CN204326100U - 盖挖逆作侧墙钢筋接头的预留节点 - Google Patents
盖挖逆作侧墙钢筋接头的预留节点 Download PDFInfo
- Publication number
- CN204326100U CN204326100U CN201420726443.4U CN201420726443U CN204326100U CN 204326100 U CN204326100 U CN 204326100U CN 201420726443 U CN201420726443 U CN 201420726443U CN 204326100 U CN204326100 U CN 204326100U
- Authority
- CN
- China
- Prior art keywords
- side wall
- layer structure
- last layer
- structure side
- vertical reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型公开了一种盖挖逆作侧墙钢筋接头的预留节点,该预留节点为在上一层结构侧墙竖向钢筋的下端,所述在上一层结构侧墙竖向钢筋的下端穿越在上一层结构侧墙的底模,所述在上一层结构侧墙竖向钢筋和所述在上一层结构侧墙的底模固定连接,在所述在上一层结构侧墙竖向钢筋的下端连接有与在下一层结构侧墙竖向钢筋上端连接的接驳器。本实用新型巧妙地吸收利用顺作施工侧墙钢筋的经验,将钢筋从上往下只留一个接头,既不增加侧墙处的自重,又推进了施工进度,为后期的施工间歇提供了作业面。最重要的是,侧墙钢筋每步接头都是先施工、固定,再浇筑混凝土,接头的精确性完全不受浇筑混凝土的影响,保证了工程质量。
Description
技术领域
本实用新型涉及一种钢筋接头的预留节点,特别是一种盖挖逆作侧墙钢筋接头的预留节点。
背景技术
地铁施工一般在市区,而对于施工场地狭小、周边构筑物保护要求高或交通组织难等情况优先选用盖挖逆作法施工,可以有效保护周围建筑和地下管线的安全,使施工对环境的影响降至最低。盖挖逆作施工中的关键技术包括地下连续墙及钢立柱的施工技术、在软弱地质条件下的底模施工技术、侧墙施工的钢筋绑扎、混凝土浇筑技术等。而侧墙施工质量的好坏很大程度取决于钢筋的对齐和绑扎质量。
盖挖逆作需要先利用地膜施工梁板,底板浇筑完成后再从下往上浇筑侧墙,故施工梁板时必须为侧墙预留钢筋接头。目前预留接头的做法大致有两种:一是侧墙上下留接头,上部为接驳器,下部进行焊接;二是上下均进行电渣压力焊进行连接。两种做法的缺点均为侧墙上有两个钢筋接头,因为两个接头上的施工的时段不同和施工误差的存在,使两个接头几乎都不能同心,给质量造成很大隐患。
实用新型内容
本实用新型为解决公知技术中存在的技术问题而提供一种盖挖逆作侧墙钢筋接头的预留节点,该预留节点能够保障侧墙钢筋的对齐和绑扎质量。
本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:
本实用新型具有的优点和积极效果是:
一)将现有一层侧墙的两个钢筋接头变成一个钢筋接头,不只是数量的减少,工程意义重大:它将不可控的钢筋连接全部在浇筑混凝土前变成“成品”,确保了施工质量。
二)侧墙钢筋上端进行机械连接,下端浇筑在结构梁板内,具备一定的拉力作用。
三)水平方向的钢筋穿插在后期施工中,能够减小施工间歇的窝工损失,降低施工成本。
四)工期节省:本实用新型能够保证施工连续,在梁板浇筑完成后,只需要少量的钢筋绑扎和支模即可浇筑砼,可以同时施工几个施工段的侧墙,无形中节约了大量工期,同时通过保证结构安全,避免了结构损失而节省了成本。
综上所述,针对盖挖逆作侧墙施工的特点,巧妙地吸收利用顺作施工侧墙钢筋的经验,将钢筋从上往下只留一个接头,既不增加侧墙处的自重,又推进了施工进度,为后期的施工间歇提供了作业面。最重要的是,侧墙钢筋每步接头都是先施工、固定,再浇筑混凝土,接头的精确性完全不受浇筑混凝土的影响,保证了工程质量。并且本实用新型能够使整个地下工程的施工过程连续、高效和施工方便。
附图说明
图1为本实用新型的结构示意图。
图中:1、在上一层结构侧墙;2、在上一层结构侧墙竖向钢筋;3、梁板;4、砖模;5、接驳器;6、素砼层;7、沙层;8、止水带;9、在上一层结构侧墙的底模;10、地连墙。
具体实施方式
