CN204346884U - A kind of high pressure multiple-phase jet cutting performance test macro - Google Patents

A kind of high pressure multiple-phase jet cutting performance test macro Download PDF

Info

Publication number
CN204346884U
CN204346884U CN201520035977.7U CN201520035977U CN204346884U CN 204346884 U CN204346884 U CN 204346884U CN 201520035977 U CN201520035977 U CN 201520035977U CN 204346884 U CN204346884 U CN 204346884U
Authority
CN
China
Prior art keywords
pressure
feed system
jet
ejector
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520035977.7U
Other languages
Chinese (zh)
Inventor
林柏泉
乔时和
孙伟浩
杨威
刘统
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201520035977.7U priority Critical patent/CN204346884U/en
Application granted granted Critical
Publication of CN204346884U publication Critical patent/CN204346884U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

The utility model provides a kind of high pressure multiple-phase jet cutting performance test macro, and test macro comprises water under high pressure feed system, pressure-air feed system, Liqiud-gas mixing device, testing experiment platform and test monitoring system etc.Utilize water under high pressure feed system, pressure-air feed system and Liqiud-gas mixing device can form high-pressure water jet or high-pressure gas-liquid dual-phase jet, and can regulate and control the pressure of jet and void fraction; Utilize testing experiment platform and test monitoring system can carry out experimental test to the impulsive force of high-pressure spray and erosion attack ability.Utilize the utility model, can carry out flooding or different pressures, void fraction, nozzle diameter, the isoparametric high-pressure water jet of range or bubble-liquid two-phase jet impulse test under non-submersion condition, relation between lithology energy and characteristic parameter thereof is broken to the multiple jet erosion of analysis, the release of Optimum Hydraulic slot is anti-reflection, and technology is significant, and the utility model is practical, structure is simple, easy to operate, safe and reliable.

