CN204376574U - For the installation briquetting of high ferro - Google Patents

For the installation briquetting of high ferro Download PDF

Info

Publication number
CN204376574U
CN204376574U CN201520064717.2U CN201520064717U CN204376574U CN 204376574 U CN204376574 U CN 204376574U CN 201520064717 U CN201520064717 U CN 201520064717U CN 204376574 U CN204376574 U CN 204376574U
Authority
CN
China
Prior art keywords
briquetting
protuberance
motor
high ferro
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520064717.2U
Other languages
Chinese (zh)
Inventor
毛仕旭
毛小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sheng Yi Machinery Co Ltd
Original Assignee
Zhejiang Sheng Yi Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sheng Yi Machinery Co Ltd filed Critical Zhejiang Sheng Yi Machinery Co Ltd
Priority to CN201520064717.2U priority Critical patent/CN204376574U/en
Application granted granted Critical
Publication of CN204376574U publication Critical patent/CN204376574U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Motor Or Generator Frames (AREA)

Abstract

The utility model discloses a kind of installation briquetting for high ferro, its drip irrigation device is, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, it is characterized in that: described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, described protuberance is that lower surface area is greater than the terrace with edge of upper surface area originally; To compare original direct inlay card, the structure of present protuberance, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.

Description

For the installation briquetting of high ferro
Technical field
The utility model relates to a kind of briquetting, and more particularly, it relates to a kind of installation briquetting for high ferro.
Background technology
High-speed railway (abbreviation high ferro), refer to by transforming original circuit (linearization(-sation), gauge standardization), the highest operation speed is reached and is not less than 200 kilometers per hour, or build specially new " at a high speed new line ", make operation speed reach the railway system of at least 250 kilometers per hour.
Along with operation speed constantly promotes, existing business model is substantially all that the high ferro motor-car moved realizes in static rail generation rolling, and the power source in high ferro motor-car transfers to wheel power through various transmission mechanism.Because the travel speed of high ferro motor-car is than other motor-driven overall height 3-5 times, even higher, therefore need to provide the motor volume of power all comparatively large, need motor to lift installation when installation.Because motor all needs to be fixed on base plate, need its high-precision installation to be placed on suitable position in the process of installing, be fixed at recycling screw.Because motor volume is comparatively large, the screwed hole is up and down less, and it is very inconvenient mutually to aim at, and easily causes the situation of threading dislocations when installation.And motor straight was connected screw and fixed and can there is certain unsteadiness, very high to the Structural strength calls of screw, also easily occur loosening simultaneously.
Therefore need to add a briquetting for being connected between motor with base plate, briquetting can with electric baseboard clamping, but briquetting demand fulfillment conveniently should be installed and also will ensure structural strength, therefore also can propose certain requirement to the structure of briquetting.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of protuberance of terrace with edge shape that utilizes to realize the installation briquetting facilitating motor to engage.
For achieving the above object, the utility model provides following technical scheme: a kind of installation briquetting for high ferro, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, and described protuberance is the terrace with edge that lower surface area is greater than upper surface area.
By adopting technique scheme, utilize this installation briquetting, when mounted motor, first the spacing hole of briquetting is enclosed within the locating convex block on base plate, just be fixed up in the position of such briquetting, again motor is transferred to above briquetting, slowly motor is put down, because the protuberance installed above briquetting is that the terrace with edge that upper surface area is little adds the concave shape that motor bottom coordinates with protuberance, very convenient when therefore inserting, along with the decline of motor, motor slowly moves along with the outline of terrace with edge, is placed to accurately and installs on briquetting.To compare original direct inlay card, the structure of present protuberance, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.
The utility model is set to further: described projections top surface is provided with the dome for slowing down pressure.
By adopting technique scheme, dome is different from the Impact direction of flat-top, and a lot of vertical direction power can be transformed into toward interior power by dome, alleviates pressure to a certain extent, and the dome protruded can facilitate plugging together of protuberance and motor, minimizing gap between the two.
The utility model is set to further: the quantity of described screwed hole and described spacing hole is two, described screwed hole is positioned at the both sides of described briquetting body, the straight line that the straight line of described two spacing holes formation and described two screwed holes are formed is mutually vertical, and one of them spacing hole is positioned on the straight line of described two screwed holes formation.
