CN204389074U - A kind of steel construction stress prior-warning device - Google Patents

A kind of steel construction stress prior-warning device Download PDF

Info

Publication number
CN204389074U
CN204389074U CN201520112287.7U CN201520112287U CN204389074U CN 204389074 U CN204389074 U CN 204389074U CN 201520112287 U CN201520112287 U CN 201520112287U CN 204389074 U CN204389074 U CN 204389074U
Authority
CN
China
Prior art keywords
base plate
pressure
lever
pressure base
contact piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520112287.7U
Other languages
Chinese (zh)
Inventor
陈宇航
李航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520112287.7U priority Critical patent/CN204389074U/en
Application granted granted Critical
Publication of CN204389074U publication Critical patent/CN204389074U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of steel construction stress prior-warning device, it is characterized in that the triangle place of three corner steadies is evenly placed in bottom bearing plate, connecting hole is placed in above bearing plate, three corner steady tops are connected with pressure survey bar one end by connecting bushing, the other end of pressure survey bar is vertically placed in pressure base plate center, described pressure survey bar bending can be out of shape or break after stressed, preferably bending distortion, double layer sleeve barrel is placed on pressure base plate, lever Amplification device is by limited support groove, conduction lever, metal contact piece, support conducting rod and Compress Spring composition, supporting conducting rod one end is vertically placed on pressure base plate, limited support groove is placed in and supports the conducting rod other end, conduction lever one end and connecting bushing are socketed, the other end is connected with metal contact piece through limited support groove, Compress Spring one end is placed on pressure base plate, the other end connects between conduction lever and metal contact piece.