为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1,一种盖挖逆作侧墙钢筋接头的预留节点,该预留节点为在上一层结构侧墙竖向钢筋2的下端,所述在上一层结构侧墙竖向钢筋2的下端穿越在上一层结构侧墙的底模9,所述在上一层结构侧墙竖向钢筋2和所述在上一层结构侧墙的底模9固定连接,在所述在上一层结构侧墙竖向钢筋2的下端连接有与在下一层结构侧墙竖向钢筋上端连接的接驳器5。
在本实施例中,为了便于侧墙混凝土浇筑方便,所述在上一层结构侧墙的底模9倾斜设置,靠近地连墙10的一侧比远离地连墙10的一侧低。
本实用新型的施工方法:
一)在上一层结构侧墙地膜施工:
根据结构尺寸,开挖出在上一层结构侧墙1与梁板3连接处的土槽,在侧墙的外边缘外8cm开始砌筑砖模4,之后砂浆抹灰。在槽底浇筑素砼层6,在素砼层6上铺10~50cm厚的沙层7,沙层表面倾斜45°,放水竹胶板作为在上一层结构侧墙的地膜9。
二)连接和定位:
根据层高完成在上一层结构侧墙竖向钢筋2的下料,将在上一层结构侧墙竖向钢筋2的上端与其上方的预留钢筋进行直螺纹连接,下端固定在在上一层结构侧墙的底模9内。具体做法为,在在上一层结构侧墙的底模9上按照竖筋的间距开孔,孔径比接驳器5的外径略大,接驳器5插入沙层7内约10cm后,将在上一层结构侧墙竖向钢筋2固定在在上一层结构侧墙的底模9内,以避免后续施工中钢筋移位。这一步是本实用新型的关键,在侧墙钢筋连接顺直的情况下,固定在底膜内。在在上一层结构侧墙的底模9上还要固定止水带8。
三)植筋和绑扎:
由于自重,地连墙10上还需植筋然后锚入结构梁板内,承载梁板的自重。注意侧墙钢筋与植筋、梁板锚固钢筋的空间关系,做到有序不让。
四)混凝土浇筑:
按照设计完成钢筋绑扎后,进行在上一层结构侧墙1与梁板3的混凝土浇筑,在上一层结构侧墙竖向钢筋2固定在混凝土结构内,接头位于混凝土结构的下方10cm位置处,为在下一层结构侧墙竖向钢筋连接做准备。
尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本实用新型的保护范围之内。
Claims (2)
1.一种盖挖逆作侧墙钢筋接头的预留节点,其特征在于,该预留节点为在上一层结构侧墙竖向钢筋的下端,所述在上一层结构侧墙竖向钢筋的下端穿越在上一层结构侧墙的底模,所述在上一层结构侧墙竖向钢筋和所述在上一层结构侧墙的底模固定连接,在所述在上一层结构侧墙竖向钢筋的下端连接有与在下一层结构侧墙竖向钢筋上端连接的接驳器。
2.根据权利要求1所述的盖挖逆作侧墙钢筋接头的预留节点,其特征在于,所述在上一层结构侧墙的底模倾斜设置,靠近地连墙的一侧比远离地连墙的一侧低。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420726443.4U CN204326100U (zh) | 2014-11-26 | 2014-11-26 | 盖挖逆作侧墙钢筋接头的预留节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420726443.4U CN204326100U (zh) | 2014-11-26 | 2014-11-26 | 盖挖逆作侧墙钢筋接头的预留节点 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204326100U true CN204326100U (zh) | 2015-05-13 |
Family
ID=53162476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420726443.4U Expired - Fee Related CN204326100U (zh) | 2014-11-26 | 2014-11-26 | 盖挖逆作侧墙钢筋接头的预留节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204326100U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178356A (zh) * | 2015-06-29 | 2015-12-23 | 上海建工四建集团有限公司 | 逆作法中柱子竖向插筋的留设施工方法 |
CN110093929A (zh) * | 2019-05-20 | 2019-08-06 | 中铁隧道局集团有限公司 | 一种地下工程顺作法施工方法及结构 |
CN110512611A (zh) * | 2019-08-30 | 2019-11-29 | 中国二十二冶集团有限公司 | 一种深基坑井壁逆作业施工方法 |