Description

A kind of high pressure multiple-phase jet cutting performance test macro
Technical field
The utility model relates to a kind of high pressure multiple-phase jet cutting performance test macro, is particularly useful for the cutting performance testing high-pressure water jet or the high-pressure gas-liquid dual-phase jet used in the anti-reflection technology of hydraulic slotted liner technique release.
Background technology
Technology that coal seam hydraulic slotted liner technique release is anti-reflection refers to first beats firedamp taking-out discharging drilling in coal seam, then in boring, utilizes high-pressure water jet to cut along hole coal body, forms in boring both sides the flat slot that has one fixed width and the degree of depth.Its ultimate principle is release extinction, changes the present situation that coverage of in the past holing is little, utilizes high-pressure water jet to cut the coal body in boring, coal body internal stress is shifted to deep, increase gas permeability of coal seam, improve one borehole coverage, significantly reduce coal-bed gas pressure.But, still there is spray orifice, plug-hole in this technology, accidental gas exceeding limit, the problems such as work system pressure is higher, and pure water jets cutting power has to be strengthened, though it can produce coal body certain degrade destruction, the discharge space formed is subject to the restriction of pure water jets working medium, and enhanced gas extraction effect still has room for promotion.For this problem, lot of domestic experts scholar proposes the hydraulic slotted liner technique methods such as cavitation jet, pulsing jet, bubble-liquid two-phase jet, though can effectively solve the problem, but the optimization of lithology energy and characteristic parameter thereof is broken in the cutting for jet, effective proving installation and method is not also had to carry out testing and studying.
Utility model content
Technical matters: the purpose of this utility model, solve the optimization problem that lithology energy and characteristic parameter thereof are broken in cutting that prior art could test and study the multiple jet such as pure water jets, bubble-liquid two-phase jet, provide a kind of easy and simple to handle, the high pressure multiple-phase jet cutting performance test macro of dependable performance.
Technical scheme:
A kind of high pressure multiple-phase jet cutting performance test macro, comprises water under high pressure feed system, pressure-air feed system, Liqiud-gas mixing device, testing experiment platform and test monitoring system;
Described water under high pressure feed system comprises emulsion plunger and the water tank of pipeline connection, and the pressure-regulating valve be arranged on water under high pressure feed system outlet conduit and intelligent vortex shedding flowmeter, described pressure-regulating valve and intelligent vortex shedding flowmeter regulate respectively the discharge pressure of emulsion plunger and water flow and monitor respectively;
Described pressure-air feed system comprises the air compressor, gas storage cylinder and the source of the gas distributor box that are linked in sequence, and described source of the gas distributor box controls and monitor flow and the pressure that pressure-air feed system exports gas in real time;
Described testing experiment platform comprises bottom bracket, cloche, two-dimentional line slideway, test board, ejector, laser orientation instru-ment and the freeing port that can move forward and backward up and down; Described cloche is fixed at support upper seal; Described two-dimentional line slideway is arranged in cloche, and is fixed on support; Described test board is fixed on two-dimentional line slideway, by rotate respectively two-dimentional line slideway horizontal and vertical on runner, realize test board horizontal and vertical along support on movement; Described ejector is fixed on directly over support front, center, and ejector front end reaches in cloche through the hole of cloche front portion, and the rear end of ejector is provided with laser orientation instru-ment, accurately locates the high-pressure spray axis direction sprayed from ejector; Described freeing port is located at support rear, discharges the ponding in cloche in time;
Described test board can be arranged alternately dismountable target plate and sample, and described target plate is embedded in the locating slot on test board, can horizontally slip;
The inlet of described Liqiud-gas mixing device is connected to the outlet conduit of water under high pressure feed system, and air intake opening is connected to the outlet pipe of pressure-air feed system, and outflow conduit is connected to the inlet of ejector;
Described test monitoring system comprise connected by signal go out flowing pressure monitoring device, jet impact force monitoring device, sample change in time and space monitoring device, computing machine and data acquisition device, described go out flowing pressure monitoring device be arranged on the outflow conduit between Liqiud-gas mixing device and ejector, the water flow pressure in Real-Time Monitoring pipeline; Described jet impact force monitoring device is fixed on target plate, and Real-Time Monitoring high-pressure spray radially or the impulsive force of axis; Described sample change in time and space monitoring device can be placed in specimen surface, the broken situation of distortion of Real-Time Monitoring specimen surface, and by data acquisition device, the information transmission of collection is carried out performance evaluation detection to computing machine.
Further, the air intake opening place of described Liqiud-gas mixing device is connected with and can prevents current from entering retaining valve in the outlet pipe of pressure-air feed system.
Beneficial effect:
(1) the utility model can to the structure of high-pressure water jet and high-pressure gas-liquid dual-phase jet and impact characteristics, and jet erosion breaks the relation research experiment between lithology energy and characteristic parameter thereof, this is to the rock breaking mechanism analyzing high-pressure water jet and bubble-liquid two-phase jet, select best fluidic features parameter, the release of Optimum Hydraulic slot is anti-reflection, and technology is significant.The utility model is practical, can realize the bubble-liquid two-phase jet impulse test under the characteristic parameters such as different hydraulic pressure, air pressure, void fraction, nozzle diameter, range, submerged jets or non-submersion jet; Structure is simple, easy to operate, safe and reliable.
(2) pure water jets of different pressures or the bubble-liquid two-phase jet of the characteristic parameter such as different pressures and void fraction can be adjusted by controlled pressure variable valve and source of the gas distributor box.
(3) to have transparency high, shock-resistant for cloche, the feature that security performance is good, can avoid that The water splash in all directions, and support personnel's safety, can also fill water and carry out submerged jets testing experiment in cloche.
(4) can by rotate two-dimentional line slideway horizontal and vertical on runner, realize test board horizontal and vertical along support on movement, thus regulate the range of jet impulse test board.
(5) going out flowing pressure monitoring device can the pressure of current in Real-Time Monitoring pipeline, jet impact force monitoring device can Real-Time Monitoring high-pressure spray radially or the impulsive force of axis, sample change in time and space monitoring device can the broken situation of distortion of Real-Time Monitoring specimen surface, and by data acquisition device by the information transmission that gathers to computing machine.
Accompanying drawing explanation
Fig. 1 is a kind of high pressure multiple-phase jet of the utility model cutting performance test macro schematic diagram.
Fig. 2 is the utility model testing experiment platform schematic diagram.
In figure: 1-emulsion plunger, 2-water tank, 3-pressure-regulating valve, 4-intelligent vortex shedding flowmeter, 5-air compressor, 6-gas storage cylinder, 7-source of the gas distributor box, 8-retaining valve, 9-support, 10-cloche, 11-two dimension line slideway, 12-test board, 13-ejector, 14-laser orientation instru-ment, 15-freeing port, 16-target plate, 17-runner, 18-goes out flowing pressure monitoring device, 19-jet impact force monitoring device, 20-sample change in time and space monitoring device, 21-computing machine, 22-data acquisition device, 23-sample, 24-Liqiud-gas mixing device.
Embodiment
With reference to the accompanying drawings embodiment of the present utility model is described in further detail.
As shown in Figure 1, a kind of high pressure multiple-phase jet cutting performance test macro of the present utility model, comprises water under high pressure feed system, pressure-air feed system, Liqiud-gas mixing device 24, testing experiment platform and test monitoring system etc.
Water under high pressure feed system is primarily of compositions such as emulsion plunger 1, water tank 2, pressure-regulating valve 3 and intelligent vortex shedding flowmeters 4, and wherein pressure-regulating valve 3 and intelligent vortex shedding flowmeter 4 can regulate the discharge pressure of emulsion plunger 1 and water flow and monitor respectively; Pressure-air feed system forms primarily of air compressor 5, gas storage cylinder 6 and source of the gas distributor box 7, and wherein source of the gas distributor box 7 can control and monitor the flow and pressure that export gas in real time; Water under high pressure and pressure-air can fully mix by Liqiud-gas mixing device, form biphase gas and liquid flow, and are connected with retaining valve 8 at air intake opening place, can prevent current from entering in high-pressure gas pipeline.
As shown in Figure 2, testing experiment platform is made up of support 9, cloche 10, two-dimentional line slideway 11, test board 12, ejector 13, laser orientation instru-ment 14 and the freeing port 15 etc. that can move forward and backward up and down, wherein cloche 10 is fixed on support 9, there is transparency high, shock-resistant, the feature that security performance is good, can avoid that The water splash in all directions, support personnel's safety, can also fill water and carry out submerged jets testing experiment in cloche; Two dimension line slideway 11 is arranged in cloche 10, and be fixed on support 9, test board 12 is fixed on two-dimentional line slideway 11, test board 12 can be arranged alternately dismountable target plate 16 and sample 23 (when target plate installed by needs, target plate is installed, when needs arrange sample, namely pull down target plate and sample is installed), target plate 16 is embedded in the locating slot on test board 12, can horizontally slip, by rotate respectively two-dimentional line slideway 11 horizontal and vertical on runner 17, can realize test board 12 horizontal and vertical along support 9 on movement; Ejector 13 is fixed on directly over support 9 front, center, ejector 13 front end reaches in cloche 10 through the hole of cloche 10 front portion, the rear end of ejector 13 is provided with laser orientation instru-ment 14, accurately can locate the high-pressure spray axis direction of ejection from ejector 13; Freeing port 15 is located at support 9 rear, can discharge the ponding in cloche 10 in time.
Test monitoring system forms by going out flowing pressure monitoring device 18, jet impact force monitoring device 19, sample change in time and space monitoring device 20, computing machine 21 and data acquisition device 22 etc., wherein go out on outflow conduit that flowing pressure monitoring device 18 is arranged between Liqiud-gas mixing device III and ejector 13, can water flow pressure in Real-Time Monitoring pipeline; Jet impact force monitoring device 19 (piezoelectric quartz force cell can monitor the impulsive force of jet) is fixed on the target plate 16 on test board 12, can Real-Time Monitoring high-pressure spray radially or the impulsive force of axis; Sample change in time and space monitoring device 20 (resistance strain gage, the strain stress of sample is gathered by sound state strain acquirement instrument) be placed in sample 23 surface, can the broken situation of distortion on Real-Time Monitoring sample 23 surface, and by data acquisition device 22 by the information transmission that gathers to computing machine 21.
High pressure multiple-phase jet cutting performance method of testing of the present utility model:
A, start-up simulation machine and data acquisition device, will go out flowing pressure monitoring device, jet impact force monitoring device and sample change in time and space monitoring device respectively and be connected with computing machine and data acquisition device and debug;
B, target plate is arranged on test board, manually rotate horizontal and vertical on two-dimentional line slideway on runner, regulate jet impact force monitoring device on target plate apart from the Distance geometry height of ejector, and guarantee that laser spot that laser orientation instru-ment penetrates is positioned at the center of jet impact force monitoring device;
C, start air compressor, by be full of required pressure in gas storage cylinder pressurized air after, start emulsion plunger;
D, by the pressure of water under high pressure required in controlled pressure variable valve and intelligent vortex shedding flowmeter adjusting water outlet pipeline and flow, pressure and the flow of required pressure-air in air pipe is adjusted again by source of the gas distributor box, after water under high pressure and pressure-air are fully mixed by Liqiud-gas mixing device, form the biphase gas and liquid flow of High-Pressure Water or certain void fraction with certain pressure, after ejector ejection, form high-pressure water jet or high-pressure gas-liquid dual-phase jet;
E, high-pressure spray impact the jet impact force monitoring device on target plate, jet impact force monitoring device converts the kinetic energy of jet to electric signal, and by data line transfer to data acquisition device and computing machine, the data obtained is depicted as jet dynamic time history plot by computing machine, by the target plate that horizontally slips, the dynamic pressure situation in jet radial direction can be recorded, by rotating two-dimentional line slideway lateral scrollwheel, adjustable target plate apart from the distance of ejector, and then records Jet Axis dynamic pressure situation upwards;
F, respectively closedown air compressor and emulsion plunger, and pull down target plate;
G, the sample being equipped with sample change in time and space monitoring device is placed on test board, and manually rotate horizontal and vertical on two-dimentional line slideway on runner, adjusting sample, apart from the Distance geometry height of ejector, makes the laser spot of laser orientation instru-ment be positioned at sample center;
H, repetition step c, d, high-pressure spray impacts the sample change in time and space monitoring device on target plate, sample change in time and space monitoring device by sample variable signal by data line transfer to data acquisition device and computing machine, the performance characteristics of high-pressure water jet or high-pressure gas-liquid dual-phase jet impact failure sample can be recorded.
Although the utility model with preferred embodiment disclose as above, so itself and be not used to limit the utility model.Have in the utility model art and usually know the knowledgeable, not departing from spirit and scope of the present utility model, when being used for a variety of modifications and variations.Therefore, protection domain of the present utility model is when being as the criterion depending on those as defined in claim.

Claims (2)

1. a high pressure multiple-phase jet cutting performance test macro, is characterized in that: comprise water under high pressure feed system, pressure-air feed system, Liqiud-gas mixing device (24), testing experiment platform and test monitoring system;
Described water under high pressure feed system comprises emulsion plunger (1) and the water tank (2) of pipeline connection, and the pressure-regulating valve (3) be arranged on water under high pressure feed system outlet conduit and intelligent vortex shedding flowmeter (4), described pressure-regulating valve (3) and intelligent vortex shedding flowmeter (4) regulate respectively the discharge pressure of emulsion plunger (1) and water flow and monitor respectively;
Described pressure-air feed system comprises the air compressor (5), gas storage cylinder (6) and the source of the gas distributor box (7) that are linked in sequence, and described source of the gas distributor box (7) controls and monitor flow and the pressure that pressure-air feed system exports gas in real time;
Described testing experiment platform comprises bottom bracket (9), cloche (10), the two-dimentional line slideway (11) that can move forward and backward up and down, test board (12), ejector (13), laser orientation instru-ment (14) and freeing port (15); Described cloche (10) is fixed at support (9) upper seal; Described two-dimentional line slideway (11) is arranged in cloche (10), and is fixed on support (9); Described test board (12) is fixed on two-dimentional line slideway (11), by rotate respectively two-dimentional line slideway (11) horizontal and vertical on runner (17), realize test board (12) horizontal and vertical along support (9) on movement; Described ejector (13) is fixed on directly over support (9) front, center, ejector (13) front end reaches in cloche (10) through the hole that cloche (10) is anterior, the rear end of ejector (13) is provided with laser orientation instru-ment (14), accurately locates the high-pressure spray axis direction of ejection from ejector (13); Described freeing port (15) is located at support (9) rear, discharges the ponding in cloche (10) in time;
Described test board (12) can be arranged alternately dismountable target plate (16) and sample (23), described target plate (16) is embedded in the locating slot on test board 12, can horizontally slip;
The inlet of described Liqiud-gas mixing device (24) is connected to the outlet conduit of water under high pressure feed system, and air intake opening is connected to the outlet pipe of pressure-air feed system, and outflow conduit is connected to the inlet of ejector (13);
Described test monitoring system comprise connected by signal go out flowing pressure monitoring device (18), jet impact force monitoring device (19), sample change in time and space monitoring device (20), computing machine (21) and data acquisition device (22), described go out flowing pressure monitoring device (18) be arranged on the outflow conduit between Liqiud-gas mixing device (24) and ejector (13), the water flow pressure in Real-Time Monitoring pipeline; Described jet impact force monitoring device (19) is fixed on target plate (16), and Real-Time Monitoring high-pressure spray radially or the impulsive force of axis; Described sample change in time and space monitoring device (20) can be placed in sample (23) surface, the broken situation of distortion on Real-Time Monitoring sample (23) surface, and by data acquisition device (22), the information transmission gathered is carried out performance evaluation detection to computing machine (21).
2. a kind of high pressure multiple-phase jet cutting performance test macro according to claim 1, is characterized in that: the air intake opening place of described Liqiud-gas mixing device (24) is connected with and can prevents current from entering retaining valve (8) in the outlet pipe of pressure-air feed system.
CN201520035977.7U 2015-01-19 2015-01-19 A kind of high pressure multiple-phase jet cutting performance test macro Expired - Fee Related CN204346884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520035977.7U CN204346884U (en) 2015-01-19 2015-01-19 A kind of high pressure multiple-phase jet cutting performance test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520035977.7U CN204346884U (en) 2015-01-19 2015-01-19 A kind of high pressure multiple-phase jet cutting performance test macro