Description

A kind of steel construction stress prior-warning device
Technical field
A kind of steel construction stress of the utility model prior-warning device, relates to and a kind ofly to the prior-warning device of the stress stressing conditions at steel structure node place, can belong to security appliance field.Be arranged on steel structure node place in particular to one, utilize lever principle that suffered Amplification is carried out the device of early warning.
Background technology
At present, due to the high-ductility of steel and toughness and its excellent wind resistance anti-seismic performance.Steel construction is just widely used in the fields such as industrial premises, executive information systems, residential houses, large public building, railroad bridge, offshore platform as a kind of novel energy-conserving and environment-protective building system.But due to the anti-corrosion property the subject of knowledge and the object of knowledge limit of steel own, therefore among its Long-Time Service, especially can produce certain distortion for large for formed steel construction framework, then can cause caving in of steel structure body when deforming more than corresponding limit, causing casualties and property loss.Therefore, the deformation monitoring for early stage steel structure body seems particularly important.At present, the main flow plant quarantine that steel construction adopts is single, is generally to utilize surveying and mapping technology carry out corresponding geometric distortion monitoring or utilize information network to form the digitized monitoring system of a set of complexity.In the process come into operation the former due to its general field work amount large, be subject to operation side interference, and can not meet and dynamically wait technical requirement continuously and can not extensively be promoted.Accordingly, for the digitized monitoring system of complete set, because steel construction shortterm deflection is less, therefore, it comes into operation costly on a large scale for a long time, and economic benefit is lower, and its installation monitoring facilities is comparatively complicated, needs to be equipped with the personnel with corresponding professional knowledge and carry out monitoring management.Monitoring cost is higher.
Summary of the invention
In order to improve above-mentioned situation, a kind of steel construction stress of the utility model prior-warning device provides one and is arranged on steel structure node place, utilize lever principle by steel structure node place carry out the device of early warning by Amplification.Structure is simple, easy to use.Greatly reduce the cost of steel construction deformation monitoring.
A kind of steel construction stress of the utility model prior-warning device is achieved in that a kind of steel construction stress of the utility model prior-warning device is made up of subject support means, circuit triggers part and lever Amplification device.Subject support means is made up of pressure base plate, connecting hole, pressure survey bar, connecting bushing, double layer sleeve barrel, bearing plate and three corner steadies.The triangle place of three corner steadies is evenly placed in bottom bearing plate, and connecting hole is placed in above bearing plate.Three corner steady tops are connected with pressure survey bar one end by connecting bushing, and the other end of pressure survey bar is vertically placed in pressure base plate center, and described pressure survey bar bending can be out of shape or break after stressed, preferably bending distortion.Double layer sleeve barrel is placed on pressure base plate.Lever Amplification device is made up of limited support groove, conduction lever, metal contact piece, support conducting rod and Compress Spring.Supporting conducting rod one end is vertically placed on pressure base plate, limited support groove is placed in and supports the conducting rod other end, conduction lever one end and connecting bushing are socketed, the other end is connected with metal contact piece through limited support groove, distance between described limited support groove and connecting bushing, is less than the distance between metal contact piece.Described limited support groove conduction.Compress Spring one end is placed on pressure base plate, and the other end connects between conduction lever and metal contact piece, and circuit triggers part is made up of early-warning lamp, wire, L shape contact and accumulator.Accumulator is placed on pressure base plate, and be connected with support conducting rod by wire, L shape contact one end is vertically placed on pressure base plate, the other end is positioned at directly over the metal contact piece of conduction lever one end, early-warning lamp is placed between double layer sleeve barrel, early-warning lamp is connected with accumulator by wire, and is connected with L shape contact by wire.Preferably transparent acrylic material outside described double layer sleeve barrel.
During use, be placed in the easily deformable place in steel structure node place, particularly steel construction by device level.Then fixed by the connecting hole above bearing plate, steel structure frame produces distortion, apply pressure to bearing plate, produce toward downforce bearing plate, STRESS VARIATION is passed to pressure survey bar by three corner steadies by bearing plate, after pressure survey bar is stressed, bending distortion or stressedly to fracture, now three corner steady tops are pressed down by connecting bushing band moving conductive lever one end, utilize lever principle, the conduction lever other end is up moved, and metal contact piece produces displacement upwards.When displacement is greater than certain limit, metal contact piece and L shape contact pad, now accumulator, by the limited support groove of conductive supporting bar, conduction and metal contact piece and L shape contact, form circuit pathways, early-warning lamp lights between double layer sleeve barrel.Utilize lever principle by steel structure node place carry out the object of early warning by Amplification.
Beneficial effect
One, structure is simple, convenient and practical.
Two, with low cost, be easy to promote.
Accompanying drawing explanation
Accompanying drawing 1 is the three-dimensional structure diagram of a kind of steel construction stress of the utility model prior-warning device
In accompanying drawing
Wherein part is: bearing plate (1), connecting hole (2), three corner steadies (3), conduction lever (4), L shape contact (5), double layer sleeve barrel (6), metal contact piece (7), Compress Spring (8), support conducting rod (9), pressure base plate (10), early-warning lamp (11), accumulator (12), wire (13), pressure survey bar (14), connecting bushing (15), limited support groove (16)
Embodiment:
A kind of steel construction stress of the utility model prior-warning device is achieved in that and is made up of subject support means, circuit triggers part and lever Amplification device.Subject support means is made up of pressure base plate (10), connecting hole (2), pressure survey bar (14), connecting bushing (15), double layer sleeve barrel (6), bearing plate (1) and three corner steadies (3).The triangle place of three corner steadies (3) is evenly placed in bearing plate (1) bottom, and connecting hole (2) is placed in bearing plate (1) top.Three corner steadies (3) top is connected with pressure survey bar (14) one end by connecting bushing (15), the other end of pressure survey bar (14) is vertically placed in pressure base plate (10) center, described pressure survey bar (14) bending can be out of shape or break after stressed, preferably bending distortion.Double layer sleeve barrel (6) is placed on pressure base plate (10).Lever Amplification device is made up of limited support groove (16), conduction lever (4), metal contact piece (7), support conducting rod (9) and Compress Spring (8).Supporting conducting rod (9) one end is vertically placed on pressure base plate (10), limited support groove (16) is placed in and supports conducting rod (9) other end, conduction lever (4) one end and connecting bushing (15) are socketed, the other end is connected with metal contact piece (7) through limited support groove (16), distance between described limited support groove (16) and connecting bushing (15), is less than the distance between metal contact piece (7).Described limited support groove (16) conduction.Compress Spring (8) one end is placed on pressure base plate (10), the other end connects between conduction lever (4) and metal contact piece (7), and circuit triggers part is made up of early-warning lamp (11), wire (13), L shape contact (5) and accumulator (12).Accumulator (12) is placed on pressure base plate (10), and be connected with support conducting rod (9) by wire (13), L shape contact (5) one end is vertically placed on pressure base plate (10), the other end is positioned at directly over the metal contact piece (7) of conduction lever (4) one end, early-warning lamp (11) is placed between double layer sleeve barrel (6), early-warning lamp (11) is connected with accumulator (12) by wire (13), and is connected with L shape contact (5) by wire (13).Described double layer sleeve barrel (6) outside preferably transparent acrylic material, during use, is placed in the easily deformable place in steel structure node place, particularly steel construction by device level.Then fixed by the connecting hole (2) of bearing plate (1) top, steel structure frame produces distortion, pressure is applied to bearing plate (1), produce toward downforce to bearing plate (1), STRESS VARIATION is passed to pressure survey bar (14) by three corner steadies (3) by bearing plate (1), after pressure survey bar (14) is stressed, bending distortion or stressedly to fracture, now three corner steadies (3) top is pressed down by connecting bushing (15) band moving conductive lever (4) one end, utilize lever principle, the conduction lever other end is up moved, metal contact piece (7) produces displacement upwards.When displacement is greater than certain limit, metal contact piece (7) contacts with L shape contact (5), now accumulator (12), by supporting conducting rod (9), the limited support groove (16) conducted electricity and metal contact piece (7) and L shape contact (5), form circuit pathways, early-warning lamp (11) lights between double layer sleeve barrel (6).Reach utilize lever principle by steel structure node place carry out the object of early warning by Amplification.

