CN204367257U - A kind of vulcanization mechanism device with warning function - Google Patents

A kind of vulcanization mechanism device with warning function Download PDF

Info

Publication number
CN204367257U
CN204367257U CN201420863585.5U CN201420863585U CN204367257U CN 204367257 U CN204367257 U CN 204367257U CN 201420863585 U CN201420863585 U CN 201420863585U CN 204367257 U CN204367257 U CN 204367257U
Authority
CN
China
Prior art keywords
alarm
pressure gauge
stage casing
pipeline
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420863585.5U
Other languages
Chinese (zh)
Inventor
麦志荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG KAIHUA ELECTRIC APPLIANCE CO., LTD.
Original Assignee
KAIHUA ELECTRIC INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAIHUA ELECTRIC INDUSTRIAL Co Ltd filed Critical KAIHUA ELECTRIC INDUSTRIAL Co Ltd
Priority to CN201420863585.5U priority Critical patent/CN204367257U/en
Application granted granted Critical
Publication of CN204367257U publication Critical patent/CN204367257U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of vulcanization mechanism device with warning function, comprise the sulfuration pipeline and control assembly that are connected with extruder, described sulfuration pipeline is equipped with at least one Pressure gauge, control assembly is connected with at least one alarm, alarm is connected with Pressure gauge, realize the inbound port of Pressure gauge to curing tube, stage casing or discharging opening, or their any two place's pipeline sections, or their whole three place's pipeline sections, or even many places pipeline section carries out Real-Time Monitoring sulfide stress, and coordinate with alarm arrangement, clearly can send alarm signal to too low or excess pressure numerical value in real time, use manpower and material resources sparingly, reduce costs, operating personnel are regulated by the sulfide stress of control assembly to curing tube in time, ensure vulcanization of rubber quality.

