CN204342827U - Railway supplyline desulphurization system - Google Patents

Railway supplyline desulphurization system Download PDF

Info

Publication number
CN204342827U
CN204342827U CN201420837777.9U CN201420837777U CN204342827U CN 204342827 U CN204342827 U CN 204342827U CN 201420837777 U CN201420837777 U CN 201420837777U CN 204342827 U CN204342827 U CN 204342827U
Authority
CN
China
Prior art keywords
stirrer
petticoat pipe
carriage
railway supplyline
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420837777.9U
Other languages
Chinese (zh)
Inventor
董万年
王学东
王福海
李军赞
黄洪发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Steel and Vanadium Co Ltd filed Critical Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority to CN201420837777.9U priority Critical patent/CN204342827U/en
Application granted granted Critical
Publication of CN204342827U publication Critical patent/CN204342827U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The utility model relates to steel industry, discloses a kind of railway supplyline desulphurization system.This system comprises railway supplyline, hot-metal ladle and carriage, KR stirrer, and described hot-metal ladle and carriage is provided with iron ladle, and described hot-metal ladle and carriage runs on railway supplyline, and described KR stirrer is arranged on railway supplyline.This invention, compared with existing desulfurization equipment, it is advantageous that: 1, owing to not needing large lifting equipment, so plant designing also simplifies greatly, input greatly reduces; 2, do not need handling on Special desulfurizing car, shorten desulfuration operations logistics time; 3, do not need to turn over tank, reduce hot metal temperature drop.