Publications (1)

Publication Number Publication Date
CN204346884U true CN204346884U (en) 2015-05-20

Family

ID=53230145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520035977.7U Expired - Fee Related CN204346884U (en) 2015-01-19 2015-01-19 A kind of high pressure multiple-phase jet cutting performance test macro

Country Status (1)

Country Link
CN (1) CN204346884U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104634687A (en) * 2015-01-19 2015-05-20 中国矿业大学 High-pressure multi-phase jet-flow cutting performance test system and method
CN106121696A (en) * 2016-08-12 2016-11-16 中冶华天工程技术有限公司 Anchor tube and the installation method of anchor tube and recovery method
CN111335861A (en) * 2020-03-20 2020-06-26 中煤科工集团重庆研究院有限公司 Safety protection method for ultrahigh-pressure hydraulic slotting device
CN113021191A (en) * 2019-12-24 2021-06-25 中国石油天然气股份有限公司 Experimental system for abrasive water jet cutting sleeve
CN114607336B (en) * 2022-03-08 2023-10-27 煤炭科学技术研究院有限公司 Colliery underground high-pressure gas-liquid two-phase jet impact pressure relief and reflection increasing method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104634687A (en) * 2015-01-19 2015-05-20 中国矿业大学 High-pressure multi-phase jet-flow cutting performance test system and method
CN104634687B (en) * 2015-01-19 2017-06-20 中国矿业大学 A kind of high pressure multiple-phase jet cutting performance test system and method
CN106121696A (en) * 2016-08-12 2016-11-16 中冶华天工程技术有限公司 Anchor tube and the installation method of anchor tube and recovery method
CN113021191A (en) * 2019-12-24 2021-06-25 中国石油天然气股份有限公司 Experimental system for abrasive water jet cutting sleeve
CN113021191B (en) * 2019-12-24 2022-08-30 中国石油天然气股份有限公司 Experimental system for abrasive water jet cutting sleeve
CN111335861A (en) * 2020-03-20 2020-06-26 中煤科工集团重庆研究院有限公司 Safety protection method for ultrahigh-pressure hydraulic slotting device
CN114607336B (en) * 2022-03-08 2023-10-27 煤炭科学技术研究院有限公司 Colliery underground high-pressure gas-liquid two-phase jet impact pressure relief and reflection increasing method

Similar Documents

Publication Publication Date Title
CN104634687A (en) High-pressure multi-phase jet-flow cutting performance test system and method
CN204346884U (en) A kind of high pressure multiple-phase jet cutting performance test macro
CN107218516B (en) A kind of water delivery in pipeline system multiple spot minute leakage detection device and method
CN101709629B (en) Reverse circulation aerodynamic cavitation method for coalbed methane well and equipment
CN102094678B (en) Method for identifying water-bursting risks in karst tunnels
CN101892841A (en) Observation system of water injection in fractured zone in coal seam goaf
CN104776971A (en) Visualization experiment device for liquid and sand carrying of gas flow
CN204436372U (en) A kind of device using mud-pulse to transmit underground signal under air-filling well-drilling condition
CN105756668A (en) Well leakage and well kick monitoring system and monitoring method
CN207366372U (en) Multifunctional pipeline closed cycle sample erosive wear experimental apparatus for testing
CN204008062U (en) Self inhaling injection stream flow characteristics integrated testing apparatus system under water
CN201284636Y (en) Circulating foam simulation experiment apparatus
JP3197146U (en) Rotating defoaming device
CN201521285U (en) Reverse circulation air power cavity manufacturing device for coal bed gas well
CN201273183Y (en) Oil well head axial rotational flow desander
CN205909988U (en) COREX stove cooler water leakage detection device
CN202746940U (en) Prevention and control tool of natural gas hydrate
CN201696048U (en) Coal seam gob fracture zone water-injection observation system
CN101886543A (en) Exploring tube used for observing coal seam goaf fissure zone subsection water injection
CN103114838B (en) High-pressure automatic sand discharge device
CN203145914U (en) Automatic high-pressure sand discharging device
CN101545358B (en) Erosion reducing system for gas drilling
CN105697000A (en) Oil well monitoring system and method
CN210714650U (en) Device for increasing heat exchange area in shallow geothermal energy
CN203905909U (en) Deep-well adjustable low-density fluid fast liquid discharge well testing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20180119