By adopting technique scheme, the distribution of screwed hole and spacing hole make use of the area of briquetting body bottom surface fully, one horizontal one vertical distribution ensure that briquetting uniform force all around, and briquetting is also not easy rotation and thinks simultaneously, and whole briquetting can keep stable after fixation for a long time.
The utility model is set to further: described protuberance is truncated rectangular pyramids shape.
By adopting technique scheme, truncated rectangular pyramids shape makes protuberance slow down motor colliding with to protuberance when penetrating motor, even if truncated rectangular pyramids structure is more stable, if it is substantially also based on face contact that motor collides with when encountering protuberance, all around the power of colliding with of four direction can progressively be distributed to protuberance inside, and entirety not easily deformation occurs.
The utility model is set to further: described briquetting body is provided with the location notch corresponding with motor screwed hole.
By adopting technique scheme, location notch can allow the screwed hole on the screwed hole of motor and briquetting seamless applying, eliminates the spacing between two screwed holes, ensure that tight that screwed hole connects is stablized.
Accompanying drawing explanation
Fig. 1 is the structure chart of the installation briquetting embodiment of the utility model high ferro;
Fig. 2 is the vertical view of the installation briquetting embodiment of the utility model high ferro;
Fig. 3 is the profile that the installation briquetting embodiment A-A of the utility model high ferro locates;
Fig. 4 is the profile that the installation briquetting Embodiment B-B of the utility model high ferro locates;
Fig. 5 is the upward view of the installation briquetting embodiment of the utility model high ferro.
Reference numeral: 1, briquetting body; 2, spacing hole; 3, screwed hole; 4, protuberance; 41, dome; 5, location notch.
Embodiment
Referring to figs. 1 through Fig. 5, the installation briquetting embodiment of the utility model high ferro is described further.
For an installation briquetting for high ferro, comprise briquetting body 1, briquetting body 1 in rectangular shape, for the limiting section of connecting bottom board bottom briquetting body 1, the spacing hole 2 that this limiting section comprises convenient location, the screwed hole 3 removably connected with base plate.This spacing hole 2 is for columniform hole and the degree of depth is 23mm.When installation, base plate is provided with corresponding projection, engaging that can be stable with spacing hole 2.Screwed hole 3 is two with the quantity of spacing hole 2, and screwed hole 3 is positioned at the both sides of pressing plate body, and the straight line that the straight line of two spacing hole 2 formations and two screwed holes 3 are formed is mutually vertical, and one of them spacing hole 2 is positioned on the straight line of two screwed holes 3 formations.
Screwed hole 3 make use of the area of briquetting body 1 bottom surface fully with the distribution of spacing hole 2, one horizontal one distribution indulged ensure that briquetting uniform force all around, simultaneously briquetting is also not easy rotation and thinks, whole briquetting can keep stable after fixation for a long time.
Briquetting body 1 is provided with a protuberance 4, and this protuberance 4 is terrace with edge shape, and upper surface is less, and lower surface is comparatively large, and large lower surface and briquetting body 1 are fixed, and little upper surface is positioned at top, and this terrace with edge is truncated rectangular pyramids.The bottom of motor is also provided with the depressed area of coincideing with this protuberance 4, and protuberance 4 can pass through moving blockage altogether with protuberance 4.Truncated rectangular pyramids shape makes protuberance 4 slow down motor colliding with to protuberance 4 when penetrating motor, even if truncated rectangular pyramids structure is more stable, if it is substantially also based on face contact that motor collides with when encountering protuberance 4, all around the power of colliding with of four direction progressively can be distributed to protuberance 4 inside, and entirety not easily deformation occurs.
Utilize this installation briquetting, when mounted motor, first the spacing hole 2 of briquetting is enclosed within the locating convex block on base plate, just be fixed up in the position of such briquetting, again motor is transferred to above briquetting, slowly motor is put down, because the protuberance 4 installed above briquetting is that the terrace with edge that upper surface area is little adds the concave shape that motor bottom coordinates with protuberance 4, very convenient when therefore inserting, along with the decline of motor, motor slowly moves along with the outline of terrace with edge, is placed to accurately and installs on briquetting.To compare original direct inlay card, the structure of present protuberance 4, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.
Projections top surface is provided with the dome 41 for slowing down pressure.Dome 41 is different from the Impact direction of flat-top, and a lot of vertical direction power can be transformed into toward interior power by dome 41, alleviates pressure to a certain extent, and the dome 41 protruded can facilitate plugging together of protuberance and motor, minimizing gap between the two.
Briquetting body is provided with the location notch 5 corresponding with motor screwed hole.Screwed hole is positioned at location notch 5, and location notch 5 can allow the screwed hole on the screwed hole of motor and briquetting seamless applying, eliminates the spacing between two screwed holes, ensure that screwed hole connects closely stable.

