CN204358261U - Across beam type pipeline elevator - Google Patents

Across beam type pipeline elevator Download PDF

Info

Publication number
CN204358261U
CN204358261U CN201420707058.5U CN201420707058U CN204358261U CN 204358261 U CN204358261 U CN 204358261U CN 201420707058 U CN201420707058 U CN 201420707058U CN 204358261 U CN204358261 U CN 204358261U
Authority
CN
China
Prior art keywords
crossbeam
section steel
type channel
fixed
pipe clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420707058.5U
Other languages
Chinese (zh)
Inventor
张耀鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Yao Zhou Fabricated Metals Co Ltd
Original Assignee
Suzhou Yao Zhou Fabricated Metals Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Yao Zhou Fabricated Metals Co Ltd filed Critical Suzhou Yao Zhou Fabricated Metals Co Ltd
Priority to CN201420707058.5U priority Critical patent/CN204358261U/en
Application granted granted Critical
Publication of CN204358261U publication Critical patent/CN204358261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of across beam type pipeline elevator, comprise and be fixedly mounted on two across the crossbeam below beam, described crossbeam and described across being provided with fixing crimping structure between beam, on described crossbeam, compartment of terrain is provided with the pipe clamp for fixed fitting, described crossbeam adopts at least one C type channel-section steel to make, and the notch direction being positioned at described C type channel-section steel is bottom downward, is provided with fixed installation structure between described pipe clamp and crossbeam; Described fixed installation structure comprises screw rod, be arranged on the internal thread connecting base on described pipe clamp and be positioned at the spring nut of described C type channel-section steel, the two ends of described screw rod are connected with spring nut with described internal thread connecting base respectively, and described screw rod is provided with for described spring nut being clamped the locknut and backing plate that are fixed in described C type channel-section steel.Of the present utility modelly can not only meet the stability of pipeline, the requirement of strength and stiffness across beam type pipeline elevator, and can coordinate with across beam and realize installing.

