CN204376574U - For the installation briquetting of high ferro - Google Patents
For the installation briquetting of high ferro Download PDFInfo
- Publication number
- CN204376574U CN204376574U CN201520064717.2U CN201520064717U CN204376574U CN 204376574 U CN204376574 U CN 204376574U CN 201520064717 U CN201520064717 U CN 201520064717U CN 204376574 U CN204376574 U CN 204376574U
- Authority
- CN
- China
- Prior art keywords
- briquetting
- protuberance
- motor
- high ferro
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Motor Or Generator Frames (AREA)
Abstract
The utility model discloses a kind of installation briquetting for high ferro, its drip irrigation device is, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, it is characterized in that: described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, described protuberance is that lower surface area is greater than the terrace with edge of upper surface area originally; To compare original direct inlay card, the structure of present protuberance, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.
Description
Technical field
The utility model relates to a kind of briquetting, and more particularly, it relates to a kind of installation briquetting for high ferro.
Background technology
High-speed railway (abbreviation high ferro), refer to by transforming original circuit (linearization(-sation), gauge standardization), the highest operation speed is reached and is not less than 200 kilometers per hour, or build specially new " at a high speed new line ", make operation speed reach the railway system of at least 250 kilometers per hour.
Along with operation speed constantly promotes, existing business model is substantially all that the high ferro motor-car moved realizes in static rail generation rolling, and the power source in high ferro motor-car transfers to wheel power through various transmission mechanism.Because the travel speed of high ferro motor-car is than other motor-driven overall height 3-5 times, even higher, therefore need to provide the motor volume of power all comparatively large, need motor to lift installation when installation.Because motor all needs to be fixed on base plate, need its high-precision installation to be placed on suitable position in the process of installing, be fixed at recycling screw.Because motor volume is comparatively large, the screwed hole is up and down less, and it is very inconvenient mutually to aim at, and easily causes the situation of threading dislocations when installation.And motor straight was connected screw and fixed and can there is certain unsteadiness, very high to the Structural strength calls of screw, also easily occur loosening simultaneously.
Therefore need to add a briquetting for being connected between motor with base plate, briquetting can with electric baseboard clamping, but briquetting demand fulfillment conveniently should be installed and also will ensure structural strength, therefore also can propose certain requirement to the structure of briquetting.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of protuberance of terrace with edge shape that utilizes to realize the installation briquetting facilitating motor to engage.
For achieving the above object, the utility model provides following technical scheme: a kind of installation briquetting for high ferro, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, and described protuberance is the terrace with edge that lower surface area is greater than upper surface area.
By adopting technique scheme, utilize this installation briquetting, when mounted motor, first the spacing hole of briquetting is enclosed within the locating convex block on base plate, just be fixed up in the position of such briquetting, again motor is transferred to above briquetting, slowly motor is put down, because the protuberance installed above briquetting is that the terrace with edge that upper surface area is little adds the concave shape that motor bottom coordinates with protuberance, very convenient when therefore inserting, along with the decline of motor, motor slowly moves along with the outline of terrace with edge, is placed to accurately and installs on briquetting.To compare original direct inlay card, the structure of present protuberance, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.
The utility model is set to further: described projections top surface is provided with the dome for slowing down pressure.
By adopting technique scheme, dome is different from the Impact direction of flat-top, and a lot of vertical direction power can be transformed into toward interior power by dome, alleviates pressure to a certain extent, and the dome protruded can facilitate plugging together of protuberance and motor, minimizing gap between the two.
The utility model is set to further: the quantity of described screwed hole and described spacing hole is two, described screwed hole is positioned at the both sides of described briquetting body, the straight line that the straight line of described two spacing holes formation and described two screwed holes are formed is mutually vertical, and one of them spacing hole is positioned on the straight line of described two screwed holes formation.
By adopting technique scheme, the distribution of screwed hole and spacing hole make use of the area of briquetting body bottom surface fully, one horizontal one vertical distribution ensure that briquetting uniform force all around, and briquetting is also not easy rotation and thinks simultaneously, and whole briquetting can keep stable after fixation for a long time.
