CN204323988U - A kind of steel tube stacking transport fixed support - Google Patents

A kind of steel tube stacking transport fixed support Download PDF

Info

Publication number
CN204323988U
CN204323988U CN201420788311.4U CN201420788311U CN204323988U CN 204323988 U CN204323988 U CN 204323988U CN 201420788311 U CN201420788311 U CN 201420788311U CN 204323988 U CN204323988 U CN 204323988U
Authority
CN
China
Prior art keywords
arc groove
rack body
steel pipe
steel tube
tube stacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420788311.4U
Other languages
Chinese (zh)
Inventor
金青
刘哲
张超
王智
龚晓凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baosteel Industrial Co Ltd
Original Assignee
Baosteel Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Development Co Ltd filed Critical Baosteel Development Co Ltd
Priority to CN201420788311.4U priority Critical patent/CN204323988U/en
Application granted granted Critical
Publication of CN204323988U publication Critical patent/CN204323988U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of steel tube stacking transport fixed support, comprise rack body (1), the upper and lower end face of described rack body offers several arc groove (2) be parallel to each other, and the connecting portion (3) between adjacent circular arc groove is planar structure.The position of the described arc groove of rack body upper surface and the arc groove of lower surface is symmetrical.The quantity of the arc groove of the upper and lower end face of described rack body is 5.When adopting the utility model to stack or transport steel pipe, only need steel pipe be placed in arc groove, fixing effect is played to the placement of steel pipe, make steel pipe not easily landing in transport or storing process, reduce danger coefficient.This device can make steel tube stacking neat, avoids the collision that steel pipe occurs because of naked putting, and has partial buffer effect.

Description

A kind of steel tube stacking transport fixed support
Technical field
The utility model relate to a kind of for stacking or transporting steel pipe time the fixed support that adopts, belong to steel pipe transmission storage facilities technical field.
Background technology
Steel pipe is for carrying fluid and powdery solid, exchange heat energy, manufacturing machine part and container, it or a kind of economic steel.Building structure rack, pillar and machinery mount is manufactured with steel pipe, can expendable weight, save metal 20 ~ 40%, and batch production mechanized construction can be realized.Because steel pipe is toroidal, not easily stack in transport, storage, it is improper to stack, then can produce steel pipe and cave in, and the danger of the personnel that are scattered, injure by a crashing object, therefore exists great potential safety hazard.For solving some problems existed in steel tube stacking and transportation, way conventional at present adopts the chock of certain radian by pile up separately between steel pipe.But there is following defect in the method adopting chock to fix stacking:
(1), wood belongs to non-renewable resources, and therefore cost is higher;
(2), adopting wood materials before use, the process of complicated procedures of forming need be carried out chock, as fumigated, adding the use cost of client;
(3), wood materials is in use easily infested and produce corrosion, brings larger quality objection, easily produces economic dispute;
(4) support intensity of wooden structures is lower, when being subject to comparatively noticeable effort extruding, easily ruptures, and because being subject to external environment impact (as shine upon, raindrop erosion etc.), the perishable and damage of the support of wooden structures.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of steel tube stacking to transport fixed support, can play fixation to the placement of steel pipe.
The technical scheme that the utility model solves the problem is as follows:
A kind of steel tube stacking transport fixed support, comprises rack body, it is characterized in that:
The upper and lower end face of described rack body offers several arc groove be parallel to each other, and the connecting portion between adjacent circular arc groove is planar structure.
Further improvement is, the position of the described arc groove of rack body upper surface and the arc groove of lower surface is symmetrical.
As preferably, the quantity of the arc groove of the upper and lower end face of described rack body is 5.
Further again, described rack body adopts plastic-steel material to make.
Compared with prior art, the beneficial effects of the utility model are:
1, when stacking or transport steel pipe, only need steel pipe be placed in arc groove, fixing effect is played to the placement of steel pipe, make steel pipe not easily landing in transport or storing process, reduce danger coefficient.
2, steel tube stacking can be made neat, avoid the collision that steel pipe occurs because of naked putting, and there is partial buffer effect.
3, the rack body withstanding corrosion of plastic-steel structure, intensity are high, and the impact that can stand comparatively harsh environment is not fragile, unspoiledly continue repeated usage, damage, steel can be moulded separation, recycling, reduce productive costs.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is end view of the present utility model.
Structural representation when Fig. 3 is the utility model placing steel tubes.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail; the restriction of described embodiment not to utility model protection scope; obviously; those of ordinary skill in the art are not needing to obtain other embodiments under the prerequisite paying creative work, and these all belong to protection domain of the present utility model.
Shown in composition graphs 1 and Fig. 2, a kind of steel tube stacking transport fixed support, comprise rack body 1, the upper and lower end face of described rack body offers several arc groove 2 be parallel to each other, and the connecting portion 3 between adjacent circular arc groove is planar structure.
Further, the position of the described arc groove of rack body upper surface and the arc groove of lower surface is symmetrical.
The quantity of the arc groove of the upper and lower end face of described rack body is 5.
Described rack body adopts plastic-steel material to make.
When adopting the utility model to stack or transport steel pipe, only need steel pipe 4 be placed in arc groove, fixing effect is played to the placement of steel pipe, make steel pipe not easily landing in transport or storing process, reduce danger coefficient.This device can make steel tube stacking neat, avoids the collision that steel pipe occurs because of naked putting, and has partial buffer effect.The rack body withstanding corrosion of plastic-steel structure, intensity are high, and the impact that can stand comparatively harsh environment is not fragile, unspoiledly continue repeated usage, damage, steel can be moulded separation, recycling, reduce productive costs.

Claims (4)

1. a steel tube stacking transport fixed support, comprises rack body (1), it is characterized in that:
The upper and lower end face of described rack body offers several arc groove (2) be parallel to each other, and the connecting portion (3) between adjacent circular arc groove is planar structure.
2. steel tube stacking transport fixed support according to claim 1, is characterized in that:
The position of the described arc groove of rack body upper surface and the arc groove of lower surface is symmetrical.
3. steel tube stacking transport fixed support according to claim 1, is characterized in that:
The quantity of the arc groove of the upper and lower end face of described rack body is 5.
4. steel tube stacking transport fixed support according to claim 1, is characterized in that:
Described rack body adopts plastic-steel material to make.
CN201420788311.4U 2014-12-12 2014-12-12 A kind of steel tube stacking transport fixed support Expired - Fee Related CN204323988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420788311.4U CN204323988U (en) 2014-12-12 2014-12-12 A kind of steel tube stacking transport fixed support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420788311.4U CN204323988U (en) 2014-12-12 2014-12-12 A kind of steel tube stacking transport fixed support

Publications (1)

Publication Number Publication Date
CN204323988U true CN204323988U (en) 2015-05-13

Family

ID=53160371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420788311.4U Expired - Fee Related CN204323988U (en) 2014-12-12 2014-12-12 A kind of steel tube stacking transport fixed support

Country Status (1)

Country Link
CN (1) CN204323988U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107600696A (en) * 2017-10-09 2018-01-19 浙江恒光汽车部件有限公司 Wheel hub stacks special stand
CN110356750A (en) * 2019-07-11 2019-10-22 上海外高桥造船有限公司 The device for pilling of pile legs of self-elevating drilling platform main shipboard tube
CN114535696A (en) * 2022-03-15 2022-05-27 浙江永业钢管有限公司 High-performance stainless steel seamless steel pipe automatic processing equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107600696A (en) * 2017-10-09 2018-01-19 浙江恒光汽车部件有限公司 Wheel hub stacks special stand
CN110356750A (en) * 2019-07-11 2019-10-22 上海外高桥造船有限公司 The device for pilling of pile legs of self-elevating drilling platform main shipboard tube
CN114535696A (en) * 2022-03-15 2022-05-27 浙江永业钢管有限公司 High-performance stainless steel seamless steel pipe automatic processing equipment

Similar Documents

Publication Publication Date Title
CN204323988U (en) A kind of steel tube stacking transport fixed support
CN201240402Y (en) Horizontal type cart
CN205367031U (en) Small -bore zinc -plating side pipe packing production line
CN203544677U (en) Stacking supporting plate rack
CN204038077U (en) A kind of medium density fibre board (MDF) external packing structure
CN202923987U (en) Steel-plastic integrated packaging frame for pipe-shaped objects
CN203901120U (en) Steel plate shot blasting assistant bracket
CN204751065U (en) Tower mast formula concrete bulk material bin
CN205034145U (en) All revolving racks of goods
CN204038101U (en) Quick detachable damping packing paper box
CN204264653U (en) A kind of steel pipe frame
CN203078990U (en) Photovoltaic welding strip reel packaging case
CN204489443U (en) A kind of container of tubing of removing stage makeup and costume
CN204453298U (en) A kind of steel wheel loading attachment
CN204280177U (en) Novel container
CN204566729U (en) A kind of distortion adhesive tape treating apparatus
CN201914483U (en) Feeding platform
CN207360945U (en) A kind of cluster brick-pressing board
CN203020658U (en) Multifunctional logistics tray
CN202829492U (en) Forklift truck storage battery transport protection tool, forklift truck stop and forklift truck
CN204750697U (en) Quick equipment for packing of fodder
CN206358537U (en) A kind of magazine
CN204222925U (en) Discus transfer cart
CN204529075U (en) A kind of laminated timber packaging lifting appliance
CN204689562U (en) One is crossed across dolly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160615

Address after: 201901 Baoshan District, Cheung Road, Shanghai, No. 889

Patentee after: SHANGHAI BAOSTEEL INDUSTRIAL Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2468 1

Patentee before: Baosteel Development Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513