CN204382209U - Rubber hose sheath installation auxiliary device - Google Patents

Rubber hose sheath installation auxiliary device Download PDF

Info

Publication number
CN204382209U
CN204382209U CN201420831780.XU CN201420831780U CN204382209U CN 204382209 U CN204382209 U CN 204382209U CN 201420831780 U CN201420831780 U CN 201420831780U CN 204382209 U CN204382209 U CN 204382209U
Authority
CN
China
Prior art keywords
section
sheath
diameter
working
mount pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420831780.XU
Other languages
Chinese (zh)
Inventor
李弘�
陈静
杨学福
刘杰
李锴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO SUNSONG CO Ltd
Original Assignee
QINGDAO SUNSONG CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO SUNSONG CO Ltd filed Critical QINGDAO SUNSONG CO Ltd
Priority to CN201420831780.XU priority Critical patent/CN204382209U/en
Application granted granted Critical
Publication of CN204382209U publication Critical patent/CN204382209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A kind of rubber hose sheath installation auxiliary device, comprises base plate, base plate is provided with mount pad and Measure Board.Described mount pad is provided with mounting rod, and described mounting rod comprises connecting portion and operate portions, connecting portion and mount pad affixed, be provided with step between connecting portion and operate portions.Described operate portions comprises working-storage section, flared section, construction section and supporting section from inside to outside successively, the diameter of working-storage section and supporting section is all less than the diameter of construction section, flared section is taper type, the diameter of flared section increases from inside to outside gradually, and flared section outer end and inner diameter equal the diameter of working-storage section and the diameter of construction section respectively.Rubber hose sheath installation auxiliary device structure is simple, uses easily, need not many people coordinate, and only needs operating personnel can complete the installation exercise of sheath, saves cost of labor, also reduce the requirement of operating personnel's qualification.Sheath is first set in working-storage section by construction section, then installs to sebific duct from working-storage section through flared section and construction section, installs to sebific duct go forward to carry out twice expansion warp to sheath at sheath, sheath is set with and is more prone to, improve the speed that sheath is installed.