The utility model is set to further: described protuberance is truncated rectangular pyramids shape.
By adopting technique scheme, truncated rectangular pyramids shape makes protuberance slow down motor colliding with to protuberance when penetrating motor, even if truncated rectangular pyramids structure is more stable, if it is substantially also based on face contact that motor collides with when encountering protuberance, all around the power of colliding with of four direction can progressively be distributed to protuberance inside, and entirety not easily deformation occurs.
The utility model is set to further: described briquetting body is provided with the location notch corresponding with motor screwed hole.
By adopting technique scheme, location notch can allow the screwed hole on the screwed hole of motor and briquetting seamless applying, eliminates the spacing between two screwed holes, ensure that tight that screwed hole connects is stablized.
Accompanying drawing explanation
Fig. 1 is the structure chart of the installation briquetting embodiment of the utility model high ferro;
Fig. 2 is the vertical view of the installation briquetting embodiment of the utility model high ferro;
Fig. 3 is the profile that the installation briquetting embodiment A-A of the utility model high ferro locates;
Fig. 4 is the profile that the installation briquetting Embodiment B-B of the utility model high ferro locates;
Fig. 5 is the upward view of the installation briquetting embodiment of the utility model high ferro.
Reference numeral: 1, briquetting body; 2, spacing hole; 3, screwed hole; 4, protuberance; 41, dome; 5, location notch.
Embodiment
Referring to figs. 1 through Fig. 5, the installation briquetting embodiment of the utility model high ferro is described further.
For an installation briquetting for high ferro, comprise briquetting body 1, briquetting body 1 in rectangular shape, for the limiting section of connecting bottom board bottom briquetting body 1, the spacing hole 2 that this limiting section comprises convenient location, the screwed hole 3 removably connected with base plate.This spacing hole 2 is for columniform hole and the degree of depth is 23mm.When installation, base plate is provided with corresponding projection, engaging that can be stable with spacing hole 2.Screwed hole 3 is two with the quantity of spacing hole 2, and screwed hole 3 is positioned at the both sides of pressing plate body, and the straight line that the straight line of two spacing hole 2 formations and two screwed holes 3 are formed is mutually vertical, and one of them spacing hole 2 is positioned on the straight line of two screwed holes 3 formations.
Screwed hole 3 make use of the area of briquetting body 1 bottom surface fully with the distribution of spacing hole 2, one horizontal one distribution indulged ensure that briquetting uniform force all around, simultaneously briquetting is also not easy rotation and thinks, whole briquetting can keep stable after fixation for a long time.
Briquetting body 1 is provided with a protuberance 4, and this protuberance 4 is terrace with edge shape, and upper surface is less, and lower surface is comparatively large, and large lower surface and briquetting body 1 are fixed, and little upper surface is positioned at top, and this terrace with edge is truncated rectangular pyramids.The bottom of motor is also provided with the depressed area of coincideing with this protuberance 4, and protuberance 4 can pass through moving blockage altogether with protuberance 4.Truncated rectangular pyramids shape makes protuberance 4 slow down motor colliding with to protuberance 4 when penetrating motor, even if truncated rectangular pyramids structure is more stable, if it is substantially also based on face contact that motor collides with when encountering protuberance 4, all around the power of colliding with of four direction progressively can be distributed to protuberance 4 inside, and entirety not easily deformation occurs.
Utilize this installation briquetting, when mounted motor, first the spacing hole 2 of briquetting is enclosed within the locating convex block on base plate, just be fixed up in the position of such briquetting, again motor is transferred to above briquetting, slowly motor is put down, because the protuberance 4 installed above briquetting is that the terrace with edge that upper surface area is little adds the concave shape that motor bottom coordinates with protuberance 4, very convenient when therefore inserting, along with the decline of motor, motor slowly moves along with the outline of terrace with edge, is placed to accurately and installs on briquetting.To compare original direct inlay card, the structure of present protuberance 4, ensure that upper surface that area is less can insert the lower surface of sunk part on the larger motor of area, both move mutually in taper, guarantee to insert smoothly, facilitate installation, avoid motor and wait needs aligning repeatedly when mounted.
