CN204352700U - A kind of spray column of filtering biological matter fuel gas and dust - Google Patents

A kind of spray column of filtering biological matter fuel gas and dust Download PDF

Info

Publication number
CN204352700U
CN204352700U CN201420778962.5U CN201420778962U CN204352700U CN 204352700 U CN204352700 U CN 204352700U CN 201420778962 U CN201420778962 U CN 201420778962U CN 204352700 U CN204352700 U CN 204352700U
Authority
CN
China
Prior art keywords
tower body
filter
gas
water
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420778962.5U
Other languages
Chinese (zh)
Inventor
史惠元
殷梅芳
施俊鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420778962.5U priority Critical patent/CN204352700U/en
Application granted granted Critical
Publication of CN204352700U publication Critical patent/CN204352700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to purifier field, and particularly a kind of spray column of filtering biological matter fuel gas and dust, comprises tower body, blower fan, filter and water supply installation; Tower body is disposed with sewage draining exit, overfall, air inlet and gas outlet from bottom to up, and the inwall of tower body is provided with spray equipment, and spray equipment is connected with water supply installation; Blower fan is connected with air inlet or gas outlet; Filter is connected with overfall.This spray column, it is the flue gas of combustion gas or the burning generation that living beings are obtained, certain pressure is produced through blower fan, enter tower body by air inlet, spray equipment ejection water, the dust in gas and water become together with muddy water and fall, sludgd deposition is in the bottom of tower body, the suspension of water is positioned at above mud, and the suspension of water flows out to filter from overfall, and mud is discharged from the sewage draining exit of tower body.Dust in the flue gas that the good like this combustion gas that living beings obtained or burning produce is removed, and this spray column cost is low.