Description

Rubber hose sheath installation auxiliary device
Technical field
The utility model relates to a kind of frock, specifically, is a kind of rubber hose sheath installation auxiliary device.
Background technology
In automobile rubber pipe, in order to avoid sebific duct is being assembled to after on automobile chassis, rub with some position of automobile chassis, cause breakage, leak, the skin of sebific duct is all set with sheath.
And sheath is after sebific duct has been produced, by being manually directly set on sebific duct, sheath installs to after on sebific duct, also need to utilize cubing frock to position sheath, be finally fixed on sebific duct with glue, this mounting means at least needs 3 operators jointly to complete, cost of labor is high, inefficiency, and three workmans need to cooperatively interact to carry out sheath installation, require also high to the skilled operation degree of workman.Because sheath is tubular, also often there will be less than sebific duct external diameter due to sheath bore and cause assembling the problem of difficulty, and then cause entire work flow smooth, employee's operation very inconvenience.
Utility model content
The utility model, for above-mentioned the deficiencies in the prior art, devises a kind of rubber hose sheath installation auxiliary device.
Rubber hose sheath installation auxiliary device of the present utility model, comprises base plate, base plate is provided with mount pad and Measure Board.
Described mount pad is provided with mounting rod, and described mounting rod comprises connecting portion and operate portions, connecting portion and mount pad affixed, be provided with step between connecting portion and operate portions.
Described operate portions comprises working-storage section, flared section, construction section and supporting section from inside to outside successively, the diameter of working-storage section and supporting section is all less than the diameter of construction section, flared section is taper type, the diameter of flared section increases from inside to outside gradually, and flared section outer end and inner diameter equal the diameter of working-storage section and the diameter of construction section respectively.
Described Measure Board is provided with guide shaft, and guide shaft two ends are packed on the mount pad of Measure Board setting, and guide shaft is parallel with mounting rod, guide shaft is slidably fitted with multiple slide block.
Preferably, be provided with slide bottom described Measure Board, slide is slidably mounted on the guide rail of base plate setting, and guide rail is vertical with mounting rod.
Preferably, described slide block is all provided with the lock(ing) bolt be fixed on guide shaft.
The beneficial effects of the utility model are: rubber hose sheath installation auxiliary device structure is simple, use easily, need not many people coordinate, only need operating personnel can complete the installation exercise of sheath, save cost of labor, also reduce the requirement of operating personnel's qualification.Sheath is first set in working-storage section by construction section, then installs to sebific duct from working-storage section through flared section and construction section, installs to sebific duct go forward to carry out twice expansion warp to sheath at sheath, sheath is set with and is more prone to, improve the speed that sheath is installed.Just can position the installation site of sheath in installation process, need not carry out respectively, simplify sheath installation procedure, improve operating efficiency.Sebific duct is set on supporting section, makes it keep linear rows, ensure that sheath installation site is accurate.Measure Board is at slide on rails, and adjustable plays the distance between the slide block of scale effect and sebific duct, makes it can carry out sheath to the sebific duct of different-diameter size and installs location, improve the applicability of device.Slide block is bolted, and after making it adjust to precalculated position, position stability, avoids because maloperation causes slide block to move, and forms error in mounting position.
Accompanying drawing explanation
Accompanying drawing 1 is the structure chart of this rubber hose sheath installation auxiliary device.
Detailed description of the invention
Rubber hose sheath installation auxiliary device of the present utility model, as shown in Figure 1, comprises base plate 1, base plate 1 is provided with mount pad 2 and Measure Board 3.
Mount pad 2 is provided with mounting rod 4, described mounting rod 4 comprises connecting portion 5 and operate portions 6, and connecting portion 5 is affixed with mount pad 2, is provided with step 7 between connecting portion 5 and operate portions 6.
Operate portions 6 comprises working-storage section 8, flared section 9, construction section 10 and supporting section 11 from inside to outside successively, the diameter of working-storage section 8 and supporting section 11 is all less than the diameter of construction section 10, flared section 9 is taper type, the diameter of flared section 9 increases from inside to outside gradually, and flared section 9 outer end and inner diameter equal the diameter of working-storage section 8 and the diameter of construction section 10 respectively.
Measure Board 3 is provided with guide shaft 12, guide shaft 12 two ends are packed on the mount pad 13 of Measure Board 3 setting, and guide shaft 12 is parallel with mounting rod 4, guide shaft 12 is slidably fitted with multiple slide block 14.Slide block 14 is all provided with the lock(ing) bolt be fixed on guide shaft 12.
Be provided with slide 15 bottom Measure Board 3, slide 15 is slidably mounted on the guide rail 16 of base plate 1 setting, and guide rail 16 is vertical with mounting rod 4.
First sheath 17 all to be installed is installed on mounting rod 4, sheath 17 is set on supporting section 11 by the inner of mounting rod 4 one by one, then pulls out sheath 17, make it by construction section 10, flared section 9, be finally set in working-storage section 8.Sheath 17 is when through construction section 10, and internal diameter is expanded by it.
Then install on the supporting section 11 of mounting rod 4 by sebific duct 18 cover, one end of sebific duct 18 is against on the step of construction section 10 formation.Supporting section 11 supports sebific duct 18, makes it keep linear rows.
Unclamp lock(ing) bolt, the position of adjusting slider 14, then locks lock(ing) bolt.Promote slide 15, slide block 14 is pushed to the sebific duct 18 also on mounting rod 4.
Then inwardly pull the sheath 17 be enclosed within working-storage section 8 one by one, sheath 17 first carries out expansion warp by flared section 9, then by being set on sebific duct 18 after construction section 10, until sheath 17 arrives the position of corresponding slide block 14 alignment.
Finally on sheath 17, be wound around adhesive tape 19 to be fixed, the winding position of adhesive tape 19 also can be calibrated by the position of slide block 14.
After sheath 17 installation, sebific duct 18 is taken off from supporting section 11.
Above-mentioned sheath 17 installation exercise a people can complete, and saves human cost, improve operating efficiency.