Description

Across beam type pipeline elevator
Technical field
[0001] the present invention relates to a kind of pipeline elevator, concrete is a kind of across beam type pipeline elevator.
Background technique
The layout of pipeline elevator and type should meet the requirement of pipeline loading, compensation and displacement, and note the vibration reducing pipeline; In addition, also must consider temperature and the working pressure of the stability of pipeline, strength and stiffness and fed sheet of a media, and easy being easy to makes and saves steel as far as possible.Except meeting above basic demand, pipeline elevator also need can with other respective outer side edges, namely when pipeline elevator and other building structure are staggered or parallel time, the feature of other building structure can be utilized to install, make it reach to utilize the object in space.
General employing pipe clamp fixing tube in pipeline elevator, although existing pipe clamp can meet usage requirement to a certain extent, but, when tightening pipe clamp bolt banding pipeline, bolt part easily drops and is not easy to be in place, and being generally high-lift operation due to the operation of pipeline elevator, this brings certain difficulty to operator.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of across beam type pipeline elevator, this suspension bracket can not only meet the stability of pipeline, the requirement of strength and stiffness, and can coordinate with across beam and realize installing.
For achieving the above object, the invention provides following technological scheme:
A kind of across beam type pipeline elevator, comprise and be fixedly mounted on two across the crossbeam below beam, described crossbeam and described across being provided with fixing crimping structure between beam, on described crossbeam, compartment of terrain is provided with the pipe clamp for fixed fitting, described crossbeam adopts at least one C type channel-section steel to make, and the notch direction being positioned at described C type channel-section steel is bottom downward, is provided with fixed installation structure between described pipe clamp and crossbeam; Described fixed installation structure comprises screw rod, be arranged on the internal thread connecting base on described pipe clamp and be positioned at the spring nut of described C type channel-section steel, the two ends of described screw rod are connected with spring nut with described internal thread connecting base respectively, and described screw rod is provided with for described spring nut being clamped the locknut and backing plate that are fixed in described C type channel-section steel.
Further, described crossbeam comprises two described C type channel-section steels be superimposed together privately mutually in notch.
Further, the interior flanging of described C type channel-section steel notch is provided with slideproof tooth, and described spring nut is provided with the serrate slot coordinated with flanging in described C type channel-section steel notch.
Further, described fixing crimping structure comprises and is pressed in across the pressing plate on beam and is enclosed within U-shaped cover on described crossbeam, the two ends of described U-shaped cover are provided with outside thread, correspondingly with the two ends of described U-shaped cover on described pressing plate be provided with mounting hole, the two ends of described U-shaped cover are respectively equipped with for being fixed on described crossbeam across the gland nut on beam.
Further, described pressing plate is bending-like, and one end of pressing plate is pressed in across on beam, and the other end is pressed on described crossbeam.
Further, described pipe clamp comprises upper clip and lower clamping piece, and one end of described upper clip and lower clamping piece is articulated and connected, and the other end is provided with the retention mechanism for closed described upper clip and lower clamping piece;
Described retention mechanism comprises and being separately positioned on described upper clip and lower clamping piece and outward extending upper fixed plate and lower fixed plate, the bottom-hinged of described lower fixed plate is connected with the sheet that is threaded, the described sheet that is threaded is provided with the tapped hole for installing clamping bolt, and all correspondingly with described tapped hole on fixed and lower fixed plate be provided with opening slot, the running shaft of the described sheet that is threaded is vertical with the opening direction of described opening slot, and fixed upturned at described opening slot opening.
Beneficial effect of the present invention is:
Of the present invention across beam type pipeline elevator, by adopting fixing crimping structure that crossbeam is fixed on two belows across beam, namely pipeline elevator of the present invention can be arranged on across on beam, the Appropriate application of implementation space; And crossbeam is fixedly mounted on across on beam, stability and the rigidity of suspension bracket can also be improved, effectively can alleviate pipe vibration; Adopt C type channel-section steel to make crossbeam, the mounting arrangements position of pipe clamp can be regulated easily, facilitate pipeline location to compensate and displacement.
By arranging retention mechanism on pipe clamp, during use, clamping bolt can be installed being threaded on sheet in advance, and nut of screwing on clamping bolt, when pipeline is between upper clip and lower clamping piece, rotate the sheet that is threaded, clamping bolt is slipped into from the opening slot of upper fixed plate and lower fixed plate, pipe clamp can be fixedly clamped by fastening nut, easy to use, need not worry to occur in high-lift operation process the potential potential safety hazard that bolt and nut drops again.
Accompanying drawing explanation
In order to make object of the present invention, technological scheme and beneficial effect clearly, the invention provides following accompanying drawing and being described:
Fig. 1 is the structural representation across beam type pipeline elevator embodiment of the present invention;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the structural representation of pipe clamp;
Fig. 4 is the B detail drawing of Fig. 3.
Embodiment
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described in detail.
As shown in Figure 1, for of the present invention across the structural representation of beam type pipeline elevator embodiment.The present embodiment across beam type pipeline elevator, comprise and be fixedly mounted on two across the crossbeam 2 below beam 1, crossbeam 2 and be provided with fixing crimping structure across between beam 2.On crossbeam 2, compartment of terrain is provided with the pipe clamp 3 for fixed fitting, and crossbeam 2 adopts at least one C type channel-section steel 2a to make, and the notch direction being positioned at C type channel-section steel 2a is bottom downward, is provided with fixed installation structure between pipe clamp 3 and crossbeam 2.The fixed installation structure of the present embodiment comprises screw rod 4, be arranged on the internal thread connecting base 5 on pipe clamp 3 and be positioned at the spring nut 6 of C type channel-section steel 2a, the two ends of screw rod 4 are connected with spring nut 6 with internal thread connecting base 5 respectively, and screw rod 4 is provided with for spring nut 6 being clamped the locknut 7 and backing plate 8 that are fixed in C type channel-section steel 2a.
The crossbeam 2 of the present embodiment comprises two C type channel-section steel 2a be superimposed together privately mutually in notch, effectively can strengthen the loading capacity of crossbeam 2.The interior flanging of the C type channel-section steel 2a notch of the present embodiment is provided with slideproof tooth, and spring nut 6 is provided with the serrate slot coordinated with flanging in C type channel-section steel 2a notch, can effectively prevent spring nut 6 from moving in C type channel-section steel 2a, namely can the mounting point of Duct fixing clamp 3.
The fixing crimping structure of the present embodiment comprises and is pressed in across the pressing plate 9 on beam 1 and the U-shaped cover 10 that is enclosed within crossbeam 2, the two ends of U-shaped cover 10 are provided with outside thread, correspondingly with the two ends of U-shaped cover 10 on pressing plate 9 be provided with mounting hole, the two ends of U-shaped cover 10 are respectively equipped with for being fixed on by crossbeam 2 across the gland nut 11 on beam 1, crossbeam 2 can be fixed on the below across beam 1.Pressing plate 9 is in bending-like, and one end of pressing plate 9 is pressed in across on beam 1, and the other end is pressed on crossbeam 2, utilizes U-shaped cover 10 and screw threads for fastening power, crossbeam 2 can be fixed on easily the below across beam 1.
The present embodiment across beam type pipeline elevator, by adopting fixing crimping structure that crossbeam 2 is fixed on two belows across beam 1, namely the pipeline elevator of the present embodiment can be arranged on across on beam 1, and the Appropriate application of implementation space, adopts I-steel to make across beam 1; And crossbeam 2 is fixedly mounted on across on beam 1, stability and the rigidity of suspension bracket can also be improved, effectively can alleviate pipe vibration; Adopt C type channel-section steel 2a to make crossbeam 2, the mounting arrangements position of pipe clamp 3 can be regulated easily, facilitate pipeline location to compensate and displacement.
Further, pipe clamp 3 comprises upper clip 12 and lower clamping piece 13, and one end of upper clip 12 and lower clamping piece 13 is articulated and connected, and the other end is provided with the retention mechanism for closed upper clip 12 and lower clamping piece 13.The retention mechanism of the present embodiment comprises and being separately positioned on upper clip 12 and lower clamping piece 13 and outward extending upper fixed plate 12a and lower fixed plate 13a, the bottom-hinged of lower fixed plate 13a is connected with the sheet 14 that is threaded, the sheet 14 that is threaded is provided with the tapped hole for installing clamping bolt 15, and all correspondingly with tapped hole on upper fixed plate 12a and lower fixed plate 13a be provided with opening slot 16, the running shaft of sheet 14 of being threaded is vertical with the opening direction of opening slot 16, and upper fixed plate 12a is upturned at the opening of opening slot 16.
By arranging retention mechanism on pipe clamp 3, during use, clamping bolt 15 can be installed being threaded on sheet 14 in advance, and nut of screwing on clamping bolt 15, when pipeline is between upper clip 12 and lower clamping piece 13, rotation is threaded sheet 14, clamping bolt 15 is slipped into from the opening slot 16 of upper fixed plate 12a and lower fixed plate 13a, pipe clamp 3 can be fixedly clamped by fastening nut, easy to use, need not worry to occur in high-lift operation process the potential potential safety hazard that bolt and nut drops again.
What finally illustrate is, above preferred embodiment is only in order to illustrate technological scheme of the present invention and unrestricted, although by above preferred embodiment to invention has been detailed description, but those skilled in the art are to be understood that, various change can be made to it in the form and details, and not depart from claims of the present invention limited range.

