CN204343349U - Fire-fighting is shoveled - Google Patents

Fire-fighting is shoveled Download PDF

Info

Publication number
CN204343349U
CN204343349U CN201420759475.4U CN201420759475U CN204343349U CN 204343349 U CN204343349 U CN 204343349U CN 201420759475 U CN201420759475 U CN 201420759475U CN 204343349 U CN204343349 U CN 204343349U
Authority
CN
China
Prior art keywords
structural sections
structural
internal thread
thread hole
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420759475.4U
Other languages
Chinese (zh)
Inventor
杨子江
周才银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING DIZHOU FIRE-FIGHTING EQUIPMENT Co Ltd
Original Assignee
CHONGQING DIZHOU FIRE-FIGHTING EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING DIZHOU FIRE-FIGHTING EQUIPMENT Co Ltd filed Critical CHONGQING DIZHOU FIRE-FIGHTING EQUIPMENT Co Ltd
Priority to CN201420759475.4U priority Critical patent/CN204343349U/en
Application granted granted Critical
Publication of CN204343349U publication Critical patent/CN204343349U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses fire-fighting shovel, it shank (2) comprising shovel head (1) and be installed on shovel head, be interconnected by helicitic texture between described shank and shovel head, described shank comprises four structural sections of front end band axial projection, rear end band internal thread hole, connected by helicitic texture each other, and comprise the handle cap (3) being removably installed in the 4th structural sections rearward end by helicitic texture; Wherein, flexible structural layer (4) is provided with between the first structural sections and the second structural sections, between the second structural sections and the 3rd structural sections, between the 3rd structural sections and the 4th structural sections.This fire-fighting shovel can carry out the dismounting in later stage as required and change the length of shank, and whole shank can break with shovel body easily.