CN114645551A (zh) * | 2022-03-11 | 2022-06-21 | 中国建筑第六工程局有限公司 | 一种盖挖逆作法地铁车站侧墙钢筋接头的预留方法 |
-
2014
- 2014-11-26 CN CN201420726443.4U patent/CN204326100U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178356A (zh) * | 2015-06-29 | 2015-12-23 | 上海建工四建集团有限公司 | 逆作法中柱子竖向插筋的留设施工方法 |
CN105178356B (zh) * | 2015-06-29 | 2017-02-01 | 上海建工四建集团有限公司 | 逆作法中柱子竖向插筋的留设施工方法 |
CN110093929A (zh) * | 2019-05-20 | 2019-08-06 | 中铁隧道局集团有限公司 | 一种地下工程顺作法施工方法及结构 |
CN110512611A (zh) * | 2019-08-30 | 2019-11-29 | 中国二十二冶集团有限公司 | 一种深基坑井壁逆作业施工方法 |
CN114645551A (zh) * | 2022-03-11 | 2022-06-21 | 中国建筑第六工程局有限公司 | 一种盖挖逆作法地铁车站侧墙钢筋接头的预留方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334439B (zh) | 矩形深基坑大跨度钢筋混凝土内支撑结构及其施工方法 | |
CN104846829B (zh) | 预留盾构穿越复合式基坑围护墙及其施工方法 | |
CN100497841C (zh) | 支腿式地下连续墙施工工法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN109505229B (zh) | 公路高陡边坡应力平衡及减振防灾高桥墩结构及施工方法 | |
CN109026064B (zh) | 一种大跨度连拱隧道半明半暗的施工方法 | |
CN101509263A (zh) | 钢盖板盖挖法基坑结构及其施工方法 | |
CN101672041B (zh) | 大型地下构筑物外壁逆作施工方法 | |
CN107091101B (zh) | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 | |
CN204326100U (zh) | 盖挖逆作侧墙钢筋接头的预留节点 | |
CN104676110A (zh) | 一种基坑开挖状况下高压电缆贝雷架原地悬吊保护方法 | |
CN105089061A (zh) | 一种超深基坑支护方法 | |
CN102966114A (zh) | 塔机基础结构及其施工方法 | |
CN103953114B (zh) | 钢框架-配筋砌体剪力墙组合结构及其施工方法 | |
CN105587320B (zh) | 富水砂卵石地层异型深竖井结构体系及其施工方法 | |
CN206928305U (zh) | 一种刚性被动区扶壁式支护结构 | |
CN106759843A (zh) | 一种地下室外墙防水结构及其施工方法 | |
CN104264663A (zh) | 咬合桩硬切削施工工艺 | |
CN102410031B (zh) | 桩墙法建造地下空间结构 | |
CN106351343A (zh) | 一种可同步交叉施工的地下室外墙防水保护结构及施工方法 | |
CN103541371B (zh) | 应用承托平台的热力管沟跨越预留地铁车站的施工方法 | |
CN206752667U (zh) | 一种地下室挡墙结构 | |
CN103590841A (zh) | 一种暗挖地下洞室初期支护的支撑方法 | |
CN107476340A (zh) | 一种地铁隧道与扩建车站的新型连接结构及其施工方法 | |
CN112012761B (zh) | 一种抗扰动的双连拱隧道结构的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150513 Termination date: 20191126 |
|
CF01 | Termination of patent right due to non-payment of annual fee |