Claims (6)

1. one kind across beam type pipeline elevator, it is characterized in that: comprise and be fixedly mounted on two across the crossbeam below beam, described crossbeam and described across being provided with fixing crimping structure between beam, on described crossbeam, compartment of terrain is provided with the pipe clamp for fixed fitting, described crossbeam adopts at least one C type channel-section steel to make, and the notch direction being positioned at described C type channel-section steel is bottom downward, is provided with fixed installation structure between described pipe clamp and crossbeam; Described fixed installation structure comprises screw rod, be arranged on the internal thread connecting base on described pipe clamp and be positioned at the spring nut of described C type channel-section steel, the two ends of described screw rod are connected with spring nut with described internal thread connecting base respectively, and described screw rod is provided with for described spring nut being clamped the locknut and backing plate that are fixed in described C type channel-section steel.
2. according to claim 1 across beam type pipeline elevator, it is characterized in that: described crossbeam comprises two described C type channel-section steels be superimposed together privately mutually in notch.
3. according to claim 2 across beam type pipeline elevator, it is characterized in that: the interior flanging of described C type channel-section steel notch is provided with slideproof tooth, described spring nut is provided with the serrate slot coordinated with flanging in described C type channel-section steel notch.
4. according to claim 1 across beam type pipeline elevator, it is characterized in that: described fixing crimping structure comprises and is pressed in across the pressing plate on beam and is enclosed within U-shaped cover on described crossbeam, the two ends of described U-shaped cover are provided with outside thread, correspondingly with the two ends of described U-shaped cover on described pressing plate be provided with mounting hole, the two ends of described U-shaped cover are respectively equipped with for being fixed on described crossbeam across the gland nut on beam.
5. according to claim 4 across beam type pipeline elevator, it is characterized in that: described pressing plate is bending-like, and one end of pressing plate is pressed in across on beam, the other end is pressed on described crossbeam.
6. according to any one of claim 1-5 across beam type pipeline elevator, it is characterized in that: described pipe clamp comprises upper clip and lower clamping piece, one end of described upper clip and lower clamping piece is articulated and connected, and the other end is provided with the retention mechanism for closed described upper clip and lower clamping piece;
Described retention mechanism comprises and being separately positioned on described upper clip and lower clamping piece and outward extending upper fixed plate and lower fixed plate, the bottom-hinged of described lower fixed plate is connected with the sheet that is threaded, the described sheet that is threaded is provided with the tapped hole for installing clamping bolt, and all correspondingly with described tapped hole on fixed and lower fixed plate be provided with opening slot, the running shaft of the described sheet that is threaded is vertical with the opening direction of described opening slot, and fixed upturned at described opening slot opening.
CN201420707058.5U 2014-11-22 2014-11-22 Across beam type pipeline elevator Expired - Fee Related CN204358261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420707058.5U CN204358261U (en) 2014-11-22 2014-11-22 Across beam type pipeline elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420707058.5U CN204358261U (en) 2014-11-22 2014-11-22 Across beam type pipeline elevator