Description

A kind of vulcanization mechanism device with warning function
Technical field
The utility model relates to the field manufacturing rubber components, particularly relates to a kind of vulcanization mechanism device of the band warning function for the manufacture of rubber.
Background technology
Sulfuration is one of main processes of rubber processing, is also last manufacturing procedure during rubber is produced.In this operation, rubber will experience the chemical change of series of complex, become elastomeric cross-linked rubber from the elastomeric compound of plasticity, thus obtain more perfect physical and mechanical properties and chemical property, improve and widened use value and the range of application of elastomeric material.Therefore, sulfuration is of great significance the manufacture of rubber and goods thereof and application tool.
Wherein, vulcanization of rubber pressure is one of important parameter of rubber vulcanization process, and it is the key factor ensureing rubber part physical dimension, density of texture, physical mechanical, also can ensure the smooth zero defect of piece surface simultaneously, reach the seal request of rubber.So the inbound port of existing curing tube generally sets up pressure gauge, Real-Time Monitoring is carried out to the pressure in sulfuration pipeline.
, the sulfide stress that needs in different segment pipe of curing tube is not of uniform size.As, when curing temperature is higher, pressure can be smaller; When temperature is lower, pressure should high point.Therefore, the pressure gauge of the single inbound port be arranged in sulfuration pipeline only carries out numerical value monitoring to the pressure of sulfuration pipeline inbound port, not only be difficult to monitor in real time curing tube according to practical application, and be difficult to send to warn to the end or the too high sulfide stress excessively in curing tube regard as use, still need to monitor pressure gauge with manually improving police strength, then artificial too low or too high sulfide stress to be regulated, troublesome poeration, otherwise, have a strong impact on the quality of the vulcanization of rubber.But, when pressure gauge be installed on curing tube too high or cross the position at the end time, be manually difficult to clearly monitor pressure gauge, being difficult to equally regulate too low or too high sulfide stress, is also the quality having a strong impact on the vulcanization of rubber.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, there is provided a kind of structure simple, according to practical application to sulfuration pipeline Real-Time Monitoring, clearly can send again the vulcanization mechanism device of the band warning function of alarm signal in real time to too low or excess pressure numerical value.
To this, a kind of vulcanization mechanism device with warning function, comprises the sulfuration pipeline and control assembly that are connected with extruder, wherein, described sulfuration pipeline is equipped with at least one Pressure gauge, and control assembly is connected with at least one alarm, alarm is connected with Pressure gauge.
Be optimized according to above-mentioned, 1 Pressure gauge described sulfuration pipeline is equipped with, Pressure gauge comprises the inlet pressure table of the arrival end being installed on sulfuration pipeline, described control assembly is connected with 1 alarm, and alarm comprises the entrance alarm with inlet pressure list catenation.
Or described sulfuration pipeline is equipped with 1 Pressure gauge, Pressure gauge comprises the delivery gauge of the port of export being installed on sulfuration pipeline, described control assembly is connected with 1 alarm, alarm comprises the outlet alarm with outlet pressure list catenation.
Or described sulfuration pipeline is equipped with 1 Pressure gauge, Pressure gauge comprises the stage casing Pressure gauge in the stage casing being installed on sulfuration pipeline, described control assembly is connected with 1 alarm, and alarm comprises the stage casing alarm be connected with stage casing Pressure gauge.
Or, 2 Pressure gauges described sulfuration pipeline are equipped with, Pressure gauge comprises inlet pressure table, the stage casing Pressure gauge in arrival end and the stage casing being installed on sulfuration pipeline, described control assembly is connected with 2 alarms, alarm comprises the entrance alarm, the stage casing alarm that are connected with inlet pressure table, stage casing Pressure gauge.
Or, 2 Pressure gauges described sulfuration pipeline are equipped with, Pressure gauge comprises inlet pressure table, the delivery gauge of arrival end and the port of export being installed on sulfuration pipeline, described control assembly is connected with 2 alarms, alarm comprises with the entrance alarm of inlet pressure table, outlet pressure list catenation, exports alarm.
Or, 2 Pressure gauges described sulfuration pipeline are equipped with, Pressure gauge comprises stage casing Pressure gauge, the delivery gauge of stage casing and the port of export being installed on sulfuration pipeline, described control assembly is connected with 2 alarms, alarm comprises with the stage casing alarm of stage casing Pressure gauge, outlet pressure list catenation, exports alarm.
Or, 3 Pressure gauges described sulfuration pipeline are equipped with, Pressure gauge comprise be installed on sulfuration pipeline arrival end, stage casing, the inlet pressure table of the port of export, stage casing Pressure gauge, delivery gauge, described control assembly is connected with 3 alarms, alarm comprises with the entrance alarm of inlet pressure table, stage casing Pressure gauge, outlet pressure list catenation, stage casing alarm, exports alarm.
Be optimized according to above-mentioned, described alarm is audible-visual annunciator.