Description

A kind of spray column of filtering biological matter fuel gas and dust
Technical field
The utility model relates to purifier field, in particular to a kind of spray column of filtering biological matter fuel gas and dust.
Background technology
The flue gas that consumer waste incineration produces, national Specification adopts sack cleaner to filter, and bag-type dusting has dry method, semidry method and wet method three kinds, and current China adopts semidry method bag-type dust mostly.In practice, flue gas is reduced to 139 DEG C will condense (steam becomes water droplet), easily causes smoke-dust moist and sticks with paste filter bag, finally bursting filter bag and cause dedusting failure.Therefore, existing house refuse semidry method sack cleaner has electrical heating one, to prevent flue gas to be reduced to less than 140 DEG C, generally all remains on more than 150 DEG C.Just because of increase the device having heating, the cost of the sack cleaner of 1 75t boiler emission flue gas (day process 600t rubbish) is generally 8,500,000 yuan-1200 between ten thousand yuan.
The height of above-mentioned deduster cost, the flue gas ash removal for villages and towns in rural areas domestic rubbish disposal is inapplicable.A Biogas station is built in rural area centered by certain town, and raw material can be rubbish and stalk, and for rubbish, day disposal of refuse 100t scale, gross investment about 1,000 ten thousand yuan, if a greater part of investment amount has been spent in dedusting, that just cannot organizational system gas station.Perhaps someone produces such idea: can by the steam produced when control rubbish or gasifying stalk, as by raw material stoving, moisture is not had in gas, does is dedusting just no longer difficult to process? in fact according to the principle of gas processed, the steam produced when controlling gasification is very difficult.The principle of gas processed is as follows: all solids living beings are as house refuse, stalk, branch bavin etc., they are moisture content about 10% time, the percentage by weight of its hydrocarbon oxygen (C, H, O) transfers mol ratio (mol volume ratio) to, no matter be house refuse, stalk, branch bavin, its C, H, O ratio is all C substantially 3h 40 2, allow it burn completely to need the amount of oxygen equation that adds be:
C 3H 4O 2+3O 2=3CO 2+2H 2O
From above formula, 3 O are sent on the equal sign left side 2molecule, obtains 5 gas molecules on the right of equal sign, wherein 3 CO 2molecule, 2 H 2o molecule, produces the water of 2/5.The amount of oxygen sent into is 60% of Exhaust Gas amount, if i.e. Exhaust Gas 1000m 3/ h, needs to send into oxygen 600m 3/ h, at this moment theoretical air requirement 100%.
If the theoretical air requirement added is 50%, then equation is:
C 3H 4O 2+1.5O 2=H 2+2CO+CO 2+H 2O
1.5 O are sent on the equal sign left side 2molecule, obtains 5 gas molecules (identical with above formula), but wherein only has 1 H on the right of equal sign 2o molecule (above formula is 2 hydrones), produces the water of 1/5.
If the theoretical air requirement added is 33%, then equation is:
C 3H 4O 2+O 2=2H 2+2CO+CO 2
1 O is sent on the equal sign left side 2molecule, obtains 5 gas molecules (identical with above formula), but does not have H on the right of equal sign 2o molecule, does not produce water.
It can thus be appreciated that the moisture in the gas that gasification of biomass obtains, is not only decided by the moisture content of fuel, it is also relevant with the gasifying agent (oxygen, air, steam etc.) sent into.In fact, interlock is had can not to control to obtain the moisture content of gas even if send into amount of oxygen with feeding fuel quantity, because the moisture content of fuel is unstable.The weight signal of fuel can be measured, but the fuel of same weight, high C, H, O is wherein just relatively few for moisture content, and the oxygen that interlock is given is joined by weight of fuel, and the oxygen so sent into is just on the high side, will increase the water content in gas.
Perhaps someone expects adopting the mode of electric precipitation to remove dust, but electric precipitation is not only afraid of oxygen but also water funk, oxygen content more than 2% by automatic cut-off power, and the oxygen content of the biological fuel gas that gasification furnace obtains reaches 5-6% sometimes, electric cleaner is water funk is because water can make electric cleaner short circuit, and the gas obtained after biomass combustion contains oxygen, containing water unstable, therefore, electric precipitation is inapplicable.
In addition, for the flue dust that coal combustion produces, although cyclone dust collectors can remove 99% of dust, but the principle of cyclone dust removal relies on inertia and speed that particle is thrown to barrel to fall collection, and biomass ash is light especially, the biomass ash that a part of particle is large is thrown to barrel and falls collection in cyclone dust collectors, also has the tiny light dust of nearly half can not be thrown to barrel, cannot collect, so cyclone dust removal is also inapplicable.
In view of this, special proposition the utility model.
Utility model content
Too high for existing bag dedusting cost, electric cleaner can not adopt, and cyclone dust collectors situation also of no avail, the utility model provides a kind of spray column of filtering biological matter fuel gas and dust, and this spray column cost is low, and good dedusting effect.
In order to realize above-mentioned purpose of the present utility model, spy by the following technical solutions:
A spray column for filtering biological matter fuel gas and dust, comprises tower body, blower fan, filter and water supply installation;
Described tower body is disposed with sewage draining exit, overfall, air inlet and gas outlet from bottom to up, and the inwall of described tower body is provided with spray equipment, and described spray equipment is connected with described water supply installation;
Described blower fan is connected with described air inlet or gas outlet;
Described filter is connected with described overfall.
The spray column of the filtering biological matter fuel gas and dust that the utility model provides, it is the flue gas of combustion gas or the burning generation that living beings are obtained, certain pressure is produced through blower fan, tower body is entered by air inlet, wherein, blower fan is connected with air inlet or gas outlet, and assembling, on the pipeline of gas outlet, makes combustion gas or flue gas enter in tower body by air inlet by graviational interaction; After gas enters tower body, spray equipment ejection water, the dust in gas and water become together with muddy water and fall, sludgd deposition is in the bottom of tower body, the suspension of water is positioned at above mud, and the suspension of water flows out to filter from overfall, and mud is discharged from the sewage draining exit of tower body; Gas enter tower body backward on, discharged by the gas outlet of tower body, enter next procedure.Dust in the flue gas that the good like this combustion gas that living beings obtained or burning produce is removed, and this spray column cost is low.
Wherein, described gas outlet is positioned at the top of described tower body, so that gas is discharged.