Claims (5)

1. the installation briquetting for high ferro, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, it is characterized in that: described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, described protuberance is the terrace with edge that lower surface area is greater than upper surface area.
2. the installation briquetting for high ferro according to claim 1, is characterized in that: described projections top surface is provided with the dome for slowing down pressure.
3. the installation briquetting for high ferro according to claim 1, it is characterized in that: the quantity of described screwed hole and described spacing hole is two, described screwed hole is positioned at the both sides of described briquetting body, the straight line that the straight line of described two spacing holes formation and described two screwed holes are formed is mutually vertical, and one of them spacing hole is positioned on the straight line of described two screwed holes formation.
4. the installation briquetting for high ferro according to claim 1, is characterized in that: described protuberance is truncated rectangular pyramids shape.
5. the installation briquetting for high ferro according to claim 1, is characterized in that: described briquetting body is provided with the location notch corresponding with motor screwed hole.
CN201520064717.2U 2015-01-30 2015-01-30 For the installation briquetting of high ferro Expired - Fee Related CN204376574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520064717.2U CN204376574U (en) 2015-01-30 2015-01-30 For the installation briquetting of high ferro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520064717.2U CN204376574U (en) 2015-01-30 2015-01-30 For the installation briquetting of high ferro

Publications (1)

Publication Number Publication Date
CN204376574U true CN204376574U (en) 2015-06-03

Family

ID=53332752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520064717.2U Expired - Fee Related CN204376574U (en) 2015-01-30 2015-01-30 For the installation briquetting of high ferro

Country Status (1)

Country Link
CN (1) CN204376574U (en)

Similar Documents

Publication Publication Date Title
CN203599393U (en) Stamping die
CN204928684U (en) Fixed structure of solar photovoltaic board
CN103990710A (en) Stamping die used for conducting bending
CN102975005B (en) Tabling device of machine shell and gear case end cap
CN204295419U (en) Lathe panel beating dodge gate derail-prevention structure
CN204376574U (en) For the installation briquetting of high ferro
CN204365860U (en) Polish structure in material strip local
CN205914996U (en) SIM cassette equipment tool
CN204135652U (en) Universal pressing tool
CN205110452U (en) Bending die
CN208592305U (en) A kind of buoyant structure
CN205870728U (en) Die -cut device of diaphragm
CN206717480U (en) Prevent the side that workpiece floats from pushing away detent mechanism
CN203380232U (en) Novel bending device
CN203403636U (en) Anchoring part for integrated plate with heat preservation function and decoration function
CN204645499U (en) A kind of improved anchoring firmware in devices
CN203265433U (en) General riveting device
CN204007493U (en) A kind of terminal row female end detects tool
CN204843102U (en) Sheet metal cutting device
CN205882183U (en) ITO dolly carbon brush sensing device
CN202701176U (en) Stamping device for automobile left suspended installation inner plate
CN105227073A (en) The photovoltaic component mounting structure of photovoltaic bracket
CN202889766U (en) Foldable flexible circuit board
CN203286216U (en) Water pump system and supporting device for water pump motor
CN201654091U (en) Base plate of electric meter box

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20160130

EXPY Termination of patent right or utility model