The beneficial effects of the utility model are, Pressure gauge is distributed on sulfuration pipeline, can according to the inbound port of practical application to curing tube, stage casing or discharging opening, or their any two place's pipeline sections, or their whole three place's pipeline sections, or even many places pipeline section carries out Real-Time Monitoring sulfide stress, and coordinate with alarm arrangement, operationally, alarm clearly can send alarm signal to too low or excess pressure numerical value in real time, use manpower and material resources sparingly, reduce costs, operating personnel are regulated by the sulfide stress of control assembly to curing tube in time, ensure vulcanization of rubber quality.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model first embodiment.
Fig. 2 is the structural representation of the utility model second embodiment.
Fig. 3 is the structural representation of the utility model the 3rd embodiment.
Fig. 4 is the structural representation of the utility model the 4th embodiment.
Fig. 5 is the structural representation of the utility model the 5th embodiment.
Fig. 6 is the structural representation of the utility model the 6th embodiment.
Fig. 7 is the structural representation of the utility model the 7th embodiment.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model will be further described, and Fig. 1 to Fig. 7 illustrates embodiment of the present utility model, the vulcanization mechanism device of described band warning function, comprises the sulfuration pipeline 1 and control assembly 2 that are connected with extruder.Wherein, described sulfuration pipeline 1 is equipped with at least one Pressure gauge, and control assembly 2 is connected with at least one alarm, alarm is connected with Pressure gauge.Be embodied in,
With reference to shown in Fig. 1, first embodiment, described sulfuration pipeline 1 is equipped with 1 Pressure gauge, and Pressure gauge comprises the inlet pressure table 3 of the arrival end being installed on sulfuration pipeline 1, described control assembly 2 is connected with 1 alarm, alarm comprises the entrance alarm 4 be connected with inlet pressure table 3.
With reference to shown in Fig. 2, second embodiment, described sulfuration pipeline 1 is equipped with 1 Pressure gauge, and Pressure gauge comprises the delivery gauge 5 of the port of export being installed on sulfuration pipeline 1, described control assembly 2 is connected with 1 alarm, alarm comprises the outlet alarm 6 be connected with delivery gauge 5.
With reference to shown in Fig. 3,3rd embodiment, described sulfuration pipeline 1 is equipped with 1 Pressure gauge, and Pressure gauge comprises the stage casing Pressure gauge 7 in the stage casing being installed on sulfuration pipeline 1, described control assembly 2 is connected with 1 alarm, alarm comprises the stage casing alarm 8 be connected with stage casing Pressure gauge 7.
With reference to shown in Fig. 4,4th embodiment, 2 Pressure gauges described sulfuration pipeline 1 are equipped with, Pressure gauge comprises inlet pressure table 3, the stage casing Pressure gauge 7 in arrival end and the stage casing being installed on sulfuration pipeline 1, described control assembly 2 is connected with 2 alarms, alarm comprises the entrance alarm 4, the stage casing alarm 8 that are connected with inlet pressure table 3, stage casing Pressure gauge 7.
With reference to shown in Fig. 5,5th embodiment, 2 Pressure gauges described sulfuration pipeline 1 are equipped with, Pressure gauge comprises inlet pressure table 3, the delivery gauge 5 of arrival end and the port of export being installed on sulfuration pipeline 1, described control assembly 2 is connected with 2 alarms, alarm comprise be connected with inlet pressure table 3, delivery gauge 5 entrance alarm 4, export alarm 6.
With reference to shown in Fig. 6,6th embodiment, 2 Pressure gauges described sulfuration pipeline 1 are equipped with, Pressure gauge comprises stage casing Pressure gauge 7, the delivery gauge 5 of stage casing and the port of export being installed on sulfuration pipeline 1, described control assembly 2 is connected with 2 alarms, alarm comprise be connected with stage casing Pressure gauge 7, delivery gauge 5 stage casing alarm 8, export alarm 6.
With reference to shown in Fig. 7,7th embodiment, 3 Pressure gauges described sulfuration pipeline 1 are equipped with, Pressure gauge comprise be installed on sulfuration pipeline 1 arrival end, stage casing, the inlet pressure table 3 of the port of export, stage casing Pressure gauge 7, delivery gauge 5, described control assembly 2 is connected with 3 alarms, alarm comprise be connected with inlet pressure table 3, stage casing Pressure gauge 7, delivery gauge 5 entrance alarm 4, stage casing alarm 8, export alarm 6.
Comprehensively above-mentioned, Pressure gauge is distributed on sulfuration pipeline 1, can according to practical application to the inbound port of curing tube, stage casing or discharging opening, or their any two place's pipeline sections, or their whole three place's pipeline sections, or even many places pipeline section carries out Real-Time Monitoring, and Pressure gauge coordinates with alarm arrangement, and this alarm is audible-visual annunciator.Operationally, clearly can send alarm signal to the too low or excess pressure numerical value in sulfuration pipeline 1 in real time, use manpower and material resources sparingly, reduce costs, operating personnel can be regulated by the sulfide stress of control assembly 2 pairs of curing tubes in time, ensure vulcanization of rubber quality.
Above-mentioned specific embodiment is only the good detailed description of the invention of the utility model effect, and the vulcanization mechanism device of all band warning functions identical or equivalent with this structure, all in the protection domain of the application.