Claims (3)

1. a rubber hose sheath installation auxiliary device, is characterized in that, comprises base plate (1), base plate (1) is provided with mount pad (2) and Measure Board (3),
Described mount pad (2) is provided with mounting rod (4), described mounting rod (4) comprises connecting portion (5) and operate portions (6), connecting portion (5) is affixed with mount pad (2), step (7) is provided with between connecting portion (5) and operate portions (6)
Described operate portions (6) comprises working-storage section (8), flared section (9), construction section (10) and supporting section (11) from inside to outside successively, the diameter of working-storage section (8) and supporting section (11) is all less than the diameter of construction section (10), flared section (9) is taper type, the diameter of flared section (9) increases from inside to outside gradually, flared section (9) outer end and inner diameter equal the diameter of working-storage section (8) and the diameter of construction section (10) respectively
Described Measure Board (3) is provided with guide shaft (12), guide shaft (12) two ends are packed on the mount pad (13) that Measure Board (3) arranges, guide shaft (12) is parallel with mounting rod (4), guide shaft (12) is slidably fitted with multiple slide block (14).
2. rubber hose sheath installation auxiliary device according to claim 1, it is characterized in that, described Measure Board (3) bottom is provided with slide (15), slide (15) is slidably mounted on the guide rail (16) that base plate (1) arranges, and guide rail (16) is vertical with mounting rod (4).
3. rubber hose sheath installation auxiliary device according to claim 1, is characterized in that, described slide block (14) is all provided with the lock(ing) bolt be fixed on guide shaft (12).
CN201420831780.XU 2014-12-24 2014-12-24 Rubber hose sheath installation auxiliary device Active CN204382209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420831780.XU CN204382209U (en) 2014-12-24 2014-12-24 Rubber hose sheath installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420831780.XU CN204382209U (en) 2014-12-24 2014-12-24 Rubber hose sheath installation auxiliary device

Publications (1)

Publication Number Publication Date
CN204382209U true CN204382209U (en) 2015-06-10

Family

ID=53354964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420831780.XU Active CN204382209U (en) 2014-12-24 2014-12-24 Rubber hose sheath installation auxiliary device

Country Status (1)

Country Link
CN (1) CN204382209U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106142533A (en) * 2016-08-31 2016-11-23 天津鹏翎胶管股份有限公司 A kind of sheath pipe fitting assembly tool
CN107650072A (en) * 2017-09-07 2018-02-02 宁波世峻汽配科技有限公司 A kind of brake pipe transition joint installing mechanism and installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106142533A (en) * 2016-08-31 2016-11-23 天津鹏翎胶管股份有限公司 A kind of sheath pipe fitting assembly tool
CN107650072A (en) * 2017-09-07 2018-02-02 宁波世峻汽配科技有限公司 A kind of brake pipe transition joint installing mechanism and installation method
CN107650072B (en) * 2017-09-07 2019-05-14 宁波世峻汽配科技有限公司 A kind of brake pipe transition joint installing mechanism and installation method

Similar Documents

Publication Publication Date Title
CN206571029U (en) Branch, which is integrated, without furred ceiling hangs system
CN204382209U (en) Rubber hose sheath installation auxiliary device
CN205011141U (en) Large -tonnage fluid pressure type caterpillar -tractor
CN105234669A (en) Coaxial casing pipe assembling device and method
CN204142393U (en) Pressure-type thermometer calibrating servicing unit
CN203237404U (en) Passenger cabin main pipe positioning and installing device
CN110290609B (en) Internal heating device for low-vacuum tunnel model test
CN201348553Y (en) Inner spraying system for curtain wall watertightness test
CN203350283U (en) Testing tool for capacitor
CN204973977U (en) Multi -functional post
CN203869871U (en) Aero-engine test stand
CN205678359U (en) A kind of inner orbit x-ray defectoscope running gear being easily installed
ATE489527T1 (en) ADJUSTING DEVICE FOR A DISTANCE BETWEEN TWO CARRIAGES MOVING ON A COMMON RAIL AND METHOD
CN207747837U (en) A kind of vehicular unmanned plane counter equipment of quick despatch
CN103758894B (en) Mechanical stop limiter
CN204186796U (en) A kind of integrated form connecting base
CN207231513U (en) A kind of adjustable mounting assembly based on filling workshop data acquisition
CN208187435U (en) A kind of positioning device of II networking measuring instrument of CP
CN202701743U (en) Braking hose protecting sleeve installing device
CN206397084U (en) A kind of plastering machine track
CN105905313B (en) A kind of large transport airplane Integral floor mounting platform and installation method
CN211032821U (en) Modularization tool equipment
CN205201878U (en) Quick -witted lower mould fixed structure of system cup
CN203752314U (en) Automatic ruling machine
CN219842243U (en) Limiting structure of pressure tester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant