CN204324708U
CN204324708U CN201420764985.0U CN201420764985U CN204324708U CN 204324708 U CN204324708 U CN 204324708U CN 201420764985 U CN201420764985 U CN 201420764985U CN 204324708 U CN204324708 U CN 204324708U
Authority
CN
China
Prior art keywords
fore
clamp
balance
bloster
pipe link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420764985.0U
Other languages
Chinese (zh)
Inventor
屈松记
李朝峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DENGFENG SONGJI CEMENT Co Ltd
Original Assignee
DENGFENG SONGJI CEMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DENGFENG SONGJI CEMENT Co Ltd filed Critical DENGFENG SONGJI CEMENT Co Ltd
Priority to CN201420764985.0U priority Critical patent/CN204324708U/en
Application granted granted Critical
Publication of CN204324708U publication Critical patent/CN204324708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of synchronously anti-skidding balance crane clamping pincers, by hanging beam, lifting hole(eyelet), balance bloster one, black nut, pipe link one, pipe link two, thru-bolt, fore-clamp, rear folder, rubber pad, balance bloster two, form with fore-and-aft gangway axle; When this synchronously anti-skidding balance crane clamping pincers on probation, the suspension hook of weight-lifting equipment is through lifting hole(eyelet), the arch arc center stressed point of lifting hole(eyelet) just contacts with suspension hook, by lifting hole(eyelet), the application force be subject to is radiated to each point of base of arch hanging beam, ensure that stress equalization.Two upper and lower equalizing bar length are consistent, ensure that the horizontal equilibrium of object during lifting.The built-in rubber pad in binding clip clip work area enhances friction force, decreases the operation using steel rope, the probability that when reducing lifting object, object comes off.When the same fore-and-aft gangway axle of fore-clamp welding makes lifting or puts down object, decrease the time of the workman's frequent operation caused because two ends clamp is asynchronous.

Description

Synchronously anti-skidding balance crane clamping pincers
Technical field
The utility model relates to lifting device field, is specifically related to a kind of synchronously anti-skidding balance crane clamping pincers.
Background technology
In the production facilities of the industries such as building materials, metallurgy, electric power, petrochemical complex, machinework, frequent use lifting device, when to the lifting of comparatively long-object, steel rope and lockset shackle is generally all used to bundle lifting workpiece, if because of misoperation, when lifting object lack of equilibrium, center of gravity, very easily come off in hoisting process, cause safety misadventure to occur.
Utility model content
The purpose of this utility model is to provide a kind of synchronously anti-skidding balance crane clamping to clamp, and when lifting object, stress point can be expanded, and ensures stress balance.Function is firmly grasped in the adhesion strengthening binding clip operating area, and can keep the horizontal equilibrium of hoist article, and when preventing from lifting object, object emphasis is unbalance, the safety misadventure caused.
For achieving the above object, the utility model have employed such technical scheme: a kind of synchronously anti-skidding balance crane clamping pincers, by hanging beam, lifting hole(eyelet), balance bloster one, black nut, pipe link one, pipe link two, thru-bolt, fore-clamp, rear folder, rubber pad, balance bloster two, form with fore-and-aft gangway axle; It is characterized in that, hanging beam profile is isosceles trapezoid, arch lifting hole(eyelet) is offered at the center of hanging beam, lifting hole(eyelet) arch arc quadrantal points is positioned at this synchronously anti-skidding balance crane clamping and clamps integrally-built line of centers, hanging beam base is welded on balance bloster one, balance bloster one or two end car has a head, the hole that the silk head of balance bloster one or two end is offered through pipe link one and pipe link two one end, then with black nut be fastened on through silk head on; The hole thru-bolt series connection that pipe link one other end at two ends is offered is pressed from both sides afterwards, and fastening by fastening for thru-bolt two ends with black nut; The hole thru-bolt that pipe link two other end at two ends is offered is connected fore-clamp, and fastening by fastening for thru-bolt two ends with black nut; The fore-clamp of two ends pipe link one, pipe link two series connection, rear folder intersection do tong-like, and offer hole at the point of crossing of fore-clamp, rear folder, run through with the silk head of balance bloster two two ends car and penetrate two ends fore-clamp, the point of crossing of rear folder offers hole, then with the position that black nut fastening balance bloster two two ends penetrate; Wherein the bottom of fore-clamp, rear folder is arcuation, and fore-clamp, force area, rear folder bottom rubber pad wrap up, and on the inwall in this arcuation region, fore-clamp bottom, center welding is with fore-and-aft gangway axle, by the fore-clamp level connection joint at two ends; Each is joined needs to use the fastening place of black nut as accessory, needs the reserved working clearance, ensures that each joins that to do between accessory flexible.
After adopting such structure, when this synchronously anti-skidding balance crane clamping pincers on probation, the suspension hook of weight-lifting equipment is through lifting hole(eyelet), and the arch arc center stressed point of lifting hole(eyelet) just contacts with suspension hook, by lifting hole(eyelet), the application force be subject to is radiated to each point of base of arch hanging beam, ensure that stress equalization.Two upper and lower equalizing bar length are consistent, ensure that the horizontal equilibrium of object during lifting.The built-in rubber pad in binding clip clip work area enhances friction force, decreases the operation using steel rope, the probability that when reducing lifting object, object comes off.When the same fore-and-aft gangway axle of fore-clamp welding makes lifting or puts down object, decrease the time of the workman's frequent operation caused because two ends clamp is asynchronous.This synchronously anti-skidding balance crane clamping pincers, in process on probation, totally decrease the frequent operation of staff, ensure that the balance transport of hoist article, greatly reduce because object breaks off relations the safety misadventure caused.
Accompanying drawing explanation
Be as shown in the figure the utility model synchronously anti-skidding balance crane clamping pincers perspective view.
Detailed description of the invention
As shown in the figure, described a kind of synchronously anti-skidding balance crane clamping pincers, by hanging beam 1, lifting hole(eyelet) 2, balance bloster 1, black nut 4, pipe link 1, pipe link 26, thru-bolt 7, fore-clamp 8, rear folder 9, rubber pad 10, balance bloster 2 11, form with fore-and-aft gangway axle 12; It is characterized in that, hanging beam 1 profile is isosceles trapezoid, arch lifting hole(eyelet) 2 is offered at the center of hanging beam 1, lifting hole(eyelet) 2 encircles arc quadrantal points and is positioned at this synchronously anti-skidding balance crane clamping and clamps integrally-built line of centers, hanging beam 1 base is welded on balance bloster 1, balance bloster 1 two ends car has a head, the hole that the silk head at balance bloster 1 two ends is offered through pipe link 1 and pipe link 26 one end, then with black nut 4 be fastened on through silk head on; The hole thru-bolt 7 that pipe link 1 other end at two ends is offered connect after folder 9, and fastening by fastening for thru-bolt 7 two ends with black nut 4; The hole thru-bolt 7 that pipe link 26 other end at two ends is offered is connected fore-clamp 8, and fastening by fastening for thru-bolt 7 two ends with black nut 4; Fore-clamp 8, rear folder 9 intersection of the series connection of two ends pipe link 1, pipe link 26 do tong-like, and offer hole at the point of crossing of fore-clamp 8, rear folder 9, run through with the silk head of balance bloster 2 11 two ends car and penetrate two ends fore-clamp 8, the point of crossing of rear folder 9 offers hole, then with the position that black nut 4 fastening balance bloster 2 11 two ends penetrate; Wherein the bottom of fore-clamp 8, rear folder 9 is arcuation, and fore-clamp 8, force area, rear folder 9 bottom rubber pad 10 wrap up, and on the inwall in this arcuation region, fore-clamp 8 bottom, center welding is with fore-and-aft gangway axle 12, by fore-clamp 8 level connection joint at two ends.

Claims (1)

1. synchronous anti-skidding balance crane clamping pincers, by hanging beam (1), lifting hole(eyelet) (2), balance bloster one (3), black nut (4), pipe link one (5), pipe link two (6), thru-bolt (7), fore-clamp (8), rear folder (9), rubber pad (10), balance bloster two (11), form with fore-and-aft gangway axle (12);
It is characterized in that, hanging beam (1) profile is isosceles trapezoid, arch lifting hole(eyelet) (2) is offered at the center of hanging beam (1), lifting hole(eyelet) (2) arch arc quadrantal points is positioned at this synchronously anti-skidding balance crane clamping and clamps integrally-built line of centers, hanging beam (1) base is welded on balance bloster one (3), balance bloster one (3) two ends car has a head, the hole that the silk head at balance bloster one (3) two ends is offered through pipe link one (5) and pipe link two (6) one end, then use black nut (4) be fastened on through silk head on; Hole thru-bolt (7) series connection that pipe link one (5) other end at two ends is offered presss from both sides (9) afterwards, and fastening by fastening for thru-bolt (7) two ends with black nut (4); The hole thru-bolt (7) series connection fore-clamp (8) that pipe link two (6) other end at two ends is offered, and fastening by fastening for thru-bolt (7) two ends with black nut (4); Two ends pipe link one (5), pipe link two (6) connect fore-clamp (8), rear folder (9) intersect do tong-like, and offer hole at the point of crossing of fore-clamp (8), rear folder (9), run through with the silk head of balance bloster two (11) two ends car and penetrate two ends fore-clamp (8), the point of crossing of rear folder (9) offers hole, then the position using black nut (4) fastening balance bloster two (11) two ends to penetrate; Wherein the bottom of fore-clamp (8), rear folder (9) is arcuation, fore-clamp (8), rear folder (9) force area, bottom rubber pad (10) parcel, on the inwall in arcuation region, this fore-clamp (8) bottom, center welding is with fore-and-aft gangway axle (12), by fore-clamp (8) level connection joint at two ends.
CN201420764985.0U 2014-12-01 2014-12-01 Synchronously anti-skidding balance crane clamping pincers Expired - Fee Related CN204324708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420764985.0U CN204324708U (en) 2014-12-01 2014-12-01 Synchronously anti-skidding balance crane clamping pincers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420764985.0U CN204324708U (en) 2014-12-01 2014-12-01 Synchronously anti-skidding balance crane clamping pincers

Publications (1)

Publication Number Publication Date
CN204324708U true CN204324708U (en) 2015-05-13

Family

ID=53161088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420764985.0U Expired - Fee Related CN204324708U (en) 2014-12-01 2014-12-01 Synchronously anti-skidding balance crane clamping pincers

Country Status (1)

Country Link
CN (1) CN204324708U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108466187A (en) * 2018-03-29 2018-08-31 刘�文 A kind of special double end cross clasp forceps of invisible anti-theft network
CN108529421A (en) * 2018-03-20 2018-09-14 西安航天动力技术研究所 A kind of rocket boom hoisting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108529421A (en) * 2018-03-20 2018-09-14 西安航天动力技术研究所 A kind of rocket boom hoisting
CN108529421B (en) * 2018-03-20 2019-12-13 西安航天动力技术研究所 Rocket hoisting accessory
CN108466187A (en) * 2018-03-29 2018-08-31 刘�文 A kind of special double end cross clasp forceps of invisible anti-theft network

Similar Documents

Publication Publication Date Title
CN204324708U (en) Synchronously anti-skidding balance crane clamping pincers
CN104444780A (en) Synchronous anti-slip balanced lifting clamp forceps
CN202808173U (en) Lifting device special for lateral columns
CN202481909U (en) Wire coil lifting device
CN205151520U (en) Large -scale ring rolling spare hoist
CN104108646B (en) A kind of handling apparatus
CN203582277U (en) Heavy-duty vehicle hub sling
CN202465041U (en) Lifting appliance of air brick seat for steel ladle
CN200985247Y (en) Novel steel tube clamp
CN202967876U (en) Special lifting tool for profile steel and sectional material
CN203428725U (en) Resin sand model hoisting tool
CN203946779U (en) Loose steel pipe operation combined sling
CN205772796U (en) Big bus suspender
CN103663130A (en) Wire coil hoisting equipment
CN205662225U (en) Become a bundle semitrailer pterygoid lamina special lifting device
CN209024070U (en) A kind of handling, which pushes away, helps specific purpose tool
CN210012558U (en) Curb hoist and mount handling tool car
CN107140525A (en) A kind of simple special suspension clamp
CN203362184U (en) Shield segment hoisting device
CN207537004U (en) A kind of steel billet hanging device
CN202594627U (en) Lifting appliance used for lifting flat plate
CN221343566U (en) Concrete pile upset hoist
CN206328042U (en) A kind of device for being used to lift support bridge
CN207390807U (en) A kind of mechanical gripper that can lift by crane steel pipe
CN106915686B (en) A kind of device for auxiliary hanging lifting scaffold steel pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20151201