Particularly, described filter comprises the water storage device and filter that are communicated with described overfall.Water storage device is generally pond, and the suspension of water enters water storage device by overfall, and then the suspension of the water in water storage device is concentrated and filtered, to remove suspension wherein by filter.
For the ease of removing the suspension in water, and removal is more thorough, and preferably, described filter adopts filter bag to filter, and the aperture of described filter bag is preferably 0.5-1.5 μm.
Particularly, sewage is entered pond by overfall, and pond is other installs filter, and filter is with water pump, and this water-aspirator pressure is 0.3MPa, and sewage pumps in filter by water pump.Filter bag is placed with in this filter, filter bag diameter is equal with filter barrel dliameter, the aperture of filter bag is 0.5-1.5 μm, sewage is extruded into filter bag top and discharges under 0.3MPa pressure in filter bag, because the aperture of filter bag is very little, the water of discharging is limpid, and suspension is stayed in filter bag, and suspension is generally lime-ash.Usual 1 filter bag can fill 5kg suspension, and filter diameter can design as required, minimumly puts 1 filter bag, puts at most 20 filter bags.Filter bag can outsourcing, and as bought from the honest filter plant Co., Ltd of Zhejiang Province's Haining City, a minimum filter bag is probably 35 yuan/.After lime-ash filled by filter bag, shut down, after look at Pressure gauge pressure release, taken out by the filter bag filling lime-ash, change clean air filter bag and put into, boiling water pump works on.The filter bag filling lime-ash pours out lime-ash afterwash and dries, recycling.
Preferably, described spray equipment comprises 2-5 spray head, and described spray head is all arranged on the top of described air inlet, and described spray head is arranged along the differing heights of the inwall of described tower body.Differing heights arranges spray head, so that by the washing progressively of the dust in gas, make the gas of discharge purer.
Because spray head can produce foam to gas water spray, if foam is discharged will affect combustion gas quality with gas, preferably, be positioned at below described tower body spray head topmost and be provided with one filter screen.Filter screen chooses the filter screen of different pore size according to dust granule, and filter screen is along the inwall circumference spot welding of tower body.The foam produced after gas water spray can be bonded at below filter screen, is sprayed water, the flush with foam below filter screen fallen, to defoam by the spray head above filter screen.
Again utilize in order to after the sewage water filtration of being discharged by overfall, preferably, described water supply installation is connected with described filter.
The clear water that filter is discharged, enter clear water reserviors, pump to spray equipment by water circulating pump, spray equipment is spray head, if spray head arranges 3, recirculated water also divides three branch pipe(tube)s, is injected in tower body through three spray heads.After gas enters from the bottom of tower body, under fan action, the gas outlet up to the top of tower body is discharged, and the washing that the dust in gas is injected into is got off, and water enters tank from overfall, realizes recycling of water.
Particularly, described tower body is cylindrical, and the diameter of described tower body is 0.7-4.0m, is preferably 1.0-3.0m; Be highly 3-15m, be preferably 4-8m, the vertical setting of described tower body.
For the ease of overfall effluent sewerage, further, the distance bottom described overfall and described tower body is 40-60cm.
Draining in order to overfall does not affect the normal work of air inlet, and further, the distance bottom described air inlet and described tower body is 80-100cm.
Cleaner by purge of gas of the water sprayed to make spray head, preferably, all equidistant setting between described spray head.
Preferably, described tower body is also provided with the manhole for overhauling.The setting of manhole is for the ease of maintenance.Manhole can arrange multiple as required, and manhole seals when spray column works, and can not leak gas, otherwise the air that will adulterate in combustion gas, so combustion gas is diluted, and calorific value declines, and combustion gas cannot use.Only when stop production to overhaul, just manhole can be opened.The diameter of manhole can be set to 500mm.
In addition, for the ease of observing the height of sewage in tower body, further, also be provided with 2 liquid level gauge mouths in tower body air inlet bottom, one upper, one under, to install liquid level gauge, observe the height of sewage, be conducive to judging and controlling the height of sewage in tower body.
The spray column of the filtering biological matter fuel gas and dust that the utility model provides, is used in this equipment that process 150t/d rubbish biomass gasification engineering is installed, cost 30,000 yuan; If be used in this equipment that process 600t/d rubbish biomass gasification engineering is installed, cost 100,000 yuan, greatly reduces cost; And the flue gas that combustion gas living beings obtained or burning produce is after the spray column dedusting that the application provides, and dust removal efficiency reaches more than 99.9%, reaches extraordinary dust removing effects.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model detailed description of the invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in detailed description of the invention or description of the prior art below, apparently, accompanying drawing in the following describes is embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The connection diagram of each device of a kind of spray column that Fig. 1 provides for the utility model embodiment;
The connection diagram of each device of another kind of spray column that Fig. 2 provides for the utility model embodiment;
The sectional view of the tower body that Fig. 3 provides for the utility model embodiment;
The side view of the tower body that Fig. 4 provides for the utility model embodiment.
Reference numeral:
1-tower body; 2-blower fan; 3-filter; 4-water supply installation;
11-sewage draining exit; 12-overfall; 13-air inlet; 14-gas outlet; 15-filter screen;
16-spray head; 17-manhole.
Detailed description of the invention
Be clearly and completely described the technical solution of the utility model below in conjunction with accompanying drawing, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
In description of the present utility model, it should be noted that, orientation or the position relationship of the instruction such as term " " center ", " on ", D score, "left", "right", " vertically ", " level ", " interior ", " outward " they be based on orientation shown in the drawings or position relationship; be only the utility model and simplified characterization for convenience of description; instead of instruction or imply the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.In addition, term " first ", " second ", " the 3rd " only for describing object, and can not be interpreted as instruction or hint relative importance.
In description of the present utility model, it should be noted that, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition the concrete meaning of above-mentioned term in the utility model can be understood.