Description

Fire-fighting is shoveled
Technical field
The utility model relates to fire fighting equipment field, especially relates to a kind of fire-fighting shovel.
Background technology
Fire-fighting shovel is mainly used in shovel and spills fire-fighting sand, rid, site clearing and combustibles etc.
The shovel head of fire-fighting shovel is steel, the usual wooden or ferrous material of shank is made, time owing to dispatching from the factory, the shank length of fire-fighting shovel is normally fixed, cannot according to the adjustment carrying out length as required for its shank of different fire fighters, this can reduce the fighting capacity of fire fighter virtually, and fire-fighting shovel cannot remove shank and shovel head easily when finishing using.
Utility model content
The purpose of this utility model is exactly to solve the problem, and provides the fire-fighting shovel that a kind of shank can carry out length adjustment as required and freely dismantle.
To achieve these goals, the utility model adopts following technical scheme:
Fire-fighting is shoveled, it shank (2) comprising shovel head (1) and be installed on shovel head, it is characterized in that, be interconnected by helicitic texture between described shank and shovel head, described shank comprises:
Columned first structural sections (20), its front end has to coordinate with shovel head installs and is with the axial projection (20a) of external thread structure, the middle position, rear end of described first structural sections is provided with the first internal thread hole, and the rear end face of described first structural sections is provided with the first ring connected in star with the concyclic heart of the first internal thread hole;
Columned second structural sections (21), its front end is axial arranged the second projection (21a) coordinated with the first internal thread hole, this second projection is provided with external thread structure, the front end face of described second structural sections is provided with the second annular protrusion (21b) that the protruding concyclic heart with second is arranged, this second annular protrusion is installed on first ring connected in star, the middle position, rear end of described second structural sections is provided with the second internal thread hole, and the rear end face of described second structural sections is provided with the second annular groove with the concyclic heart of the second internal thread hole;
Columned 3rd structural sections (22), its front end is axial arranged the 3rd projection (22a) coordinated with the second internal thread hole, 3rd projection is provided with external thread structure, the front end face of described 3rd structural sections is provided with the 3rd annular protrusion (22b) that the protruding concyclic heart with the 3rd is arranged, 3rd annular protrusion is installed on the second annular groove, the middle position, rear end of described 3rd structural sections is provided with the 3rd internal thread hole, and the rear end face of described 3rd structural sections is provided with the 3rd annular groove with the concyclic heart of the 3rd internal thread hole;
Columned 4th structural sections (23), its front end is axial arranged the 4th projection (23a) coordinated with the 3rd internal thread hole, 4th projection is provided with external thread structure, the front end face of described 4th structural sections is provided with the 4th annular protrusion (23b) that the protruding concyclic heart with the 4th is arranged, 4th annular protrusion is installed on the 3rd annular groove, the middle position, rear end of described 4th structural sections is provided with the 4th internal thread hole, and the rear end face of described 4th structural sections is provided with the 4th annular groove with the concyclic heart of the 4th internal thread hole;
The handle cap (3) of the 4th structural sections rearward end is removably installed in by helicitic texture;
Wherein, flexible structural layer (4) is provided with between described first structural sections and the second structural sections, between the second structural sections and the 3rd structural sections, between the 3rd structural sections and the 4th structural sections.
Further, described flexible structural layer is annular structural part, this flexible structural layer has the annular inner portion (4a) be made up of magnetic material, and described first, second, third, fourth structural sections adopts the metal material that mutually can adsorb with annular inner portion to make.
The utility model has following beneficial effect: this fire-fighting shovel can carry out the dismounting in later stage as required and change the length of shank, and whole shank can break with shovel body easily.
Accompanying drawing explanation
Fig. 1 is fire-fighting shovel structural representation.
Fig. 2 is shank structural representation.
This flexible structural layer of Fig. 3 structural representation.
Detailed description of the invention
The technological means realized to make the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with specific embodiment, setting forth the utility model further.
As Figure 1-3, fire-fighting is shoveled, it shank 2 comprising shovel 1 and be installed on shovel head, is interconnected between described shank and shovel head by helicitic texture.Described shank comprises: first, second, third, fourth structural sections.
Wherein, columned first structural sections 20, its front end has to coordinate with shovel head installs and is with the axial projection 20a of external thread structure, the middle position, rear end of described first structural sections is provided with the first internal thread hole, and the rear end face of described first structural sections is provided with the first ring connected in star with the concyclic heart of the first internal thread hole.
Columned second structural sections 21, its front end is axial arranged the second protruding 21a coordinated with the first internal thread hole, this second projection is provided with external thread structure, the front end face of described second structural sections is provided with the second annular protrusion 21b that the protruding concyclic heart with second is arranged, this second annular protrusion is installed on first ring connected in star, the middle position, rear end of described second structural sections is provided with the second internal thread hole, and the rear end face of described second structural sections is provided with the second annular groove with the concyclic heart of the second internal thread hole.
Columned 3rd structural sections 22, its front end is axial arranged the 3rd protruding 22a coordinated with the second internal thread hole, 3rd projection is provided with external thread structure, the front end face of described 3rd structural sections is provided with the 3rd annular protrusion 22b that the protruding concyclic heart with the 3rd is arranged, 3rd annular protrusion is installed on the second annular groove, the middle position, rear end of described 3rd structural sections is provided with the 3rd internal thread hole, and the rear end face of described 3rd structural sections is provided with the 3rd annular groove with the concyclic heart of the 3rd internal thread hole.
Columned 4th structural sections 23, its front end is axial arranged the 4th protruding 23a coordinated with the 3rd internal thread hole, 4th projection is provided with external thread structure, the front end face of described 4th structural sections is provided with the 4th annular protrusion 23b that the protruding concyclic heart with the 4th is arranged, 4th annular protrusion is installed on the 3rd annular groove, the middle position, rear end of described 4th structural sections is provided with the 4th internal thread hole, and the rear end face of described 4th structural sections is provided with the 4th annular groove with the concyclic heart of the 4th internal thread hole.
The handle cap 3 of the 4th structural sections rearward end is removably installed in by helicitic texture, different structure section rearward end can be prevented jagged etc. on-the-spot and hang up the hand of fire fighter for this handle cap, handle cap inside has an externally threaded projection of band, and it is installed on corresponding structural sections easily by helicitic texture.
For preventing from occurring gap between different structure section and the problem that tong occurs, between described first structural sections and the second structural sections, between the second structural sections and the 3rd structural sections, between the 3rd structural sections and the 4th structural sections, be provided with flexible structural layer 4.
See Fig. 3, described flexible structural layer is the annular structural part that main body is made up of quality of rubber materials, this flexible structural layer has the annular inner portion 4a be made up of magnetic material, and described first, second, third, fourth structural sections adopts the metal material that mutually can adsorb with annular inner portion to make, when the flexible structural layer of loop configuration is sheathed put in place after, on the shank being adsorbed onto two adjacent metal materials by magnet iron piece.
The foregoing is only preferred embodiment of the present utility model, protection domain of the present utility model is not limited in above-mentioned embodiment, and every technical scheme belonging to the utility model principle all belongs to protection domain of the present utility model.For a person skilled in the art, the some improvement carried out under the prerequisite not departing from principle of the present utility model, these improvement also should be considered as protection domain of the present utility model.

