier 8, complete the Fast Installation that steel bends bridge.
The utility model is not limited to above-mentioned embodiment, and anyone can obtain steel bow bridge quick attach structure under enlightenment of the present utility model.All equalizations done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.
Claims (4)
1. for the steel bow bridge construction of war Fast Installation, comprise the steel bow bridge body of a bridge and bridge pier, it is characterized in that: steel bow bridge bridge adopts the form of bow to realize crossing over linking-up road, Prefabrication bridge plate element body and bridge pier in workshop, and bridge plate element body is installed in combination in workshop, after having combined, steel is bent the bridge body of a bridge and bridge pier and be transported to the place needing to build bridge, connect bridge pier and bridge, complete the construction of steel bow bridge.
2. the bow of the steel for war Fast Installation bridge construction according to claim 1, is characterized in that: the form of described bow and steel bow bridge adopt bow inverted pattern, and the steel bow bridge body of a bridge is equivalent to the bow arm bent, and bridge pier is played a supporting role.
3. the bow of the steel for war Fast Installation bridge construction according to claim 1, is characterized in that: namely described bridge plate element body forms the minimum combination monomer of the body of a bridge.
4. the steel for war Fast Installation according to claim 1 bow bridge construction, is characterized in that: described combination is installed bridge plate element body and namely adopted welding method bridge plate element body to be coupled together the composition steel bow bridge body of a bridge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520002882.5U CN204417993U (en) | 2015-01-05 | 2015-01-05 | For the steel bow bridge construction of war Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520002882.5U CN204417993U (en) | 2015-01-05 | 2015-01-05 | For the steel bow bridge construction of war Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204417993U true CN204417993U (en) | 2015-06-24 |
Family
ID=53468377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520002882.5U Expired - Fee Related CN204417993U (en) | 2015-01-05 | 2015-01-05 | For the steel bow bridge construction of war Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204417993U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220610A (en) * | 2015-10-26 | 2016-01-06 | 中国海洋石油总公司 | A kind of for the new trestle between offshore oil platform |
CN107524080A (en) * | 2016-06-21 | 2017-12-29 | 任丘市永基建筑安装工程有限公司 | Steel bends bridge construction tile designs |
-
2015
- 2015-01-05 CN CN201520002882.5U patent/CN204417993U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220610A (en) * | 2015-10-26 | 2016-01-06 | 中国海洋石油总公司 | A kind of for the new trestle between offshore oil platform |
CN105220610B (en) * | 2015-10-26 | 2017-03-22 | 中国海洋石油总公司 | Novel trestle used between offshore oil platforms |
CN107524080A (en) * | 2016-06-21 | 2017-12-29 | 任丘市永基建筑安装工程有限公司 | Steel bends bridge construction tile designs |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105019918B (en) | A kind of underwater shield tunneling structure anti-shock methods and device | |
CN201722776U (en) | Beam column nodal point suitable for square steel pipe column | |
CN204608592U (en) | A kind of bridge energy-dissipating and shock-absorbing anti-fall girder apparatus | |
CN204417993U (en) | For the steel bow bridge construction of war Fast Installation | |
CN104060522B (en) | A kind of Integral Abutment seamless bridge applying double-layer pipe concrete flexible pile | |
CN204920980U (en) | Shield tunnel structure antidetonation device under water | |
CN203701292U (en) | Steel tube and concrete reinforced tubular joint with local hollow interlayers | |
CN203603050U (en) | Telescopic device for inverted-T-shaped bent cap | |
CN203284725U (en) | Steel corrugated plate circular arc arch bridge arch foot fixing structure | |
CN205024585U (en) | Steel case liang dunliang solidifies structure | |
CN204238341U (en) | A kind of resistance to compression rain perforaled strainer | |
CN204417984U (en) | The especially big Oil pipeline of a kind of steel bow bridge | |
CN204417985U (en) | The bridging of a kind of steel bow continues Oil pipeline | |
CN102277828A (en) | Steel and concrete combined box-shaped structured pier | |
CN204530516U (en) | Large-scale assembling type steel corrugated culvert | |
CN105568840A (en) | Application of steel bow bridge in municipal road | |
CN201835390U (en) | Beam-column rigid connection joint for tubular concrete column | |
CN204803751U (en) | Bridge expansion joint structure | |
CN204140090U (en) | A kind of Novel circular steel pipe concrete bracket link | |
CN103321157B (en) | A kind of construction method of weathering steel steel box-girder | |
CN103255707A (en) | Fixing structure of arc feet of steel corrugated plate arc arch bridge | |
CN202913364U (en) | Steel truss girder flexible arch bridge main pier steel truss girder rod piece pieced temporary support | |
CN202705903U (en) | Linear segment support | |
CN207727421U (en) | Repair structure in bridge floor expansion joint | |
CN203330611U (en) | Adjustable pipeline assembly welding bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150624 |