The connection diagram of each device of spray column of the filtering biological matter fuel gas and dust that Fig. 1 provides for the utility model embodiment, is specially: tower body 1 is connected with blower fan 2, filter 3 and water supply installation 4 respectively;
The connection diagram of each device of another kind of spray column that Fig. 2 provides for the utility model embodiment, is specially: tower body 1 is connected with blower fan 2, filter 3 and water supply installation 4 respectively, and filter 3 is connected with water supply installation 4;
The sectional view of the tower body that Fig. 3 provides for the utility model embodiment, the side view of the tower body that Fig. 4 provides for the utility model embodiment, as can be seen from Fig. 3 and Fig. 4, tower body is disposed with sewage draining exit 11, overfall 12, air inlet 13 and gas outlet 14 from bottom to up, the inwall of tower body 1 is provided with spray equipment, wherein, spray equipment is connected with the water supply installation 4 in Fig. 1 and Fig. 2.
The workflow of the spray column of the filtering biological matter fuel gas and dust that the utility model embodiment provides is: as shown in Figure 1, the gases such as the combustion gas that living beings obtain by blower fan 2 or the flue gas that burning produces pass in tower body 1, gas through blower fan 2 has certain pressure, and gas enters tower body 1 by air inlet 13; Water supply installation 4 provides water source for tower body 1, thus is cleaned by the gas in tower body 1, and the sludgd deposition that the process of cleaning produces, in the bottom of tower body 1, is discharged by sewage draining exit 11; The aqueous suspensions produced is positioned at above mud, is expelled to filter 3 through overfall 12; Aqueous suspensions filters through filter 3, thus the dust in the flue gas of combustion gas living beings obtained or burning generation is removed.
Wherein, as shown in Figure 3, the cleaning of gas in tower body is specially: water is supplied spray head 16 by water supply installation 4, and spray head 16 is to the gas water spray entered in tower body, and the dust in gas and water become together with muddy water and falls, and obtain the mud at the bottom of tower and aqueous suspensions; Described spray equipment comprises 2-5 spray head 16, and described spray head is all arranged on the top of described air inlet 13, and described spray head 16 is arranged along the differing heights of the inwall of described tower body 1.Differing heights arranges spray head 16, so that by the washing progressively of the dust in gas, make the gas of discharge purer.
Because spray head 16 can produce foam to gas water spray, if foam is discharged will affect combustion gas quality with gas, preferably, be positioned at below described tower body 1 spray head topmost and be provided with one filter screen 15.Filter screen 15 chooses the filter screen of different pore size according to dust granule, and filter screen is along the inwall circumference spot welding of tower body.The foam produced after gas water spray can be bonded at below filter screen 15, is sprayed water, the flush with foam below filter screen 15 fallen, to defoam by the spray head above filter screen 15.
For the ease of being reused by water after filtering, to save water source, as shown in Figure 2, filter 3 is connected with water supply installation 4, and particularly, filter 3 comprises water storage device as pond, filter.Like this, sewage is expelled to pond, and sewage filters by filter, particularly: pond is other installs filter, and filter is with water pump, and this water-aspirator pressure is 0.3MPa, sewage pumps in filter by water pump, be placed with filter bag in filter, the aperture of filter bag is 0.5-1.5 μm, and sewage is extruded into filter bag top and discharges under 0.3MPa pressure in filter bag, because the aperture of filter bag is very little, the water of discharging is limpid, and suspension is stayed in filter bag, and suspension is generally lime-ash.Filter bag can outsourcing, and as bought from the honest filter plant Co., Ltd of Zhejiang Province's Haining City, usual 1 filter bag can fill 5kg suspension.After lime-ash filled by filter bag, shut down, after look at Pressure gauge pressure release, taken out by the filter bag filling lime-ash, change clean air filter bag and put into, boiling water pump works on.The filter bag filling lime-ash pours out lime-ash afterwash and dries, recycling.
The water of discharging after filter filters is clear water, clear water enters in tower body 1 by water supply installation 4, as, water supply installation comprises clear water reserviors, water circulating pump, and clear water enters clear water reserviors, pump to spray equipment by water circulating pump, as shown in Figure 3, spray equipment is spray head 16, and spray head arranges 3, recirculated water also divides three branch pipe(tube)s, is injected in tower body through three spray heads.After gas enters tower body from the bottom of tower body, under fan action, the gas outlet 14 up to the top of tower body is discharged, and the washing that the dust in gas is injected into is got off, and water enters cesspool from overfall, achieves recycling of water.
In addition, as shown in Figure 3 and Figure 4, described gas outlet 14 is positioned at the top of described tower body 1, so that gas is discharged.
The size of tower body 1 is arranged according to the amount of process gas, and particularly, tower body 1 can be set to cylindrical, and the diameter of tower body is 0.7-4.0m, is preferably 1.0-3.0m; Be highly 3-15m, be preferably 4-8m, the vertical setting of described tower body.
For the ease of overfall 12 effluent sewerage, further, described overfall 12 is 40-60cm with the distance bottom described tower body.
Draining in order to overfall does not affect the normal work of air inlet, and further, described air inlet 13 is 80-100cm with the distance bottom described tower body.
Cleaner by purge of gas of the water sprayed to make spray head, preferably, all equidistant setting between described spray head 16.
In addition, as shown in Figure 4, described tower body is also provided with the manhole 17 for overhauling.The setting of manhole 17 is for the ease of maintenance.Manhole 17 can arrange multiple as required, and manhole 17 seals when spray column works, and can not leak gas, otherwise the air that will adulterate in combustion gas, so combustion gas is diluted, and calorific value declines, and combustion gas cannot use.Only when stop production to overhaul, just can open manhole 17.The diameter of manhole 17 can be set to 500mm.
In addition, for the ease of observing the height of sewage in tower body, further, also be provided with 2 liquid level gauge mouths in tower body air inlet bottom, one upper, one under, to install liquid level gauge, observe the height of sewage, be conducive to judging and controlling the height of sewage in tower body.
Last it is noted that above each embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to foregoing embodiments, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein some or all of technical characteristic; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of each embodiment technical scheme of the utility model.