Publications (1)

Publication Number Publication Date
CN204358261U true CN204358261U (en) 2015-05-27

Family

ID=53259731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420707058.5U Expired - Fee Related CN204358261U (en) 2014-11-22 2014-11-22 Across beam type pipeline elevator

Country Status (1)

Country Link
CN (1) CN204358261U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645256A (en) * 2014-11-22 2016-06-08 苏州耀洲金属制品有限公司 Span beam type pipeline hanger
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN107166098A (en) * 2017-05-31 2017-09-15 安徽奥睿德科技发展有限公司 A kind of para-seismic support mounting structure of wall-through hole both sides
CN114017547A (en) * 2021-10-26 2022-02-08 中冶天工集团有限公司 Pipeline installation and transportation device and method adopting crown block beam lower sliding method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645256A (en) * 2014-11-22 2016-06-08 苏州耀洲金属制品有限公司 Span beam type pipeline hanger
CN107166098A (en) * 2017-05-31 2017-09-15 安徽奥睿德科技发展有限公司 A kind of para-seismic support mounting structure of wall-through hole both sides
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN114017547A (en) * 2021-10-26 2022-02-08 中冶天工集团有限公司 Pipeline installation and transportation device and method adopting crown block beam lower sliding method

Similar Documents

Publication Publication Date Title
CN204358262U (en) Bearing diagonal multitube gallows frame
CN204358261U (en) Across beam type pipeline elevator
CN204358258U (en) Airduct water pipe shares suspension bracket
CN105673942A (en) Groove top type pipeline hanger
CN204358256U (en) Groove top formula pipeline elevator
CN105605326A (en) Corbel diagonal bracing type pipeline hanger
CN204358263U (en) Trailing arm derrick type pipeline elevator
CN105650355A (en) Inclined bracing multi-tube gantry hanging bracket
CN204176142U (en) A kind of antidetonation connects substrate and antidetonation connection bracket composite structure
CN105645256A (en) Span beam type pipeline hanger
CN103921737A (en) Automobile TCU (transmission control unit) support and storage battery support combination structure
US20110084178A1 (en) Conduit hanging device
CN105673940A (en) Wall groove type pipeline hanger
CN105673950A (en) Supporting arm and boom type pipeline hanger
CN205226638U (en) A adjustable bracket for pipe laying
CN203888572U (en) Stabilizer bar fixing clamp connecting structure and passenger car suspension system
CN204042193U (en) A kind of pipe clamp and sanitation equipment
CN204083514U (en) A kind of discharge tube bracket and bulk cement truck
CN206496090U (en) A kind of support of pipelines
CN202782508U (en) Rear axle housing structure of commercial vehicle
CN204701605U (en) A kind of clutch cushion valve bracket assembly
CN204978820U (en) Power steering oilcan fixed structure
CN207045323U (en) Vacuum tank mounting bracket
CN202074208U (en) Coaxial constant-force supporting and hanging bracket of plate-type displacement indicator
CN201712615U (en) Hoisting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20151122

EXPY Termination of patent right or utility model