CN204417071U - A kind of steel rope track transporting precast concrete board mold - Google Patents

A kind of steel rope track transporting precast concrete board mold Download PDF

Info

Publication number
CN204417071U
CN204417071U CN201520069515.7U CN201520069515U CN204417071U CN 204417071 U CN204417071 U CN 204417071U CN 201520069515 U CN201520069515 U CN 201520069515U CN 204417071 U CN204417071 U CN 204417071U
Authority
CN
China
Prior art keywords
steel rope
concrete board
precast concrete
board mold
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520069515.7U
Other languages
Chinese (zh)
Inventor
朱连吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renqiu Yongji Construction and Installation Engineering Co Ltd
Original Assignee
Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Yongji Construction and Installation Engineering Co Ltd filed Critical Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority to CN201520069515.7U priority Critical patent/CN204417071U/en
Application granted granted Critical
Publication of CN204417071U publication Critical patent/CN204417071U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model relates to a kind of steel rope track transporting precast concrete board mold, belongs to building appliance field.A kind of steel rope track transporting precast concrete board mold that this utility model relates to, comprises bearing platform, precast concrete board mold, suspension ring, hook, steel pipe, steel rope, assembly pulley, driving engine; Bearing platform edge arranges a steel pipe, is steel rope in steel pipe, and steel rope is hooked in the suspension ring place of prefabricated concrete board with the one end linked up with, and the other end connects on the engine via assembly pulley.When replacing prefabricated concrete slab, engine operation, is transported to the precast concrete board mold that steel rope connects on bearing platform.The utility model structure is simple, easy to operate, reduces the energy consumption of transport precast concrete board mold.

Description

A kind of steel rope track transporting precast concrete board mold
Technical field
The utility model relates to building appliance field, particularly a kind of steel rope track transporting precast concrete board mold.
Background technology
Often steel rope is used when bearing platform transporting the precast concrete board mold taken over, steel rope hooks with one end of hook the precast concrete board mold taken over, the other end connects on the engine, uses driving engine to be transported on bearing platform by the precast concrete board mold taken over.But in the process, steel rope with hook easily come off, and steel rope often to rub bearing platform when transporting, and can cause the wearing and tearing in various degree of bearing platform, steel rope, reduces the service life etc. of bearing platform, steel rope.
Utility model content
For the deficiencies in the prior art, the utility model provides a kind of steel rope track transporting precast concrete board mold.
To achieve these goals, the utility model is realized by following technological means: a kind of steel rope track transporting precast concrete board mold, comprises bearing platform, precast concrete board mold, suspension ring, hook, steel pipe, steel rope, assembly pulley, driving engine.Bearing platform edge arranges a steel pipe, is steel rope in steel pipe, and steel rope is hooked in the suspension ring place of prefabricated concrete board with the one end linked up with, and the other end connects on the engine via assembly pulley.When replacing prefabricated concrete slab, engine operation, is transported to the precast concrete board mold that steel rope connects on bearing platform.
Described assembly pulley is the combination of a movable pulley and a fixed pulley.
Described hook be steel rope one-body molded time, use inner core be made.
It is made when suspension ring on described precast concrete board mold are prefabricated.
Advantage of the present utility model: movable pulley adds assembly pulley, makes the power saving half during engine operation, saves the energy; Steel Pipe Design, on bearing platform, makes steel rope directly not contact bearing platform, reduces the loss rubbing and cause; Made when hook and suspension ring are pre-formed, the problems such as minimizing is linked up with and suspension ring come off.The utility model structure is simple, easy to operate, reduces the energy consumption of transport precast concrete board mold.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model.
1-bearing platform in figure, 2-precast concrete board mold, 3-suspension ring, 4-links up with, 5-steel pipe, 6-steel rope, 7-assembly pulley, 8-driving engine.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
Transport a steel rope track for precast concrete board mold, comprise bearing platform 1, precast concrete board mold 2, suspension ring 3, hook 4, steel pipe 5, steel rope 6, assembly pulley 7, driving engine 8.Bearing platform 1 edge arranges a steel pipe 5, is steel rope 6 in steel pipe 5, and steel rope 6 is hooked in suspension ring 3 place of prefabricated concrete board 2 with one end of hook 4, and the other end is connected on driving engine 8 via assembly pulley 7.When replacing prefabricated concrete slab 2, driving engine 8 works, and is transported on bearing platform 1 by the precast concrete board mold 2 that steel rope connects.Assembly pulley 7 is the combination of a movable pulley and a fixed pulley.Hook 4 be steel rope 6 one-body molded time, use inner core be made.It is made when suspension ring 3 on precast concrete board mold 2 are prefabricated.