Claims (10)

1. a spray column for filtering biological matter fuel gas and dust, is characterized in that, comprises tower body, blower fan, filter and water supply installation;
Described tower body is disposed with sewage draining exit, overfall, air inlet and gas outlet from bottom to up, and the inwall of described tower body is provided with spray equipment, and described spray equipment is connected with described water supply installation;
Described blower fan is connected with described air inlet or gas outlet;
Described filter is connected with described overfall.
2. the spray column of filtering biological matter fuel gas and dust according to claim 1, is characterized in that, described filter comprises the water storage device and filter that are communicated with described overfall.
3. the spray column of filtering biological matter fuel gas and dust according to claim 2, is characterized in that, described filter adopts filter bag to filter, and the aperture of described filter bag is preferably 0.5-1.5 μm.
4. the spray column of filtering biological matter fuel gas and dust according to claim 1, it is characterized in that, described spray equipment comprises 2-5 spray head, and described spray head is all arranged on the top of described air inlet, and described spray head is arranged along the differing heights of the inwall of described tower body.
5. the spray column of filtering biological matter fuel gas and dust according to claim 4, is characterized in that, is positioned at below described tower body spray head topmost and is provided with one filter screen.
6. the spray column of filtering biological matter fuel gas and dust according to claim 1, it is characterized in that, described water supply installation is connected with described filter.
7. the spray column of the filtering biological matter fuel gas and dust according to any one of claim 1-6, is characterized in that, described tower body is cylindrical, and the diameter of described tower body is 0.7-4.0m, is preferably 1.0-3.0m; Be highly 3-15m, be preferably 4-8m, the vertical setting of described tower body.
8. the spray column of filtering biological matter fuel gas and dust according to claim 7, is characterized in that, the distance bottom described overfall and described tower body is 40-60cm.
9. the spray column of filtering biological matter fuel gas and dust according to claim 8, is characterized in that, the distance bottom described air inlet and described tower body is 80-100cm.
10. the spray column of filtering biological matter fuel gas and dust according to claim 1, it is characterized in that, described tower body is also provided with the manhole for overhauling.
CN201420778962.5U 2014-12-10 2014-12-10 A kind of spray column of filtering biological matter fuel gas and dust Expired - Fee Related CN204352700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420778962.5U CN204352700U (en) 2014-12-10 2014-12-10 A kind of spray column of filtering biological matter fuel gas and dust