Projections top surface is provided with the dome 41 for slowing down pressure.Dome 41 is different from the Impact direction of flat-top, and a lot of vertical direction power can be transformed into toward interior power by dome 41, alleviates pressure to a certain extent, and the dome 41 protruded can facilitate plugging together of protuberance and motor, minimizing gap between the two.
Briquetting body is provided with the location notch 5 corresponding with motor screwed hole.Screwed hole is positioned at location notch 5, and location notch 5 can allow the screwed hole on the screwed hole of motor and briquetting seamless applying, eliminates the spacing between two screwed holes, ensure that screwed hole connects closely stable.
Claims (5)
1. the installation briquetting for high ferro, comprise briquetting body, described briquetting body bottom portion is used for the limiting section of connecting bottom board, the spacing hole that described limiting section comprises convenient location, the screwed hole removably connected with base plate, it is characterized in that: described briquetting bodies top is provided with the protuberance with inlay card under motor bottom, described protuberance is the terrace with edge that lower surface area is greater than upper surface area.
2. the installation briquetting for high ferro according to claim 1, is characterized in that: described projections top surface is provided with the dome for slowing down pressure.
3. the installation briquetting for high ferro according to claim 1, it is characterized in that: the quantity of described screwed hole and described spacing hole is two, described screwed hole is positioned at the both sides of described briquetting body, the straight line that the straight line of described two spacing holes formation and described two screwed holes are formed is mutually vertical, and one of them spacing hole is positioned on the straight line of described two screwed holes formation.
4. the installation briquetting for high ferro according to claim 1, is characterized in that: described protuberance is truncated rectangular pyramids shape.
5. the installation briquetting for high ferro according to claim 1, is characterized in that: described briquetting body is provided with the location notch corresponding with motor screwed hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520064717.2U CN204376574U (en) | 2015-01-30 | 2015-01-30 | For the installation briquetting of high ferro |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520064717.2U CN204376574U (en) | 2015-01-30 | 2015-01-30 | For the installation briquetting of high ferro |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204376574U true CN204376574U (en) | 2015-06-03 |
Family
ID=53332752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520064717.2U Expired - Fee Related CN204376574U (en) | 2015-01-30 | 2015-01-30 | For the installation briquetting of high ferro |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204376574U (en) |
-
2015
- 2015-01-30 CN CN201520064717.2U patent/CN204376574U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203599393U (en) | Stamping die | |
CN204928684U (en) | Fixed structure of solar photovoltaic board | |
CN103990710A (en) | Stamping die used for conducting bending | |
CN102975005B (en) | Tabling device of machine shell and gear case end cap | |
CN204295419U (en) | Lathe panel beating dodge gate derail-prevention structure | |
CN204376574U (en) | For the installation briquetting of high ferro | |
CN204365860U (en) | Polish structure in material strip local | |
CN205914996U (en) | SIM cassette equipment tool | |
CN204135652U (en) | Universal pressing tool | |
CN205110452U (en) | Bending die | |
CN208592305U (en) | A kind of buoyant structure | |
CN205870728U (en) | Die -cut device of diaphragm | |
CN206717480U (en) | Prevent the side that workpiece floats from pushing away detent mechanism | |
CN203380232U (en) | Novel bending device | |
CN203403636U (en) | Anchoring part for integrated plate with heat preservation function and decoration function | |
CN204645499U (en) | A kind of improved anchoring firmware in devices | |
CN203265433U (en) | General riveting device | |
CN204007493U (en) | A kind of terminal row female end detects tool | |
CN204843102U (en) | Sheet metal cutting device | |
CN205882183U (en) | ITO dolly carbon brush sensing device | |
CN202701176U (en) | Stamping device for automobile left suspended installation inner plate | |
CN105227073A (en) | The photovoltaic component mounting structure of photovoltaic bracket | |
CN202889766U (en) | Foldable flexible circuit board | |
CN203286216U (en) | Water pump system and supporting device for water pump motor | |
CN201654091U (en) | Base plate of electric meter box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150603 Termination date: 20160130 |
|
EXPY | Termination of patent right or utility model |