Claims (4)

1. transport a steel rope track for precast concrete board mold, comprise bearing platform, precast concrete board mold, suspension ring, hook, steel pipe, steel rope, assembly pulley, driving engine; It is characterized in that bearing platform edge arranges a steel pipe, is steel rope in steel pipe, and steel rope is hooked in the suspension ring place of prefabricated concrete board with the one end linked up with, and the other end connects on the engine via assembly pulley; When replacing prefabricated concrete slab, engine operation, is transported to the precast concrete board mold that steel rope connects on bearing platform.
2. a kind of steel rope track transporting precast concrete board mold according to claim 1, is characterized in that, described assembly pulley is the combination of a movable pulley and a fixed pulley.
3. a kind of steel rope track transporting precast concrete board mold according to claim 1, is characterized in that, described hook be steel rope one-body molded time, use inner core be made.
4. a kind of steel rope track transporting precast concrete board mold according to claim 1, is characterized in that, made when the suspension ring on described precast concrete board mold are prefabricated.
CN201520069515.7U 2015-02-02 2015-02-02 A kind of steel rope track transporting precast concrete board mold Expired - Fee Related CN204417071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520069515.7U CN204417071U (en) 2015-02-02 2015-02-02 A kind of steel rope track transporting precast concrete board mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520069515.7U CN204417071U (en) 2015-02-02 2015-02-02 A kind of steel rope track transporting precast concrete board mold

Publications (1)

Publication Number Publication Date
CN204417071U true CN204417071U (en) 2015-06-24

Family

ID=53467460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520069515.7U Expired - Fee Related CN204417071U (en) 2015-02-02 2015-02-02 A kind of steel rope track transporting precast concrete board mold

Country Status (1)

Country Link
CN (1) CN204417071U (en)

Similar Documents

Publication Publication Date Title
CN204417071U (en) A kind of steel rope track transporting precast concrete board mold
CN200963627Y (en) Automatic mold washing machine
CN203449451U (en) Material conveying track of still kettle
CN205464194U (en) Feeding a casting device
CN205403405U (en) Removal type drying device
CN204761363U (en) Can supply automatic frequency conversion constant voltage control system of cooling tower of two sets of unit sharings
CN203976189U (en) A kind of elevator is compound to pouring weight
CN203003107U (en) Engineering machinery floating seal dual-end centrifugal casting machine
CN204022322U (en) A kind of suspender energy saver of gauntry crane
CN202883920U (en) Transmission device capable of displacing in side direction
CN201687203U (en) U-shaped beam prefabricated form
CN105128391A (en) Movable hydraulic machine for automobile accessory machining
CN202182184U (en) Piston rod seal component
CN203500039U (en) Rust-prevention peripheral pump
CN103307017B (en) A kind of High-efficiency spacer sleeve and preparation method thereof
CN202833080U (en) Reciprocating pump split type rolling bearing crankshaft assembly
CN202718852U (en) Outdoor unfixed water pump installation support
CN202746547U (en) Flange for reducer motor
CN202597079U (en) Water outlet segment with detachable pull rings
CN204148092U (en) Blowout formula spray equipment
CN201193621Y (en) Trapezium connecting piece for water pump principal axis
CN204381359U (en) The special long muzzle of peritectic steel
CN204327585U (en) A kind ofly be provided with the submersible sand discharging pump suction casing that water conservancy diversion gets rid of husky device
CN204056686U (en) A kind of pump shaft fixing and mounting bracket
CN209536887U (en) A kind of hand elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150624

Termination date: 20220202

CF01 Termination of patent right due to non-payment of annual fee