Claims (2)

1. fire-fighting shovel, it shank (2) comprising shovel head (1) and be installed on shovel head, is characterized in that, be interconnected by helicitic texture between described shank and shovel head, described shank comprises:
Columned first structural sections (20), its front end has to coordinate with shovel head installs and is with the axial projection (20a) of external thread structure, the middle position, rear end of described first structural sections is provided with the first internal thread hole, and the rear end face of described first structural sections is provided with the first ring connected in star with the concyclic heart of the first internal thread hole;
Columned second structural sections (21), its front end is axial arranged the second projection (21a) coordinated with the first internal thread hole, this second projection is provided with external thread structure, the front end face of described second structural sections is provided with the second annular protrusion (21b) that the protruding concyclic heart with second is arranged, this second annular protrusion is installed on first ring connected in star, the middle position, rear end of described second structural sections is provided with the second internal thread hole, and the rear end face of described second structural sections is provided with the second annular groove with the concyclic heart of the second internal thread hole;
Columned 3rd structural sections (22), its front end is axial arranged the 3rd projection (22a) coordinated with the second internal thread hole, 3rd projection is provided with external thread structure, the front end face of described 3rd structural sections is provided with the 3rd annular protrusion (22b) that the protruding concyclic heart with the 3rd is arranged, 3rd annular protrusion is installed on the second annular groove, the middle position, rear end of described 3rd structural sections is provided with the 3rd internal thread hole, and the rear end face of described 3rd structural sections is provided with the 3rd annular groove with the concyclic heart of the 3rd internal thread hole;
Columned 4th structural sections (23), its front end is axial arranged the 4th projection (23a) coordinated with the 3rd internal thread hole, 4th projection is provided with external thread structure, the front end face of described 4th structural sections is provided with the 4th annular protrusion (23b) that the protruding concyclic heart with the 4th is arranged, 4th annular protrusion is installed on the 3rd annular groove, the middle position, rear end of described 4th structural sections is provided with the 4th internal thread hole, and the rear end face of described 4th structural sections is provided with the 4th annular groove with the concyclic heart of the 4th internal thread hole;
The handle cap (3) of the 4th structural sections rearward end is removably installed in by helicitic texture;
Wherein, flexible structural layer (4) is provided with between described first structural sections and the second structural sections, between the second structural sections and the 3rd structural sections, between the 3rd structural sections and the 4th structural sections.
2. fire-fighting shovel according to claim 1, it is characterized in that, described flexible structural layer is annular structural part, this flexible structural layer has the annular inner portion (4a) be made up of magnetic material, and described first, second, third, fourth structural sections adopts the metal material that mutually can adsorb with annular inner portion to make.
CN201420759475.4U 2014-12-05 2014-12-05 Fire-fighting is shoveled Expired - Fee Related CN204343349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420759475.4U CN204343349U (en) 2014-12-05 2014-12-05 Fire-fighting is shoveled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420759475.4U CN204343349U (en) 2014-12-05 2014-12-05 Fire-fighting is shoveled

Publications (1)

Publication Number Publication Date
CN204343349U true CN204343349U (en) 2015-05-20

Family

ID=53226627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420759475.4U Expired - Fee Related CN204343349U (en) 2014-12-05 2014-12-05 Fire-fighting is shoveled

Country Status (1)

Country Link
CN (1) CN204343349U (en)

Similar Documents

Publication Publication Date Title
USD819687S1 (en) Display screen or portion thereof with graphical user interface for security to reduce risk
USD802001S1 (en) Portion of a display panel with a graphical user interface component for flight operations management
USD818487S1 (en) Display screen with a graphical user interface
USD783663S1 (en) Display screen or portion thereof with graphical user interface
USD740847S1 (en) Display screen or portion thereof with graphical user interface for security to reduce risk
USD752601S1 (en) Display or portion thereof with graphical user interface
USD788141S1 (en) Display screen or portion thereof with graphical user interface
USD764524S1 (en) Display screen with graphical user interface
USD708222S1 (en) Display screen or portion thereof with graphical user interface
USD768176S1 (en) Display screen or portion thereof with graphical user interface
USD768203S1 (en) Portion of display with graphical user interface
USD762710S1 (en) Display screen with a graphical user interface
USD783039S1 (en) Display screen or portion thereof with graphical user interface
USD765706S1 (en) Display screen or portion thereof with graphical user interface
USD764525S1 (en) Display screen with graphical user interface
USD769267S1 (en) Display screen with graphical user interface
USD766301S1 (en) Display screen or portion thereof with graphical user interface
USD754170S1 (en) Display screen or portion thereof with graphical user interface
CN104480980A (en) Firefighting shovel
CN204343349U (en) Fire-fighting is shoveled
USD779503S1 (en) Display screen or portion thereof with graphical user interface
USD767594S1 (en) Display screen with graphical user interface
USD768704S1 (en) Display screen or portion thereof with graphical user interface
USD758442S1 (en) Display screen or portion thereof with graphical user interface
CN205116423U (en) Safe link device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20151205

EXPY Termination of patent right or utility model