Claims (9)

1. the vulcanization mechanism device with warning function, comprise the sulfuration pipeline (1) and control assembly (2) that are connected with extruder, it is characterized in that: described sulfuration pipeline (1) is equipped with at least one Pressure gauge, (2) are connected with at least one alarm to control assembly, and alarm is connected with Pressure gauge.
2. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 1 Pressure gauge, Pressure gauge comprises the inlet pressure table (3) of the arrival end being installed on sulfuration pipeline (1), described control assembly (2) is connected with 1 alarm, alarm comprises the entrance alarm (4) be connected with inlet pressure table (3).
3. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 1 Pressure gauge, Pressure gauge comprises the delivery gauge (5) of the port of export being installed on sulfuration pipeline (1), described control assembly (2) is connected with 1 alarm, alarm comprises the outlet alarm (6) be connected with delivery gauge (5).
4. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 1 Pressure gauge, Pressure gauge comprises the stage casing Pressure gauge (7) in the stage casing being installed on sulfuration pipeline (1), described control assembly (2) is connected with 1 alarm, alarm comprises the stage casing alarm (8) be connected with stage casing Pressure gauge (7).
5. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 2 Pressure gauges, Pressure gauge comprises inlet pressure table (3), the stage casing Pressure gauge (7) in arrival end and the stage casing being installed on sulfuration pipeline (1), described control assembly (2) is connected with 2 alarms, alarm comprises the entrance alarm (4), the stage casing alarm (8) that are connected with inlet pressure table (3), stage casing Pressure gauge (7).
6. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 2 Pressure gauges, Pressure gauge comprises inlet pressure table (3), the delivery gauge (5) of arrival end and the port of export being installed on sulfuration pipeline (1), described control assembly (2) is connected with 2 alarms, alarm comprise be connected with inlet pressure table (3), delivery gauge (5) entrance alarm (4), export alarm (6).
7. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 2 Pressure gauges, Pressure gauge comprises stage casing Pressure gauge (7), the delivery gauge (5) of stage casing and the port of export being installed on sulfuration pipeline (1), described control assembly (2) is connected with 2 alarms, alarm comprise be connected with stage casing Pressure gauge (7), delivery gauge (5) stage casing alarm (8), export alarm (6).
8. the vulcanization mechanism device according to claim 1 with warning function, it is characterized in that: described sulfuration pipeline (1) is equipped with 3 Pressure gauges, Pressure gauge comprise be installed on sulfuration pipeline (1) arrival end, stage casing, the inlet pressure table (3) of the port of export, stage casing Pressure gauge (7), delivery gauge (5), described control assembly (2) is connected with 3 alarms, alarm comprise be connected with inlet pressure table (3), stage casing Pressure gauge (7), delivery gauge (5) entrance alarm (4), stage casing alarm (8), export alarm (6).
9. the vulcanization mechanism device with warning function according to any one of claim 1 to 8, is characterized in that: described alarm is audible-visual annunciator.
CN201420863585.5U 2014-12-31 2014-12-31 A kind of vulcanization mechanism device with warning function Expired - Fee Related CN204367257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420863585.5U CN204367257U (en) 2014-12-31 2014-12-31 A kind of vulcanization mechanism device with warning function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420863585.5U CN204367257U (en) 2014-12-31 2014-12-31 A kind of vulcanization mechanism device with warning function

Publications (1)

Publication Number Publication Date
CN204367257U true CN204367257U (en) 2015-06-03

Family

ID=53323503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420863585.5U Expired - Fee Related CN204367257U (en) 2014-12-31 2014-12-31 A kind of vulcanization mechanism device with warning function

Country Status (1)

Country Link
CN (1) CN204367257U (en)

Similar Documents

Publication Publication Date Title
CN204367257U (en) A kind of vulcanization mechanism device with warning function
CN105889656A (en) Gas conveying pipeline for methyl aldehyde production process
CN206145438U (en) A monitoring and protection device for liquid chlorine conveyer pipe
CN204241350U (en) A kind of filter check device
CN204141145U (en) A kind of pipeline wind
CN204214689U (en) Low pressure pipeline fluid sampling apparatus
CN204785137U (en) Novel pipeline of liquid chlorine
CN204736295U (en) A vacuum wallboard extruder for making light weight wallboard
CN204177790U (en) A kind of gas controlling device
CN205084858U (en) Vapour -pressure type putty alarm
CN103736698A (en) Cleaning equipment for pipe fitting inner cavity
CN203472016U (en) Automatic pressure relief device for vulcanizing tank
CN205981172U (en) Utensil is examined to G section bar
CN204267966U (en) Online plug in sensor installation sleeve with pressure
CN210935501U (en) Sheet flush coater nozzle flow alarm device
CN204554105U (en) A kind of fuel oil conveyance conduit
CN203686578U (en) Air distributing device adding corrosive air from bypass
CN202808335U (en) Safety device for distributor of high-risk chemical liquids
CN204286693U (en) A kind of impermeability pressure testing/detecting device
CN204202899U (en) A kind of novel reaction kettle sampler with protective device
CN216524646U (en) Air tightness detection device for plastic U-shaped pipe
CN104908147A (en) Vacuum wallboard extruding machine used for manufacture of light wall boards
CN203192158U (en) Tunnel fire alarm device
CN207424277U (en) A kind of detection device for being used to detect threeway and elbow
CN204395259U (en) A kind of New Protective Breathing Apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 528322 Guangdong Province, Foshan city Shunde District Leliu Town Industrial Zone Chung Longzhou Road North

Patentee after: GUANGDONG KAIHUA ELECTRIC APPLIANCE CO., LTD.

Address before: 528322 Guangdong Province, Foshan city Shunde District Leliu Town Industrial Zone Chung Longzhou Road North

Patentee before: Kaihua Electric Industrial Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20191231

CF01 Termination of patent right due to non-payment of annual fee