Description

Railway supplyline desulphurization system
Technical field
The utility model relates to steel industry, especially a kind of desulfurizing iron system.
Background technology
The harm of sulphur in steel is well-known, for the economic target that develops skill, alleviate the metallurgical load of converter, hot metal pretreatment (desulfurization) is absolutely necessary means, but owing to being subject to the restrictions such as power house place, height, newly-built desulfurization equipment difficulty is large, is build up technological process also more complicated.Build desulfurization equipment outward at power house, the desulfurization equipment of domestic steel mill is substantially all be placed on by iron ladle on special desulfurizing iron car, handling, ladle-to-ladle, tumble and skim and will construction investment be made very high.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of railway supplyline desulphurization system of low input.
Railway supplyline desulphurization system disclosed in the utility model, comprise railway supplyline, hot-metal ladle and carriage, KR stirrer, described hot-metal ladle and carriage is provided with iron ladle, and described hot-metal ladle and carriage runs on railway supplyline, and described KR stirrer is arranged on railway supplyline.
Preferably, dragveyer is provided with at KR stirrer along front and back two side of railway supplyline.
Preferably, described molten iron tank car frame both sides have U-shaped structure, railway supplyline are provided with the drift with the corresponding adaptation of described U-shaped structure below described KR stirrer, described drift are connected with the hydro-cylinder driving its motion.
Preferably, dust-collecting fume hood is provided with below KR stirrer, described dust-collecting fume hood is divided into A section petticoat pipe, B section petticoat pipe, C section petticoat pipe from top to down, described A section petticoat pipe is fixed on below KR stirrer, described B section petticoat pipe to be set on A section petticoat pipe and can relatively sliding, C section petticoat pipe to be set on B section petticoat pipe and can relatively sliding, and described B section petticoat pipe and C section petticoat pipe are all connected with the hydro-cylinder for driving it to move up and down.
This invention, compared with existing desulfurization equipment, has following advantage:
1, owing to not needing large lifting equipment, so plant designing also simplifies greatly, input greatly reduces;
2, do not need handling on Special desulfurizing car, shorten desulfuration operations logistics time;
3, do not need to turn over tank, reduce hot metal temperature drop.
Accompanying drawing explanation
Fig. 1 is overall schematic of the present invention;
Fig. 2 is the schematic diagram of embodiment in the present invention;
Fig. 3 is the side-view of Fig. 2.
Reference numeral: 1-railway supplyline, 2-hot-metal ladle and carriage, 3-KR stirrer, 4-dragveyer, 5-iron ladle, 6-dust-collecting fume hood, 61-A section petticoat pipe, 62-B section petticoat pipe, 63-C section petticoat pipe, 7-U type structure, 8-drift.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As shown in Figure 1, railway supplyline desulphurization system of the present utility model, comprises railway supplyline 1, hot-metal ladle and carriage 2, KR stirrer 3, and described hot-metal ladle and carriage 2 is provided with iron ladle 5, described hot-metal ladle and carriage 2 runs on railway supplyline 1, and described KR stirrer 3 is arranged on railway supplyline 1.
The utility model adopts the desulfurization of KR stirring desulphurization method, when carrying out desulfurization, first hot-metal ladle and carriage is under the traction of 2 its headstocks, moves to below KR stirrer 3 along railway supplyline 1, when iron ladle 5 is just to KR stirrer 3, transfer the stirring-head of KR stirrer 3, add sweetening agent and carry out stirring desulphurization, stir after terminating, stirring-head raises up, and then hot-metal ladle and carriage 2 traction is left, so just can realize sulfur removal technology very easily.
For ease of dragging for slag before and after desulfurization, as optimal way, be provided with dragveyer 4 at KR stirrer 3 along front and back two side of railway supplyline 1.Specifically, front and back dragveyer 4 can be arranged at the distance of the about vehicle frame of distance KR stirrer 3, the dragveyer 4 being arranged at KR stirrer 3 upstream drags for the bits before desulfurization, and the dragveyer 4 being arranged at KR stirrer 3 downstream drags for the bits after desulfurization.
In above-mentioned whipping process, vehicle frame there will be to rock and brings security risk, for stablizing car body in stirring, as optimal way, described hot-metal ladle and carriage 2 vehicle frame both sides have U-shaped structure 7, railway supplyline 1 is provided with the drift 8 with the corresponding adaptation of described U-shaped structure 7 below described KR stirrer 3, described drift 8 is connected with the hydro-cylinder driving its motion.
After hot-metal ladle and carriage 2 moves to mixing position, drift 8, under the driving of hydro-cylinder, bottom the U-shaped structure 7 of wedging vehicle frame both sides, is stablized car body, and then is stirred, and can prevent from shaking in its whipping process.After stirring completes, drift 8 exits, and hot-metal ladle and carriage 2 can normally run.
Need dust-collecting fume hood 6 is set in sweetening process and carries out dedusting, but the locomotive engine height of hot-metal ladle and carriage is higher, locomotive engine can be caused after dust-collecting fume hood 6 is set below KR stirrer 3 to pass through, for addressing this problem, as optimal way, dust-collecting fume hood 6 is provided with below KR stirrer 3, described dust-collecting fume hood 6 is divided into A section petticoat pipe 61 from top to down, B section petticoat pipe 62, C section petticoat pipe 63, described A section petticoat pipe 61 is fixed on below KR stirrer 3, described B section petticoat pipe 62 to be set on A section petticoat pipe 61 and can relatively sliding, C section petticoat pipe 63 to be set on B section petticoat pipe 61 and can relatively sliding, described B section petticoat pipe 61 and C section petticoat pipe 63 are all connected with the hydro-cylinder for driving it to move up and down.
When hot-metal ladle and carriage 2 locomotive engine passes through, B section petticoat pipe 62 and C section petticoat pipe 63 are upwards packed up under Driven by Hydraulic Cylinder, and locomotive engine passes through smoothly, and when stirring, B section petticoat pipe 62 and C section petticoat pipe 63 are transferred, and cover iron ladle 5, play its dustproof function.
Below embodiment of the present utility model:
First, on the railway supplyline 1 between blast furnace to steelworks, selected desulfurization equipment building site,
At desulfurization station construction period, this railway supplyline is closed.Directly over railway line, determine the position of KR stirrer 3, determine position and other processing set-up of dragveyer 4 with the position of KR stirrer 3; KR stirrer 3 and sweetening agent storehouse be arranged in high across, built on stiltsly to arrange, dragveyer 4 platform and operation room be arranged in low across, electric panel room is arranged in below operation room.Drag for slag take off rake, stirring-head and handling desulfurization slag basin, low across establishing one 16 tons drivings to change.Dust-collecting fume hood 6 be located at high across KR stirrer 3 platform below, dedust air duct passes through and stirs platform and receive fly-ash separator.In sweetening process, prevent rocking of iron ladle, design an oil hydraulically powered drift device and iron ladle is stablized.
Hot-metal ladle and carriage 2 drags for slag position needing the iron ladle 5 of desulfurization to be first positioned at upstream, and drag for slag before carrying out desulfurization, dragveyer 4 picks up the bits in iron ladle 5 and is put in slag basin.After having dragged for slag, hot-metal ladle and carriage 2 is drawn to below KR stirrer 3, and bottom the U-shaped structure 7 of employing Driven by Hydraulic Cylinder drift 8 wedging vehicle frame both sides, put down dust excluding hood 6, decline stirring-head stirs, and adds sweetening agent by processing requirement simultaneously.After stirring, hot-metal ladle and carriage 2 is drawn to downstream and drags for slag position and carry out dragging for desulfurization slag, adds insulating covering agent, then hot-metal ladle and carriage 2 is drawn to steelworks after having dragged for.