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420778962.5U CN204352700U (en) 2014-12-10 2014-12-10 A kind of spray column of filtering biological matter fuel gas and dust

Publications (1)

Publication Number Publication Date
CN204352700U true CN204352700U (en) 2015-05-27

Family

ID=53254198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420778962.5U Expired - Fee Related CN204352700U (en) 2014-12-10 2014-12-10 A kind of spray column of filtering biological matter fuel gas and dust

Country Status (1)

Country Link
CN (1) CN204352700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105617797A (en) * 2016-03-11 2016-06-01 常熟市金成机械有限公司 Novel simple wet method dust remover

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105617797A (en) * 2016-03-11 2016-06-01 常熟市金成机械有限公司 Novel simple wet method dust remover

Similar Documents

Publication Publication Date Title
CN201930700U (en) Centrifugal atomization type dedusting device
WO2021083408A2 (en) Coal-fired power plant soot settling apparatus
CN112076579A (en) Small-sized equipment and method for cyclone-water curtain two-stage purification of flue gas of agricultural dwelling houses
CN101406804A (en) High-efficient purification treatment device for flue tail gas of fuel oil cremator
CN204352700U (en) A kind of spray column of filtering biological matter fuel gas and dust
CN206823449U (en) A kind of firewood and coal stove dust flue gas cleaner
CN204933167U (en) A kind of self-loopa desulfurization case
CN104587829A (en) Workshop air purification device
CN207591515U (en) Suitable for the flue gas processing device of civil heating stove
CN106474894A (en) A kind of flue gas of refuse burning processing system
CN206027343U (en) Chimney and air cleaning filter
CN208082090U (en) A kind of plastic film workshop flue dust exclusion machine
CN201357042Y (en) Cyclone boiler flue gas desulfurization dust collector
CN101391843A (en) Sewage disposal method and apparatus after asphalt flue gas wet cleaning
CN202803043U (en) Boiler smoke purifying device
CN201059572Y (en) Spume exhaust gas purifying device
CN206320725U (en) Energy-conservation zero-emission boiler
CN201990642U (en) Biomass gas-making integrated fuel gas purifying device
CN208620363U (en) A kind of environmental protection chemical industry tail gas burning waste heat boiler
CN102161914B (en) Biogas integrated gas purifying device
CN106731355A (en) Full-automatic tobacco gas separates and recovers integration apparatus
CN209378772U (en) Flue gas desulfurization denitration dust-removing device
CN208642189U (en) Coal-burning boiler tail fume and dust device
CN201912865U (en) Smog and dust filtering and recycling device
CN205598794U (en) Dry -type pulse bag dust remover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20191210

CF01 Termination of patent right due to non-payment of annual fee