Claims (1)

1. a steel construction stress prior-warning device, it is characterized in that: by subject support means, circuit triggers part and lever Amplification device composition, subject support means is by pressure base plate, connecting hole, pressure survey bar, connecting bushing, double layer sleeve barrel, bearing plate and three corner steadies composition, the triangle place of three corner steadies is evenly placed in bottom bearing plate, connecting hole is placed in above bearing plate, three corner steady tops are connected with pressure survey bar one end by connecting bushing, the other end of pressure survey bar is vertically placed in pressure base plate center, double layer sleeve barrel is placed on pressure base plate, lever Amplification device is by limited support groove, conduction lever, metal contact piece, support conducting rod and Compress Spring composition, supporting conducting rod one end is vertically placed on pressure base plate, limited support groove is placed in and supports the conducting rod other end, conduction lever one end and connecting bushing are socketed, the other end is connected with metal contact piece through limited support groove, described limited support groove conduction, Compress Spring one end is placed on pressure base plate, the other end connects between conduction lever and metal contact piece, circuit triggers part is by early-warning lamp, wire, L shape contact and accumulator composition, accumulator is placed on pressure base plate, and be connected with support conducting rod by wire, L shape contact one end is vertically placed on pressure base plate, the other end is positioned at directly over the metal contact piece of conduction lever one end, early-warning lamp is placed between double layer sleeve barrel, early-warning lamp is connected with accumulator by wire, and be connected with L shape contact by wire.
CN201520112287.7U 2015-02-11 2015-02-11 A kind of steel construction stress prior-warning device Expired - Fee Related CN204389074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520112287.7U CN204389074U (en) 2015-02-11 2015-02-11 A kind of steel construction stress prior-warning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520112287.7U CN204389074U (en) 2015-02-11 2015-02-11 A kind of steel construction stress prior-warning device

Publications (1)

Publication Number Publication Date
CN204389074U true CN204389074U (en) 2015-06-10

Family

ID=53361784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520112287.7U Expired - Fee Related CN204389074U (en) 2015-02-11 2015-02-11 A kind of steel construction stress prior-warning device

Country Status (1)

Country Link
CN (1) CN204389074U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107702030A (en) * 2017-09-28 2018-02-16 谢志坚 A kind of constructing tunnel lighting device
CN114235258A (en) * 2021-10-27 2022-03-25 福建省永正工程质量检测有限公司 Steel structure stress early warning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107702030A (en) * 2017-09-28 2018-02-16 谢志坚 A kind of constructing tunnel lighting device
CN114235258A (en) * 2021-10-27 2022-03-25 福建省永正工程质量检测有限公司 Steel structure stress early warning device
CN114235258B (en) * 2021-10-27 2024-05-17 福建省永正工程质量检测有限公司 Steel structure stress early warning device

Similar Documents

Publication Publication Date Title
CN204389074U (en) A kind of steel construction stress prior-warning device
CN204163474U (en) Environment protection fence moulded by wood
CN204183445U (en) The localization tool of automatic film applicator
CN203616206U (en) Concrete compression creep test system
CN203565590U (en) Copper bar bending-based hydraulic equipment
CN102610336A (en) Compound cross arm insulator
CN204901066U (en) Section bar hoist and mount support frame
CN204897325U (en) A sister block mechanism for high -pressure rubber pipe
CN204711963U (en) A kind of novel mechanical automation cannula system
CN203203739U (en) Novel bearing beam load tester
CN111215480A (en) Steel pipe shaping device
CN204183231U (en) A kind of Connection Block assembly
CN204103205U (en) A kind of conductor compression jointing pipe straightener
CN204899175U (en) Building strutting arrangement
CN205833905U (en) A kind of forming elbow mould for tubing manufacturer
CN104723245A (en) Novel assembling and clamping device of automobile pipeline support
CN205217701U (en) Multistation stamping device with bearing structure
CN203341821U (en) Medical tower crane anchor installation system
CN204675744U (en) Large part furniture appliance lifting apparatus
CN204265387U (en) Novel extruded sheet metering bont
CN204199438U (en) A kind of bilateral purlin holder
CN203757299U (en) Triangular movable support
CN208559511U (en) A kind of Rear frame mechanism arrangement
CN209658869U (en) A kind of lightning-arrest support frame of the arc of glazed tile roofs
CN209395416U (en) A kind of compressing rod for gold stamping device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20170211