Claims (4)

1. railway supplyline desulphurization system, it is characterized in that: comprise railway supplyline (1), hot-metal ladle and carriage (2), KR stirrer (3), described hot-metal ladle and carriage (2) is provided with iron ladle (5), described hot-metal ladle and carriage (2) runs on railway supplyline (1), and described KR stirrer (3) is arranged on railway supplyline (1).
2. railway supplyline desulphurization system as claimed in claim 1, is characterized in that: be provided with dragveyer (4) at KR stirrer (3) along front and back two side of railway supplyline (1).
3. railway supplyline desulphurization system as claimed in claim 1, it is characterized in that: described hot-metal ladle and carriage (2) vehicle frame both sides have U-shaped structure (7), described KR stirrer (3) below railway supplyline (1) is provided with the drift (8) with the corresponding adaptation of described U-shaped structure (7), described drift (8) is connected with the hydro-cylinder driving its motion.
4. as claim 1, railway supplyline desulphurization system described in 2 or 3, it is characterized in that: KR stirrer (3) below is provided with dust-collecting fume hood (6), described dust-collecting fume hood (6) is divided into A section petticoat pipe (61) from top to down, B section petticoat pipe (62), C section petticoat pipe (63), described A section petticoat pipe (61) is fixed on KR stirrer (3) below, it is upper and can relatively sliding that described B section petticoat pipe (62) is set in A section petticoat pipe (61), it is upper and can relatively sliding that C section petticoat pipe (63) is set in B section petticoat pipe (61), described B section petticoat pipe (61) and C section petticoat pipe (63) are all connected with the hydro-cylinder for driving it to move up and down.
CN201420837777.9U 2014-12-25 2014-12-25 Railway supplyline desulphurization system Expired - Fee Related CN204342827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420837777.9U CN204342827U (en) 2014-12-25 2014-12-25 Railway supplyline desulphurization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420837777.9U CN204342827U (en) 2014-12-25 2014-12-25 Railway supplyline desulphurization system

Publications (1)

Publication Number Publication Date
CN204342827U true CN204342827U (en) 2015-05-20

Family

ID=53226111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420837777.9U Expired - Fee Related CN204342827U (en) 2014-12-25 2014-12-25 Railway supplyline desulphurization system

Country Status (1)

Country Link
CN (1) CN204342827U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106367562A (en) * 2016-08-31 2017-02-01 云南德胜钢铁有限公司 Vanadium-titanium molten iron slag salvaging and desulfuration platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106367562A (en) * 2016-08-31 2017-02-01 云南德胜钢铁有限公司 Vanadium-titanium molten iron slag salvaging and desulfuration platform

Similar Documents

Publication Publication Date Title
CN107663561A (en) A kind of smelting process of steel scrap stove external heat reuse
CN106367562A (en) Vanadium-titanium molten iron slag salvaging and desulfuration platform
CN204342827U (en) Railway supplyline desulphurization system
CN106735159A (en) A kind of ladle slag cleaning device with cover
CN102528011B (en) Slag salvaging system
CN102912083A (en) Melted iron desulfuration and slag skimming product line system
CN103602782A (en) Method for removing nonmetallic inclusions in molten steel by means of supergravity
CN101418357B (en) Overturn type top dust cover
CN202461510U (en) Dreg-catching device
CN209210857U (en) A kind of system that molten iron slag and desulfurization slag are distinguished in KR desulfurization
CN102251115B (en) Method for producing high-carbon manganese-iron alloy from high-alkalinity manganese ore
CN206779449U (en) The system of steel line of return off-line baking hot-metal bottle more than a kind of utilization
CN206567534U (en) A kind of ladle slag cleaning device with cover
CN105108127A (en) Ladle capping device
CN205062091U (en) Braised sediment processing system of heat
CN206244828U (en) Converter feeding device
CN102828038B (en) The method of symmetrical full reclining formula copper bath smelting furnace process converter slag
CN205008563U (en) Ladle adds covers device
CN210213818U (en) Continuous feeding device for scrap steel
CN206936362U (en) A kind of molten iron ladle pouring system based on the remaining steel line of return
CN104232827B (en) One utilizes KR desulfurization final dusting ash to carry out molten iron smelting method
CN203495209U (en) On-line tank tilting system based on molten iron desulfuration line
CN208378922U (en) A kind of double-station KR desulphurization system
CN206721232U (en) A kind of converter slag ladle movement system
US4286776A (en) Arrangement of a steel-making plant for capturing and conducting away flue gases

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20171225

CF01 Termination of patent right due to non-payment of annual fee